Core Strategy Preferred Options (Revised October 2008)

Search representations

Results for Aber Ltd search

New search New search

Support

Core Strategy Preferred Options (Revised October 2008)

ENV1 Protection and Enhancement of the Natural Landscape and Habitats - Preferred Option

Representation ID: 3408

Received: 08/12/2008

Respondent: Aber Ltd

Agent: Colliers International

Representation Summary:

It is important that development is directed away from the sites of international, national and local nature conservations importance and support the implementation of the Crouch and Roach Management Plans.

Full text:

Please find attached our respresentations in respect of the Core Strategy preferred Options (October 2008) which have been submitted on behalf of our client (Aber Ltd).

Support

Core Strategy Preferred Options (Revised October 2008)

ENV3 Flood Risk - Preferred Option

Representation ID: 3409

Received: 08/12/2008

Respondent: Aber Ltd

Agent: Colliers International

Representation Summary:

The approach to direct development away from areas at risk of flooding is supported.

Full text:

Please find attached our respresentations in respect of the Core Strategy preferred Options (October 2008) which have been submitted on behalf of our client (Aber Ltd).

Comment

Core Strategy Preferred Options (Revised October 2008)

ENV6 Large Scale Renewable Energy Projects - Preferred Option

Representation ID: 3410

Received: 08/12/2008

Respondent: Aber Ltd

Agent: Colliers International

Representation Summary:

With major developments the preparation of development briefs should include the requirement to address sustainable layouts and construction, together with the requirement for renewable energy, which dependent on the location should include amongst other things, wind energy, solar power and ground heat. In addition, to the energy produced by these means it would also be important to consider any possible adverse effects they could have on local and visual amenity.

Full text:

Please find attached our respresentations in respect of the Core Strategy preferred Options (October 2008) which have been submitted on behalf of our client (Aber Ltd).

Support

Core Strategy Preferred Options (Revised October 2008)

ENV7 Small Scale Renewable Energy Projects - Preferred Option

Representation ID: 3411

Received: 08/12/2008

Respondent: Aber Ltd

Agent: Colliers International

Representation Summary:

Future developments should be designed to include (when appropriate) small scale renewable energy projects, as this will contribute to a more sustainable form of development.

Full text:

Please find attached our respresentations in respect of the Core Strategy preferred Options (October 2008) which have been submitted on behalf of our client (Aber Ltd).

Support

Core Strategy Preferred Options (Revised October 2008)

ENV8 Code for Sustainable Homes - Preferred Option

Representation ID: 3412

Received: 08/12/2008

Respondent: Aber Ltd

Agent: Colliers International

Representation Summary:

Combined with the use of renewable energy projects, this will assist in reducing carbon dioxide emissions from new residential developments.

Full text:

Please find attached our respresentations in respect of the Core Strategy preferred Options (October 2008) which have been submitted on behalf of our client (Aber Ltd).

Support

Core Strategy Preferred Options (Revised October 2008)

T1 Highways - Preferred Option

Representation ID: 3413

Received: 08/12/2008

Respondent: Aber Ltd

Agent: Colliers International

Representation Summary:

Developments located in sustainable locations will assist in reducing the need to travel by private vehicles.

Full text:

Please find attached our respresentations in respect of the Core Strategy preferred Options (October 2008) which have been submitted on behalf of our client (Aber Ltd).

Support

Core Strategy Preferred Options (Revised October 2008)

CP1 Design - Preferred Option

Representation ID: 3414

Received: 08/12/2008

Respondent: Aber Ltd

Agent: Colliers International

Representation Summary:

New developments should promote good, high quality design, which should have a good relationship with its surroundings.

Full text:

Please find attached our respresentations in respect of the Core Strategy preferred Options (October 2008) which have been submitted on behalf of our client (Aber Ltd).

Support

Core Strategy Preferred Options (Revised October 2008)

CLT1 Planning Obligations and Standard Charges - Preferred Option

Representation ID: 3415

Received: 08/12/2008

Respondent: Aber Ltd

Agent: Colliers International

Representation Summary:

The use of planning obligations and standard charges for financial contributions towards the required off-site and strategic infrastructure in that all development makes a reasonable and appropriate contribution towards the cost of such provision is supported. The prompt and efficient use of financial contributions should be required.

Full text:

Please find attached our respresentations in respect of the Core Strategy preferred Options (October 2008) which have been submitted on behalf of our client (Aber Ltd).

Support

Core Strategy Preferred Options (Revised October 2008)

CLT3 Secondary Education - Preferred Option

Representation ID: 3416

Received: 08/12/2008

Respondent: Aber Ltd

Agent: Colliers International

Representation Summary:

In order to facilitate the addition residential proposed for Ashingdon, it is important that King Edmund School can be expanded in order to accommodate the additional children generated by the new housing.

Full text:

Please find attached our respresentations in respect of the Core Strategy preferred Options (October 2008) which have been submitted on behalf of our client (Aber Ltd).

For instructions on how to use the system and make comments, please see our help guide.