Representation Summary:

This area is not the most suitable, with some of the area being Flood Zone 3, a flood risk assessment (FRA)would have to be passed by the environment agency, including a sequential test. As there are other options for housing in areas offered which are not in flood zone 3, then this application should fail, and other areas must be considered for housing which are not in flood Zone 3.

Full text:

This area is not the most suitable, with some of the area being Flood Zone 3, a flood risk assessment (FRA)would have to be passed by the environment agency, including a sequential test. As there are other options for housing in areas offered which are not in flood zone 3, then this application should fail, and other areas must be considered for housing which are not in flood Zone 3.

Object

Allocations DPD Discussion and Consultation Document

Option NLR2

Representation ID: 18101

Received: 15/04/2010

Respondent: Bull Lane Development Group

Representation Summary:

This area is not the most suitable, with some of the area being Flood Zone 3, a flood risk assessment (FRA)would have to be passed by the environment agency, including a sequential test. As there are other options for housing in areas offered which are not in flood zone 3, then this application should fail, and other areas must be considered for housing which are not in flood Zone 3.
All other areas have not been considered which is evident by the lack of completion witihin SHLAA Proforma document.
Plus costs of necessary schools , transport , sustainability is too high.

Full text:

This area is not the most suitable, with some of the area being Flood Zone 3, a flood risk assessment (FRA)would have to be passed by the environment agency, including a sequential test. As there are other options for housing in areas offered which are not in flood zone 3, then this application should fail, and other areas must be considered for housing which are not in flood Zone 3.
All other areas have not been considered which is evident by the lack of completion witihin SHLAA Proforma document.
Plus costs of necessary schools , transport , sustainability is too high.

Object

Allocations DPD Discussion and Consultation Document

Option NLR3

Representation ID: 18108

Received: 15/04/2010

Respondent: Bull Lane Development Group

Representation Summary:

Proposed housing here in Rayleigh -not the best choice , with Flood Zone 3, a flood risk assessment (FRA)would have to be passed by the environment agency, including a sequential test.

Costs of schools , transport , sustainability too high.

As there are options for housing at other sites then this application should fail, and other areas must be considered for housing which are not in flood Zone 3. Sites put foward have not been considered - evident by the lack of completion witihin SHLAA Proforma document.

Full text:

Proposed housing here in Rayleigh -not the best choice , with Flood Zone 3, a flood risk assessment (FRA)would have to be passed by the environment agency, including a sequential test.

Costs of schools , transport , sustainability too high.

As there are options for housing at other sites then this application should fail, and other areas must be considered for housing which are not in flood Zone 3. Sites put foward have not been considered - evident by the lack of completion witihin SHLAA Proforma document.

Object

Allocations DPD Discussion and Consultation Document

Option NLR4

Representation ID: 18111

Received: 15/04/2010

Respondent: Bull Lane Development Group

Representation Summary:


This area is not the most suitable, with some of the area being Flood Zone 3, a flood risk assessment (FRA)would have to be passed by the environment agency, including a sequential test. As there are other options for housing in areas offered which are not in flood zone 3, then this application should fail, and other areas must be considered for housing which are not in flood Zone 3.
All other areas have not been considered which is evident by the lack of completion witihin SHLAA Proforma document.
Plus costs of necessary schools , transport , sustainability is too high.

Full text:


This area is not the most suitable, with some of the area being Flood Zone 3, a flood risk assessment (FRA)would have to be passed by the environment agency, including a sequential test. As there are other options for housing in areas offered which are not in flood zone 3, then this application should fail, and other areas must be considered for housing which are not in flood Zone 3.
All other areas have not been considered which is evident by the lack of completion witihin SHLAA Proforma document.
Plus costs of necessary schools , transport , sustainability is too high.

Object

Allocations DPD Discussion and Consultation Document

Option NLR5

Representation ID: 18113

Received: 15/04/2010

Respondent: Bull Lane Development Group

Representation Summary:


This area is not the most suitable, with some of the area being Flood Zone 3, a flood risk assessment (FRA)would have to be passed by the environment agency, including a sequential test. As there are other options for housing in areas offered which are not in flood zone 3, then this application should fail, and other areas must be considered for housing which are not in flood Zone 3.
All other areas have not been considered which is evident by the lack of completion witihin SHLAA Proforma document.
Plus costs of necessary schools , transport , sustainability is too high.

Full text:


This area is not the most suitable, with some of the area being Flood Zone 3, a flood risk assessment (FRA)would have to be passed by the environment agency, including a sequential test. As there are other options for housing in areas offered which are not in flood zone 3, then this application should fail, and other areas must be considered for housing which are not in flood Zone 3.
All other areas have not been considered which is evident by the lack of completion witihin SHLAA Proforma document.
Plus costs of necessary schools , transport , sustainability is too high.

Object

Allocations DPD Discussion and Consultation Document

NLR - Should other sites in this location be considered?

Representation ID: 18127

Received: 15/04/2010

Respondent: Bull Lane Development Group

Representation Summary:

NLR 1-5 I cannot understand why building in flood zone 3 ihas been put forward, with regard to safe access and ingress, sequential test, transport, schools, and sustainability. What is very conscerning is, WHY ARE THESE SITES BEING CONSIDERED??.

When I trace the Site information Proforma information on other good sites they have not all been completed, therefore it is an unfair playing field. WHY IS THIS??

Here we have too many houses , additional traffic in one area,

Full text:

NLR 1-5 I cannot understand why building in flood zone 3 ihas been put forward, with regard to safe access and ingress, sequential test, transport, schools, and sustainability. What is very conscerning is, WHY ARE THESE SITES BEING CONSIDERED??.

When I trace the Site information Proforma information on other good sites they have not all been completed, therefore it is an unfair playing field. WHY IS THIS??

Here we have too many houses , additional traffic in one area,

Object

Allocations DPD Discussion and Consultation Document

Option NLR1

Representation ID: 18138

Received: 15/04/2010

Respondent: Bull Lane Development Group

Representation Summary:


NLR1 should not be considered as part of the area is in Flood Zone 3, a flood risk assessment (FRA)would have to be passed by the environment agency, including a sequential test. As there are other options for housing in areas offered which are not in flood zone 3, then this application should fail, and other areas must be considered for housing which are not in flood Zone 3.
All other areas have not been considered which is evident by the lack of completion witihin SHLAA Proforma document.
Plus costs of necessary schools , transport , sustainability is too high.


Full text:


NLR1 should not be considered as part of the area is in Flood Zone 3, a flood risk assessment (FRA)would have to be passed by the environment agency, including a sequential test. As there are other options for housing in areas offered which are not in flood zone 3, then this application should fail, and other areas must be considered for housing which are not in flood Zone 3.
All other areas have not been considered which is evident by the lack of completion witihin SHLAA Proforma document.
Plus costs of necessary schools , transport , sustainability is too high.


Object

Allocations DPD Discussion and Consultation Document

Option SWH4

Representation ID: 20047

Received: 30/04/2010

Respondent: Bull Lane Development Group

Representation Summary:

Hullbridge is unable to take a further 500 properties, RDC has renegaded on the amount originaly intended for the village.

This would be the better option of the four, build by the supermarket and main road for ease of access. New build numbers must be limited. Hullbridge is unable to cope iwith schooling, transport, parking & access to and from the new homes.

Potholes, dust and lack of maintenance of unmade roads is a disgrace, and the busier the roads the dirtier the homes become.

Full text:

Hullbridge is unable to take a further 500 properties, RDC has renegaded on the amount originaly intended for the village.

This would be the better option of the four, build by the supermarket and main road for ease of access. New build numbers must be limited. Hullbridge is unable to cope iwith schooling, transport, parking & access to and from the new homes.

Potholes, dust and lack of maintenance of unmade roads is a disgrace, and the busier the roads the dirtier the homes become.

Object

Allocations DPD Discussion and Consultation Document

Option SWH2

Representation ID: 20050

Received: 30/04/2010

Respondent: Bull Lane Development Group

Representation Summary:

Hullbridge is unable to take a further 500 properties, RDC has renegaded on the amount originaly intended for the village.

To choose to buld here would affect much of the village. New build numbers must be limited. Hullbridge is unable to cope iwith schooling, transport, parking & access to and from the new homes.

The green belt enjoyed by many will be detroyed.

Full text:

Hullbridge is unable to take a further 500 properties, RDC has renegaded on the amount originaly intended for the village.

To choose to buld here would affect much of the village. New build numbers must be limited. Hullbridge is unable to cope iwith schooling, transport, parking & access to and from the new homes.

The green belt enjoyed by many will be detroyed.

Object

Allocations DPD Discussion and Consultation Document

Option SWH3

Representation ID: 20052

Received: 30/04/2010

Respondent: Bull Lane Development Group

Representation Summary:

Hullbridge is unable to take a further 500 properties, RDC has renegaded on the amount originaly intended for the village.

This option however , will cause more anxiety, as it wraps around so many of the houses, traffic for example down Grassmere Ave is a sinmgle track, and Windermere some single, all of the area considered is unmade. More traffic and dust.
New build numbers must be limited. Hullbridge is unable to cope iwith schooling, transport, parking & access to and from the new homes.

The green belt enjoyed by many will be detroyed.

Full text:

Hullbridge is unable to take a further 500 properties, RDC has renegaded on the amount originaly intended for the village.

This option however , will cause more anxiety, as it wraps around so many of the houses, traffic for example down Grassmere Ave is a sinmgle track, and Windermere some single, all of the area considered is unmade. More traffic and dust.
New build numbers must be limited. Hullbridge is unable to cope iwith schooling, transport, parking & access to and from the new homes.

The green belt enjoyed by many will be detroyed.