Our Environment

Showing comments and forms 1 to 13 of 13

Comment

Issues and Options Document

Representation ID: 35170

Received: 02/03/2018

Respondent: Rayleigh Town Council

Representation Summary:

The summary of statistics in paragraph 3.20 is muddled. "The proportion of residents aged 20 to 64 is expected to remain relatively stable over the next 20 years." is inconsistent with "An increase in the older proportion of residents compared to the rest of the population has the potential to lead to a smaller workforce and higher dependency needs."

Full text:

Paragraph 3.14 "'green part' of the South Essex". The word "the" is superfluous.

Figure 5: Ecological Map of the District. I think this is a bit out of date. Should not the whole of the eastern side of Wallasea island be shown as a local wildlife site? Also metropolitan green belt and sites of special scientific interest are shaded in the same colour.

The summary of statistics in paragraph 3.20 is muddled. "The proportion of residents aged 20 to 64 is expected to remain relatively stable over the next 20 years." is inconsistent with "An increase in the older proportion of residents compared to the rest of the population has the potential to lead to a smaller workforce and higher dependency needs."

Object

Issues and Options Document

Representation ID: 35178

Received: 02/03/2018

Respondent: Ms Sian Thomas

Representation Summary:

3.'Our district has significant areas of ecological value, particularly the Crouch' and it is imperative that this be preserved and not harmed by additional building.

Full text:

3.'Our district has significant areas of ecological value, particularly the Crouch' and it is imperative that this be preserved and not harmed by additional building.

Object

Issues and Options Document

Representation ID: 35179

Received: 02/03/2018

Respondent: Ms Sian Thomas

Representation Summary:

3.15 The IAO document states that some areas are at risk of or prone to flooding and this is certainly true of the Watery Lane area in Hullbridge and so makes this land unsuitable for building upon.

Full text:

3.15 The IAO document states that some areas are at risk of or prone to flooding and this is certainly true of the Watery Lane area in Hullbridge and so makes this land unsuitable for building upon.

Object

Issues and Options Document

Representation ID: 35180

Received: 02/03/2018

Respondent: Ms Sian Thomas

Representation Summary:

3.16 'A significant proportion of our area is important for its landscape and/or ecological value. The landscape character of our district is broadly made up of three types: Crouch and Roach Farmland' and two others. This area (and the others) should be protected for the future and not destroyed by building upon it.

Full text:

3.16 'A significant proportion of our area is important for its landscape and/or ecological value. The landscape character of our district is broadly made up of three types: Crouch and Roach Farmland' and two others. This area (and the others) should be protected for the future and not destroyed by building upon it.

Object

Issues and Options Document

Representation ID: 35228

Received: 04/03/2018

Respondent: Mr Brian Guyett

Representation Summary:

The current District Plan takes a 'scattergun' approach to planning, with about 13 separate sites. This means there are no economies of scale and the already stretched infrastructure cannot cope. This approach is unsustainable.
A long term vision is required with consideration to a new 'garden village' with appropriate new infrastructure. The scale and logistics of this would suggest a location east of Rochford, with a link across the Crouch.
This could be done as a joint project with Southend Council thus creating a new Southend north/south access route and opening up the north of Essex to strategic opportunities.

Full text:

The current District Plan takes a 'scattergun' approach to planning, with about 13 separate sites. This means there are no economies of scale and the already stretched infrastructure cannot cope. This approach is unsustainable.
A long term vision is required with consideration to a new 'garden village' with appropriate new infrastructure. The scale and logistics of this would suggest a location east of Rochford, with a link across the Crouch.
This could be done as a joint project with Southend Council thus creating a new Southend north/south access route and opening up new strategic opportunities. The new inter-council agreement would facilitate this.

Comment

Issues and Options Document

Representation ID: 35253

Received: 27/02/2018

Respondent: Mr Richard Shorter

Representation Summary:

In paragraph 3.3 "The area home to around 3,320 businesses...." the verb "is" is missing.

Paragraph 3.5 "The workplace and resident earnings in the district are below average compared to Essex and the UK." This is not true. It is true for workplace earnings but not for resident weekly earnings which at 670.9 are higher than Essex (594.0) and UK (539). The statement is also inconsistent with the first sentence of the next paragraph "The area is a generally prosperous part of the country,"

Paragraph 3.14 "'green part' of the South Essex". The word "the" is superfluous.

Figure 5: Ecological Map of the District. I think this is a bit out of date. Should not the whole of the eastern side of Wallasea island be shown as a local wildlife site? Also metropolitan green belt and sites of special scientific interest are shaded in the same colour.

The summary of statistics in paragraph 3.20 is muddled. "The proportion of residents aged 20 to 64 is expected to remain relatively stable over the next 20 years." is inconsistent with "An increase in the older proportion of residents compared to the rest of the population has the potential to lead to a smaller workforce and higher dependency needs."

Full text:

In paragraph 3.3 "The area home to around 3,320 businesses...." the verb "is" is missing.

Paragraph 3.5 "The workplace and resident earnings in the district are below average compared to Essex and the UK." This is not true. It is true for workplace earnings but not for resident weekly earnings which at 670.9 are higher than Essex (594.0) and UK (539). The statement is also inconsistent with the first sentence of the next paragraph "The area is a generally prosperous part of the country,"

Paragraph 3.14 "'green part' of the South Essex". The word "the" is superfluous.

Figure 5: Ecological Map of the District. I think this is a bit out of date. Should not the whole of the eastern side of Wallasea island be shown as a local wildlife site? Also metropolitan green belt and sites of special scientific interest are shaded in the same colour.

The summary of statistics in paragraph 3.20 is muddled. "The proportion of residents aged 20 to 64 is expected to remain relatively stable over the next 20 years." is inconsistent with "An increase in the older proportion of residents compared to the rest of the population has the potential to lead to a smaller workforce and higher dependency needs."

Paragraph 4.3. "Through the Growth Deal, SELEP can direct Government monies towards specific projects across the LEP area - including schemes to deliver new homes, jobs and infrastructure - which can competitively demonstrate a growth return for the investment." My comment is that the criterium 'can competitively demonstrate' pushes investment towards homes and jobs at the expense of infrastructure, as it is easier to demonstrate growth from the former than the latter. But, adequate infrastructure is a necessary enabler of growth. If you use an unsuitable analysis method, you get the wrong answer.

Paragraph 4.5. The words "we must not over-burden investment in business." are meaningless and make the whole sentence incomprehensible. Delete these and the first word "Whilst" and the sentence makes sense.

Paragraph 4.13. The word "however" occurs twice in one sentence, which is incorrect.

Paragraphs 4.13 and 4.15. If Castle Point and Southend really are unable to meet their housing obligations then perhaps RDC could offer them some land in the extreme south east of the district, which is reasonably near Shoebury rail station, provided that central government funds the much needed relief road from the A130 to Shoebury, crossing the Crouch somewhere between Hullbridge and Fambridge and crossing the Roach. Southend and Castle Point would pay for the necessary flood defences for the new homes.

Twenty two Strategic Objectives is far too many! The document would be more convincing if you called the five Strategic Priorities the five Strategic Objectives and put the other points under them as numbered bullet points. Many of these are not strategic and they are not objectives; they are job descriptions of what the council is expected to do.

Putting homes and jobs first might be what central government want but it is not what the existing residents want. These two are interdependent - build more homes and you have to create jobs for the people to work in; create more jobs and then you cannot fill the jobs until you have built homes for the workers. The first priority should be what you have at number three: transport, waste management, and flood risk. You can forget about telecoms, water supply, wastewater and the provision of minerals and energy as these will all be provided by the private sector.

Paragraph 6.12. "Affordability can be measured by comparing the lowest 25% of earnings to the lowest 25% of house prices, which gives an affordability ratio." This is written the wrong way round and would give a ratio of 0.103. It should be written "Affordability can be measured by comparing the lowest 25% of house prices to the lowest 25% of earnings, which gives an affordability ratio."

Tell Us More SP1.1: Affordable homes and ageing population.
Surely the district council's responsibility is restricted to ensuring that sufficient land is available for development and that there are no unreasonable planning hurdles put in the way of developers. The net completions graph shows that the actual number of houses built depends on the overall state of the economy and the economics of the housing market. The district council has no control over either of these. Central government has only minor influence, even if they think otherwise.

6.30 Option: A Option C sounds like a good idea but will not work. If you are thinking of the children of existing residents then in many cases those children who would like to buy a home here will not currently be residents here. They may be renting elsewhere (in my case in South Woodham Ferrers and the Isle of Man). You would have to come up with a definition of something like a "right to residence" rather than "resident". The whole concept is fraught with difficulties.

6.21 Option: C Market forces will sort out what gets built and options D and E are then irrelevant.

6.33 Option: A

If there is a particular requirement for providing additional assistance for certain sectors of the population then try persuading central government to allow you to increase the rates paid by everybody already in the district and put that money away, securely, in a fund earmarked for that purpose.

Tell Us More SP1.2: Care homes Option: A

Paragraph 6.45. I do not agree with this statement: "We need to demonstrate that we have considered all the options before considering the Green Belt."

The original idea of the Green Belt has become distorted over time. The idea was that existing towns and cities would be surrounded by a belt of green land to prevent urban sprawl. (It is usually cheaper to build on greenfield instead of brownfield sites and so without this "belt" developments will always expand outwards, leaving a neglected and eventually derelict inner core, as in many USA cities.) In Rochford District we have a lot of Green Belt land which is not a belt around anything - it is just a vast expanse of undeveloped land.

Instead of infilling within existing developments and nibbling away at what really is the green belt immediately adjacent to them, something a lot more radical is needed and if central government are going to keep handing down housing targets then they must be prepared to provide the necessary infrastructure. It is this:
Build the relief road previously mentioned from the A130 to Shoebury, crossing the Crouch somewhere between Hullbridge and Fambridge and crossing the Roach. It needs to be a high capacity dual carriageway feeding directly onto the A130 and not at Rettendon Turnpike. The Fairglen interchange needs to be substantially improved (not the current inadequate proposals) to handle the extra traffic between the A130 and the A127 in both directions. The new road needs direct exits to both Battlesbridge and Shoebury stations and 2 or more exits to allow new developments to be built on this huge area of green land which is not green belt at all. A bus service will provide transport from the new developments to both stations. Obviously, schools, health, drainage, and power infrastructure will be needed as well but it will be cheaper to provide it out here than adding to existing conurbations. Flooding is an issue but the existing villages have to be protected against flooding anyway.

Tell Us More SP1.3: New homes ...
Option: E All of the other options are just short-term tinkering.

Tell Us More SP1.4: Good mix of homes
Option: A (The policy on affordable housing in conjunction with market forces takes care of this.) Option E is also worth considering but will only be viable if option E has been chosen in SP1.3.

I do not agree with the statement "This approach would therefore not be appropriate." in Option I. What justifies the "therefore"? It would be sensible to adopt option I and not have a specific policy. If you want to build bungalows you will probably have to accept a lower density than the current minimum, if you want to have an area of affordable housing then a good way to keep the costs down is to go for a higher density. Not to have a specific policy does not mean that there is no policy at all. Why constrain yourselves unnecessarily?

Paragraph 6.70 "There is no need has been identified..." remove "There is"

Tell Us More SP1.5: Gypsys and Travellers Option B

Tell Us More SP1.6: Houseboats Option B

Tell Us More SP1.7: Business needs Options B, C, and E

Tell Us More SP1.8: New Jobs Options B, D, E, F

Tell Us More SP1.9: Southend airport Implement all options A, B, C, D

Paragraph 6.127 "The availability of broadband in more rural areas is a constraint to the development of tourism in the district; nowadays visitors need access to promotional and other material electronically to help them navigate around (although paper copies are still
important)." This is just not true. Do you mean broadband or do you mean 3G/4G phone coverage? Local businesses need broadband, tourists do not.

Tell Me More SP1.10: Tourism and rural diversification Option B

Tell Us More SP2.1: Retail and leisure Options A, B, C, D If it ain't broke, don't fix it!

Tell Us More SP2.2 Local facilities
This is outside of the council's sphere of influence and so there is no point in worrying about it. Pubs and local shops will close if there is insufficient trade to keep them going, while in new developments business will spring up once there is sufficient demand provided planning restrictions do not get in the way. Options A and B.

Tell Us More SP3.1 Roads
Paragraph 8.1 "The equality of infrastructure in terms of services and facilities is challenging across the district given that we have such a large rural area to the east, which can mean that isolation becomes an issue." If you embrace my previous suggestion and with Southend and Castle Point persuade central government to fund the new road, the large area to the east will no longer be rural and isolated. In paragraph 8.10 "It also includes
the area to the south of the River Roach in proximity to Great Wakering." you identify exactly the problem that this would address.

Paragraph 8.12 mentions a requirement for a bypass around Rayleigh but there is nowhere to build such a bypass even if it could be justified and funded. Part of the problem in Rayleigh is that in the evening rush hour the A127 towards Southend is so congested that traffic turns off either at the Weir or Fairglen interchange and diverts through Rayleigh. Also, traffic coming down the A130 and heading for Southend finds it quicker to divert through London Road, Rayleigh town centre, and Eastwood Road than to queue for the Fairglen interchange and Progress Road. A bypass is needed not around Rayleigh but from the A130 to the eastern side of Southend.

Paragraph 8.17 "upgrades have been completed at the Rayleigh Weir junction". Is there any evidence that these 'upgrades' have made any difference whatsoever? Local people think not. If they have not been completed, do not say so.

Option C would be better than nothing. The others are only tinkering around the edges of the problem. What is really needed - although outside of RDC's control - is improvements to the strategic road network.

Paragraph 8.21. Option A is marginally better than doing nothing.

Tell Us More SP3.2: Sustainable travel
Paragraph 8.27. "Encouraging cycling within and through Rayleigh town centre are, in particular, supported to drive improvements to local air quality in this area, for example improved cycling storage." This is wishful thinking. Rayleigh is on top of a hill, of the four approaches, three involve cycling up hill in poor air quality. There are a few diehard cyclists (like my son) but normal people will not be influenced by improved cycle storage.

Paragraph 8.31. "study recommends several mitigation measures ..." These measures are just tinkering and are completely inadequate. More traffic lights are needed and some pedestrian crossings need to be moved or removed. I submitted a comprehensive plan for this previously and I shall submit it again as an appendix to this document.

Paragraph 8.34. "We could consider setting a more challenging mode share, for example 30/30/40 (public transport/walking and cycling/private vehicle)." This is wishful thinking. You can set what mode share you like but you cannot influence it.

Options A, C, and E are sensible. B will not help, D is impractical

Tell Us More SP3.3: Communications infrastructure Option B

Tell Us More SP3.4: Flood risk Options A and C

Tell Us More SP3.5: Renewable energy Option A

Tell Us More SP3.6: Planning Option A

Tell Me More SP4.1: Health Option D

Tell Me More SP4.2 Community facilities Option B

Tell Us More SP4.3: Education Option A and B

Tell Us More SP4.4: Childcare Option A and B

Tell Me More SP4.3: Open spaces and sports. [this number has been repeated]
These do not look like options. You seem to want to do all of them. What is there to choose?

Tell Me More SP4.4 Indoor sports and leisure [this number has been repeated] Option A

Tell Me More SP4.5: Young people Option A

Tell Me More SP4.6 Play spaces
Paragraph 9.57. "In order to reduce the amount of greenfield (undeveloped) land...." I do not entirely agree with this premise and think you should reconsider it. Most of the district is greenfield. Surely, building on some of that is better than trying to squash more and more development into the existing towns and villages. People in new houses can access their gardens every day, they possibly only 'go out east' to look at a field once or twice a year.
Option A

Paragraph 10.6 "A fundamental principle of the Green Belt is to keep a sense of openness between built up areas." Yes, that is what the green belt is for. However, most of the metropolitan green belt in Rochford District is maintaining a sense of openness between the built up areas to the west and the sea to the east.

Tell Us More SP5.1 Green belt vs homes Option B

Tell Us More SP5.2 Protecting habitats
Option A but leave it as it is; do not waste your time and our money worrying about climate change or wildlife corridors. There are plenty of wildlife pressure groups to do that. Also, implement options C, D, E, F, and H. Do not waste your time and our money with G.

Tell Us More SP5.3 Wallasea Island Options A and B

Tell Us More SP5.4 Landscape character
Paragraphs 10.35 to 10.45 - two and a half pages (!) written by someone who has gone overboard extolling the virtues of the countryside. I love the countryside and particularly the coastline and mudflats but this reads as though RDC councillors from the east have too much influence and want to protect their backyards (NIMBY) while pushing all the development to the west where, in fact, the majority of ratepayers actually live.
Options A and B

Tell Us More SP5.5 Heritage and culture Option A

Tell Us More SP5.6 Building design
I question whether there is any justification for doing this. Why not just follow the national guidelines, Essex Design Guide, and building regulations? Option A and K

Tell Us More SP5.7 Air quality
None of the actions proposed will make a significant difference to air quality. The biggest improvement will come from the gradual replacement of older vehicles with new ones built to a higher emissions standard and, ultimately, the introduction of hybrid and electric vehicles.

Air quality now has increased importance. The EU is threatening to fine our government because its plans to improve air quality in a large number of cities and towns are inadequate. Just waiting and hoping that things get better will not do!

If you want to do anything in a faster time frame than that then steps must be taken to: reduce traffic congestion; avoid building new homes in areas that are already congested; build new homes in areas where the air quality is good.

I refer you again to the plan that I append to this document to significantly reduce congestion and improve air quality in Rayleigh town centre. This could be achieved in much less time than waiting for all the existing vehicles to be replaced.

You may as well stay with option A since options B and C will make no difference.

Tell Us More D.P1.1 Affordable homes Option F What happened to options A to E?

Tell Us More D.P1.2 Self build
You are making a mountain out of a molehill on this. No policy is needed. Anyone wishing to self build will have to find a plot of land first. They will then have to apply for planning permission and meet building regulations the same as anybody else would. All the council has to do is NOT to discriminate against such applications. From the self-builders point of view, negotiating the VAT maze is far more of a problem. New builds are zero rated but everything they buy will have VAT on it. The only way to claim back the VAT is to form a company and register it for VAT but that is difficult when it has no trading history and will only complete one project. This is all for central government to sort out, not local councils.
Option D

Tell Us More D.P1.3 Rural exception sites
Paragraph 11.16 "with the publication of the Housing White Paper in February 2017 the definition of what constitutes affordable homes could be amended" This is clearly out of date and needs updating. Was the paper published last year? Was the definition amended?

There is no point in wasting time and effort worrying about a situation that has not arisen yet and may not arise. Since there are so many possible variables in the circumstances any such policy would have to be extremely comprehensive. Wait until a planning application is made and then assess it on its merits. If there is no formal policy in place then this would have to be debated by the Development Committee. You could meet the NPPF requirement by putting a reference to rural exception sites on the council's website.
Option H

Tell Us More D.P1.4 Annexes and outbuildings
Option B which should say "...rely on case law", not "reply on case law".

Tell Us More D.P1.5 Basements
Option A

Tell Us More D.P1.6 Rebuilding in the green belt
Option B

Tell Us More D.P1.7 Agricultural occupational homes
Paragraph 11.42 ".... applications for the removal of agricultural occupancy conditions will not, therefore, be permitted except in the most exceptional circumstances." Are you sure this is sensible? If an agricultural home becomes empty would you rather let it remain empty and possibly become derelict than allow a non-agricultural worker to move into it? Option A

Tell Us More D.P1.8 Brownfield land in the green belt
Option B

Tell Us More D.P1.9 Extending gardens in the green belt
Option A

Tell Us More D.P1.10 Parking and traffic management
Options A and B

Tell Us More D.P1.11 Home businesses
A thriving home business could cause parking issues in the immediate area but it also provides local employment thereby reducing commuting out of the area. Also, noise and pollution issues have to be considered. This requires each case to be assessed on its own merits. Option A

Tell Us More D.P1.12 Altering businesses in the green belt
Option A

Tell Us More D.P1.13 Advertising and signage
Option A

Tell Us More D.P1.13 Light pollution [this number has been repeated]
Option B

Tell Us More D.P1.14 Contaminated land
Option A

The introduction is too verbose and will deter people from reading the whole document. A professional editor should have been employed to précis it down to a length that people will be willing to read. Some of the rest of the document is better but would still benefit from editing.

There are too many spelling, grammatical, and punctuation errors to make it worthwhile proof-reading this initial draft until it has been edited.



Interim Sustainability Appraisal

The first ten pages have been constructed by concatenating standard paragraphs, with minimal editing, in the same way than an accountant or surveyor prepares a report.

The rest of it consists of extracts from the Issues and Options document with meaningful, but not particularly incisive, comments.

Preparing this document was a legal requirement but it does not add much to the sum total of human knowledge.




Appendix

A proposal for the reduction of traffic congestion in central Rayleigh and consequent improvement of air quality

Air pollution is an acknowledged problem in central Rayleigh and just today the high court have ruled that the government must do more to reduce it, particularly NOx emissions from diesel vehicles. A major cause of air pollution in Rayleigh is traffic queuing on Crown Hill and creeping forward one vehicle at a time - engines continually running and repeated hill starts which are particularly bad for NOx emissions. Many recent cars and buses have automatic engine stop when stationary so that if traffic is held at a red light emissions will be significantly reduced. This feature will become commonplace over the next few years.

The pedestrian crossing at the top of Crown Hill and the mini roundabout at its junction with the High Street must be eliminated in order to cure this problem. This proposal achieves that and improves traffic flow in Websters Way as well as eliminating most traffic from the central part of the High Street.

1. Close the High Street to traffic between the Crown and Half Moon/ Church. Allow access for taxis to the existing taxi lagoon only. Allow access for delivery vehicles but perhaps only at specified times. This will be a shared space and so 10 MPH speed limit.
2. Block off access from Bellingham Lane and Church Street to the High Street.
3. Replace the mini roundabout at the Crown Hill / High Street junction with a swept bend with limited access to and from the High Street (see 1) with give way lines on the outside of the bend.
4. Replace mini roundabouts at the High Street / Eastwood Road and Eastwood Road/ Websters Way junctions with traffic lights.
5. Replace the zebra crossing at the top of Crown Hill with a light controlled pedestrian crossing.
6. Remove the pedestrian crossing outside the Spread Eagle. This is no longer needed as people can cross from The Crown to the taxi lagoon.
7. Replace the zebra crossing across Eastwood Road outside Marks and Spencer with a light controlled pedestrian crossing.
8. Replace the zebra crossing across Websters Way near to Eastwood Road with a light controlled pedestrian crossing.
9. Arrange for coordinated control of the two new sets of traffic lights, and the four light controlled pedestrian crossings (Crown Hill, Websters Way, and two in Eastwood Road). *
10. Remove the pedestrian crossing in the centre of the High Street as it is no longer needed.
11. Remove the traffic lights at the Junction of Websters Way and High Street and the pedestrian crossing across the High Street as they are no longer needed. Retain the pedestrian crossing across Websters Way. This junction becomes a swept bend and will be free flowing for traffic except when pedestrians are crossing.
12. Access for wedding cars and hearses to the church will be unaffected except that they will have to use London Hill instead of Bellingham Lane to/from Church Street.
13. Access to the Mill Hall and its car parks will be via London Hill and Bellingham Lane. A new exit will be required from the windmill car park to London Hill adjacent to Simpsons solicitors. **
14. Provide parking for disabled people in Bellingham Lane between the Mill hall and its previous junction with the High Street. Create a small turning circle where the junction used to be.
15. Create a layby in Websters Way for buses heading for Hockley or Bull Lane.
16. The loading bay outside Wimpy will become the bus stop for the No 9 bus.
17. The No 1 bus is a problem as it will no longer be able to stop in the High Street or Websters Way and the first stop in the High Road is too far from the town centre. A new bus layby will be needed outside Pizza Express. ***
18. Install traffic lights at the junction of Downhall Road and London Road, incorporating the existing light controlled pedestrian crossing.
19. Install traffic lights at the junction of London Hill and London Road / Station Road. Traffic lights will not be needed at the junction of The Approach and London Road if the lights either side of this junction are phased correctly.

* There are potentially some problems which arise because there will be traffic lights at junctions where the limited space available prohibits the use of a right turn lane or a left filter lane and there are pedestrian crossings nearby. The traffic lights at High Street / Eastwood Road and Eastwood Road / Websters Way will each need to have a phase when traffic from all three directions is stopped and both the adjacent pedestrian crossings are open for pedestrians. This phase will only need to occur when a pedestrian has requested it at either of the adjacent crossings. When there is a lot of pedestrian traffic it will be necessary to synchronise both junctions so that the "all traffic stopped" phase occurs at both junctions at the same time.

** Some drivers will complain that in order to get to the Mill Hall they have to go down Crown Hill and up London Hill, although they could park in Websters Way car park or the market car park and walk. However, people approaching Rayleigh along the London Road will have easier access to the Mill Hall car parks and will not enter the town centre at all, reducing congestion and pollution.

*** Considering traffic coming up Crown Hill, it will be advantageous to arrange that when the pedestrian crossing on Crown Hill goes red to stop traffic there is a delay of several seconds before the light at the High Street/ Eastwood Road junction and the Eastwood Road pedestrian crossing turn red. This should empty this section of road and allow a bus in the layby to pull out without disrupting the traffic flow up Crown Hill.




Comment

Issues and Options Document

Representation ID: 35781

Received: 04/03/2018

Respondent: Mr Ian Dell

Representation Summary:

para 3.14 We should be trying to keep it that way. This statement contradicts with the desire to build 7.5K houses.
para 3.14 This is a positive. Nothing wrong with this.

par 3.15 What are these actions and are they considerate with the desire to build 7.5k houses in the district?

para 3.16 Seems to contradict with the desire to build 7.5 houses.

Full text:

para 1.1 future 'of' our district.
par 1.3 'Silent' is ambiguous and subjective. How long is silent... a day... a month... a year...? How long is it before a local plan is deemed to be silent and therefore, could be ignored?
footnote 2 p1 typo
para 1.13 This is subjective. I'm sure what is valued by myself may not necessarily be valued by the council. Needs to consider emotional needs of landscape and not those of someone walking around with a clipboard.
para 1.14 Who does the Planning Inspector work for?
para 1.21 What happens if that fund is insufficient to meet the baseline infrastructure requirements?
para 3.2 Is there a map available of these designated areas?
para 3.3 The area 'is' home...
para 3.3 Contradicts with the characteristics of our district that have just been described. How can a district with very low unemployment and deprivation levels be a target area for improvement and regeneration? Why is our district not an exception within South Essex?
para 3.12 What plans and which schools? These need to be included or referred to in the document if not already done so.
para 3.14 We should be trying to keep it that way. This statement contradicts with the desire to build 7.5K houses.
para 3.14 This is a positive. Nothing wrong with this.
para 3.15 What are these actions and are they considerate with the desire to build 7.5k houses in the district?
para 3.16 Seems to contradict with the desire to build 7.5 houses
Our Communities p14 Re point 3, building more 4/5 bed houses does not address the concern of affordability, the new builds along Hall Road being a case in point - This is not sustainable development
para 3.22 Agreed. The developments at Hall Road and Folly Lane have not helped this trend.
para 4.4 I consider this a dangerous approach to take. It suggests that housing needs are being put before all other needs. I get the idea of 'policy off' and the requirement to identify housing need but this cannot be done in isolation. All needs must be considered, as a whole, if this is to work.
para 4.4 Again, has to be affordable and sustainable. No point in building 4/5 bed properties for 500k as will not meet objectives and will just add to an ageing population.
Challenge before para 4.6 The challenge will be delivering business that can afford to pay wages that allow residents to live in the district. This comes back to affordable housing. Your figures show that most residents commute to London; that is where the higher wages are paid.
para 4.6 Typo : Need to need to.
para 4.6 It is also critical if 7.5k homes are going to be built. They go hand in hand. Can't have one without the other which is what we're starting to see at Hall Road and Folly Lane where additional infrastructure is not being provided.
Challenge before para 4.7 It has to be long term strategic thinking, not short term for a short term quick hit win. Pride and self gain have to be put to one side and everyone needs to buy in to the long term vision, including developers, builders and land owners. This cannot be about personal gain and profit. If this isn't sustainable and the infrastructure isn't in place, we will have a post war planning disaster on our hands, which future generations will be left to deal with, by which time it will be too late.
Challenge before 4.8 Depends on who the neighbours are, and how similar the issues and challenges they face, are to those of our district. I would always encourage communication, collaboration and idea sharing but it has to be meaningful and strategic and not just doing it for the sake of it.
para 4.9 What is a sub-regional housing market area?
para 4.10 What about utilities infrastructure (energy) and education?
para 4.13 What does this mean in real terms? Does the burden fall on our district to meet the shortfall e.g. 7.5 k becomes 8k?
para 4.15 Typo... 'its'
Our Draft Vision before para 5.10 I support the Vision. However, the Vision should refer to affordable homes.
Strategic Objective 7I would like to see more support for local start ups instead of being swamped by more super brands like Sainsburys and Costas, to the detriment of local businesses.
p29 Tell Us More: I'm supportive of all the objectives but it is a balancing act between them.
People have to work in London because that is where most of the jobs are and which pay the wages to pay for the cost of an average size house in our district.
Creating jobs in the region that can pay equivalent wages is always going to be a challenge unless housing becomes more affordable for future generations.
I'm supportive of more play spaces. These are disappearing or access to them being removed.
Building 7.5k houses is in contradiction with the environmental objectives to a degree.
Tell Us More SP1.1 Everyone involved in this process needs to be mindful that this isn't about profit. It cannot be solely about profit if it is to be sustainable.
It needs a complete change of mindset from developers, builders and architects that this isn't about personal gain but about the future of our district.
I struggle to see, that in the current economic climate, a global development corporation would buy in to this ethos.
Figure 9: What region is this for? Our district or the East of England?
What is the scale along the y axis?
para 6.6 Excessive market level housing will drive up the cost of affordable housing, to the point where what was once affordable housing, no longer is.
para 6.7 Type : in 'for' the form
Table 2 What size are the homes? 10 bedroom mansions or one bed flats?
para 6.10 Not sure I understand what this statement is saying. What happens if the 'need' and 'target' differ significantly?
para 6.12 Not a sustainable approach.
para 6.13 Feels like a get out clause so that affordable housing can be conveniently ignored.

Comment

Issues and Options Document

Representation ID: 36633

Received: 27/02/2018

Respondent: Mr Richard Shorter

Representation Summary:

Paragraph 3.14 "'green part' of the South Essex". The word "the" is superfluous.

Figure 5: Ecological Map of the District. I think this is a bit out of date. Should not the whole of the eastern side of Wallasea island be shown as a local wildlife site? Also metropolitan green belt and sites of special scientific interest are shaded in the same colour.

The summary of statistics in paragraph 3.20 is muddled. "The proportion of residents aged 20 to 64 is expected to remain relatively stable over the next 20 years." is inconsistent with "An increase in the older proportion of residents compared to the rest of the population has the potential to lead to a smaller workforce and higher dependency needs."

Full text:

Issues and Options Document

In paragraph 3.3 "The area home to around 3,320 businesses...." the verb "is" is missing.

Paragraph 3.5 "The workplace and resident earnings in the district are below average compared to Essex and the UK." This is not true. It is true for workplace earnings but not for resident weekly earnings which at 670.9 are higher than Essex (594.0) and UK (539). The statement is also inconsistent with the first sentence of the next paragraph "The area is a generally prosperous part of the country,"

Paragraph 3.14 "'green part' of the South Essex". The word "the" is superfluous.

Figure 5: Ecological Map of the District. I think this is a bit out of date. Should not the whole of the eastern side of Wallasea island be shown as a local wildlife site? Also metropolitan green belt and sites of special scientific interest are shaded in the same colour.

The summary of statistics in paragraph 3.20 is muddled. "The proportion of residents aged 20 to 64 is expected to remain relatively stable over the next 20 years." is inconsistent with "An increase in the older proportion of residents compared to the rest of the population has the potential to lead to a smaller workforce and higher dependency needs."

Paragraph 4.3. "Through the Growth Deal, SELEP can direct Government monies towards specific projects across the LEP area - including schemes to deliver new homes, jobs and infrastructure - which can competitively demonstrate a growth return for the investment." My comment is that the criterium 'can competitively demonstrate' pushes investment towards homes and jobs at the expense of infrastructure, as it is easier to demonstrate growth from the former than the latter. But, adequate infrastructure is a necessary enabler of growth. If you use an unsuitable analysis method, you get the wrong answer.

Paragraph 4.5. The words "we must not over-burden investment in business." are meaningless and make the whole sentence incomprehensible. Delete these and the first word "Whilst" and the sentence makes sense.

Paragraph 4.13. The word "however" occurs twice in one sentence, which is incorrect.

Paragraphs 4.13 and 4.15. If Castle Point and Southend really are unable to meet their housing obligations then perhaps RDC could offer them some land in the extreme south east of the district, which is reasonably near Shoebury rail station, provided that central government funds the much needed relief road from the A130 to Shoebury, crossing the Crouch somewhere between Hullbridge and Fambridge and crossing the Roach. Southend and Castle Point would pay for the necessary flood defences for the new homes.

Twenty two Strategic Objectives is far too many! The document would be more convincing if you called the five Strategic Priorities the five Strategic Objectives and put the other points under them as numbered bullet points. Many of these are not strategic and they are not objectives; they are job descriptions of what the council is expected to do.

Putting homes and jobs first might be what central government want but it is not what the existing residents want. These two are interdependent - build more homes and you have to create jobs for the people to work in; create more jobs and then you cannot fill the jobs until you have built homes for the workers. The first priority should be what you have at number three: transport, waste management, and flood risk. You can forget about telecoms, water supply, wastewater and the provision of minerals and energy as these will all be provided by the private sector.

Paragraph 6.12. "Affordability can be measured by comparing the lowest 25% of earnings to the lowest 25% of house prices, which gives an affordability ratio." This is written the wrong way round and would give a ratio of 0.103. It should be written "Affordability can be measured by comparing the lowest 25% of house prices to the lowest 25% of earnings, which gives an affordability ratio."

Tell Us More SP1.1: Affordable homes and ageing population.
Surely the district council's responsibility is restricted to ensuring that sufficient land is available for development and that there are no unreasonable planning hurdles put in the way of developers. The net completions graph shows that the actual number of houses built depends on the overall state of the economy and the economics of the housing market. The district council has no control over either of these. Central government has only minor influence, even if they think otherwise.

6.30 Option: A Option C sounds like a good idea but will not work. If you are thinking of the children of existing residents then in many cases those children who would like to buy a home here will not currently be residents here. They may be renting elsewhere (in my case in South Woodham Ferrers and the Isle of Man). You would have to come up with a definition of something like a "right to residence" rather than "resident". The whole concept is fraught with difficulties.

6.21 Option: C Market forces will sort out what gets built and options D and E are then irrelevant.

6.33 Option: A

If there is a particular requirement for providing additional assistance for certain sectors of the population then try persuading central government to allow you to increase the rates paid by everybody already in the district and put that money away, securely, in a fund earmarked for that purpose.

Tell Us More SP1.2: Care homes Option: A

Paragraph 6.45. I do not agree with this statement: "We need to demonstrate that we have considered all the options before considering the Green Belt."

The original idea of the Green Belt has become distorted over time. The idea was that existing towns and cities would be surrounded by a belt of green land to prevent urban sprawl. (It is usually cheaper to build on greenfield instead of brownfield sites and so without this "belt" developments will always expand outwards, leaving a neglected and eventually derelict inner core, as in many USA cities.) In Rochford District we have a lot of Green Belt land which is not a belt around anything - it is just a vast expanse of undeveloped land.

Instead of infilling within existing developments and nibbling away at what really is the green belt immediately adjacent to them, something a lot more radical is needed and if central government are going to keep handing down housing targets then they must be prepared to provide the necessary infrastructure. It is this:
Build the relief road previously mentioned from the A130 to Shoebury, crossing the Crouch somewhere between Hullbridge and Fambridge and crossing the Roach. It needs to be a high capacity dual carriageway feeding directly onto the A130 and not at Rettendon Turnpike. The Fairglen interchange needs to be substantially improved (not the current inadequate proposals) to handle the extra traffic between the A130 and the A127 in both directions. The new road needs direct exits to both Battlesbridge and Shoebury stations and 2 or more exits to allow new developments to be built on this huge area of green land which is not green belt at all. A bus service will provide transport from the new developments to both stations. Obviously, schools, health, drainage, and power infrastructure will be needed as well but it will be cheaper to provide it out here than adding to existing conurbations. Flooding is an issue but the existing villages have to be protected against flooding anyway.

Tell Us More SP1.3: New homes ...
Option: E All of the other options are just short-term tinkering.

Tell Us More SP1.4: Good mix of homes
Option: A (The policy on affordable housing in conjunction with market forces takes care of this.) Option E is also worth considering but will only be viable if option E has been chosen in SP1.3.

I do not agree with the statement "This approach would therefore not be appropriate." in Option I. What justifies the "therefore"? It would be sensible to adopt option I and not have a specific policy. If you want to build bungalows you will probably have to accept a lower density than the current minimum, if you want to have an area of affordable housing then a good way to keep the costs down is to go for a higher density. Not to have a specific policy does not mean that there is no policy at all. Why constrain yourselves unnecessarily?

Paragraph 6.70 "There is no need has been identified..." remove "There is"

Tell Us More SP1.5: Gypsys and Travellers Option B

Tell Us More SP1.6: Houseboats Option B

Tell Us More SP1.7: Business needs Options B, C, and E

Tell Us More SP1.8: New Jobs Options B, D, E, F

Tell Us More SP1.9: Southend airport Implement all options A, B, C, D

Paragraph 6.127 "The availability of broadband in more rural areas is a constraint to the development of tourism in the district; nowadays visitors need access to promotional and other material electronically to help them navigate around (although paper copies are still
important)." This is just not true. Do you mean broadband or do you mean 3G/4G phone coverage? Local businesses need broadband, tourists do not.

Tell Me More SP1.10: Tourism and rural diversification Option B

Tell Us More SP2.1: Retail and leisure Options A, B, C, D If it ain't broke, don't fix it!

Tell Us More SP2.2 Local facilities
This is outside of the council's sphere of influence and so there is no point in worrying about it. Pubs and local shops will close if there is insufficient trade to keep them going, while in new developments business will spring up once there is sufficient demand provided planning restrictions do not get in the way. Options A and B.

Tell Us More SP3.1 Roads
Paragraph 8.1 "The equality of infrastructure in terms of services and facilities is challenging across the district given that we have such a large rural area to the east, which can mean that isolation becomes an issue." If you embrace my previous suggestion and with Southend and Castle Point persuade central government to fund the new road, the large area to the east will no longer be rural and isolated. In paragraph 8.10 "It also includes
the area to the south of the River Roach in proximity to Great Wakering." you identify exactly the problem that this would address.

Paragraph 8.12 mentions a requirement for a bypass around Rayleigh but there is nowhere to build such a bypass even if it could be justified and funded. Part of the problem in Rayleigh is that in the evening rush hour the A127 towards Southend is so congested that traffic turns off either at the Weir or Fairglen interchange and diverts through Rayleigh. Also, traffic coming down the A130 and heading for Southend finds it quicker to divert through London Road, Rayleigh town centre, and Eastwood Road than to queue for the Fairglen interchange and Progress Road. A bypass is needed not around Rayleigh but from the A130 to the eastern side of Southend.

Paragraph 8.17 "upgrades have been completed at the Rayleigh Weir junction". Is there any evidence that these 'upgrades' have made any difference whatsoever? Local people think not. If they have not been completed, do not say so.

Option C would be better than nothing. The others are only tinkering around the edges of the problem. What is really needed - although outside of RDC's control - is improvements to the strategic road network.

Paragraph 8.21. Option A is marginally better than doing nothing.

Tell Us More SP3.2: Sustainable travel
Paragraph 8.27. "Encouraging cycling within and through Rayleigh town centre are, in particular, supported to drive improvements to local air quality in this area, for example improved cycling storage." This is wishful thinking. Rayleigh is on top of a hill, of the four approaches, three involve cycling up hill in poor air quality. There are a few diehard cyclists (like my son) but normal people will not be influenced by improved cycle storage.

Paragraph 8.31. "study recommends several mitigation measures ..." These measures are just tinkering and are completely inadequate. More traffic lights are needed and some pedestrian crossings need to be moved or removed. I submitted a comprehensive plan for this previously and I shall submit it again as an appendix to this document.

Paragraph 8.34. "We could consider setting a more challenging mode share, for example 30/30/40 (public transport/walking and cycling/private vehicle)." This is wishful thinking. You can set what mode share you like but you cannot influence it.

Options A, C, and E are sensible. B will not help, D is impractical

Tell Us More SP3.3: Communications infrastructure Option B

Tell Us More SP3.4: Flood risk Options A and C

Tell Us More SP3.5: Renewable energy Option A

Tell Us More SP3.6: Planning Option A

Tell Me More SP4.1: Health Option D

Tell Me More SP4.2 Community facilities Option B

Tell Us More SP4.3: Education Option A and B

Tell Us More SP4.4: Childcare Option A and B

Tell Me More SP4.3: Open spaces and sports. [this number has been repeated]
These do not look like options. You seem to want to do all of them. What is there to choose?

Tell Me More SP4.4 Indoor sports and leisure [this number has been repeated] Option A

Tell Me More SP4.5: Young people Option A

Tell Me More SP4.6 Play spaces
Paragraph 9.57. "In order to reduce the amount of greenfield (undeveloped) land...." I do not entirely agree with this premise and think you should reconsider it. Most of the district is greenfield. Surely, building on some of that is better than trying to squash more and more development into the existing towns and villages. People in new houses can access their gardens every day, they possibly only 'go out east' to look at a field once or twice a year.
Option A

Paragraph 10.6 "A fundamental principle of the Green Belt is to keep a sense of openness between built up areas." Yes, that is what the green belt is for. However, most of the metropolitan green belt in Rochford District is maintaining a sense of openness between the built up areas to the west and the sea to the east.

Tell Us More SP5.1 Green belt vs homes Option B

Tell Us More SP5.2 Protecting habitats
Option A but leave it as it is; do not waste your time and our money worrying about climate change or wildlife corridors. There are plenty of wildlife pressure groups to do that. Also, implement options C, D, E, F, and H. Do not waste your time and our money with G.

Tell Us More SP5.3 Wallasea Island Options A and B

Tell Us More SP5.4 Landscape character
Paragraphs 10.35 to 10.45 - two and a half pages (!) written by someone who has gone overboard extolling the virtues of the countryside. I love the countryside and particularly the coastline and mudflats but this reads as though RDC councillors from the east have too much influence and want to protect their backyards (NIMBY) while pushing all the development to the west where, in fact, the majority of ratepayers actually live.
Options A and B

Tell Us More SP5.5 Heritage and culture Option A

Tell Us More SP5.6 Building design
I question whether there is any justification for doing this. Why not just follow the national guidelines, Essex Design Guide, and building regulations? Option A and K

Tell Us More SP5.7 Air quality
None of the actions proposed will make a significant difference to air quality. The biggest improvement will come from the gradual replacement of older vehicles with new ones built to a higher emissions standard and, ultimately, the introduction of hybrid and electric vehicles.

Air quality now has increased importance. The EU is threatening to fine our government because its plans to improve air quality in a large number of cities and towns are inadequate. Just waiting and hoping that things get better will not do!

If you want to do anything in a faster time frame than that then steps must be taken to: reduce traffic congestion; avoid building new homes in areas that are already congested; build new homes in areas where the air quality is good.

I refer you again to the plan that I append to this document to significantly reduce congestion and improve air quality in Rayleigh town centre. This could be achieved in much less time than waiting for all the existing vehicles to be replaced.

You may as well stay with option A since options B and C will make no difference.

Tell Us More D.P1.1 Affordable homes Option F What happened to options A to E?

Tell Us More D.P1.2 Self build
You are making a mountain out of a molehill on this. No policy is needed. Anyone wishing to self build will have to find a plot of land first. They will then have to apply for planning permission and meet building regulations the same as anybody else would. All the council has to do is NOT to discriminate against such applications. From the self-builders point of view, negotiating the VAT maze is far more of a problem. New builds are zero rated but everything they buy will have VAT on it. The only way to claim back the VAT is to form a company and register it for VAT but that is difficult when it has no trading history and will only complete one project. This is all for central government to sort out, not local councils.
Option D

Tell Us More D.P1.3 Rural exception sites
Paragraph 11.16 "with the publication of the Housing White Paper in February 2017 the definition of what constitutes affordable homes could be amended" This is clearly out of date and needs updating. Was the paper published last year? Was the definition amended?

There is no point in wasting time and effort worrying about a situation that has not arisen yet and may not arise. Since there are so many possible variables in the circumstances any such policy would have to be extremely comprehensive. Wait until a planning application is made and then assess it on its merits. If there is no formal policy in place then this would have to be debated by the Development Committee. You could meet the NPPF requirement by putting a reference to rural exception sites on the council's website.
Option H

Tell Us More D.P1.4 Annexes and outbuildings
Option B which should say "...rely on case law", not "reply on case law".

Tell Us More D.P1.5 Basements
Option A

Tell Us More D.P1.6 Rebuilding in the green belt
Option B

Tell Us More D.P1.7 Agricultural occupational homes
Paragraph 11.42 ".... applications for the removal of agricultural occupancy conditions will not, therefore, be permitted except in the most exceptional circumstances." Are you sure this is sensible? If an agricultural home becomes empty would you rather let it remain empty and possibly become derelict than allow a non-agricultural worker to move into it? Option A

Tell Us More D.P1.8 Brownfield land in the green belt
Option B

Tell Us More D.P1.9 Extending gardens in the green belt
Option A

Tell Us More D.P1.10 Parking and traffic management
Options A and B

Tell Us More D.P1.11 Home businesses
A thriving home business could cause parking issues in the immediate area but it also provides local employment thereby reducing commuting out of the area. Also, noise and pollution issues have to be considered. This requires each case to be assessed on its own merits. Option A

Tell Us More D.P1.12 Altering businesses in the green belt
Option A

Tell Us More D.P1.13 Advertising and signage
Option A

Tell Us More D.P1.13 Light pollution [this number has been repeated]
Option B

Tell Us More D.P1.14 Contaminated land
Option A

The introduction is too verbose and will deter people from reading the whole document. A professional editor should have been employed to précis it down to a length that people will be willing to read. Some of the rest of the document is better but would still benefit from editing.

There are too many spelling, grammatical, and punctuation errors to make it worthwhile proof-reading this initial draft until it has been edited.



Interim Sustainability Appraisal

The first ten pages have been constructed by concatenating standard paragraphs, with minimal editing, in the same way than an accountant or surveyor prepares a report.

The rest of it consists of extracts from the Issues and Options document with meaningful, but not particularly incisive, comments.

Preparing this document was a legal requirement but it does not add much to the sum total of human knowledge.




Appendix

A proposal for the reduction of traffic congestion in central Rayleigh and consequent improvement of air quality

Air pollution is an acknowledged problem in central Rayleigh and just today the high court have ruled that the government must do more to reduce it, particularly NOx emissions from diesel vehicles. A major cause of air pollution in Rayleigh is traffic queuing on Crown Hill and creeping forward one vehicle at a time - engines continually running and repeated hill starts which are particularly bad for NOx emissions. Many recent cars and buses have automatic engine stop when stationary so that if traffic is held at a red light emissions will be significantly reduced. This feature will become commonplace over the next few years.

The pedestrian crossing at the top of Crown Hill and the mini roundabout at its junction with the High Street must be eliminated in order to cure this problem. This proposal achieves that and improves traffic flow in Websters Way as well as eliminating most traffic from the central part of the High Street.

1. Close the High Street to traffic between the Crown and Half Moon/ Church. Allow access for taxis to the existing taxi lagoon only. Allow access for delivery vehicles but perhaps only at specified times. This will be a shared space and so 10 MPH speed limit.
2. Block off access from Bellingham Lane and Church Street to the High Street.
3. Replace the mini roundabout at the Crown Hill / High Street junction with a swept bend with limited access to and from the High Street (see 1) with give way lines on the outside of the bend.
4. Replace mini roundabouts at the High Street / Eastwood Road and Eastwood Road/ Websters Way junctions with traffic lights.
5. Replace the zebra crossing at the top of Crown Hill with a light controlled pedestrian crossing.
6. Remove the pedestrian crossing outside the Spread Eagle. This is no longer needed as people can cross from The Crown to the taxi lagoon.
7. Replace the zebra crossing across Eastwood Road outside Marks and Spencer with a light controlled pedestrian crossing.
8. Replace the zebra crossing across Websters Way near to Eastwood Road with a light controlled pedestrian crossing.
9. Arrange for coordinated control of the two new sets of traffic lights, and the four light controlled pedestrian crossings (Crown Hill, Websters Way, and two in Eastwood Road). *
10. Remove the pedestrian crossing in the centre of the High Street as it is no longer needed.
11. Remove the traffic lights at the Junction of Websters Way and High Street and the pedestrian crossing across the High Street as they are no longer needed. Retain the pedestrian crossing across Websters Way. This junction becomes a swept bend and will be free flowing for traffic except when pedestrians are crossing.
12. Access for wedding cars and hearses to the church will be unaffected except that they will have to use London Hill instead of Bellingham Lane to/from Church Street.
13. Access to the Mill Hall and its car parks will be via London Hill and Bellingham Lane. A new exit will be required from the windmill car park to London Hill adjacent to Simpsons solicitors. **
14. Provide parking for disabled people in Bellingham Lane between the Mill hall and its previous junction with the High Street. Create a small turning circle where the junction used to be.
15. Create a layby in Websters Way for buses heading for Hockley or Bull Lane.
16. The loading bay outside Wimpy will become the bus stop for the No 9 bus.
17. The No 1 bus is a problem as it will no longer be able to stop in the High Street or Websters Way and the first stop in the High Road is too far from the town centre. A new bus layby will be needed outside Pizza Express. ***
18. Install traffic lights at the junction of Downhall Road and London Road, incorporating the existing light controlled pedestrian crossing.
19. Install traffic lights at the junction of London Hill and London Road / Station Road. Traffic lights will not be needed at the junction of The Approach and London Road if the lights either side of this junction are phased correctly.

* There are potentially some problems which arise because there will be traffic lights at junctions where the limited space available prohibits the use of a right turn lane or a left filter lane and there are pedestrian crossings nearby. The traffic lights at High Street / Eastwood Road and Eastwood Road / Websters Way will each need to have a phase when traffic from all three directions is stopped and both the adjacent pedestrian crossings are open for pedestrians. This phase will only need to occur when a pedestrian has requested it at either of the adjacent crossings. When there is a lot of pedestrian traffic it will be necessary to synchronise both junctions so that the "all traffic stopped" phase occurs at both junctions at the same time.

** Some drivers will complain that in order to get to the Mill Hall they have to go down Crown Hill and up London Hill, although they could park in Websters Way car park or the market car park and walk. However, people approaching Rayleigh along the London Road will have easier access to the Mill Hall car parks and will not enter the town centre at all, reducing congestion and pollution.

*** Considering traffic coming up Crown Hill, it will be advantageous to arrange that when the pedestrian crossing on Crown Hill goes red to stop traffic there is a delay of several seconds before the light at the High Street/ Eastwood Road junction and the Eastwood Road pedestrian crossing turn red. This should empty this section of road and allow a bus in the layby to pull out without disrupting the traffic flow up Crown Hill.

Comment

Issues and Options Document

Representation ID: 36831

Received: 08/03/2018

Respondent: Ms G Yeadell

Representation Summary:

3.13-3.16 As you well illustrate, circa two thirds of Rochford district is agricultural, flood risk, so difficult of access and of limited population, the bulk of which is in much smaller west. Consequences are clear.

Schools are overcrowded and measures are being sought, with difficulty, to extend them. Examples:- developers of new 600 estate in Hall Road promised a new primary school. Then, then with excuse that 2 developers involved, only 300 each, they opted out of S106 agreement, so no school.

Hospitals are at risk, surgeries are overcrowded - and it isn't just the old problem.

Traffic, on most accesses, including B1013, now of rush hour size all day, characterised by mile long traffic jams. Road works may contribute, including A127 at Kent Elms, but all noticeably worse since autumn 2016 due to Hall Road, Clements Hall, Christmas Tree Farm and other large developments in the west. Wholesale demolition of residences for redevelopment, including historic ones in eg Hockley that would have been listed elsewhere.

3.18 Note historic Rochford and Rayleigh, plus Conservation areas, of high historic value. "400 listed buildings.. a number of heritage assets not listed nationally, but of local historic importance". But in Hockley, a considerable number of historic buildings have been demolished that elsewhere would have been listed. Reference is made to Local List - one iconic, historic building on the hill entering Hockley was on Local List. So Rochford council abolished its Local List "Government now frowns on Local Lists", until after demolition, when list was renewed. Building was replaced by flats. Hockley has always been the poor relation in this respect. Meanwhile much public money was being spent on preservation is Rayleigh and Rochford, council saying money mustn't be wasted on preservation of iconic building in Hockley.

Full text:

NEW LOCAL PLAN - Rochford District Council 2018 - Issues and Options

3. OUR CHARACTERISTICS

Our Economy

3.3 "South Essex.. a national priority for growth and regeneration". I object. We have employment sources eg London Southend Airport (but people commute in from elsewhere for jobs and rent locally, thus using up jobs and housing. We have local businesses, industrial parks, shops. Many commute to London. But S. Essex is overcrowded and there is some unemployment. Though we are served by Greater Anglia and C2C rail lines to London, other areas, Kent, Sussex etc, are served by main line termini, so we don't need more population here.

3.13-3.16 As you well illustrate, circa two thirds of Rochford district is agricultural, flood risk, so difficult of access and of limited population, the bulk of which is in much smaller west. Consequences are clear.

Schools are overcrowded and measures are being sought, with difficulty, to extend them. Examples:- developers of new 600 estate in Hall Road promised a new primary school. Then, then with excuse that 2 developers involved, only 300 each, they opted out of S106 agreement, so no school.

Hospitals are at risk, surgeries are overcrowded - and it isn't just the old problem.

Traffic, on most accesses, including B1013, now of rush hour size all day, characterised by mile long traffic jams. Road works may contribute, including A127 at Kent Elms, but all noticeably worse since autumn 2016 due to Hall Road, Clements Hall, Christmas Tree Farm and other large developments in the west. Wholesale demolition of residences for redevelopment, including historic ones in eg Hockley that would have been listed elsewhere.

3.18 Note historic Rochford and Rayleigh, plus Conservation areas, of high historic value. "400 listed buildings.. a number of heritage assets not listed nationally, but of local historic importance". But in Hockley, a considerable number of historic buildings have been demolished that elsewhere would have been listed. Reference is made to Local List - one iconic, historic building on the hill entering Hockley was on Local List. So Rochford council abolished its Local List "Government now frowns on Local Lists", until after demolition, when list was renewed. Building was replaced by flats. Hockley has always been the poor relation in this respect. Meanwhile much public money was being spent on preservation is Rayleigh and Rochford, council saying money mustn't be wasted on preservation of iconic building in Hockley.

3.20 "higher proportion of older residents". For a while, but recently an increasing number of younger people in Hockley, so don't target older people for eviction.

3.22 "long term worsening in affordability" and 893 households on Housing Waiting List. One major cause - Government policy of mass selling off of Council housing cheaply during 1980s, councils not allowed to use resultant sums to build more council homes or care for what remained. Council houses had 2 purposes:- one, for families need to save up with cheap rent till they could buy own home; two, for families who could never afford to buy.

4 Our spatial challenges

4.4 I object. Under the National Planning Policy Framework Local Planning Authorities are to work out how many houses they need and plan positively how to meet need in full or if they need help from neighbours - presumably Duty to Cooperate - this is unrealistic.

4.13, 15, 18 I object. If Castle Point, Southend, London are unable to meet all their need for new homes, as you demonstrated in paras 4.13, 15, 16, Rochford will be unable to fulfil their surplus needs under Duty to Cooperate.

5. OUR VISION AND STRATEGIC OBJECTIVES

5.11 Drafting our Strategic Objectives

Strategic Objective 2 this doesn't work... Affordability - developers of schemes above a certain size are required to set 35% as affordable. Information is at least one developer sold off the Waiting List percentage to another borough for its Waiting List. What about Rochford's Waiting List of over 900?

Strategic objective 10 Doesn't work. ".. to work with other authorities and Essex County Council to deliver meaningful improvements to highway network". The ECC 2016 fund for this showed a £4.4 billion gap not matched by Government investment.

Strategic Objective 14 "To work with ECC and health care providers to ensure residents have.. quality social and health services. Doesn't work. Local health arrangements are struggling and too many people are pouring down from London and elsewhere to live here. Hospital under threat and Government heavy charges for care at home.

Strategic Objective 17 Doesn't work. On 4.2.18 Government announced change to plan law to permit extending buildings by 1-3 storeys - how can you cope with that?

Strategic Objective 18 I object. "to support.. delivery of.. primary, secondary etc education facilities".. see my earlier comment re a developer promising S106 agreement for a primary school, then when plan consent given, he opted out as 2 developers involved - 300 homes each. What can you do about that except getting law changed?

6 Delivering Homes/Jobs

6.2 I object. "Delivering.. of new homes.. market, affordable etc". "Any new homes.. supported by suitable infrastructure.. so does not impose unnecessary burden on capacity of existing infrastructure". As I commented under earlier headings, local population has been added to by others coming down from London and elsewhere. Local settlements were agricultural villages and 2 market towns, so local main roads were narrow, winding country lanes, now tarmacked over for motorised traffic, which cannot be changed to motorways, particularly as they are now fully developed either side and beyond.

Also as I said earlier, in 2016 Essex County Council has a £4.4 billion fund gap for highways infrastructure.

6.9 6.10 This sums it up - realisation that environment capacity and availability, viability, infrastructure etc limits what is possible re housing need.

The only possible solution - a new garden settlement to take more population, obviously in Green Belt some of which is flood plain. A by-road would be needed which would also help with traffic density elsewhere. This would need to be carefully planned.

6.19 Affordability a significant issue in Rochford. Re market houses - London people are selling up for good prices and can buy in Rochford district for lower price, though still expensive apparently and local people cannot afford. Re the 921 people on Rochford Waiting List, information is that another council bought out the required percentage of social homes in one development. I think such cases should be taken into account in the Duty to Cooperate.

There are local families who want gardens for their children - even homes they could afford are snapped up by developers. Estates are built with houses packed together, for profit naturally - builders need a living - so no gardens.

6.20 I agree what you say re private rent and Waiting List. As before - 1980s Government had council houses sold off - rest assigned to housing associations. Until law changes re council housing - nil you can do.

6.25 Re Duty to Cooperate, it is already clear you cannot contribute to other districts, without driving locals out of their homes.

6.29 It is clear to you also you cannot deliver the target given by S. Essex HMA, so you cannot aid other councils under Duty to Cooperate.

6.30 I agree Option C seems the most practical.

6.30 and 31 Problem seems insoluble.

6.33 Homes for Older People and Adults with Disabilities Don't forget many older people are able to manage in own homes. Some are suggesting they be removed to make room for younger people. In fact, if removed, only the bulldozer would move in to provide expensive executive dwellings for rich people moving down from London and elsewhere.

7 Supporting Commercial Development

7.12 Retail/Leisure/Town Centres

Re Cinema - "Scope for small independent niche cinema" - you had the Regal cinema in Rayleigh, very successful, but demolished to accommodate the Mill Hall.

"Catering.. priority need for Class A3 restaurant/café in Hockley - I object - there are no less than 7 in the centre already. Hockley well provided for retail, except that since supermarket arrived, basic needs - grocers, butchers, greengrocers with which Hockley was well furnished and are needed, have all gone.

8 Delivering Infrastructure

8.4 "high level of car ownership" - naturally, nowadays. Hence that militates against largescale developments.

8.6 Object. CIL and S.106 agreements won't solve anything. Firstly, they are only for developers to mitigate immediate vicinity traffic problems in relation to their application. In Rochford and elsewhere traffic problem is widespread. Secondly, it is notorious that developers enter S.106 agreements to get plan consent, then they find excuses to opt out of them.

8.8 This is the nub. Your propose eg 7,500 new homes, needing vast changes to traffic facilities, costing huge sums. As previously, Essex County Council noted in 2016 a £4.4 billion fund gap in their infrastructure needs, not matched by Government investment.

8.13 "lack of resilience on local highway network" eg "large volumes of traffic queuing at key junctions" - this is just what you get with huge new development estates - each home having 2+ cars.

8.14 The B1013 via Rayleigh, Hockley, Hawkwell, Rochford "large volumes of traffic queuing at key junctions" is just what you had in morning/evening rush hours. Now, since autumn 2016, you have it all day, often 7 days/week, precisely due to vast new development estates in the vicinity. A new settlement is needed, probably in Green Belt.

8.19 " it's important to acknowledge.. there are limited funds available.. to deliver improvements to the local highway network" - exactly as noted before regarding ECC highways funds - this militates against large development whatever Government is reputed to demand.

8.20 Options

B CIL, like S.106 agreements, as before, is doubtful and individual cases of improvement would not solve B1013 problem. It's now almost as busy with commercial traffic as A127.

Only answer is new motorway through S E Essex, also serving new settlement.
8.22 Sustainable Travel

Idea of increasing public transport is great. Only problem is bus services are privatised. Due to many of those working age in some areas having cars, the bulk of bus passengers there are free passers and Arriva naturally doesn't want them - they claim full sum is not paid to them via Government. Once said "we are not running a service, but a business". This is why some services are drastically cut. I can't think of a solution.

What are the identified issues?

8.33 You note cycle paths are badly needed. Problems of safety occur in Hockley for lack of them. Problem is there is no transit area available for them in Hockley.

You propose amendments to bus routes in Rochford, presumably via Bradley Way - fair enough. There is a rumour of re-routing No8 through Hall Road and Cherry Orchard Way, presumably to serve new 600 estate and new business park. If true, hard luck for those in Rectory Road, Hawkwell. Also, unlike rest of Rectory Road, new stops either side serving new Christmas Tree Farm estate are hardly ever used. Won't the same apply to Hall Road estate whose occupants will undoubtedly be car owners, likewise users of the business park?

Free bus service for Hullbridge secondary school children a good idea.

8.37 What are the realistic options? Option C seems the most practical.

Water and Flood Risk Management

What are the realistic options?

8.58 Option A Retain existing flood risk policy for coastal flooding - forbid development with exception of brownfield - most likely but still doubtful - even if previously developed, still at flood risk.

Planning obligations and standard charges

8.67 Problem with S.106 agreements (payments or mitigating additional works by developers) as before, they enter agreements to get plan consent, then find plausible excuses to opt out.

8.69 Planning conditions - also opted out if they want something else.

8.70 As before one developer promised a primary school, then claimed 2 builders involved, each with half the houses, so escaped obligation. A developer reputedly sold his percentage of social housing to another council for their Waiting List. I hope you can succeed with Community Infrastructure Levy.

9 Supporting Health, Community an Culture

9.7 to 9.10 What are the identified issues
With inevitable Government cuts to NHS provision for the hospital and surgeries and ever greater numbers pouring down into S E Essex from London and elsewhere, problem is insoluble.

9.11 What are the realistic options?

I cannot think of a solution. Money and land needed not available.

Community Facilities

What are the identified issues?

9.14 "facilities.. under threat.. to be developed for other uses" not only shops, pubs etc, also public libraries - eg Hockley one admitted by a County Councillor an a Leader of RDC councillors to be so.

Options

Option B definitely a good idea ".. to resist conversion of community facilities to residential". In fact "prevent" would be better word than "resist".

Education and Skills

I am informed some London 11+ passers are bussed to our nearby grammar schools - Southend and Westcliff, thus reducing places for local children.

Re local villages - some primary schools have closed due to reduced population, but middle class parents so resident drive their children to preparatory schools in Southend, while those of other social classes are left out.

9.28 Option E I support Promoting apprenticeships through cooperation with businesses in offering same and further education a good idea.

10 Protecting an Enhancing our Environment

10.15 I agree with the Environmental Capacity Study 2015 that "it is uncertain whether the district could accommodate additional growth, and unlikely t9o be able to accommodate needs from other areas".

10.16 Options

Option B is sinister - "an assessment of the Green Belt as a whole would need to be taken into consideration". I admit I said a new settlement would possibly be unavoidable, but wholesale change is not on. There would be a solid wall of development from London to the coast.

10.26 Habitats I agree Natural England's need to develop an Essex-wide strategy to identify how potential impacts of .. disturbance resulting from delivering new homes in the country may be mitigated against. The fact is a number of home gardens in somewhat developed areas have habitats of protected creatures which are potentially threatened by developers, not just SPAs, SACs and Ramsars.

10.40 I disagree - Environmental Capacity Study 2015 re grades of agricultural land, Study recommends distinction between 3a and 3b to identify possibilities for smallscale housing development - ? is that how 600 were built in Hall road outside Rochford, mostly sold to Londoners for £650,000?

10.48 How to overcome the Local List - typical - 1 Southend Road Hockley - iconic building, up for development and on Local List - so Rochford council abolished their Local List - "government now frowns on Local Lists", until I =t was demolished. Then Local List was restored as government now approved Lists. (Other councils denied knowledge of such order and had no intention of abolishing theirs.

10.50 conservation Areas - such designation does not prevent adverse changes apparently - so why bother?

10.52 Options

Option A - Action Plans for Rochford and Rayleigh in particular, due to their historic significance are heavily focussed on protecting the character o town centres, unlike Hockley where many historic and iconic buildings have ben demolished. Incidentally circa half of Rayleigh centre was demolished in 1960s, now obviously replaced with typical 1960s buildings. See my comment at 10.48 re one iconic building in Hockley, where in fact many such buildings, which would have been protected elsewhere have gone.

10.54 "good design" to prevent further erosion of area's character - where Hockley is concerned - don't make me laugh at the consequences.

11 Detailed Policy considerations

11.2 35% affordable, of which 80% should be social, to provide homes for those on Rochford Waiting List - fine, but how come we are informed of a case this percentage was bought out by another council for their waiting list?

11.4 "If definition changes we would still need to ensure we seek to meet needs of our residents as far as we can" throws some doubt on your powers in 11.2 in face of above and government and the House Builders Federation.

11.5 This seems to confirm my doubts about the Waiting List in view of government policy and above federation.





Light Pollution

11.73-11.76
11.74 "Identification of environmental zones to dictate the permitted lighting threshold that can be reached" is nonsense. It doesn't matter whether urban, countryside, whatever, if a neighbour light can be seen from one's home, but does not penetrate one's home same, that is permissible. But if the light does penetrate one's home, that is not permissible.

Comment

Issues and Options Document

Representation ID: 36909

Received: 09/03/2018

Respondent: Natural England

Representation Summary:

Local Plan (Issues and Options Document)

Section 3: our characteristics

 Under key Environment Characteristics: (page 12) the first bullet point states "our district has significant areas of ecological value, particularly the Crouch and Roach estuaries and Foulness Island". We advise that this sentence includes the international and national designated importance of the estuaries.

Full text:

Dear Sir/Madam

Rochford District Council Issues and Options Document and Draft Sustainability Appraisal (Screening) Public Consultation

Thank you for your consultation on the above dated 6th February 2018 which was received by Natural England on the same date.

Natural England is a non-departmental public body. Our statutory purpose is to ensure that the natural environment is conserved, enhanced, and managed for the benefit of present and future generations, thereby contributing to sustainable development.

Local Plan (Issues and Options Document)

Section 3: our characteristics

 Under key Environment Characteristics: (page 12) the first bullet point states "our district has significant areas of ecological value, particularly the Crouch and Roach estuaries and Foulness Island". We advise that this sentence includes the international and national designated importance of the estuaries.

Section 4: our special challenges

 Section 4.10 highlights cooperation between Essex authorities in strategic and cross-boundary matters. We advise that the natural environment is included as a cross-boundary matter in light of the strategic approach required to address recreational disturbance impacts on coastal protected sites. Rochford District Council has signed a Memorandum of Understanding to work with neighbouring authorities though the Essex Recreation Avoidance Mitigation Strategy (RAMS) project and we recommend that this is recognised in the list of cross-boundary matters which will be addressed through the Duty to Cooperate.

Section 5: our vision and strategic objectives

 The draft vision for 2037 (page 25) is written as "Rochford District is a green and pleasant place with a focus on business and high quality homes supported by accessible and responsive services and facilities, creating healthy and sustainable communities". We suggest the following amendment: Rochford District is an environmentally rich and pleasant place with a focus on business and high quality homes supported by accessible and responsive services and facilities, creating healthy and sustainable communities.

Our Environment (page 26): as in line with the NPPF and the commitment of the 25 Year Environmental Plan to "embed an environmental net gain principle for development, including housing and infrastructure" we recommend a commitment to delivering net gain for the natural environment, in order to compensate for residual impacts of development on environmental assets. In addition this could be included and expanded in Strategic Objective 19.

Section 6: delivering homes and jobs

Strategic Priority 1.6: Houseboats and Liveaboards (page 54): further information on current houseboat and liveaboard numbers and location in Rochford and the wider Essex area would be useful as baseline data to understand potential impacts of increased numbers to designated sites. Impacts should include both disturbance to species and habitats and pollution from waste effluent.

We support the following options:
o B) Amend existing policy to strengthen criteria.
o D) Amend the definition in the Development Management Plan with the aim of agreeing a clear definition at county level and one that reflects potential impacts on protected sites
o C) Allocate specific areas of coastline where such uses may be acceptable
 Policy should align with best practice proposed by the Essex RAMS project to ensure recreation disturbance is adequately managed within a strategic framework that is Habitats Regulations Assessment compliant (HRA).

 Natural England welcomes the opportunity to work with the Local Planning Authority to address the issue, with regard to potential ecological impacts, and help formulate a policy that does not pose an adverse impact on any designated sites.

 Strategic Policy 1.9: London Southend Airport (page 65): any potential impacts to air quality resulting from an increase in flights, duration and/or adjustment in aircraft or flight paths (including the operational implications of stacking) and road infrastructure should be considered and HRA compliant. It is likely any proposed expansion would require a Habitats Regulations Assessment and this needs to be addressed at a strategic level as part of the Local Plan. Delivery of any mitigation recommendations identified through the HRA and SA will need to be secured through robust Plan policies.

 Natural England's preferred option is A, "retain and update the Core Strategy policy supporting London Southend Airport's growth". This option will update existing policy and ensure reflection of any environmental impacts particularly on any Sites of Special Scientific Interests (SSSI's) and Natura 2000 sites.

 Strategic Policy 1.10: supporting tourism and rural diversification. This policy should consider any potential impacts to the natural environment including recreational disturbance.

 This section should also recognise that the England Coast Path may provide economic opportunities for tourism and the rural environment.

Strategic Policy 3: the provision of infrastructure for transport, telecommunications, waste management, water supply, wastewater, flood risk and coastal change management, and the provision of minerals and energy (including heat)

 Strategic Policy 3.4: water and flood risk management. Natural England supports the proposal to update the Water Cycle Study and we advise that the results of this study should be used to inform the HRA. We acknowledge that that the Environmental Capacity Study found that water supply and capacity for water treatment was sufficient until 2032. The revised Local Plan extends this time period until 2036 and consideration should be given to ascertain if additional capacity is required to meet the needs of development up to 2036. Evidence should be provided to demonstrate that any measures needed to address capacity shortfalls can be implemented ahead of / in line with development. This is needed to demonstrate that Local Plan development is sustainable and will not have an adverse effect on the environment including nationally and internationally designated sites. Delivery of mitigation measures should be secured through robust Plan policies.

 In Para 8.46 this section states "As noted within the Environmental Capacity Study 2015 the Essex and South Suffolk Shoreline Management Plan policy is to hold the line with maintaining or upgrading defences along the coast." This implies that 'hold the line' is the SMP preferred policy along the whole of the Rochford shoreline. We advise this section is revised to reflect the SMP fully and include coastline areas under managed realignment.

The plan should refer to the relevant Shoreline Management Plan and take forward applicable actions. Local Authorities should use Shoreline Management plans as a key evidence base for shaping policy in coastal areas.

Sea level rise and coastal change are inevitable and bring both challenges and opportunities for people and nature. Sustainable coastal management needs to embrace long-term change and achieve positive outcomes for both.

Local Plans should therefore provide for coastal adaptation and work with coastal processes. Plans within coastal areas should recognise the need to respond to changes over long timescales and adopt an integrated approach across administrative and land/sea boundaries. A successful integrated approach should set levels of sustainable levels of economic and social activity whilst protecting the environment.

We would also advise that Local Plans should help facilitate the relocation of valued environmental assets away from areas of risk.

Strategic Priority 4: The provision of health, security, community and cultural infrastructure and other local facilities

Strategic Policy 4.3: open space and outdoor sports recreation. We advise that open space policy corresponds with Natural England's Accessible Natural Green Space Standards (ANGST), which describes the amount, quality and level of visitor services we recommend for all areas. This will help to ensure the delivery of sufficient levels of high quality informal open space to meet the needs of new residents and to buffer and enhance the resilience of the natural environment, particularly more sensitive designated sites.
Strategic Policy 5: protecting and enhancing our environment

Strategic Policy 5.2: biodiversity, geology, and green infrastructure (10.27). We recommend the strengthening of existing policy ENV1 and a commitment to net gain in line with the requirements and aspirations of the NPPF and 25 Year Environmental Plan.

Protection of local habitats of important ecological value (10.28).We agree that option F should be updated to reflect the findings of the latest Local Wildlife Sites assessment. If options C-F are merged to form a singular strategic nature conservation policy, it should include the same level of protection and enhancement as existing policy.

Section 10.43 identifies broad soil sensitivity and its importance to wildlife across the district. The Local Plan should give appropriate weight to the roles performed by the area's soils. These should be valued as a finite multi-functional resource which underpins our wellbeing and prosperity. Decisions about development should take full account of the impact on soils, their intrinsic character and the sustainability of the many ecosystem services they deliver.

The plan should safeguard the long term capability of best and most versatile agricultural land (Grades 1, 2 and 3a in the Agricultural Land Classification) as a resource for the future in line with National Planning Policy Framework paragraph 112 to safeguard 'best and most versatile' agricultural land. The plan should recognise that development (soil sealing) has an irreversible adverse (cumulative) impact on the finite national and local stock of Best and Most Versatile (BMV) land. Avoiding loss of BMV land is the priority as mitigation is rarely possible. Retaining higher quality land enhances future options for sustainable food production and helps secure other important ecosystem services.

 Strategic Policy 5.3: Wallasea Island and the RSPB's Wild Coast Project. Natural England supports option A which retains existing policy and supports Wallasea Island Wild.

 Strategic Policy 5.4: landscape character. Natural England expects the Plan to include strategic policies to protect and enhance valued landscapes, as well as criteria based policies to guide development, as set out in the National Planning Policy Framework (NPPF).

 We support the review of the Upper Roach Valley and coastal protection belt as part of the Local Landscape Character Assessment and new evidence should be used to strengthen and adapt existing policy.

Detailed policy considerations

 D.P1.13: light pollution (page 163): light pollution can give negative impacts on local amenity, intrinsically dark landscapes and on nature conservation, particularly invertebrate and bats. We advise that policies should address impacts on the natural environment in accordance with government guidance on light pollution1. Light pollution policy should ensure the protection of existing dark skies and that new developments increased local light pollution in sensitive areas.

 The Campaign to Protect Rural England have produced maps on light pollution which may be a useful evidence resource for local policy.

Sustainability Appraisal

Natural England is broadly satisfied that the Sustainability Appraisal has been prepared in accordance with the requirements of the SEA Directive, as transposed through the Environmental Assessment of Plans and Programmes Regulations 2004. We have provided advice on the Issues and Options Document and Draft Sustainability Appraisal below.

1. Do you think the Local Plan might have a 'likely significant effect' on Natura 2000 sites? If so, in which broad locations and what might be the likely effects?
Depending on the quantum and location of development, the local plan may have a likely significant effect on:
 Crouch and Roach Estuaries SPA and Ramsar,
 Foulness SPA and Ramsar
 Essex Estuaries SAC
 three SSSIs Hockley Woods, Foulness and the Crouch and Roach Estuaries

However, details of new housing location allocations is not provided in the sustainability appraisal or issues and options document. The local plan will need to have its own Habitats Regulations Assessment (HRA) in due course. The findings and recommendations of the HRA should inform the SA. Mitigation recommendations should be referenced, and implementation secured, through robust Plan policies.

Sufficient evidence should be provided through the HRA to demonstrate any significant effects including increased recreational pressure and changes in air quality associated with new development, with suitable and proportionate mitigation included. The district is sensitive to changes in air quality and evidence through air quality modelling may need to be provided. A likely increase in visitor pressure at key locations may also need to be delivered and measures to address adverse effects should follow the mitigation hierarchy, i.e. measures to avoid impacts should be prioritised. Where adverse impacts cannot be avoided, detailed measures to mitigate these will need to be provided.

Natural England welcomes the commitment to develop an Essex wide strategy to identify potential impacts of recreational disturbance resulting from the delivery of new homes and mitigation delivery through the Essex Coastal Recreational Avoidance and Mitigation Strategy.

We fully support the ambition to work with neighbouring local authorities to identify local wildlife corridors and networks across boundaries

2. Have all the policies, plans, and programmes that are relevant to the production of the Plan been considered? Or are there other documents that should be added to those outlined in the 'Schedule of Plans, Policies & Programmes relevant to the Plan'?

Natural England has not reviewed the plans listed. However, we advise that the following types of plans relating to the natural environment should be considered where applicable to your plan area;

Green infrastructure strategies
 Biodiversity plans
 Rights of Way Improvement Plans
 Shoreline management plans
 Coastal access plans
 River basin management plans
 Relevant landscape plans and strategies

3. Is the data collected in the 'Schedule of Baseline Information relevant to the Plan', to the best of your knowledge, factually correct?

No comment

4. Is the data collected in the 'Schedule of Baseline Information relevant to the Plan' is relevant and suitable for the Plan? Do you know of, or have, any additional data that you think should be added to the list already collected?

We advise that local habitat policy is reviewed and aligned with up to date baseline data to ensure maximum positive effect on biodiversity, health and wellbeing
Please see attached Annex A for our advice on additional sources of local plan evidence on the natural environment.

5. Do you agree that the issues identified as 'Key sustainability issues' are the main sustainability issues relevant to the Plan? Are there any other sustainability issues that you believe should be added?

Strategic Priority 1: Delivering homes and jobs

3.2.1.4 Tourism and rural diversification - option B: if the council seeks to expand the current approach to tourism and include other forms of rural diversification, consideration should be given to increased recreational disturbance and assessed as part of the HRA process. Any mitigation should be proportionate to insure sustainable growth in this area.

6. Will the indicators and data identified in the 'Schedule of Baseline Information relevant to the Plan' provide an effective framework for monitoring the performance of the Plan against the SA Objectives in the 'Draft Sustainability Objectives and SEA Topic'?

As set out in Planning Practice Guidance, you should be monitoring the significant environmental effects of implementing the current local plan. This should include indicators for monitoring the effects of the plan on biodiversity (NPPF para 117).
The natural environment metrics in the baseline information are largely driven by factors other than the plan's performance. They are thus likely to be of little value in monitoring the performance of the Plan. It is important that any monitoring indicators relate to the effects of the plan itself, not wider changes. Bespoke indicators should be chosen relating to the outcomes of development management decisions.

Whilst it is not Natural England's role to prescribe what indicators should be adopted, the following indicators may be appropriate.

Biodiversity:
 Number of planning approvals that generated any adverse impacts on sites of acknowledged biodiversity importance.
 Percentage of major developments generating overall biodiversity enhancement.
 Hectares of biodiversity habitat delivered through strategic site allocations.
Green infrastructure: Percentage of the city's population having access to a natural greenspace within 400 metres of their home.
 Length of greenways constructed.
 Delivery of objectives and targets in the Green Grid Strategy
 Hectares of accessible open space per 1000 population.

7. Are there other/additional methodologies that could be used to identify the significant effects of the Local Plan?

No comment

Sources of local plan evidence on the natural environment

The following sources of evidence may be useful in ensuring local plans are evidence based, in line with paragraph 165 of the National Planning Policy Framework (NPPF) and assist in meeting Strategic Environmental Assessment (SEA) requirements. A range of additional locally specific evidence is also likely to be needed to underpin plan preparation.

i. General natural environmental evidence

National Character Areas (NCAs) divide England into 159 distinct natural areas. NCA profiles contain descriptions of the area and statements of environmental opportunity, which may be useful to inform proposals in your plan. Natural England has also published downloadable natural capital maps. There is a suite of ten maps, of different aspects of natural capital, which contributes to our understanding of where our natural capital is.

The Magic website will provide you with much of the nationally held natural environment data for your plan area in downloadable GIS format.
Local environmental record centres may hold a range of additional information on the natural environment, principally ecological. The following local organizations may also hold environmental information where applicable: Local Nature Partnerships, Wildlife Trusts, Areas of Outstanding Natural Beauty Partnerships and Nature Improvement Areas.

Evidence relating to the significant environmental effects of the current local plan should be available (in line with SEA legislation), as should suitable biodiversity evidence for any plan adopted after the NPPF came into effect (27 March 2012), usually through the current plan's Annual Monitoring Report.

ii. Landscape

The Magic website provides data on the extent of protected landscapes (National Parks and Areas of Outstanding Natural Beauty). National Park/Area of Outstanding Natural Beauty Management Plans may also be a source of useful evidence. These are usually found on these organisations websites.

Most areas have local landscape character assessments. These are tools to help understand the character and local distinctiveness of the landscape and identify the features that give it a sense of place. It can help to inform, plan and manage change in the area. Data on tranquillity is held by CPRE. They also hold mapping data on light pollution.

iii. Biodiversity and geodiversity

The most relevant layers on Magic for you to consider are Ancient Woodland, Local Nature Reserves, Priority Habitat Inventory, Sites of Special Scientific Interest (including their impact risk zones), Special Areas of Conservation, Special Protection Areas, and Ramsar Sites (including, where relevant, marine designations).
You may also wish to draw on more detailed information on specific Sites of Special Scientific Interest and the Conservation Objectives and Site Improvement Plans for Special Areas of Conservation and Special Protection Areas.

Priority habitats and species are those listed under Section 41 of the Natural Environment and Rural Communities Act, 2006 and UK Biodiversity Action Plan (UK BAP). Larger areas of priority habitat will usually be mapped either as Sites of Special Scientific Interest on the Magic website or as Local Wildlife Sites or Local Geological Sites. Local wildlife site data is usually held by local planning authorities themselves as is local geological site data. Local Environmental Record Centres and local wildlife and geoconservation groups are also a source of information on Local Sites.

Natural England maintains the Open Mosaic Habitat on Previously Developed Land Inventory (a priority habitat dataset currently not integrated into the Priority Habitat Inventory on Magic) and is available on request from Natural England via email; NaturalEnglandGIDataManagers@naturalengland.org.uk.
Local Biodiversity Action Plans (LBAPs) identify the local action needed to deliver UK targets for habitats and species. They also identify targets for other habitats and species of local importance and can provide a useful blueprint for biodiversity enhancement in any particular area. Local Geodiversity Action Plans (LGAPS) identify agreed local action for geodiversity, a list of active LGAPs can be found at UK Geodiversity Action Plan (http://www.ukgap.org.uk/getting-involved/lgaps.aspx).
Some areas have identified Biodiversity Opportunity Areas or similar for spatially targeting biodiversity restoration work.

Protected species are those species protected under domestic or European law. Local environmental record centres are likely to hold much of the available data on such species.

APIS holds data on air pollution in particular in relation to protected nature conservation sites.

iv. Access

The Magic website holds the following access related data: National Trails, Public Rights of Way (on the Ordnance Survey base map), Open Access Land (the Countryside and Rights of Way Act 2000 layer), together with national and local nature reserves, country parks and the England Coast Path.

Locally held data will include the definitive Public Rights of Way, and may include Rights of Way Improvement Plans where they exist, and any locally mapped open space audits or assessments.

Natural England's work on Accessible Natural Greenspace Standards (ANGSt) may be of use in assessing current level of accessible natural greenspace and planning improved provision.

v. Green infrastructure

Green infrastructure strategies may comprise or contain useful evidence sources where they exist.

vi. Soils

A provisional Agricultural Land Classification (ALC) map is on Magic, and the GIS layer 'Likelihood of Best and Most Versatile Land' is available on request from Natural England via email;

Some areas already have detailed ALC maps. The coverage of existing detailed MAFF post 1988 ALC surveys is shown on Magic. The MAFF post 1988 ALC survey reports and maps themselves are available from Natural England or from Gov.UK. Our publication Agricultural Land Classification: protecting the best and most versatile agricultural land may also be of help.

General mapped information on soil types and Agricultural Land Classification is available (under 'landscape') on the Magic website and also from the LandIS website, which contains more information about obtaining soil data.

vii. Climate change

The Climate Change Adaptation Manual provides evidence to support nature conservation in a changing climate. The National Biodiversity Climate Change Vulnerability Assessment Model provides a spatially explicit assessment of the relative vulnerability of priority habitats. The data files can be accessed here: National Biodiversity Climate Change Vulnerability Assessment data. The LWEC Climate Change Impacts Report Cards present the latest evidence on how climate change is affecting different aspects of our environment, economy and society.

viii. Coastal and Marine issues
The following may be of help:
 Catchment flood management plans (considers all types of inland flooding, from rivers, groundwater, surface water and tidal flooding).
 Shoreline management plans (considers flooding from the sea).
 Any estuary or harbour management plans that are held locally.
 River basin management plans (covers entire river systems, including river, lake, groundwater, estuarine and coastal water bodies).
 Coastal Erosion Maps.

 The Marine Management Organisation has a marine planning evidence base which supplies a range of information on marine planning.

 There may be specific Heritage Coast information held locally, such as a management plan.

ix. Water Quality and Resources and Flood Risk Management

The Planning Practice Guidance provides guidance on information sources for the water environment.

Comment

Issues and Options Document

Representation ID: 36941

Received: 07/03/2018

Respondent: Ian Davidge

Representation Summary:

3.1 Map of District (Figure 1)

2.1.1 Implications for Great Wakering

What is striking about this is the significant disparity in characteristics between the west and east of the district, where Great Wakering is currently the ONLY major residential area in the East.

2.1.2 No River Roach?.

What is also noticeable about the Figure 1 Map is the absence of the River Roach, although it is shown in Figure 5.

I suggest feature be shown on the map, together with a discussion of the implications for the District Plan, that such a natural constraint places on the District. This is because it forms a significant natural barrier, effectively splitting the eastern side of the district in two i.e. in order to reach the other shore you always have to go inland to Rochford.

Full text:

Dear Rochford Council Planning Policy Dept

Issues & Options Document - Public Consultation ending 7th March 2018


1. Introduction

The purpose of this letter is to provide comments under the current public consultation exercise for this document.

Please note, I have used italic text to offer my suggestions for your consideration.

2. Section 3

3.1 Map of District (Figure 1)

2.1.1 Implications for Great Wakering

What is striking about this is the significant disparity in characteristics between the west and east of the district, where Great Wakering is currently the ONLY major residential area in the East.

2.1.2 No River Roach?.

What is also noticeable about the Figure 1 Map is the absence of the River Roach, although it is shown in Figure 5.

I suggest feature be shown on the map, together with a discussion of the implications for the District Plan, that such a natural constraint places on the District. This is because it forms a significant natural barrier, effectively splitting the eastern side of the district in two i.e. in order to reach the other shore you always have to go inland to Rochford.

2.2 Table 1 (3.19)

The figures shown in the Table present a useful (historic) baseline for a discussion of planning issues.

But it is suggested that these be augmented by population figures calculated using the Districts housing density / dwelling occupancy assumptions for those developments either planned or actually in development, arising from the Districts Adopted Allocations documents.

This would give a more accurate CURRENT and FUTURE picture of the impacts already taking place or in the pipeline within the various Parishes.


3. Section 4

3.1 General Comment

There is no point in Central Government merely dictating to Local Councils that they MUST build more new homes if Central Government is not prepared to help councils provide the wherewithal in terms technical infrastructure, particularly road transport, and Social infrastructure in terms of local medical facilities.

It is unclear how local councils are expected to attract businesses and economic activity if it is virtually impossible to travel across the District predominantly during the Working / School Day?, because of the inadequacies of the transport infrastructure, be that managed at National, County or local level.

3.2 4.8 onwards

Figure 8 presents a useful view of the neighbouring Authorities that the District has to deal with, as amplified by the paragraphs which follow it.

3.2.1 Essex County Council (ECC),

One Authority missing from this analysis is Essex County Council (ECC), a significant player in the local planning scene. For example does ECC recognise South-East Essex as a defined Sub-Region within the broader ambit of the county?

In view of the importance of the county for local planning it is suggested that an analysis of the relationship between the District and ECC could usefully be provided in this document.

3.2.2 Southend

When considering the relationship with Southend you may wish to include some reference to the potential knock-on effects for the District of the Temple Farm / New Southend United Stadium / residential / retail development.

Given that if it ever happens, it will sit right on the border of the District and will have a significant impact on the local road infrastructure, for example making getting to the Airport more difficult from the east of the District.


3.2.3 London

One specific transport development which you might want to mention is the introduction later this year of CrossRail 1 / The Elizabeth Line.

Although being phased in over a couple of years this will result in trains running from Shenfield through Central London (Liverpool Street) and the West End, and out further west toward Heathrow and Reading.

If successful, it is unclear what latent demand this will release for both employment and recreational opportunities albeit outside the District itself. But it could place additional burdens for transport and parking on the railway stations across the District,


4. Delivering Homes and Jobs = Section 6

4.1 Realistic Options (6.48)

Options 1 -4 are all equally unattractive

Merely dumping new housing on existing locations risks creating "Development Ghettos" i.e. condemning residents in these locations to an endless diet of continuous development for decades to come

A further points applies here regarding the further development of existing locations i.e. Copeability

In spite of all the fine words about "contributing more to existing infrastructure(6.46.D) if the currently planned developments in WGW are anything to go by, then such improvements are largely invisible and illusory i.e. the roads in the East of the District can't cope now, just building more housing is only going to make matters worse.

Also where are the improvements to the Social infrastructure e.g. the schools, the medical services, coming from? Merely adding more buses to the procession of vehicles leaving the village each morning carrying secondary age pupils to KES hardly seems to be an improvement.

So my preferred option is 6.46E, as it would allow a proper strategic approach to be taken especially to the infrastructure required to support such a development, rather than the piecemeal, tactical approach implicit in the other 4 options here.


5. Section 8

5.1 8.37 and elsewhere

Cycling and Walking are not the same. They should be separated out, as pedestrians needs are quite different from those of cyclists.

For example in the Great Wakering area:

 There is a need to improve the width of footpath e.g. Poynters Lane from Star Lane to Angel Inn roundabout, as currently it is very narrow and scary to walk along.

 Install a proper pavement from Cupids Corner to North Shoebury Road and along Old Southend Road. It is wrong in this day and age for people to have to take their life in their hands by walking on the carriageways which is the only option in these cases.

 Improve local crossing points i.e Star Lane / Poynters Lane Junction which is currently a nightmare for pedestrians

I am sure that similar examples can be found right across the District. To stimulate people to take up Walking options, much more has to be done to make it attractive and SAFE.



6. Improve Road Infrastructure (Section 8)

6.1 General Point

The points made throughout the document about the vital importance of the road infrastructure to the current and future well-being of the District are well made.

My disappointment is that in the Options Table at 8.20, there is NO explicit reference to addressing any specific issues regarding difficulties in the East of the District. In particular identifying improvements to those roads and junctions which link Great Wakering to Rochford and beyond.

6.2 8.25 Bus Services Map

This is potentially open to mis-interpretation because it does not distinguish between the types of services.

 regular including = Daily / Monday =- Saturday Services, although even in this category many routes do NOT run on Sundays or are curtailed , and,

 irregular e.g The Barrow Hall Road service which I think runs only on two days per week.

Suggest it be modified to do so i.e. to provide a more accurate picture..

6.3 8.23

There have also been a number of cutbacks from the County recently which have further diminished some local bus services.

Given that nearly all the Services in the District also involve other Authorities particularly Southend, it is suggested that reference be specifically for cooperation between these Authorities with the respective Bus Operators to minimise future reductions and promote greater use of such services.


7. Section 10

I note the word "coalescence" is only used once anywhere in the document i.e. in connection with Brownfield sites (11.47)

Suggest that it is added to the other discussions in Section 10 where residential developments could risk leading the District to become directly "joined" with the other Authorities as mentioned in Section 3. A situation which risks prejudicing the unique character of the District.

8. Other point

I was surprised that I could find no mention of the implications of increased residential development on the Recycling of household waste. An area on which the District can be rightly proud of your record on tackling this.

Suggest you might wish to include wording to cover this aspect.


9. Conclusion

Of all the points made in your document, by far the major need for the District in my view is for a Strategic look at the Road Transport needs, if the current increasing pressure on this scarce resource (road-space) is not ultimately to lead to gridlock before ECC actually decides to do something about it.

In the meantime we all suffer, businesses, employment opportunities, residents, schools, emergency services and those they are trying to help.

Merely adding to the Residential housing stock no matter how laudable, whilst doing nothing much about the road infrastructure will only hasten this unfortunate eventuality.

The District needs and deserves better, hopefully ECC can be prevailed upon to "up their game" and start addressing this issue strategically rather than tactically on development-by-development basis, because at the moment there seems to be little evidence of any action by them on this at all.

Finally Thank You for providing the opportunity for residents to comment on your Plans.

Comment

Issues and Options Document

Representation ID: 37086

Received: 07/03/2018

Respondent: Historic England

Representation Summary:

Dear Sir/Madam,

Re. Rochford District Council Local Plan Issues and Options

Thank you for consulting Historic England on Rochford District Council's Local Plan
Issues and Options stage. As the Government's adviser on the historic environment
Historic England is keen to ensure that the protection of the historic environment is
fully taken into account at all stages and levels of the local planning process.
Therefore we welcome the opportunity to comment on the Issues and Options. We
have now had the opportunity to review the documents and can provide the following substantive comments.

Comments on Issues and options

District Characteristics: The Environment

We are pleased to see reference to the District's rich and varied historic environment
in this section. The supporting text acknowledges the District's rural, coastal
characteristics as well as that of its settlements, it is important to note however that
rural and coastal areas are rich in their own sorts of cultural heritage and that it is not just towns and conservation areas that constitute the historic environment.

Please note that the term Scheduled Monuments should be used rather than
Scheduled Ancient Monuments. This term better reflects that not all scheduled
monuments are ancient.

Full text:

Dear Sir/Madam,

Re. Rochford District Council Local Plan Issues and Options

Thank you for consulting Historic England on Rochford District Council's Local Plan
Issues and Options stage. As the Government's adviser on the historic environment
Historic England is keen to ensure that the protection of the historic environment is
fully taken into account at all stages and levels of the local planning process.
Therefore we welcome the opportunity to comment on the Issues and Options. We
have now had the opportunity to review the documents and can provide the following substantive comments.

Comments on Issues and options

District Characteristics: The Environment

We are pleased to see reference to the District's rich and varied historic environment
in this section. The supporting text acknowledges the District's rural, coastal
characteristics as well as that of its settlements, it is important to note however that
rural and coastal areas are rich in their own sorts of cultural heritage and that it is not just towns and conservation areas that constitute the historic environment.

Please note that the term Scheduled Monuments should be used rather than
Scheduled Ancient Monuments. This term better reflects that not all scheduled
monuments are ancient.

Vision

The Plan's strategic policies will derive form the Vision and so there needs to be
sufficient aspirations in the Vision for the maintenance and enhancement of the
historic environment as a strand in the pursuit of sustainable development as defined by paragraph 14 of the NPPF. This will help ensure that the associated strategic policies incorporate a positive and clear strategy to deliver the conservation and enjoyment of the historic environment (as linked to paragraphs 126 and 157 of the NPPF).

The Vision is extremely succinct and includes no high level consideration of the
historic environment. It is noted that the Vision is supported by a number of key
themes on the following page of the consultation document. The environment theme
does address the need to conserve and enhance the built, natural and historic
environments which is welcomed; however we recommend that this is better
reflected in the Vision itself and not just in supporting themes.

Strategic Objectives and Priorities

Strategic Priority 5 seeks to conserve and enhance the natural and historic
environment, including landscape. This priority is supported by Objective 21 which
seeks to preserve and enhance the quality of the district's built and historic
environment. We are pleased to see these strategic level objectives within the Plan
and request that they carried through into further drafts.

SP1.3: How do we plan for and facilitate the delivery of our need for new homes
over the next 20 years within the district?

When exploring housing growth options, the capacity for the area to accommodate
new housing development whilst maintaining its historic environment should be a key consideration so that the quality and character of neighbourhoods, towns and villages is conserved. Integrating consideration of the historic environment into plan making alongside other considerations is a key principle of sustainable development. Where less successful neighbourhoods are proposed for redevelopment opportunities for enhancement should be outlined as a priority.

Allocation of new housing sites should be considered in the most sustainable
locations and should get the right densities and character appropriate to the area.
This approach will require a careful and detailed analysis of locations to ensure that
distribution of housing is appropriate. The historic environment is a critical factor in
this analysis in terms of considering the ability of sites and locations to accommodate new housing without undue harm to heritage assets and their settings. We hope that the distinctive qualities of individual settlements will be taken into account when
determining where development should take place. Conservation Area Appraisals
should be used to help assess suitability for development.

Section 6.48 of the consultation outlines a number of growth options. The district
contains many areas of historic interest with sensitive landscape settings. From a
historic environment perspective, it is difficult to rank the options in order of
preference given the range and distribution of heritage assets that could be affected.
Each option will have an impact on heritage assets, and it will depend to some extent on where site allocations are identified and the quantum of development as well as its design. Each option considered should include appropriate reference to the historic environment. It will be important to preserve settlement character and to avoid coalescence with neighbouring settlements. Growth options within existing
settlement centres should reflect the scale and character of the surrounding
townscape.

Before options can be considered further it is important to know whether or not
adequate land to meet the Objectively Assessed Need (OAN) can be identified
through the Call for Sites process and what implications this may have upon the
historic environment. It is noted that one of the options being considered is a new
settlement. In principle this idea could be an effective way of delivering the required
growth across the district in a sustainable way, but this is dependent on the
soundness of any future site allocations for a new settlement. Landscape and
heritages assets should be considered from the outset when determining the location
of a new settlement in order to ensure that development can be delivered whilst
having regard to the these assets. It is expected that strategic new settlement
policies makes reference to the historic environment and the need for its
conservation or enhancement. Without this being demonstrated in the identification
and justification of sites, and in the wording of the policies the Plan will be unsound.
It is essential that the local plan should contain a framework to guide how the
boundaries and extent of a new settlement will be determined in the emerging
development plan documents as the Plan process progresses. A Historic Impact
Assessment (HIA) should be undertaken in accordance with our advice note 'Site
Allocations in Local Plans' for each of the proposed broad locations to be taken
forward to determine the appropriateness or otherwise of the locations for
development, the extent of the development and therefore potential capacity of the
sites, the impacts upon the historic environment (considering each asset and its
setting and its significance), impacts of development upon the asset and any
potential mitigation measures necessary to accompany the proposals.

SP3.1: How can we prioritise and deliver improvements to the strategic and
local highway network over the next 20 years?

We support the provision of sustainable transport improvements in principle but we
do not advocate any specific options. Transport infrastructure provision has the
potential to impact on the historic environment in both a positive and negative way.
Upgrades to transport networks for example will need to be carefully planned to avoid harm to heritage assets and maximise opportunities for enhancement. Any schemes promoted through the Local Plan will need to assess the potential heritage impacts. All proposed transport infrastructure schemes and route options should take into consideration theirs impacts on heritage assets and their setting, alongside
archaeological potential. We expect any Transport Appraisals to address the impact
upon the historic environment. Paragraph 132 of the NPPF states that significance
can be harmed or lost through development within the setting of a heritage asset.
These matters will be material to the further drafting of transport policy and the
selection of routes.

SP3.3: How do we support and deliver improvements to the communications
infrastructure across the district over the next 20 years?

Telecommunications

Advanced, high quality communications infrastructure is essential for sustainable
growth. The development of high speed broadband technology and other
communications networks also play a vital role in enhancing provision of local
community facilities and services. However, the siting and location of
telecommunications equipment can affect the appearance of the public realm,
streetscene, the historic environment and wider landscapes. The consideration of
their positioning is therefore important, particularly in conservation areas. Paragraph
43 of the National Planning Policy Framework (NPPF) states that local planning
authorities, in preparing local plans, should support the expansion of electronic
communications networks, including telecommunications and high speed broadband
but that they should aim to keep the numbers masts and sites to a minimum
consistent with the efficient operation of the network.

The NPPF goes on to state that where new sites are required, equipment should be
sympathetically designed and camouflaged where appropriate. Crucially, the NPPF
identifies the protection and enhancement of the historic environment as being a key
strand in what it defines sustainable development (paragraph 7). We would therefore urge the emerging Local Plan, to ensure that any telecommunications policies include a provision for the protection of the historic environment and a requirement for applicants to consider the siting, design and positioning of equipment in this context. Telecommunications policies should have regard to the wider townscape and historic environment.

SP5.4: How should we address local landscape character?

We are pleased to see that this section of the consultation documents recognises the
link between landscape character and the role it has to play in conserving the historic environment. We welcome the forthcoming further district-level landscape character assessment as outlined within paragraph 10.40 of the supporting text. This additional evidence that will build off the existing 2006 Historic Environment Characterisation project will help identify a suitable policy approach.

SP5.5: How do we continue to protect and enhance our heritage and culture in
the future?

The consultation document outlines 2 options for heritage and culture:
Option A: retain existing policies that are considered to be adequate
Option B: do not have policy or guidance relating to culture and heritage
Whilst the current policies may be working unfortunately neither of these options is
appropriate and neither will constitute a positive strategy for the conservation and
enhancement of the historic environment as required by the NPPF. The existing
policies date from 2011 and therefore pre-date the NPPF, as such they will need to
be updated. The current plan has standalone policies for: CP1: Design, CP2:
Conservation Areas and CP3: Local Lists. There is no policy provision for listed
buildings, scheduled monuments, archaeology, historic or designed landscape,
setting etc. It is noted that the supporting text of the current plan does address some of these elements but there is no actual policy provision for their conservation or enhancement. We request that these policies are revised and expanded upon to
reflect the objectives of the NPPF, not doing this would risk the forthcoming plan
being unsound. I am happy to comment on any policy wording before the next draft
of the plan is issued.

Some local authorities bring forward one or two overarching policies on the historic
environment, others prefer to have a standalone policy for each aspect e.g. listed
buildings, conservation, non-designated heritage assets, heritage at risk etc. Either
approach can be acceptable if worded correctly, I would say that the key issue to for applicants to consider the siting, design and positioning of equipment in this
context. Telecommunications policies should have regard to the wider townscape
and historic environment.
SP5.4: How should we address local landscape character?
We are pleased to see that this section of the consultation documents recognises the
link between landscape character and the role it has to play in conserving the historic
environment. We welcome the forthcoming further district-level landscape character
assessment as outlined within paragraph 10.40 of the supporting text. This additional
evidence that will build off the existing 2006 Historic Environment Characterisation
Project will help identify a suitable policy approach.
SP5.5: How do we continue to protect and enhance our heritage and culture in
the future?
The consultation document outlines 2 options for heritage and culture:
Option A: retain existing policies that are considered to be adequate
Option B: do not have policy or guidance relating to culture and heritage
Whilst the current policies may be working unfortunately neither of these options is
appropriate and neither will constitute a positive strategy for the conservation and
enhancement of the historic environment as required by the NPPF. The existing
policies date from 2011 and therefore pre-date the NPPF, as such they will need to
be updated. The current plan has standalone policies for: CP1: Design, CP2:
Conservation Areas and CP3: Local Lists. There is no policy provision for listed
buildings, scheduled monuments, archaeology, historic or designed landscape,
setting etc. It is noted that the supporting text of the current plan does address some
of these elements but there is no actual policy provision for their conservation or
enhancement. We request that these policies are revised and expanded upon to
reflect the objectives of the NPPF, not doing this would risk the forthcoming plan
being unsound. I am happy to comment on any policy wording before the next draft
of the plan is issued.
Some local authorities bring forward one or two overarching policies on the historic
environment, others prefer to have a standalone policy for each aspect e.g. listed
buildings, conservation, non-designated heritage assets, heritage at risk etc. Either
approach can be acceptable if worded correctly, I would say that the key issue to avoid is having an overemphasis on one aspect of the historic environment and not
others. The current plan has a policy on conservation areas but not listed buildings
for example which can create ambiguity for readers and decision makers.

General comments on historic environment policies:

We request the term "historic environment" is used rather than "heritage and culture" when referring to a standalone policy covering these areas. The historic environment is considered the most appropriate term to use as a topic heading as it encompasses all aspects of heritage, for example the tangible heritage assets and less tangible cultural heritage as well as designated and non-designated heritage assets.

The conservation and enhancement of the historic environment can bring a range of
multi-faceted benefits which can help achieve spatial planning goals. Recognising the
role the historic environment has to play in creating locally distinct places can help
improve economic prospects for places within the Plan area, can help improve wellbeing for local residents, and promotes an understanding of local history and identity.

It is important to see the opportunities that some developments may have in
enhancing the historic environment through public realm improvement, allowing
public access or better revealing significance. A coordinated appreciation of the
historic environment which addresses both the heritage assets themselves and their
setting will reinforce their integrity and therefore will help ensure that historic places
and spaces continue to provide long term public benefits. An integrated approach to
policy preparation that recognises the social, economic and environmental
dimensions of the historic environment and which seek to conserve this irreplaceable
resource will improve the ability of the Plan to protect and enhance the historic
environment.

Non-designated heritage assets:

The consultation document makes reference to non-designated heritage assets
which is welcomed. The compilation of Local Lists is encouraged as it is a good way
of keeping track of the condition of the historic environment. We are pleased to see
that the current plan has a standalone policy which addresses locally listed buildings
and we hope to this something similar carried forward into the new plan.
Whilst it is correct to say that local listings are non-statutory; it is also important to
highlight the requirements within the NPPF regarding non-designated heritage
assets. In national policy terms, 'non-designated heritage assets' (including those on
a local list) are recognised as having a degree of significance meriting consideration
in planning decisions. Paragraph 135 of the NPPF states that the effect of an application on the significance of a non-designated heritage asset should be taken into account in determining the application. In weighing applications that affect
directly or indirectly non-designated heritage assets, a balanced judgement will be
required having regard to the scale of any harm or loss and the significance of the
heritage asset. Reference in the local plan to the NPPF in this respect will better
reflect the NPPF and improve the soundness of the plan.

Climate change and energy efficiency

Listed buildings, buildings in conservation areas and scheduled monuments are
exempted from the need to comply with energy efficiency requirements of the
Building Regulations where compliance would unacceptably alter their character or
appearance. Special considerations under Part L of the Building Regulations are also
given to locally listed buildings, buildings of architectural or historic interest within
registered parks and gardens and the curtilages of scheduled monuments, and
buildings of traditional construction with permeable fabric that both absorbs and
readily allows the evaporation of moisture. It is recommended take emerging policies relating to climates change and energy efficiency in historic buildings are formulated with this in mind.

The design and siting of some energy efficiency equipment can have impacts upon
the character and appearance of historic places and upon the setting of heritage
assets. Again it is recommended that consideration is given to the continued need to
conserve and enhance the historic environment when developing these types of
policies. Policies which promote or encourage a blanket approach to energy
efficiency technology for should be avoided without some sort of qualification with
regards to heritage assets and their settings.

Setting

We expect to see appropriate references to setting in policies. As with assessing the
impact of site allocations on setting, with a site specific allocation, it is important to
understand the significance of any heritage asset/s, and their setting/s, that would be affected by the site allocation in order for the policy to reflect these considerations.
This involves more than identifying known heritage assets within a given distance,
but rather a more holistic process which seeks to understand their significance and
value. Whilst a useful starting point, a focus on distance or visibility alone as a gauge is not appropriate. Site allocations which include a heritage asset (for example a site within a Conservation Area) may offer opportunities for enhancement and tackling heritage at risk, while conversely, an allocation at a considerable distance away from a heritage asset may cause harm to its significance, reducing the suitability of the site allocation in sustainable development terms. We would expect to see this reflected in the policy wording and supporting text.

Design

We strongly encourage provision for the historic environment throughout the plan, not solely within heritage focused policies. Most particularly, we seek a specific
requirement for consideration of the historic environment within the design policies of the local plan which should seek to draw on opportunities offered by the historic
environment and reflect local character and distinctiveness. This should not stymie
contemporary development but should require an appreciation of the significance and character of the historic environment in producing a high standard of design.

D.P1.5: How do we deal with applications for basements within the existing
residential area in the future?

Basement developments in both rural and urban areas can have implications for the
historic environment which should be articulated in the forthcoming plan if basement
developments are becoming more common place and if a basement policy can be
justified.

It is important to be aware that basement development and subterranean works
brings the specific risk of disturbing archaeology. There are also problems when
considering subterranean developments within the curtilage of or setting of listed
buildings as careful consideration will need to be given to the need to avoid loss of
and disturbance to historic fabric, as well as how the basement level will accessed
and arranged. Underpinning of a listed building or structure such as listed garden
wall for example, will have significant impacts upon the historic footings and
foundations similarly linking the basement to the original property will be problematic.

From layout terms, the creation of an additional storey below a property can be as
equally harmful to internal plan form, layout, hierarchy and character as adding one
above a property. Even smaller works such as a lightwell serving a basement in nondesignated heritage asset can emphasis the existence of an additional storey below ground therefore allowing what historically was a two storey building for example to be read as a three storey building. Alterations such as this can have major implications upon the character of an area.

Omitting specific reference to archaeology and other heritage assets from the policy
is likely to make it harder for applicants to make successful planning applications and for the council to make informed decisions. It also increases the risk of delays during the planning and building phases of developments if significant archaeology is
discovered, which has not been identified at the appropriate stage of the process. We would emphasise the importance of the early assessment of archaeological potential to ensure applicants give this adequate consideration.

As the consultation documents acknowledges, robust evidence will be required to
support this policy. Evidence is required to inform the policy and to demonstrate how
issues associated with the subterranean development and the historic environment
can be addressed by the policy. For example, the method of excavation,
construction, and piling/underpinning can have considerable repercussions on the
structural integrity of above ground structures within or adjacent to the site and below ground archaeology as well as the wider historic environment. Associated activities such as pumping ground water out of a basement dig can impact upon the wider water table resulting in displacement of water or even dewatering which, depending on the underlying geological conditions, can have serious impacts upon foundations.

Ideally there should be evidence to show how the Council has considered these sorts
of issues and how the policy has been tailored to address them. It may be that the
Council intends to provide a Supplementary Planning Document which contains this
information. If an SPD is being considered it should be referred to in the Plan itself
and appear as a monitoring indicator.

D.P1.8: How do we address applications for the development of Brownfield
Land in the Greenbelt in the future?

Our advice note 3 on site allocations in local plans sets out a suggested approach to
assessing sites and their impact on heritage assets. This is equally applicable to the
assessment of urban brownfield sites. It advocates a number of steps, including
understanding what contribution a site, in its current form, makes to the significance
of the heritage asset/s, and identifying what impact the site might have on
significance. This could be applied to the assessment and selecting of sites within a
plan (see section on site allocations below).

In assessing sites it is important to identify those sites which are inappropriate for
development and also to assess the potential capacity of the site in the light of any
historic environment (and other) factors.

If brownfield sites are to be brought forward using the Brownfield Register System we would expect to see reference in the Notes column of the Register (Part 2) to the
need to conserve and seek opportunities to enhance the on-site or nearby heritage
assets and their setting, the need for high quality design and any other factors
relevant to the historic environment and the site in question.

Developments of brownfield sites within the greenbelt should be sensitive to their
surroundings to ensure the inherent character of the place is conserved.

D.P1.11: How do we continue to support the growth of home businesses
across the district?

When considering a policy on home businesses it is important to considered whether
or not the scale and nature of the business will result in a change of the primary use
of the property as can have implication on the wider character of the area. Physical
changes such as the encroachment of signage/advertisements in residential or
domestic areas can erode the established character of neighbourhood and result in
visual clutter.

Site Allocations

The consultation document does not contain any potential site allocations. It is noted
that the SHELAA (2017) appendices do contain a list of sites from the Call for Sites
process. Appendix C contains the results and outlines the site details of each site but
this runs to over 1100 pages. It is therefore not practicable or possible for us to
comment on this raw data in the absence of a short list of prospective sites. The
template used in the SHELAA appendix C is helpful and does contain much of the
information that we would expect to inform a site specific policy if the site were to
come forward as an allocation. However, it is advised that the templates better
address the historic environment by referring to issues such as setting, whether or
not there is a listed building near, or if the site is within a conservation area etc.
We have the following general comments to make on the site allocation process
which I hope will be of use:

Historic England advocates a wide definition of the historic environment which
includes not only those areas and buildings with statutory designated protection but
also those which are locally valued and important, as well as the landscape and
townscape components of the historic environment. The importance and extent of
below ground archaeology is often unknown, although information in the Historic
Environment Record (HER) will indicate areas of known interest, or high potential
where further assessment is required before decisions or allocations are made.
Conservation and archaeology staff within the relevant councils should be consulted
on matters relating to archaeology, landscape/townscape and the historic
environment generally.

We often find that while some of the sites in the Plan identify heritage assets as
potential constraints, this is not consistently done for all sites and all heritage assets.

There also can be limited information in documents on how sites might be developed, making it difficult for Historic England, and others, to assess their full impact. We are keen that allocated sites include development criteria to guide future proposals, including references to the historic environment where needed (this follows the national Planning Practice Guidance). There is a danger to both heritage assets and potential developers of allocating sites without such criteria and establishing the principle of development without guidance on the issues that need to be addressed at the planning application stage. The significance of heritage assets, and the potential impact of allocations on that significance, will need to be understood and justified.

It should be noted that there are areas of archaeological interest beyond scheduled
monuments and historic landscape issues beyond registered historic parks &
gardens. Wider archaeological and landscape/townscape impacts are important
considerations and need to be factored into site assessment. The possible
cumulative impact of a number of site allocations in one location could also cause
considerable harm to the historic landscape/townscape.

All sites should be scoped for archaeological potential before taking them forward to
the next stage, as there is a high likelihood of archaeological sites not on the HER.
Archaeological assessment and evaluation should be in line with the NPPF and best
practice guidance so that impacts can be assessed at the earliest opportunity.

Assessing sites

Our advice note 3 on site allocations in local plans sets out a suggested approach to
assessing sites and their impact on heritage assets. It advocates a number of steps,
including understanding what contribution a site, in its current form, makes to the
significance of the heritage asset/s, and identifying what impact the allocation might
have on significance. This could be applied to the assessment and selecting of sites
within a plan.

In essence, it is important that you
a) Identify any heritage assets that may be affected by the potential site allocation.
b) Understand what contribution the site makes to the significance of the asset
c) Identify what impact the allocation might have on that significance
d) Consider maximising enhancements and avoiding harm
e) Determine whether the proposed allocation is appropriate in light of the NPPFs
tests of soundness

In assessing sites it is important to identify those sites which are inappropriate for
development and also to assess the potential capacity of the site in the light of any
historic environment (and other) factors.

If a site is allocated, we would expect to see reference in the policy and supporting
text to the need to conserve and seek opportunities to enhance the on-site or nearby heritage assets and their setting, the need for high quality design and any other factors relevant to the historic environment and the site in question. We recommend that Heritage Impact Assessments (HIAs) are carried out to support major allocations. HIAs should assess the suitability of each area for development and the impact on the historic environment. Should the HIA conclude that development in the area could be acceptable and the site be allocated, the findings of the HIA should inform the Local Plan policy including development criteria and a strategy diagram which expresses the development criteria in diagrammatic form.
Paragraph 157 of the National Planning Policy Framework requires Local Plans to
provide detail with site allocations where appropriate (fifth bullet point), with the
Planning Practice Guidance stating "where sites are proposed for allocation,
sufficient detail should be given to provide clarity to developers, local communities
and other interests about the nature and scale of development (addressing the 'what, where, when and how' questions)" (PPG Reference ID: 12-010-20140306 (last revised 06/03/2014). Paragraph 154 of the NPPF also states that only policies that provide a clear indication of how a decision maker should react to a development proposal should be included in the plan. Conservation of the historic environment is a core planning principle (Paragraph 17) and Local Plans should set out a positive strategy in this respect (Paragraph 126).

Assessment criteria

Many authorities include a distance based criteria to assess impact on the historic
environment. It is important to understand the significance of any heritage assets,
and their settings, that would be affected by a potential site allocation. This involves
more than identifying known heritage assets within a given distance, but rather a
more holistic process which seeks to understand their significance and value. Whilst
a useful starting point, a focus on distance or visibility alone as a gauge is not
appropriate. Site allocations which include a heritage asset (for example a site within
a Conservation Area) may offer opportunities for enhancement and tackling heritage
at risk, while conversely, an allocation at a considerable distance away from a
heritage asset may cause harm to its significance, reducing the suitability of the site
allocation in sustainable development terms.

Local Plan Evidence on the Historic Environment

Rochford District Council has a very useful Historic Environment Characterisation
Project (March 2006) and we are pleased to see that this document forms part of the
evidence base for the Local Plan along with existing Conservation Area Appraisals
and Management Plans. Generally the type and range of evidence is useful but all
the documents listed are now rather dated with the majority being over ten years old and pre-dating the NPPF. It would be helpful if an updated topic paper could be
pulled together to better reflect the current condition of the District's historic
environment, outlines current challenges/pressures on the historic environment within the district, and that reflects current national policy. This could perhaps supplement the landscape characterisation work that the Council is also intending to undertake.

Having up-to-date evidence to support the plan policies will improve its soundness in
line with paragraph 158 of the NPPF.

Monitoring

We recommend indicators to measure how successful historic environment policies
are. These can include preparation of a local list, completion of conservation area
action plans and management plans, reduction in the number of assets that are
classified as heritage at risk.

Glossary

Glossaries should include consistent definitions for all heritage assets mentioned in
the local plan. These would typically include:
Listed Buildings
Scheduled Monuments
Conservation Areas
Registered Parks and Gardens
Non-designated heritage assets / Local Heritage Assets / Locally Listed Heritage
Assets / Locally Listed Buildings

Mapping

We recommend that designated heritage assets are marked on maps, where
appropriate.

Comments on Interim SA Report Oct 2017

The SA Objectives are generally appropriate and acknowledge that the historic
environment is formed by tangible heritage assets and less tangible elements such
as landscape character and associations of place. We have no other comments to
make with regard to the Sustainability Appraisal Interim Report which is well written and which will hopefully lead to a robust local plan that makes a positive provision for the historic environment.

Conclusion

In preparation of the forthcoming Local Plan we encourage you to draw on the
knowledge of local conservation officers, the county archaeologist and local heritage
groups.

These comments have been written in line with the current NPPF, this document is in
the process of being revised. The plan should reflect the policies of the new NPPF
once it has been revised and published later this year.

Please note that absence of a comment on an allocation or document in this letter
does not mean that Historic England is content that the allocation or document forms part of a positive strategy for the conservation and enjoyment of the historic
environment or is devoid of historic environment issues. Where there are various
options proposed for a settlement, identification of heritage issues for a particular
allocation does not automatically correspond to the support for inclusion of the
alternative sites, given we have not been able to assess all of the sites.
Finally, we should like to stress that this opinion is based on the information provided by the Council in its consultation. To avoid any doubt, this does not affect our obligation to provide further advice and, potentially, object to specific proposals,
which may subsequently arise where we consider that these would have an adverse
effect upon the historic environment. We hope that the above comments of
assistance.

Comment

Issues and Options Document

Representation ID: 37235

Received: 06/03/2018

Respondent: Hullbridge Residents Association

Representation Summary:

Page 12 and 13. Our Environment. Clause 3.13
We take issue with your statement describing the Flood Area.
Statements made by the Environment Department, Highways and Water Authorities suggesting assessments made in 2011 and 2014 that these were 'insufficient' at the time and further assessments are required to be made. We disagree, Hullbridge is not a 'sparsely populated' area. Flood water has been a major concern for many years including surface and foul water discharges onto roads and gardens, due to lack of improved drainage facilities and gardens constantly under water. The fear is that with further land being put forward for development this flood issue is likely to get worse over the next 20 years. It seems that RDC do not keep records of 'public health issues, and any complaints are ignored. Hullbridge community historical representatives have records to prove the issues and have consistently investigated complaints. The Hullbridge Parish Council deny this is their problem. Foul sewers are grossly overloaded. A full upgrade of the drainage


Section 3 (cont.

system is well overdue, neglected over 50 years, and may become the best investment Hullbridge ever had.

Full text:

*THIS REPRESENTATION INCLUDES SEVERAL ATTACHMENTS*

New Local Plan 2018. Issues and Options Documents

The Hullbridge Residents Association have viewed the Issues and Options Document and are pleased to give the views of the 5385 (extrapolated) Residents. This submission is also considered to be our Statement of Community Involvement.

Section 1. Introduction
1.1 States this is a new document, yet information has been repeated from documents produced previously in 2011/2012.
We understand the need for additional homes but we are concerned that 'Infrastructure' always seems to be a secondary consideration, when it should be the first.

Page 1. Clause 1.2
HRA produced and delivered to RDC a 45-page document pertaining to the Core Strategy, Land Development Framework and National Planning Policy Framework for a previous development, and altogether we submitted some 525 issues (un-answered) in criticism of the documents presented by RDC. Our main criticism lies with the lack of proper consultation and transparency, fearing another regretful experience, although we are asked to rely on the statements made by the Councillors that close consultation must be observed, we hope this will be recognised and our 'professional' views taken into consideration. We disagree with a statement made in clause 1.2 on page 1. Very few opportunities were given to the community to 'have their say'.

24 Sites.
To demonstrate our reasons for our rejection to allow developments of dwellings on the plans indicating 24 sites submitted for development and will apply the following clauses of the NPPF and CS:

NPFF - Core Planning Principles. Pages 1, 5-6, Clauses 1-2, 6-17.
NPPF 4 - Promoting Sustainable Transport.
NPPF 5 - Supporting high quality communications infrastructure. With roads/transport a priority.
NPPF 6 - Delivering a wide choice of high quality homes.
NPPF 7- Requiring Good Design.
NPPF 8 - Promoting Healthy communities.
NPPF 9 - Protecting the Green Belt land.
NPPF 10- Meeting the Challenge of Climate Change, Flooding & Coastal change.
NPPF 11- Conserving and enhancing the future environment.
NPPF Plan Making - Local Plans (p. 37).
NPPF Using a Proportionate evidence base- (p. 38).
NPPF Ensuring Viability and Deliverability- ( p. 41).
Section 1 (cont).

NPPF Decision taking - Pre-application engagement & front loading, (p. 45).
Technical Guidance to the NPPF- Flood risk on page 2. Sequential and Exceptional Tests p. 3 to 7.
NPPF - Sequential and Exceptional Tests -

Drainage
Sustainable drainage systems;
The existing drainage system needs substantial improvements prior to any links being provided to the new developments and should be part of the necessary required Infrastructure works.

Page 2.
Clause 1.7 Statement of Community Involvement.
Having been disappointed with the first Statement of Community Involvement document in 2013 we take the clause 1.7 on page 2 seriously and we are hoping that RDC will engage in speaking with HRA who represent the majority of the Hullbridge community.

Clauses 1.8 & 1.9.
A plan indicating 24 additional sites in Hullbridge has been viewed by HRA. We consider the 24 sites will provide 2518 dwellings at a minimum density of 30 dwellings per hectare which has the potential of housing some 10,000 persons.
Having examined the plan we found that 6 sites are within the Rawreth Parish but not indicated in this section of this document namely- CFS006, CFS149, CFS099, GY 01, GY 02 and CFS 138. The total areas equate to 58.4 hectares = 1773 homes. 2 Sites are designated as Gipsy Sites providing a minimum of 18 homes. Our concerns are that this clause does not suit the "appropriate balance" between the environmental, economical and social factors stated in these clauses. These developments cannot be approved without consideration for the infrastructure. Sustainability of the infrastructure is the main ingredient to a successful community. HRA have been consistent in mentioning that the existing drainage and road network is in urgent need of maintenance and upgrading as lack of investment over the last 50 years has contributed to the reason for "Not fit for purpose" statements made by HRA previously.

Clause 1.10 is of special interest as it mentions "on-going consultation" at every stage. We did not have the opportunity to discuss 'The Draft Scoping Report which was published on the RDC websites, residents, businesses and other 'stakeholders' on the RDC mailing list were not consulted (HRA is a Stakeholder).

Clause 1.14 on page 4 is of special interest to us as we placed emphasis on the Localism Act (2011) with the Managing Director of RDC and were told that the Localism Act was irrelevant. Why is it now more relevant than before? We request this 'Act' to be included as it supports Human Rights.

Clause 1.15 suggests 'ultra-co-operation' with other Local Authorities but this statement is contradicted by statements made in the media some time ago of major disagreements particularly on the Southend Airport proposals.

Clause 1.16. Only one 'workshop' was set up in Hullbridge Community Centre but not followed up. The attendance was low because it was held at a time during working hours, with majority of the residents working away from home. The Q & A sessions were set to suit the Councillor's knowledge of planning and who could not answer questions put to him by a professional member of the community.

Clause 1.17 HRA have particular knowledge that the Parish Council do not have the ability to conduct a 'neighbourhood plan' without assistance from external Consultants but the costs to implement this are prohibitive.


Section 1 (cont).

HRA offered to do the Neighbourhood Planning Group adopting the CPALC 'Constitution', but were rejected without considering our professional expertise. HRA provided the appropriate clauses via the Localism Act that if the Parish Council were unable to conduct this duty, then, provided there was ample
scope for this, it could be carried out by a local community group. The Parish Council are on record of having admitted they are not equipped financially or in 'the know' how to deal with the complexities of large scale developments. HRA have consistently provided ample evidence of professionalism since 2013.
HRA, team members are professionally qualified having worked in a professional capacity in most types of construction development and refurbishment work.

A Neighbourhood Development Order would not be able to fulfil the requirements of large-scale developments, particularly by a Parish Council who would be out of their depth and the District Council would not be able to sustain the financial burden that would entail.
We refer to the Laws empowering the community to use the Freedom of Information Act, Localism Act (2011). The National Planning Policy Framework as prescribed by the Communities and Local Government Act (March 2012) which also provides the framework with which local people can produce their own Distinctive Local and Neighbourhood Plans which affect the needs and priorities of their communities (April 2012). Particularly where it is proven that the Statutory Consultee (The Parish Council) are restricted in 'consultation' through lack of Planning knowledge and the lack of finance to employ the necessary professionals, and where it is proven that HRA, having the professional members who have proved their worth through the submissions made in respect of the previous outline planning approval for 500 dwellings with a total of 525 issues presented with the help of the regulations stipulated in the Core Strategy, Land Development Framework, NPPF etc as mentioned above.
Planning law requires that applications for planning permission must be determined in accordance with the development plan, unless material considerations indicate otherwise and includes the Regulations Governing Neighbourhood Planning Laws- NPPF 6 - Plans and Strategies - Part 6, Chapter 1, clauses 109 to 113,. Neighbourhood Planning - Part 6, chapter 3, clauses 116 to 121., and gives the community the right to Consultation - Part 6, chapter 4, clause 122.

This implies that the core strategy should be relevant, sustainable and 'Fit for Purpose':
* Positively prepared.
Our observation on the previous Local Plan that insufficient forward planning has been carried in accordance with the Core Strategy was adhered to. We hope that those policies will be repeated.
* Justified.
In view of the aforesaid we do not believe there was any justification to provide more dwellings on Green Belt land particularly as the Core Strategy expressly stipulates that Green belt land should only be used as a last resort, many issues which we have demonstrated have not been addressed sufficiently.
According to the Localism Act 2011, we have demonstrated that transparency and consultation were lacking with the community. This has to be rectified and included within the proposed Local Plan.
* Effective
The conditions for the development of the 24 Hullbridge sites will not be satisfied for the reasons given above, therefore we consider a complete review of these proposed developments and the Core Strategy allows for the community to raise these issues and get into meaningful dialogue with RDC.
* Consistent with National Policy
National policy insists that all the policies stated should be transparent, proper consultation pursued in relations to all the development criteria. We do not believe that proper feasibility studies, risk analysis have been conducted in order to satisfy the requirements of the National Planning Policy Framework. Most subjects referred to in this presentation will imply reasons for withdrawal, in view of Government legislation, i.e. the Localism Act 2011 Chapter 20.


Section 1 (cont).

Our 45 page submission in 2013 suggested meaningful dialogue with the HRA. Our residents asked what guarantees will be given to HRA that we have been listened to, not merely placing this document on RDC website. We require RDC Planning/Legal department to clarify.
Clauses 1.18 and 1.19 speaks of 'community-led planning' which is of interest to HRA but we were ignored. We have consistently placed great emphasis on 'community cohesion'. Which makes for good public awareness.

Page 5.
Clauses 1.20 and 1.21
How can the RDC ensure that proposals within the New Local Plan can be supported by robust, up-to-date information when RDC are suffering a shortage of staff and funding to support Parish Councils to administer the Local Plan.

Clause 1.21 Infrastructure Delivery Plan (IDP) and the Community Infrastructure Levy (CIL) will be prepared to set out the circumstances that the CIL will be applied and the key infrastructure that the CIL will seek to fund.
The Council will seek to fund this through a 'Community levy'. This implies that the RDC are not protecting the community. What assessments are made to prove the viability?

The Essex County Council document "Greater Essex Growth" states that Greater Essex Growth and Infrastructure Framework 2016 is not listed or discussed. The Executive Summary says that Section 106 and 'Community Infrastructure Levy' will fall way short of expectations and other Government Funding will be in 'shortfall' to the tune of £ Billions (report produced by AECOM) who also produced the RDC "Sustainability Analysis", please explain why they did not cite this issue.

HRA object to the IDP and CIL because these should be RDC, ECC and Agency obligations and should not be an 'extra' burden which the authorities neglected to set aside funding for in the past. If this is allowed to come into force this will set a precedent for other forms of funding from the communities. The community are concerned by this new statement lacking in the Core Strategy and the Land Development Framework. This could be an 'Infrastructure Congestion Levy (ICL).

Section 2. Pages 6 & 7. Tell Us Your Views.
We look forward to cohesive engagement throughout the timetable stated on page 7 clause 2.5 on the delivery of the New Local Plan. The HRA have the authority from the community of 5385 adults (97% extrapolated) who should be consulted and our views taken seriously to make the necessary amendments.

Section 3 Page 8. Rochford Characteristics.
Introduction. Item 3.1 No comment.
.
Page 9. Item 3.2. 24 Sites additional development Land.
The Land Mass measured and stated in this clause we find is possibly out of date because several hectares have already been built on since 2012 which should have been taken into consideration thus reducing the Land Mass area. Your review and consultation is necessary.

We have viewed the map showing 24 sites on MAP A of RDC Strategic Housing & Employment Land availability 2017 - Appendix B.


Section 3 (cont

The result of our examination provides the following information:
The total measure of 24 sites = 84 hectares (approximately) which will provide a capacity of 2517 dwellings at 30 dwellings per hectare. The range in terms of 30 to 60 dwellings per hectare can provide a range of 2517 to 5040 dwellings.

Boundary Line.
Further examination of the same map indicates that a large proportion of the land lies in the adjoining Rawreth Parish.
The result provides the following information:
The total measure of 6 sites = 59 hectares (approximately) will provide a capacity of 1773 dwellings at 30 dwellings per hectare. The range in terms of 30 to 60 dwellings per hectare can provide a range of 1773 to 3540 dwellings.
In our examination of the New Local Plan Document, we are unable to find any explanation for omitting this 'division'.
Using our previous submission in relation to the Boundary Line indicated in the Ordinance Survey shown and confirmed by the Local Boundary Commission correspondence on a new development recently given "Outline Planning Approval" for a development in Malyons Farm in Hullbridge Essex. We corresponded with Rochford District Council who on this issue but they refused to accept the existence of the Boundary line. At a meeting with Barratts (incumbent developer) we are informed that RDC will make arrangements to have the Council Tax collected by Hullbridge on behalf of Rawreth Parish without explanation about the differing postal address, and whether or not Rawreth will be amalgamated with Hullbridge but there is no correspondence from the Local Boundary Commission acknowledging this possible change. We can only assume that the same principle will apply on this land mentioned above which resides in Rawreth Parish, if so, this will be in conflict with the Boundary Commission England and the National Planning Policy Framework regulations.
We ask RDC for an urgent review of this New Local Plan.

Page 10. Clauses 3.6 to 3.8, Figures 2 and 3. "Travel to work outflows and inflows".
The travel patterns have changed since 2011 by about 18% with the increase of population. We request a review of the information being given, affecting transport congestion and lack of proper infrastructure with the lack of improvement known to be evident in the whole district, where 'grid-lock' occurs on all local roads.

Page 11. Clauses 3.9 to 3.12. Employment statistics.
We suggest these statements are using out-of-date information transferred from 2011, therefore a review is necessary. What guarantees will the prospective developers give to employ local skills. Bring back the paid 'apprenticeships' for all persons up to the age of 20.

Page 12 and 13. Our Environment. Clause 3.13
We take issue with your statement describing the Flood Area.
Statements made by the Environment Department, Highways and Water Authorities suggesting assessments made in 2011 and 2014 that these were 'insufficient' at the time and further assessments are required to be made. We disagree, Hullbridge is not a 'sparsely populated' area. Flood water has been a major concern for many years including surface and foul water discharges onto roads and gardens, due to lack of improved drainage facilities and gardens constantly under water. The fear is that with further land being put forward for development this flood issue is likely to get worse over the next 20 years. It seems that RDC do not keep records of 'public health issues, and any complaints are ignored. Hullbridge community historical representatives have records to prove the issues and have consistently investigated complaints. The Hullbridge Parish Council deny this is their problem. Foul sewers are grossly overloaded. A full upgrade of the drainage


Section 3 (cont.

system is well overdue, neglected over 50 years, and may become the best investment Hullbridge ever had.

Page 14. Our Communities. The RDC figures on the population is inaccurate.
Concentrating on the Hullbridge population count for 2011 suggests 6527 but the doctors patient list suggests a population of 6858 (4.83%) (2014). HRA support from the community in 2017 suggests 7000 population (+ 6.79% on 2011). With the approved outline plans for 500 homes at 100 homes per annum proves an annual population increase from 2019 to 7400 (+11.8%), 2020 to 7800 (+16.33%), 2021 to 8200 (+20.40%), fast forward to 2023 = 9000 population (+27.50%). The growth in the previous 3 decades (census) indicated an average of 2.2% increase. This indicates an average annual increase of 2% per annum. This is contrary to the Core Strategy, LDF and the NPPF clauses, and the Localism Act so much heralded by the Government for close consultation with the District Council, this has lost all its credibility. Hopes rise for a new climate of close Community Consultation.

Page 15 Table 1. Breakdown of Population by Parish from 2011 Census.
These possible developments will increase the Hullbridge population to 19,000 within 15 to 20 years, which is contrary to the NPPF requirements and will be classified as over-population.
Hullbridge has a 'village status' which will be lost forever and become a Town with a population second only to Rayleigh. The portfolio holder, Councillor Ian Ward, stated in the '1st Local Plan meeting' in Rayleigh that things have changed and it was now paramount to 'listen' and closely 'consult and engage' with the community, but most people are sceptical that our voices will be heard, and the necessary amendments put forward by the HRA 'professionals' will not be heeded.

Clause 3.20 Using HRA figures given above we are unable to reconcile with your statement that "the proportion of residents in all demographic ranges will remain 'stable'. We advise the RDC to review all the above clauses. We suggest the whole population breakdown table of Parishes should be reviewed to reflect the current figure.

Projected Population Count.
The new Local Plan suggests 24 new sites put forward in Map A for Hullbridge/Rawreth for sale/development, equates to approximately 83 hectares at minimum 30 dwellings per hectare = 2518 dwellings.
Spread over a period of 20 years = 125 dwellings to be built per annum.
The average increased population per annum will be 5%+ reaching a maximum of 10,000 (minimum) over 20 years occupation of 2518 dwellings and the total population estimated to be about 19,000, subject to the minimum development ration of 30 dwellings per hectare but the variance which can be 30 to 60 dwellings per hectare. The effects of this 'development policy' will have consequences on the original Core Strategy through to the National Planning Policy Framework which needs to be reviewed urgently. The implications of this 'overdevelopment' is that insufficient thought is given to the road network, general infrastructure, healthcare, safety, flood, drainage, environment, travel and above all congestion of population, traffic and lack of thought given to an expansion to the road network.

Page 16
Clauses 3.21 to 3.25 needs to be reviewed in respect of the statements made being out of date as the document is prepared using data prescribed in 2011 without some fact-finding surveys being conducted to carry out 'forward planning' especially with the owner-occupation criteria becoming financially unreliable. With experience of the Public Finance Initiative (PFI) being suspect it will be necessary to return to Council House Building with participation between Local Government and Housing Associations being a prime 'home provider'.

Section 4

Page 17 - Spatial Challenges.
Great emphasis is placed on the laws governing the National Planning Policy Framework. We highlight the following to allow you to respond to the Hullbridge Residents Association.

We request you uphold the clauses requiring Consultation with the community Representative such as the HRA with and allowing replies to issues of interest to the community, before finalising this document.
Consultative Objections.
We submit our "Consultative Objections" and conform to the NPPF policy stated on page 16, Clause 66, namely - 'that the Local Authority and the 'Applicants' must work closely with those directly affected by their proposals to evolve designs that take account of the views of the community.

Brownfield and Greenfield land.
Government Portals have indicated use of identified Brown Field Land in preference to Green Field Land and the Consultation Procedures identified in the Core Strategy & Site Allocation Documents.
The allocation DPD Document (Feb 2010)- Discussion & Consultative Document on page 1 states that the Council Statement of Community Involvement is committed to Regulations 25 Public Participation in the preparation of Planning for the District (revised 2017).

Section 5.
Page 24. Clause 5.1. Our Vision and Strategic Objectives.
HRA experience gained over 6 years of deliberations over the Hullbridge 'development', we are unable to state that this has been a success for the District Council with a majority of the 185 issues within our 45- page submission, presented at the time, not being satisfied by the local population and with alliances formed with other localities the same view is expressed. The fact that you did not respond indicates that we are right on all the issues submitted to you and hope the Planning Inspector will take this into account in respect of any future "Consultation".

We hope the current Portfolio Holder will allay the fears of the community of the lack of trust, that they are committed to meaningful consultation with the community representative and to adhere to any agreements that can be made with respect to any further developments in a congested area.

Clause 5.4 Our current Vision
HRA disagree that what is being prescribed on the Hullbridge Plan will allow the community to have the best quality of life, when there is at least 20 years of disruption to look forward to, which will blight our lives. Whole sale development is taking place with major clauses in the NPPF being disregarded (please refer to the HRA document submitted to Rochford District Council in April 2013). A "Considerate Contractor Scheme Notice must be a requirement for all contractors to observe the rules towards the community.

Page 26. Clause 5.10. Rochford District 2037. Our Society
We disagree with the statement made that' the green infrastructure network across the district has been enhanced to support our population. Many hectares of Green Belt Land and are being allowed to be developed disregarding all the clauses which are supposed protect the Green Belt. Articles written by the Campaign to Protect Rural England (CPRE) bear witness to the contrary and the community remain sceptical about the final outcome.

Page 27. Clause 5.11. Homes and Jobs. Strategic Priority 1 and 2.
The homes and jobs, retail, leisure and other commercial development is the aspiration of RDC but the community do not believe that the proposed dwellings are for the indigenous population.

Section 5 (cont

The community believe that the homes will be for the over- burgeoning populace of London, not of Essex. We fail to see how you can demonstrate the indigenous population expansion taking priority when it is evident that this statement only acts as a cover to succeed in making it happen.

Page 28. Cl. 5.11. Strategic Objective 13. Flood..
Experience gained by the lack of proper assessments on flood, disregarding all the issues provided to you in 2013. Decisions are being made according to financial constraints. What you do not understand is that you have a recipe for disaster in an area naturally susceptible to suface water discharge from the 'rayleigh Heights' about 65m above ground level.

Page 29. Strategic Priority 5. Climate change.
The Hullbridge community are concerned that the information provided by various Agencies and Insurance Companies that the 1:100 flood incident is flawed and is more likely to be a maximum 1:25 due to Climate change. There is scepticism that the LA will change the law and this will be detrimental to the community at large.
Sea levels have officially been recorded as rising some 150mm above sea level from the beginning of this century and are forecast to rise by 500mm before the end of this century.

Section 6.
Page 30. Clause 6.1 - 6.4. Delivering homes and jobs. Strategic Priority 1: Homes and Jobs
We understand your commitment to deliver the above but at what expense? Refer also to Clause 5.11 above.

Page 31. Clause 6.5 Figure 9: Need for Market, Affordable & Specialist Homes.
Net housing completions 2006/7 - 2016/17.
Our statement above providing some proof that your statistics are out of date. We advise you to review and revise this statement immediately to avoid any anomalies.

Pages 32 to 38. Clauses 6.8 to 6.29. Tables 2 to 4.
We have demonstrated that the figures given for homes and population are flawed.
Meaningful discussions should be allowed to provide amended statements to satisfy the community.
Advance notice. Property Insurance.
The potential Property Insurance costs against 'flood risk' and 'subsidence in these areas, can range from £2500 to £5000. per household depending on the risk analysis which will be made at the required time.
An exercise on Post Codes SS5 reveals that using the 'Hawkeye' system determining the level of associated risks such as flood, subsidence etc., the combined results show that in both instances, subsidence is Red, meaning these are perils which will either be excluded or a large excess applied in respect of subsidence - usually £2,500.00 (£1000.00 being 'Standard').
And for any areas susceptible to flood, no protection barriers or flood defences will increase the Cost Risk to £5,000.00 per property making 'flood excess' a priority and no claims accepted by the Insurance Companies if this is applied to development in flood areas.

Page 38 to 40. Clauses 6.29 to 6.33. Homes for purchase and Affordable Homes.
This document was obviously written before the changes which have taken place in the financial industry and Government policies. The change in 'affordability' has not been fully considered. We advise you to review and amend this statement to suit.
How can you demonstrate the 'affordability' during this financial climate, which are likely to continue for the next 10 years irrespective of the incentives given on stamp duty and directives to the lending institutions. It is obvious to most people that their children will have great difficulty to purchase their


Section 6 (cont

own homes, and the financial climate changes could be stoking up problems in the foreseeable future and this will require full understanding of financial markets.

Page 40 to 42. Clauses 6.33 to 6.37. Need for Care Homes.
We agree this policy of providing habitation for elderly and infirm. Your plans should include a separate location for 1 and 2 bedroom bungalows for the elderly and infirm.

Table 5 Rochford District- Settlement Hierarchy.
We have always had an issue with the infringement of the Green Belt. Most of the present developments recently completed or under construction are being built on Green Belt land. We suspect that the new Land Development Framework document will allow new building on the green belt land. We suspect the NPPF' document will not be respected.

Page 45. Clause 6.48. Housing Density Options .
Earlier we provided calculations for the lowest density of development per hectare, Here it is evident that the option may be for up to 60 homes per hectare. RDC have recently suggested that they may reduce the number of available sites put forward but will possibly increase the density. We proved that this doubling of homes will cause even greater strain and stress on the Hullbridge community and the infrastructure. The community suggest a review of this policy for Hullbridge with the argument that the road network does not allow for this type of over development. We have always emphasised that the existing infrastructure is inadequate. Can we persuade you to take appropriate action as given in our letter to the Managing Director Mr. S. Scrutton as follows:
That RDC take advantage of requesting funds from the Government announcement of £866m funds from the Housing Infrastructure Fund (HIF) to enable the existing Hullbridge infrastructure be brought up to date, on the grounds that the previous planning regime's over the last 30 years or more neglected to deal with the drainage and traffic problems. Please read this in conjunction with page 5. Clause 1.21.

Page 46. Clause 6.49. Good mix of homes.
We are not sure that the present 'mix' has been thought out properly, with the 'cost' of homes being identified as 'expensive' is it right that the 1 to 4 bed homes in percentage terms is A) 3 beds, B) 4+ beds, C) 2 beds and D) 1 bed homes.
We note a conflict in statement that under clause 6.51 it states that the demand is greater for 1 and 2 bed homes yet the above percentages prove to be different. Please amend the statement.

Page 49. Clause 6.58. Type and size of new homes.
Due to the change of cost considerations should you consider amending the clauses to suit the financial environment for affordable cost-related dwellings and the hierarchy for dwellings should be in the following order A) 2-bed. B) 3-bed. C) 1-bed. D) 4-Bed. The financial purchase prices will fluctuate.

Page 51 to 54. Table 7. Clause 6.66 to 6.78. Gipsy and Travellers sites.
The community ask, how can the law justify providing 'valuable' sites to people who have no respect for the community who are forced to 'pay' indirectly for this 'provision', and using other sites which became public knowledge, the devastation it caused to the local community. No one is given the opportunity to understand this Law that in wider terms seem to force the community to pay 'however indirectly' by their Council Tax to pay for the site and the amenities provided, in some cases occupied illegally and without planning approval as reported by the media. The mere mention of these circumstances affect home values, security, illegal extraction of 'services by illegal connections to neighbour services and being a law unto themselves etc.

Page 57 -60. Clause 6.87 to 6.96 Meeting Business needs.

Section 6 (cont

HRA wrote in our last submissions that we required guarantees from the 'developers and businesses to give the local community first option for jobs, we look forward to dialogue with all the businesses to set out some rules allowing the local population consideration. Our business survey seems to be the first of its kind and has been well received by the businesses visited. See HRA Business survey.

Section 7.
Page 71 - 77. Clause 7.1 - 7.27 Supporting Commercial Development. See Business Survey.
Considering the existing Hullbridge businesses we are unable to identify how these existing businesses can expand to support the needs of the expanding population. Will the RDC identify some of these sites for commercial or industrial purposes, which can provide jobs for the local population. Clauses 7.21 seems to give the impression that the Supermarket and town centres serve the community without need to provide land for 'business' premises, but there are some folk who are unable to get to these larger shops etc due to illness or other infirmity or no means of public transport.
There may be scope for an 'advice centre' 'assist in mental incapacity' or 'club' to assist these folk.

Section 8.
Page 78 Clause 8.1. Delivering Infrastructure.
Strategic Priority 3. As stated before, the existing infrastructure is in urgent need of planners' attention to create improvement, and there is no 'strategy' is in place to provide this urgent work to be carried out, before any development takes place.
We wrote to Mr. S. Scrutton to take advantage of part of the £866m the Government has set aside for LA infrastructure work. Hullbridge community are concerned that this will continue to be ignored, and will cause problems for the future, the costs will be the main cause of dissatisfaction in the ability of the RDC to adhere to the CS, LDF and NPPF clauses and again as experience suggests the Highways, Environment and Water Authorities will ignore it.

Local Highways Capacity and Infrastructure. Clause 8.3
LDF Development Management Submission Document- Section 5- Transport page 73.
Improvements to local road network
The only access points to get to Hullbridge is Lower Road and Hullbridge Road. Watery lane should not be considered as a main thoroughfare and we despair that the Essex County Council, Rochford District Council and the Agencies seem to ignore this fact. We want the Planning Inspector to review his statement in the 'Planning approval' given in 2014 that RDC consult with HRA on the feasibility for improvement of this Lane, as it is not 'fit for purpose'.
We must emphasise that setting out the 24 sites for development will only make matters worse for access purposes.
Watery Lane, is in urgent need of improvement and HRA have corresponded with RDC, but ignored. Watery lane and Hullbridge Road are identified as traffic congestion points in clauses 8.13 to 8.15. HRA have mentioned this consistently since 2013, but we were and are ignored by all the authorities. We demand the upgrade which was promised for discussion by the Planning Inspector.
People find themselves obliged to use this road because Rawreth Lane (to the South of Hullbridge), is the only other means of access, but continually congested with traffic also joining from Hockley via Rayleigh. The Hullbridge community are concerned that this will continue to be ignored, and will cause problems for the future, the costs will be the main cause of dissatisfaction in the ability of the RDC to adhere to the CS, LDF and NPPF clauses and again, the Highways, Environment and Water Authorities will ignore it.
We request that RDC contact the SAT NAV services to remove Watery Lane as a general thoroughfare or to emphasise this is "weight restricted" and only just wide enough to suit farm vehicles etc.
There are some big obstacles to be overcome with just a single access into the village and hardly any room to improve the road network, Hullbridge will become the most
Section 8 (cont

congested 'town' in Essex and 'over populated' causing infringement of clauses in the CS, LDDF and NPPF.

This lane is too narrow for any vehicles over 30 cwt. The lane is without a public footpath making this lane a health and safety issue which needs urgent rectification.

Page 81. Clause 8.13 to 8.15. Congestion and access impositions.
HRA suggest that this section of the document should be reviewed, particularly as the Planning Inspector acknowledged HRA argument that Watery Lane is not 'fit for purpose', we reject the statement that Watery Lane is NOT part of the "Strategic Highways Network", which is in conflict against other statements made above, and request an urgent meeting with the Highways Agency and Environment Departments of Essex County Council to review this part of the document.
We need to point out dissatisfaction expressed from the discussions held at the 'workshop' mentioned in clause 8.13. We hope this New Local Plan will allow closer consultation.

Accessibility to Services. Hullbridge has many un-adopted, single lane and unmade roads making access difficult for the Fire, Police, and Ambulance services and will not be suitable for for constant construction site traffic for next 20 years..

Fire Hydrants. Hullbridge only has 8 Fire Hydrants to serve the whole village, which is considered inadequate for the fire services.

Highways Risk Analysis.
HRA are concerned that a proper Highways Risk Analysis has not been carried out recently as required by the Core Strategy and the NPPF documents. Further consideration must be given for 'transparency' as stated in The Localism Act (2011). Recent replacement of 50 years old Gas services emphasises the disruption which will be caused by both existing and any future construction work

Page 85 - 90. Clause 8.22 to 8.37. Sustainable Travel.
Presently the transport system is being overhauled to reduce the number of buses serving the communities and the frequency, if this carries on there are going to be future major problems with the increased population with insufficient public transport. We think the policies being put forward seems to be for the benefit of the 'short term', to save money.
Please refer to LDF Allocations Submission Document Page 60 Cl 3.177 and Cl 3.178
Transport Impact Assessment should be carried out prior to any development and all side roads should be 'sign posted' NT SUITABLE FOR SITE TRAFFIC'. This also applies to the development taking place in Malyons Farm.

Page 87. Clause 8.31 Rayleigh Air Quality.
Reading this clause it does not fill us with confidence that something will be done to provide good quality air. It has been reported recently in the media, that dangerous levels of nitrous oxide caused by diesel fumes are being recorded ibn and around the Rayleigh area. It has also been stated that record amounts of carbon dioxide have been recorded in 2017 and is on the rise, the highest it has been in the last 4 years.
Air quality is lacking in both depth and detail which means the RDC 'evidence base' on the subject of traffic is lacking. Please explain your remedy? This pollution issue has been apparent for many years but has been ignored for too long. The community now demand action to remedy this issue.

Page 90-92. Clauses 8.38 to 8.44. Communications Infrastructure.
We hope the statements made about the speed factors on "Superfast Essex" will be fulfilled to satisfy the community within a timetable to be viewed and commented on.

Section 8 (cont


Page 92 to 96. Clause 8.45 to 8.58. Water and Flood Risk management.
Flood
At times of flood (very frequent 25 times in 5 years), in Watery Lane, this results in accidents, causing 'gridlock' to the whole local traffic system in Hullbridge and surrounding areas.
Drainage is unable to cope with excess flood water resulting in overflow of excrement and water into roads and gardens and cross-surging foul water and surface water services

Page 96- 98. Clause 8.59 - 8.66. Renewable Energy Generation.
We agree about the 'renewable energy' 'dream' from all sources and accept there is natural course of events to be taken for the sake of the concerns on Global Environment. It is the political challenges which become the difficult part of this 'dream'. The other part of this equation is trying to educate the rest of the world to accept that changes must be made with meaningful expediency. We need to know how you will fulfil these obligations given the financial constraints in the next 10 years.

Page 98-100. Clause 8.67- 8.75. Planning Obligations and Standard Charges.
HRA previous experience suggest that the Local Authorities ignore the observations and pleas made to review the standards laid down by the NPPF, Core Strategy and LDDF to allow 'proper' consultation with those of the community who are genuinely interested in all the issues presented to them.
The NPPF guidelines on all planning obligations suggest that the 3 tests as set out, must pass:
1 Necessary to make the development acceptable in planning terms.
2 Directly related to the development.
3 Fairly and reasonable related in scale and kind to the development.
The community find it difficult to believe that there will be any changes to allow meaningful consultation with the community. An Action Plan is required to clarify and eradicate all anomalies.

Section 9 Supporting Health, Community and Culture.
Page 101- 120. Clauses 9.1 - 9.61. Health Impact assessment- Cl 3.186
Enquiries at the Hullbridge Riverside Health Centre suggested that the Practice did not have any advance information about the Malyons Lane development. An increase in the population will mean a proportional increase in number of Doctors. We (HRA) brought to the authorities' attention various anomalies in the financial accountability in assessing the "Contributions" without giving considerations to contingency for increases in inflation and time related uplift. HRA are happy to be consulted in the future.
HRA investigated the Health Provision indicated in Section 106 'contributions and concentrated on the sum stated to be for the Riverside Medical Centre on Ferry Road and found the sum stated to be inadequate. We fear the same decisions may be made for the foreseeable future. AS HRA have been active on this issue it would be in the interests of all partries to consult and agree a course of action.

Section 10
Protecting and Enhancing our Environment.
Page 121 - Clause 10.1 to 10.4
General planning policy of the NPPF suggests minimising vulnerability and provide resilience to climate change impacts but there is conflict in these statements by resistance to make appropriate assessments of ground water levels, flood impact, coastal changes, changes to biodiversity and with developments in areas vulnerable to the above issues.

Page 121 - 141. Clause 10.5 - 10.72 Green Belt
We agree the purposes of the NPPF clause 10.7-10.8 in that the 5 purposes of the green belt set out to:
1. Check the unrestricted sprawl of large built up areas
2. Prevent neighbouring towns merging into one another.
Section 10 (cont

3. Assist in safeguarding the countryside from 'encroachment.
4. Preserve the setting and special character of historic towns.
5. Assist in urban regeneration, by encouraging the recycling of derelict and other urban land ie Brownfield Sites. Promoting a Green District.
The proposed developments sites are in Green Belt, we are not convinced that the Core Strategy is encouraging the conservation or prevention of erosion of the Green Belt.

Page 122. Clause 10.8 Inappropriate development.
Specifically states that the construction of new buildings in the Green Belt is generally considered to be inappropriate development.
The Hullbridge Residents Association respectively request that Rochford District Council adhere to these policies and review the New Local Plan Document (Issues and Options) to make sure any potential developers take this into consideration. It may be appropriate to classify this as "Special Measures" and allow the intervention of a Planning Inspector to adjudicate.

Section 11. Detailed Policy Considerations. Pages 142- 165
Page 142. Clause 11.2 Mix of Affordable Homes
In HRA discussions with a possible developer we were advised that the RDC stated that the Core Strategy and the land Development Framework were 'out of date' therefore some clauses were not applicable.
The same situation applied to discussions when applied to the Localism Act. The Core Strategy and the NPPF are evident in many statements in this new Local Plan document, so, can we deduce there has been no change in the above named main documents as such?
We respectfully request a complete review and amendment to suit up-to-date information, for 2018, of the Core Strategy, Land Development Framework and National Planning Policy Framework documents. Can Rochford District Council provide evidence that these documents have been amended to suit present day and future activities? The NPPF clauses states that merging of towns and villages should be resisted.
We anticipate difficulties by the people under 40 years of age being unable to afford purchase or rental prices of homes, all as predicted by the media. HRA look forward to view your policies to allow us to advise a number of young folk asking us for advice and we are creating a 'List of people' requesting to be placed on this list, which will be forwarded to you.
Please take into consideration many Planning Ministers and indeed our Prime Minister stating on the media that Green Belt Development must remain sacrosanct. Once again we respectfully request RDC do not ignore our plea for transparency and fairness invoking the NPPF and LDF clauses as appropriate.

Page 155. Clause 11.45 Brownfield Sites.
As we (HRA) have emphasised before, clauses 11.45 and 11. 46 are taken into consideration that all Brownfield sites must be used first in preference to Green Belt development.
Our experience has been, to date, on a site recently given outline approval, that 11 Brownfield sites had
been put forward for development but ignored in favour of 23.4 hectares of Greenbelt farmland.
We agree that NPPF paragraph 89 and Policy DM10 on brownfield development and should be taken into consideration when producing these documents.
We refer you to the 'ambitious' clauses stipulated in the LDF Management Submission Document- Clause 3 page 33- The Green Belt and Countryside - Vision.
Short term. The first paragraph stipulates the "openness and character" of the Rochford Green belt continues to be protected, but small areas released for development are not being protected.

Page 156. Extensions etc. No comment

Page 157. Parking Standards etc. Cl 11.54 to 11.57. see above.

Page 164. Contaminated land. Cl 11.77 to 11.81.
Section 11 (cont

All sites must be assessed for flood, contamination and environmental issues. These sites will need an environmental study and specific action plans produced to decide appropriate measures for supervisory treatment.

Other issues.
Core Strategy Clause 3.158- SITE CAPACITY (Core Strategy Policy H2 and H3)
This clause is suggesting a minimum 2518 dwellings in Hullbridge on Green Belt land (24 sites) is included in the "Sites for development" call by RDC to be considered during a plan period of 2023 to 2030 at a minimum density of 30 dwellings per hectare.
HRA predicted, in 2013 (see our 45 page submittal document to RDC) that further sites will be classified as a 'sustainable development site' which implies that more Green Belt land will be sought. This will be contradictory to the policy of "maintaining the Green Belt" as stipulated throughout the Core Strategy and indeed by Government statements.
This further development will not promote 'Community Cohesion' and are not convinced that this development will be for our indigenous population, but to accommodate the London 'overspill'.

Flood implications
Refer to Core Strategy and LDF Submission Document
Policy ENV3 - Flood Risk page 85.

We are concerned that these 'sites' may be classified as 'sustainable Development' over a period of 10 to 20 'disruptive' years, on top of the present development which are programmed to be developed for the next 6-7 years, as presumed under clauses 1.30 to 1.32, there can be implication from a Risk Analysis in respect of flood, refer to National Planning Policy

LDF Cl 3.177 and 3.178 Page 60. Promoting a Green District and LDF Management Submission Document-Clause 3 page 33- The Green Belt and Countryside - Vision.
The proposed development 'sites' are in green belt, we are not convinced that the Core Strategy is encouraging the conservation or prevention of erosion of the Green Belt.
We refer you to the 'ambitious' clauses stipulated in the

Allocation Submission Document Allocation Development Plan
Greenbelt and Brownfield land - see Evidence base Document.
Call for sites - Appendix 1. Page 14 Clause 2.1 Brownfield sites - policy ED3.
The core strategy previously identified 12 sites for potential development of which 8 are Brownfield sites. The sites are as follows: No's 10,15,17-19, 66, 115, 124,127.
Site no. 66 is the proposed development for Hullbridge. This is Greenbelt grade 2 agricultural land which according to the Core Strategy should have been protected against any development.

LOCALISM ACT 2011 chapter 20. Item 2.1 (5th bullet point)

The 'Localism Act' was brought into force in 2011, the community did not have the opportunity to apply the clauses of this act. The Core Strategy and Allocations DPD Documents which were published in 2009, 2010 and 2011. This act stipulates that the Local community has: the 'right to challenge' ( Part 5, Chapter 2, Clauses 81 to 86).

Note:
The Business Surveys and the Statement of Community Involvement are stated on separate sheets.