Policy NEL3 - South of Great Wakering

Showing comments and forms 1 to 8 of 8

Object

Allocations Submission Document

Representation ID: 28668

Received: 23/01/2013

Respondent: Miss Marion Sawyer

Legally compliant? Yes

Sound? No

Duty to co-operate? Not specified

Representation Summary:

If a single access/egress is to be considered onto Star Lane the following needs to be considered:
Access should not go through wildlife site - stated in SER9b policy
If the road/track south of the industrial estates is chosen then access from the "road/track" to BFR1 and SER9b must be shortly (within 50 metres) after the junction with Star Lane to minimise disruption of wildlife site
Visibility splays to be created possibly on land in BFR1
Impact on road structure in BFR1 of traffic to/from SER9b
Impact on dwellings of industrial traffic using this access/egress

Full text:

"The road to the south of the industrial estate (which is located within the Green Belt) provides access/egress to the adjacent Local Wildlife Site which would need to be considered. Development of the site should not restrict existing vehicular/pedestrian access/egress to the Local Wildlife Site. However, the potential to utilise the existing access/egress for the Local Wildlife Site (which is in the Green Belt) to enable a combined access/egress point for these development should be explored."
In addition SER9b states
"Access/egress to the land within Policy SER9b should not go through the Local Wildlife Site but should be provided to the north east corner of the southern section of the industrial estate, if delivered prior to the northern section."
The "road/track" to the south of the industrial estate (in Green Belt) which provides access/egress to the Local Wildlife Site is only used by fishermen and is only used on average by a maximum of 3 vehicles per day via a padlocked gate. This locking is necessary to prevent the dumping of cars in the lakes and also vandals/car thieves setting light to stolen vehicles in a quiet area.
This "road/track" runs in an easterly direction from Star Lane along the southern edge of the south industrial estate (Brickworks Site) for about 200metres before entering the wildlife site when it becomes unmade, it then forks, north in the direction of SER9b, north east to the large lake and continues east to the small car park.
There is no visibility splay at this access/egress and it is very dangerous when exiting onto Star Lane.
If this existing access/egress is to be used as a combined access/egress to BFR1 (north and south industrial estates), SER9b and NEL3 then disruption to the wildlife site must be carefully considered.
In order to minimise disruption to the wildlife site then access from the "road/track" to BFR1 and SER9b must be shortly (within 50 metres) after the junction with Star Lane otherwise there will be major disruption to the wildlife site. A visibility splay will need to be created by using part of the industrial estate south (Brickworks site). This will also have an impact on the roads in BFR1 as they will carry the traffic to SER9b and eventually the industrial estate north when this is developed.
If this is also to serve NEL3 then the noise/pollution of lorries using this access/egress needs to be considered plus would this make a bad neighbour situation with lorries turning within several metres of dwellings?

Support

Allocations Submission Document

Representation ID: 28729

Received: 24/01/2013

Respondent: Environment Agency

Representation Summary:

We support the concept statement acknowledging:
- SuDS need to be provided and a drainage strategy submitted;
- That capacity in the foul water network will need modelling at the planning application stage;
- Green buffers should be provided which have an ecological value.

Full text:

We support the concept statement acknowledging:
- SuDS need to be provided and a drainage strategy submitted;
- That capacity in the foul water network will need modelling at the planning application stage;
- Green buffers should be provided which have an ecological value.

Support

Allocations Submission Document

Representation ID: 28809

Received: 25/01/2013

Respondent: Raven Group

Agent: Pomery Planning Consultants

Representation Summary:

Support but alternative option offered for consideration.

Full text:

NEL 3 South of Great Wakering

The respondent supports allocation NEL 3 for new employment land south of Great Wakering.

Attached to these representations is an illustrative layout and a Master Plan, which illustrates how the site could be developed and as part of wider development proposals. It can be seen from the master plan that the position envisaged for NEL is perhaps a curious one and the respondent wonders whether this was the Council's intention. There would be plenty of scope to move the site further north so that it is sufficiently distant from housing areas, but not isolated. Attached to these representations is a plan (Master Plan 3) that illustrates an alternative option, albeit with a larger allocation area.

The respondent has serious reservations in relation to the likelihood of Star Lane Industrial Estate being redeveloped within the plan period. Were the existing employment site not to come forward as expected, the respondent has prepared an alternative housing allocation on site NEL 3 to make up for the shortfall in supply.

Attached to these representations is a plan, which illustrates how this site could be used for housing if required. In addition, the plan shows other allocations as planned alongside wider public open space provision.

The alternative housing option has been moved north towards the Brickworks development as there would no longer need to be a significant buffer as there would if the site were required for employment provision.

The plans mentioned have had to be emailed to the Council separately.

Object

Allocations Submission Document

Representation ID: 28826

Received: 25/01/2013

Respondent: Stolkin and Clements (Southend) LLP

Agent: Firstplan

Legally compliant? Yes

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Stolkin and Clements (Southend) LLP object to the proposed designation of the land identified for employment development to the South of Great Wakering in Policy NEL3. The proposed site will cause harm to the green belt as it does not abut an existing settlement and does not have defensible green belt boundaries.

Tithe Park represents a better option as it can meet the aims of Core Strategy Policy ED4 whilst ensuring that the remaining green belt is protected.

Full text:

Stolkin and Clements (Southend) LLP object to the proposed designation of the land identified for employment development to the South of Great Wakering in Policy NEL3, as shown on page 88 of the submission document. The allocation of this site is unsound as it is not justified, effective, positively prepared or consistent with national policy.

The proposed site is poorly related to an existing built up area. The site is adjoined by open fields to the north, south and east, and on the opposite side of Star Lane to the west, and therefore it would be difficult to create defensible green belt boundaries around the site. The lack of defensible green belt boundaries is recognised as an important consideration in the draft plan. While it is proposed that boundaries can be created through landscaping, the site identified cannot be provided with sufficient landscaping to create an adequate buffer and to provide sufficient replacement employment land, as the size of the site is restricted in area to 2.5 hectares.

The proposed site is further south than the current southerly limit of Great Wakering and it is situated approximately half way between the village and the urban area of Southend. It will therefore lead to the commencement of coalescence between the two settlements, which may worsen over time given the lack of defensible green belt boundaries.

The site is close to the Star Lane Pits Local Wildlife Site and it is proposed that the development could use the existing vehicular access to this wildlife site. No details of this proposed access are provided, and the location of the existing access is a significant distance away from the proposed site. There is potential that this arrangement will encourage development between the existing access and the allocated site, leading to coalescence. The proximity to the wildlife site may also raise environmental concerns.

The identified site is not consistent with Government advice contained within the NPPF, in particular Section 9 which concerns protecting Green Belt land. Section 9 sets out the purposes of the green belt, including preventing neighbouring towns merging into one another. When defining Green Belt boundaries local planning authorities should define boundaries clearly, using physical features that are readily recognisable and that are likely to be permanent.

From the representations available online for the 2010 Allocations consultation document, it is clear that the landowner(s) did not submit representations supporting the allocation of this proposed site. This calls into question the deliverability of the proposed allocation. The proposed allocation can therefore not be considered to be effective.

In our client's view, the west of Tithe Park is the most sustainable option when considered against the other alternatives.

Two options for part of Tithe Park were put forward in the 2010 Allocations consultation covering 23ha and 12ha of the site (Options E23 and E24). In our response we supported an allocation although we said that the part of the site which should be allocated should be the western edge which adjoins the built up area of Southend.

The Detailed Assessment of Potential Employment Sites considers Tithe Park as a whole (approximately 35 ha) and asserts that the size of the site would promote coalescence between Great Wakering and Shoebury. The previous options E23 and E24 are not considered in this document, nor is our previous suggestion of allocating the western side of the site.

If part, as opposed to the whole, of the site is considered for an allocation then Tithe Park will meet the requirements of the Core Strategy Policy ED4 whilst giving rise to an appropriate development having regard to the functions of the green belt. The western part of Tithe Park therefore needs to be given due consideration.

In summary, the benefits of allocating the western part of Tithe Park are:

* The site is available, deliverable, and suitable for development. It is owned solely by our clients and can be brought forward for development at short notice. To our knowledge there are no major obstacles to development of the site, which is currently in an agricultural use, but, in the past has been the subject of brickearth extraction, which has reduced its agricultural quality.

* By virtue of its location, the development of the western part of Tithe Park for employment purposes will have a lesser impact on the landscape and openness of the green belt than would the proposed allocation, because Tithe Park adjoins Southend to the south and west, and Poynters Lane to the north. The west of the site will ensure that a significant degree of separation is retained between Great Wakering and Shoebury.

* Defensible green belt boundaries to the north, south and west can be provided and this is recognised in the 'Detailed Assessment of Potential Employment Sites' document. These defensible boundaries will ensure that the site will not create coalescence between Great Wakering and Shoebury. The site also benefits from comprising sufficient land to ensure that a defensible boundary to the east of the site can be created through an adequate landscaping buffer.

* Local shops and services are within a short distance of Tithe Park and can provide services for prospective employees. These include the amenities at Great Wakering (Co-op supermarket, pubs, restaurants etc.) and the shopping and associated facilities at the Asda superstore, Southend.

* Residents of Great Wakering will be easily able to access the site as it is located within a c.800 metre walk (10 minutes). However, the site will also be more accessible to those commuting from outside Great Wakering by public transport because Shoeburyness Railway Station is closer to Tithe Park than Great Wakering and there are convenient bus stops situated on Poynters Lane.

* Tithe Park is approximately 450 metres from the Local Wildlife Site, significantly further than the current site NEL3.

* The western part of the site is not within a flood risk zone.

Overall, the allocation of the western part of the Tithe Park should be considered to be the most appropriate strategy, when considered against the reasonable alternatives. In particular it will have a lesser impact on the green belt and potential coalescence and is immediately deliverable.

Object

Allocations Submission Document

Representation ID: 28965

Received: 24/01/2013

Respondent: Aber Ltd

Agent: Colliers International

Legally compliant? Yes

Sound? No

Duty to co-operate? Not specified

Representation Summary:

This Policy relates to a single parcel, south of the brickworks; it would be detached from the existing settlement and would extend further south than the existing settlement, and be in close proximity to the boundary with Southend. In addition, it would also have a potential conflict with other allocations proposed for Great Wakering location (BFR1 & SER9).

This location would be further away from public transport and existing services and facilities than the existing industrial estate that it seeks to replace, which means that it would be in not as sustainable location. The locations of commercial accommodation in the proposed location would not accord with the locational requirements detailed within the NPPF.

Full text:

This Policy relates to a single parcel, south of the brickworks; it would be detached from the existing settlement and would extend further south than the existing settlement, and be in close proximity to the boundary with Southend. In addition, it would also have a potential conflict with other allocations proposed for Great Wakering location (BFR1 & SER9).

This location would be further away from public transport and existing services and facilities than the existing industrial estate that it seeks to replace, which means that it would be in not as sustainable location. The locations of commercial accommodation in the proposed location would not accord with the locational requirements detailed within the NPPF.

Object

Allocations Submission Document

Representation ID: 29029

Received: 25/01/2013

Respondent: Essex County Council

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

b) Minerals and Waste
* The Minerals and Waste Local Plans produced by Essex County Council are part of the Development Plan for Rochford District and regard must be had to relevant policies in those documents in determination of the future development of the District. The section of the document entitled 'Relationship with other LDF Documents' should be amended to include appropriate and relevant reference to the status of the Minerals and Waste Local Plans.

* The National Planning Policy Framework requires Minerals Planning Authorities to define Mineral Safeguarding Areas within their Local Plans so that known locations of specific minerals are not needlessly sterilised by other forms of development, whilst not creating a presumption that the defined resources will ever be worked. The County Council has done this through Policy S8 (Safeguarding mineral resources and mineral reserves) in the Replacement Minerals Plan Pre-Submission Draft January 2013. It is necessary to safeguard existing mineral workings and Preferred Sites to prevent the possibility of new incompatible neighbours being established and ultimately restricting extraction activities. Mineral Consultation Areas (MCAs) apply to the safeguarded site itself and extend for a distance of 250 metres outwards from the site boundary of each of these safeguarded sites. The following proposed allocation sites fall within a Mineral Safeguarding Area:
o Policy SER2 West Rochford
o Policy SER5 East Ashingdon
o Policy SER8 South East Ashingdon
o Policy SER9 West Great Wakering
o Policy NEL3 South of Great Wakering
o Policy NEL4 North of London Southend Airport
o Policy EDU3 King Edmund School

Full text:

ESSEX COUNTY COUNCIL
RESPONSE TO ROCHFORD DISTRICT COUNCIL ALLOCATIONS SUBMISSION DOCUMENT (NOVEMBER 2012)

Essex County Council welcomes the production of an Allocations DPD by Rochford District Council. The setting out of site specific allocations for development at the general locations identified within the Core Strategy will positively assist realisation of the Core Strategy and the Vision for the District. The inclusion of allocations not just for residential and business development but also for community facilities and environmental designations is particularly supported as providing a firm basis for the holistic and sustainable approach to the future of the District.

The County Council generally supports the proposed content of the document whilst suggesting some amendments to the text to assist clarity on future requirements and to provide contextual information that should assist delivery and implementation.

This response is structured as,
* Specific Highway and Transport comment on Policy NEL2 and Policy GT1
* Comments on topics and themes
* Site specific comments
* Annex on Historic environment considerations on individual sites

1. Specific Highway and Transport comment on Policy NEL2 and Policy GT1

a) Policy NEL2: West of the A1245, Rayleigh
The content of paragraph 5.35 and subsequent paragraphs 5.36 to 5.39 relating to highways and transport requirements and considerations for development of this site is noted. Access to the proposed allocation at this location would be contrary to a number of current Highways Development Management Policies. Given the location of the site at a key strategic junction lack of design compliant access points would contribute to an increase in congestion and safety concerns. The County Council is unaware of any studies or evidence to indicate that access/egress on and off the site can be secured in a design compliant manner. In these circumstances the highway authority is unable to support allocation of the site for the proposed employment uses.

b) Policy GT1: Gypsy and Traveller Accommodation
The site access/egress to the proposed allocation would contribute to congestion and safety concerns at this strategic junction and be contrary to a number of current Highways Development Management Policies. Nevertheless, it may be possible to cater for the traffic movements arising from not more than 15 gypsy and traveller pitches in a manner that has minimum impact on existing levels of traffic movement and safety. Accordingly, the local highway authority would wish to further discuss with the district council the potential traffic implications of this proposed allocation.

2. Comments on topics and themes

a) Flood Risk and Water Management
* Essex County Council, as a Lead Local Flood Authority, now has a strategic role to oversee the management of local flood risk. This covers the risk of flooding from surface water runoff, groundwater and ordinary watercourses that occurs as a result of heavy rainfall. The County Council has produced a number of inter-related Flood and Water Management documents which seek to improve understanding of surface water flood risk with the ultimate aim of reducing that risk wherever possible. The following documents should be added to the Evidence Base listed in paragraph 1.29,
o Preliminary Flood Risk Assessment (PFRA) - is a requirement under the Flood Risk Regulations (2009). The PFRA is a high level, county-wide analysis which considers past flooding and possible future flooding from,
 Essex Flood Risk Management Strategy - to be published Feb/March 2013 meets responsibilities under the Flood and Water Management Act (2010). This strategy looks at ways to tackle local flood risk in a co-ordinated way. It will identify some strategic actions needing to occur over the next two years and the underlying principles upon which to base future decisions.
 Surface Water Management Plans (SWMP) - these are plans which outline the preferred surface water management strategy for a given location. A SWMP will establish a long-term action plan to manage surface water in an area and should influence future capital investment, drainage maintenance, public engagement and understanding, land-use planning, emergency planning and future developments.

* On Page 11, fifth bullet, 'Surface Water Management Plan 2011' should read 'South Essex Surface Water Management Plan 2012'.

* The County Council welcomes the promotion of Sustainable Drainage Systems (SuDS) within the Concept Statements for each site allocation. However, the existing text should be amended to include reference to,
o the involvement of the Environment Agency - Essex County Council is not expected to become the SuDS Approving Body until at least April 2014 and therefore cannot officially comment/determine SuDS proposals until then.
o The need for a site specific flood risk assessment - any site drainage strategy for a site will be informed by and need to address issues arising from a specific flood risk assessment.
o The inclusion of source control as part of the SuDS proposals - source control, i.e. the control of runoff or pollution at or near its source, will be needed as well as attenuation measures to ensure an acceptable sustainable drainage system.

The relevant text should be amended to read as follows and included as a paragraph in the Concept Statement of each proposed site allocation,
"Attenuation and source control Sustainable Drainage Systems (SUDS) of a size proportionate to the development should be used such as balancing ponds, swales, detention basins and green roofs. This could be incorporated into the greenspace provided on-site. Appropriate SUDS should be determined in consultation with Essex County Council and the Environment Agency. A site specific flood risk assessment incorporating a surface water drainage strategy should be prepared for the site."

b) Minerals and Waste
* The Minerals and Waste Local Plans produced by Essex County Council are part of the Development Plan for Rochford District and regard must be had to relevant policies in those documents in determination of the future development of the District. The section of the document entitled 'Relationship with other LDF Documents' should be amended to include appropriate and relevant reference to the status of the Minerals and Waste Local Plans.

* The National Planning Policy Framework requires Minerals Planning Authorities to define Mineral Safeguarding Areas within their Local Plans so that known locations of specific minerals are not needlessly sterilised by other forms of development, whilst not creating a presumption that the defined resources will ever be worked. The County Council has done this through Policy S8 (Safeguarding mineral resources and mineral reserves) in the Replacement Minerals Plan Pre-Submission Draft January 2013. It is necessary to safeguard existing mineral workings and Preferred Sites to prevent the possibility of new incompatible neighbours being established and ultimately restricting extraction activities. Mineral Consultation Areas (MCAs) apply to the safeguarded site itself and extend for a distance of 250 metres outwards from the site boundary of each of these safeguarded sites. The following proposed allocation sites fall within a Mineral Safeguarding Area:
o Policy SER2 West Rochford
o Policy SER5 East Ashingdon
o Policy SER8 South East Ashingdon
o Policy SER9 West Great Wakering
o Policy NEL3 South of Great Wakering
o Policy NEL4 North of London Southend Airport
o Policy EDU3 King Edmund School

To ensure compatibility and consistency between the Allocations Document and the Minerals Local Plan the following text should be added to the Concept Statement for each of the seven (7) sites listed above,
'The site is within a Minerals Safeguarding Area and therefore consultation on the proposed development of the site with Essex County Council is required'

* It should be noted that the Replacement Minerals Plan Pre-Submission Draft safeguards the following two sites in Rochford District,
o the Strategic Aggregate Recycling Site (SARS) at Purdey's Industrial Estate is safeguarded under Policy S5 'Creating a network of aggregate recycling facilities';
o the coated stone plant at Suttons Wharf is considered to be of 'strategic importance' in policy terms and is safeguarded under Policy S9 'Safeguarding mineral transhipment sites and secondary processing facilities'.

c) Historic Environment
Essex County Council is pleased at the identification of the Historic Environment within the Document and the specific mention of the Historic Environment Characterisation Report for the District. An annex to this response sets out additional detailed information on a site-specific basis that could usefully be added to the Document to ensure awareness of the key historic environment features and requirements associated with development of proposed allocations.

d) Biodiversity
* The Concept Statements for most proposed development sites include reference to green buffers, site boundary treatment, tree/hedge planting or habitat mitigation. For clarity and to make a positive contribution to local ecology the concept statement for each site should use, or adapt, as appropriate the statement in paragraph 5.58 which states: "landscaped green buffers should be provided in the form of publicly accessible green space, with conditions attached to ensure that it has ecological value".

* Potential development proposals should be prepared in accordance with the Institute of Ecological and Environmental Management (IEEM) guidelines for Ecological Impact Assessment (EcIA) which require,
o applications for development over 0.1ha to be accompanied by an ecological statement, which should include a Phase 1 habitat survey, a data search for records of designated sites and protected species within 2km of the site, and an assessment of habitat suitability for European Protected Species.
o for major developments (10 or more dwellings, or creation of more than 1000 square meters), a full Ecological Impact Assessment, prepared in accordance with the IEEM guidelines for EcIA, will be required (http://www.ieem.net/ecia-guidelines-terrestrial-freshwater-and-coastal-).

* Policy ELA1 should require completion of the Management Plans that will be drawn up for Local Wildlife Sites and that they be taken into account, as appropriate, during design and construction phases and that their disturbance is avoided. Development sites subject to Policy SER8 (South East Ashingdon), Policy SER9 (West Great Wakering), and Policy NEL3 (South of Great Wakering) should contain a similar specific requirement.

* Several sites show potential to support European Protected Species, namely,
o Policy SER4 - South Hawkwell
o Policy SER6 - South West Hullbridge
o Policy SER9 - West Great Wakering
o Policy NEL1 - South of London Road, Rayleigh

e) Urban Design
* Generally, the vision for each of the allocation should be developed further as .the concept statements provide limited evaluation of the sites and their infrastructure requirements. A solution could be for a master plan or design brief to be required, prior to the submission of a planning application, for all sites of a certain size or sensitivity setting out the vision for future development with design codes for larger sites where development will be phased (as supported by Paragraph 59 of the National Planning Policy Framework). A landscape strategy promoting green links and biodiversity corridors for each site should also be required.

* The document could also be improved with more visual content. Simple diagrams illustrating the principles/objectives referred to in the text would add clarity, particularly where connections are required between different sites or parts of a site that may be developed at different stages or post 2021, for example, between the land allocations for employment South of Great Wakering (NEL3), Star Lane Industrial Estate Great Wakering (BFR1) and land south of the High St (SER9b).

3. Site specific comments

a) Policy BFR1: Star Lane Industrial Estate, Great Wakering
* This is one of the few industrial estates in the District where there are relatively few environmental impediments to the establishment of a future waste treatment facility. Provision of housing on the site will introduce a sensitive use and make the estate potentially incompatible for waste uses. 'Guidance for local planning authorities on implementing planning requirements of the EU Waste Framework Directive (2008/98/EC)' (December 2012) is relevant to this issue. The Guidance expects those local planning authorities which do not deal directly with waste planning applications to contribute to delivery of the waste hierarchy. This includes working constructively with waste planning authorities to identify and protect those sites needed for waste management facilities and considering, where relevant, the likely impact of proposed, non-waste related development on existing waste management sites and on sites and areas allocated for waste management. Planning authorities should ensure that any such proposal does not prejudice the implementation of the waste strategy set out in the local Waste Plan. The County Council, as waste planning authority, would welcome discussion with the District Council to identify an alternative suitable industrial site within the District to accommodate waste treatment facilities that could have been established on this estate.
* In paragraph 2.34 the words 'Transport Impact Assessment' should be amended to read 'Transport Assessment'. Equivalent amendments should be made where a similar reference is made throughout the document.

b) Policy SER1: North of London Road, Rayleigh
* In paragraph 3.17, first bullet, the text should be extended to include the words 'with commensurate early years and childcare provision' to reflect the full requirement for provision of education facilities on the site.
* Figure 7 should be deleted as being a matter more appropriate for inclusion in a masterplan or design brief where possible highway and transport links can be directly related and integrated with green links, biodiversity corridors and relationship to adjacent development. Consequent to the above comment, paragraph 3.27 should be amended to simply note that the means access and scope of transport assessment should be explored with Essex County Council Highways, to include the site being served by public transport and designed to ensure that it is not used as a through route for private traffic.

c) Policy SER2: West Rochford
The precise site boundary of the proposed education facilities on the site has been agreed through a s106 agreement and could be indicated on Figure 8.

d) Policy SER5: East Ashingdon
Paragraph 3.141 should specifically identify the proposed improved access/egress to King Edmund School, which is the subject of a s106 agreement, and show the precise site boundary of the proposed new bus/car park for King Edmund School on Figure 11 (p53).

e) Policy SER6: South West Hullbridge
Paragraph 3.178 should be amended to note that highway improvements would focus on the strategic network, which includes the junction of Hullbridge Road/ Watery Lane. Watery Lane is not part of the strategic network and the reference to improvements should be deleted.

f) Policy SER8: South East Ashingdon
* In paragraph 3.218 the word 'access' should be amended to read 'accesses' because the proposed development is a minimum of 500 dwellings for which a single access is insufficient.
* Paragraph 3.240 should be extended to state that 'All internal layout options should be considered in line with the Essex Design Guide'.
* Paragraph 3.242, second sentence, should be amended to read 'Pedestrian and cycle routes to south of site.....'.

g) Policy SER9: West Great Wakering
Paragraph 3.277 should be amended to read 'Pedestrian and cycle routes to the north...'.

h) Policy EDU1: North of London Road, Rayleigh
The criteria listed in paragraph 7.5 are not exhaustive and omit some of the most key characteristics. Accordingly, the text of the paragraph should be deleted and replaced by cross reference to the full list provided in the Developers' Guide Education Supplement (Appendix D).

i) Policy EDU2: West Rochford
The criteria listed in paragraph 7.9 are not exhaustive and omit some of the most key characteristics. Accordingly, the text of each paragraph should be deleted and replaced by cross reference to the full list provided in the Developers' Guide Education Supplement (Appendix D).

j) Policy EDU3: King Edmund School
For ease of reference Figure 27 (p104) should also show the land south of Bray's Lane that has been secured by King Edmund for a new bus/car park.

k) Policy EDU4: Existing Primary and Secondary Schools
As Local Education Authority, the County Council welcomes acknowledgement in paragraph 7.15 that schools change and expand over time in order to meet local need. However, the proposals in paragraph 7.15 are potentially confusing and unduly restrictive because in most cases school expansion and/or re-modelling will extend beyond the existing built footprint on school sites. Retaining Green Belt status for school playing fields in their entirety would not offer sufficient flexibility to attain the policy intent due to some school expansion proposals necessarily straddling the Green Belt boundary.


ANNEX TO
ESEX COUNTY COUNCIL RESPONSE TO ROCHFORD ALLOCATIONS SUBMISSION DOCUMENT (NOVEMBER 2012)

Key Historic Environment Features and Requirements

This annex to the County Council response sets out additional detailed information on a site-specific basis that could usefully be added to the Document to ensure awareness of the key historic environment features and requirements associated with development of proposed sites. Reference to Historic Environment Zones (HECZ) within this Annex is taken from the Historic Characterisation Study for Rochford District.

A. Brownfield Residential land allocations

Policy BFR1 - Star Lane, Industrial Estate, Great Wakering.
The southern section is currently a disused brickworks. Although the site has now been cleared of all upstanding structures, without a historic building record being undertaken, the site still retains considerable archaeological potential for the study of the countys' industrial archaeology and in particular the development of brick making within the region (EHER 15369). Records depict this development from the use of brick clamps in the early post war period to oil fired down draught kilns by the 1970s and gas fired kilns by the 1990s. Whilst brickworks are not necessarily considered significant in purely architectural or aesthetic terms they represent an increasingly rare site and structure type which have been identified in the regional research agendas as being of particular interest. Any redevelopment should be preceded by archaeological desk-based research and investigation of surviving underground deposits.

Policy BFR3 - Stambridge Mills, Rochford
Stambridge Mill survives as a complex multi-period site comprising a wide range of buildings, structures and earthworks which together chart the development of an historic milling site dating from the 18th century or earlier. A building record of all surviving structures has been completed with no further archaeological conditions required.

Policy BFR4 - Rawreth Industrial Estate
A number of brick-built World War II accommodation huts survive at the southern end of the industrial estate. These were associated with the heavy anti-aircraft gunsite TN4 'Rayleigh' (EHER 20133) sited here during World War II and are a rare survival. Where possible these buildings should be retained within any development. However if this proves impossible to achieve they will require a historic building survey to record the complex prior to any demolition.

B. Settlement Extension Residential Allocations

Policy SER1 - North of London Road Rayleigh
A pre-determination assessment (by fieldwalking and geophysical survey) of the archaeology on-site is currently ongoing. Any future large scale housing development would require an agreed programme of work, depending on the present evaluation and any future trial trenching to ensure that the historic environment assets are either protected in situ or preserved by excavation.

Policy SER2 - West Rochford
A pre-determination assessment (by trenching) of the archaeology on-site has been completed. The results are expected shortly and will be used to ensure that there is appropriate management and/or a mitigation strategy agreed to protect the historic environment assets that will be impacted.

Policy SER3 - West Hockley
For those parts of the site not previously developed, a programme of archaeological evaluation should be undertaken to ensure that the Historic Environment is taken into account at an early stage and to make sure that opportunities for pro-active assessment, management and enhancement are fully considered. Consideration should also be given to the landscape character of the area and the woodland setting.

Policy SER4 - South Hawkwell
The proposed development south of Hawkwell lies within Historic Environment Characterisation Zone 26 (HECZ 26: Land between Hockley and Ashingdon). This area of predominantly rural landscape, sloping down to the Crouch Estuary between Hawkwell and Ashingdon, is noted for its dispersed settlement and the number of find spots, particularly of prehistoric material, and its potential for archaeological sites despite little formal investigation having been carried out. Any future housing development would require a programme of archaeological evaluation to ensure that the historic environment is taken into account at an early stage and to make sure that opportunities for pro-active assessment, management and enhancement are fully considered.

Policy SER6 - South West Hullbridge
The Historic Environment Character Zone (HECZ 36) for land west of Hullbridge states that whilst archaeological deposits are rare, prehistoric sites are present within the inter tidal zone and in general the area has potential for deposits to survive. Two known undated earthworks at Maylons and South of Maylons lie within the proposed development area while a medieval moated site is located close by. A programme of archaeological evaluation would be required to ensure that the historic environment is taken into account at an early stage and to make sure that opportunities for pro-active assessment, management and enhancement are fully considered.

Policy SER7 - South Canewdon
The Historic Environment Character Zone (HECZ 12) shows that Canewdon is an example of a late Saxon/early Medieval settlement focused on the church hall complex but surrounded by a wider dispersed pattern of manors. By comparison with similar settlements it is reasonable to assume that archaeological remains survive within, and in the proximity of, the historic settlement, particularly those historic assets associated with the coast and historic core. A programme of archaeological evaluation would be required to ensure that the historic environment is taken into account at an early stage and to make sure that opportunities for pro-active assessment, management and enhancement are fully considered.

Policy SER8 - South East Ashingdon
The site lies within Historic Environment Character Zone (HECZ 13) characterised by its landscape of dispersed and poly-focal settlements, church/hall complexes and historic farms. The medieval church/hall complex of Ashingdon Hall/St Andrews Church lies nearby while a number of halls, moated sites and farms including Apton Hall, Little Stambridge Hall, Moated site of Rectory Hall and Doggetts Farm are in close proximity. Roman material has also been identified to the west of Doggetts Farm. The zone is also noted for the many archaeological sites of a multi-period date and the potential for archaeological survival due to lack of development. Although there is limited archaeological knowledge within the limits of the proposed site, the area has been identified as being sensitive to change. A programme of archaeological evaluation would be required to ensure that the historic environment is taken into account at an early stage and to make sure that opportunities for pro-active assessment, management and enhancement are fully considered.

Policy SER9 - West Great Wakering
Options for West Great Wakering lie within Historic Environment Character Zone (HECZ 7) an area notable for its multi period landscape dating from the Middle Bronze Age. Brickearth quarrying has had a significant impact upon the historic environment although there remains a high potential for archaeological remains in those areas not previously subject to quarrying. For those areas not quarried there would be a requirement for a programme of archaeological evaluation to ensure that the historic environment is taken into account at an early stage and to make sure that opportunities for pro-active assessment, management and enhancement are fully considered.

C. New Employment Land Allocations

Policy NEL1 - South of London Road
The Rochford Historic Environment Character project identifies that the options for land West of Rayleigh lie within an area characterised by historic dispersed settlement retaining good potential for below ground deposits (HECZ 34). Any future development would require a programme of archaeological evaluation to ensure that the historic environment potential of the area is taken into account at an early stage.

Policy NEL2 - West of the A1245
The Rochford Historic Environment Character project identifies that the options for land West of Rayleigh lie within an area characterised by historic dispersed settlement retaining good potential for below ground deposits (HECZ 34). Any future development would require a programme of archaeological evaluation to ensure that the historic environment potential of the area is taken into account at an early stage.

Policy NEL3 - South of Great Wakering
Although the proposed development area has been subject to some quarrying, there is still potential that some archaeological features remain in situ. The Essex Historic Environment Record (EHER) lists a number of archaeological sites in the vicinity: cropmarks of a linear feature and a rectangular enclosure (EHER 11157) and find spots including a Bronze Age vessel (EHER 11085). A programme of archaeological evaluation would be required to ensure that the cultural heritage is taken into account at an early stage and to make sure that opportunities for pro-active assessment, management and enhancement are fully considered.

POLICY NEL4 - North of London Southend Airport
This area has a large amount of historic environment assets recorded on the EHER. Excavations to the east of Cherry Orchard Farmhouse identified the remains of a medieval or post medieval kiln (EHER 9744) during salvage excavations on the birckearth quarry. This kiln is clearly a precursor of the later Cherry Orchard Brickworks which continued production in to the early 21st century. The brickworks has now been demolished although there is potential for surviving deposits relating to the industry surviving beneath the ground. Cherry Orchard Farmhouse is a listed 17th century timber framed farmhouse which is nationally designated as a grade II listed building. Archaeological evaluation at Westbarrow Hall Farm (EHER17441) has recorded extensive multi-period archaeological deposits over a wide area. A number of military monuments relating to the defence of Southend Airport during World War II survive (including two examples of rare cantilever pillboxes). Detailed discussion will be required to produce a development proposal which protects the most significant deposits and provides for a mitigation strategy including excavation for any remains that cannot be preserved.

Object

Allocations Submission Document

Representation ID: 29057

Received: 25/01/2013

Respondent: Essex County Council

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Policy NEL3 - South of Great Wakering
Although the proposed development area has been subject to some quarrying, there is still potential that some archaeological features remain in situ. The Essex Historic Environment Record (EHER) lists a number of archaeological sites in the vicinity: cropmarks of a linear feature and a rectangular enclosure (EHER 11157) and find spots including a Bronze Age vessel (EHER 11085). A programme of archaeological evaluation would be required to ensure that the cultural heritage is taken into account at an early stage and to make sure that opportunities for pro-active assessment, management and enhancement are fully considered.

Full text:

ESSEX COUNTY COUNCIL
RESPONSE TO ROCHFORD DISTRICT COUNCIL ALLOCATIONS SUBMISSION DOCUMENT (NOVEMBER 2012)

Essex County Council welcomes the production of an Allocations DPD by Rochford District Council. The setting out of site specific allocations for development at the general locations identified within the Core Strategy will positively assist realisation of the Core Strategy and the Vision for the District. The inclusion of allocations not just for residential and business development but also for community facilities and environmental designations is particularly supported as providing a firm basis for the holistic and sustainable approach to the future of the District.

The County Council generally supports the proposed content of the document whilst suggesting some amendments to the text to assist clarity on future requirements and to provide contextual information that should assist delivery and implementation.

This response is structured as,
* Specific Highway and Transport comment on Policy NEL2 and Policy GT1
* Comments on topics and themes
* Site specific comments
* Annex on Historic environment considerations on individual sites

1. Specific Highway and Transport comment on Policy NEL2 and Policy GT1

a) Policy NEL2: West of the A1245, Rayleigh
The content of paragraph 5.35 and subsequent paragraphs 5.36 to 5.39 relating to highways and transport requirements and considerations for development of this site is noted. Access to the proposed allocation at this location would be contrary to a number of current Highways Development Management Policies. Given the location of the site at a key strategic junction lack of design compliant access points would contribute to an increase in congestion and safety concerns. The County Council is unaware of any studies or evidence to indicate that access/egress on and off the site can be secured in a design compliant manner. In these circumstances the highway authority is unable to support allocation of the site for the proposed employment uses.

b) Policy GT1: Gypsy and Traveller Accommodation
The site access/egress to the proposed allocation would contribute to congestion and safety concerns at this strategic junction and be contrary to a number of current Highways Development Management Policies. Nevertheless, it may be possible to cater for the traffic movements arising from not more than 15 gypsy and traveller pitches in a manner that has minimum impact on existing levels of traffic movement and safety. Accordingly, the local highway authority would wish to further discuss with the district council the potential traffic implications of this proposed allocation.

2. Comments on topics and themes

a) Flood Risk and Water Management
* Essex County Council, as a Lead Local Flood Authority, now has a strategic role to oversee the management of local flood risk. This covers the risk of flooding from surface water runoff, groundwater and ordinary watercourses that occurs as a result of heavy rainfall. The County Council has produced a number of inter-related Flood and Water Management documents which seek to improve understanding of surface water flood risk with the ultimate aim of reducing that risk wherever possible. The following documents should be added to the Evidence Base listed in paragraph 1.29,
o Preliminary Flood Risk Assessment (PFRA) - is a requirement under the Flood Risk Regulations (2009). The PFRA is a high level, county-wide analysis which considers past flooding and possible future flooding from,
 Essex Flood Risk Management Strategy - to be published Feb/March 2013 meets responsibilities under the Flood and Water Management Act (2010). This strategy looks at ways to tackle local flood risk in a co-ordinated way. It will identify some strategic actions needing to occur over the next two years and the underlying principles upon which to base future decisions.
 Surface Water Management Plans (SWMP) - these are plans which outline the preferred surface water management strategy for a given location. A SWMP will establish a long-term action plan to manage surface water in an area and should influence future capital investment, drainage maintenance, public engagement and understanding, land-use planning, emergency planning and future developments.

* On Page 11, fifth bullet, 'Surface Water Management Plan 2011' should read 'South Essex Surface Water Management Plan 2012'.

* The County Council welcomes the promotion of Sustainable Drainage Systems (SuDS) within the Concept Statements for each site allocation. However, the existing text should be amended to include reference to,
o the involvement of the Environment Agency - Essex County Council is not expected to become the SuDS Approving Body until at least April 2014 and therefore cannot officially comment/determine SuDS proposals until then.
o The need for a site specific flood risk assessment - any site drainage strategy for a site will be informed by and need to address issues arising from a specific flood risk assessment.
o The inclusion of source control as part of the SuDS proposals - source control, i.e. the control of runoff or pollution at or near its source, will be needed as well as attenuation measures to ensure an acceptable sustainable drainage system.

The relevant text should be amended to read as follows and included as a paragraph in the Concept Statement of each proposed site allocation,
"Attenuation and source control Sustainable Drainage Systems (SUDS) of a size proportionate to the development should be used such as balancing ponds, swales, detention basins and green roofs. This could be incorporated into the greenspace provided on-site. Appropriate SUDS should be determined in consultation with Essex County Council and the Environment Agency. A site specific flood risk assessment incorporating a surface water drainage strategy should be prepared for the site."

b) Minerals and Waste
* The Minerals and Waste Local Plans produced by Essex County Council are part of the Development Plan for Rochford District and regard must be had to relevant policies in those documents in determination of the future development of the District. The section of the document entitled 'Relationship with other LDF Documents' should be amended to include appropriate and relevant reference to the status of the Minerals and Waste Local Plans.

* The National Planning Policy Framework requires Minerals Planning Authorities to define Mineral Safeguarding Areas within their Local Plans so that known locations of specific minerals are not needlessly sterilised by other forms of development, whilst not creating a presumption that the defined resources will ever be worked. The County Council has done this through Policy S8 (Safeguarding mineral resources and mineral reserves) in the Replacement Minerals Plan Pre-Submission Draft January 2013. It is necessary to safeguard existing mineral workings and Preferred Sites to prevent the possibility of new incompatible neighbours being established and ultimately restricting extraction activities. Mineral Consultation Areas (MCAs) apply to the safeguarded site itself and extend for a distance of 250 metres outwards from the site boundary of each of these safeguarded sites. The following proposed allocation sites fall within a Mineral Safeguarding Area:
o Policy SER2 West Rochford
o Policy SER5 East Ashingdon
o Policy SER8 South East Ashingdon
o Policy SER9 West Great Wakering
o Policy NEL3 South of Great Wakering
o Policy NEL4 North of London Southend Airport
o Policy EDU3 King Edmund School

To ensure compatibility and consistency between the Allocations Document and the Minerals Local Plan the following text should be added to the Concept Statement for each of the seven (7) sites listed above,
'The site is within a Minerals Safeguarding Area and therefore consultation on the proposed development of the site with Essex County Council is required'

* It should be noted that the Replacement Minerals Plan Pre-Submission Draft safeguards the following two sites in Rochford District,
o the Strategic Aggregate Recycling Site (SARS) at Purdey's Industrial Estate is safeguarded under Policy S5 'Creating a network of aggregate recycling facilities';
o the coated stone plant at Suttons Wharf is considered to be of 'strategic importance' in policy terms and is safeguarded under Policy S9 'Safeguarding mineral transhipment sites and secondary processing facilities'.

c) Historic Environment
Essex County Council is pleased at the identification of the Historic Environment within the Document and the specific mention of the Historic Environment Characterisation Report for the District. An annex to this response sets out additional detailed information on a site-specific basis that could usefully be added to the Document to ensure awareness of the key historic environment features and requirements associated with development of proposed allocations.

d) Biodiversity
* The Concept Statements for most proposed development sites include reference to green buffers, site boundary treatment, tree/hedge planting or habitat mitigation. For clarity and to make a positive contribution to local ecology the concept statement for each site should use, or adapt, as appropriate the statement in paragraph 5.58 which states: "landscaped green buffers should be provided in the form of publicly accessible green space, with conditions attached to ensure that it has ecological value".

* Potential development proposals should be prepared in accordance with the Institute of Ecological and Environmental Management (IEEM) guidelines for Ecological Impact Assessment (EcIA) which require,
o applications for development over 0.1ha to be accompanied by an ecological statement, which should include a Phase 1 habitat survey, a data search for records of designated sites and protected species within 2km of the site, and an assessment of habitat suitability for European Protected Species.
o for major developments (10 or more dwellings, or creation of more than 1000 square meters), a full Ecological Impact Assessment, prepared in accordance with the IEEM guidelines for EcIA, will be required (http://www.ieem.net/ecia-guidelines-terrestrial-freshwater-and-coastal-).

* Policy ELA1 should require completion of the Management Plans that will be drawn up for Local Wildlife Sites and that they be taken into account, as appropriate, during design and construction phases and that their disturbance is avoided. Development sites subject to Policy SER8 (South East Ashingdon), Policy SER9 (West Great Wakering), and Policy NEL3 (South of Great Wakering) should contain a similar specific requirement.

* Several sites show potential to support European Protected Species, namely,
o Policy SER4 - South Hawkwell
o Policy SER6 - South West Hullbridge
o Policy SER9 - West Great Wakering
o Policy NEL1 - South of London Road, Rayleigh

e) Urban Design
* Generally, the vision for each of the allocation should be developed further as .the concept statements provide limited evaluation of the sites and their infrastructure requirements. A solution could be for a master plan or design brief to be required, prior to the submission of a planning application, for all sites of a certain size or sensitivity setting out the vision for future development with design codes for larger sites where development will be phased (as supported by Paragraph 59 of the National Planning Policy Framework). A landscape strategy promoting green links and biodiversity corridors for each site should also be required.

* The document could also be improved with more visual content. Simple diagrams illustrating the principles/objectives referred to in the text would add clarity, particularly where connections are required between different sites or parts of a site that may be developed at different stages or post 2021, for example, between the land allocations for employment South of Great Wakering (NEL3), Star Lane Industrial Estate Great Wakering (BFR1) and land south of the High St (SER9b).

3. Site specific comments

a) Policy BFR1: Star Lane Industrial Estate, Great Wakering
* This is one of the few industrial estates in the District where there are relatively few environmental impediments to the establishment of a future waste treatment facility. Provision of housing on the site will introduce a sensitive use and make the estate potentially incompatible for waste uses. 'Guidance for local planning authorities on implementing planning requirements of the EU Waste Framework Directive (2008/98/EC)' (December 2012) is relevant to this issue. The Guidance expects those local planning authorities which do not deal directly with waste planning applications to contribute to delivery of the waste hierarchy. This includes working constructively with waste planning authorities to identify and protect those sites needed for waste management facilities and considering, where relevant, the likely impact of proposed, non-waste related development on existing waste management sites and on sites and areas allocated for waste management. Planning authorities should ensure that any such proposal does not prejudice the implementation of the waste strategy set out in the local Waste Plan. The County Council, as waste planning authority, would welcome discussion with the District Council to identify an alternative suitable industrial site within the District to accommodate waste treatment facilities that could have been established on this estate.
* In paragraph 2.34 the words 'Transport Impact Assessment' should be amended to read 'Transport Assessment'. Equivalent amendments should be made where a similar reference is made throughout the document.

b) Policy SER1: North of London Road, Rayleigh
* In paragraph 3.17, first bullet, the text should be extended to include the words 'with commensurate early years and childcare provision' to reflect the full requirement for provision of education facilities on the site.
* Figure 7 should be deleted as being a matter more appropriate for inclusion in a masterplan or design brief where possible highway and transport links can be directly related and integrated with green links, biodiversity corridors and relationship to adjacent development. Consequent to the above comment, paragraph 3.27 should be amended to simply note that the means access and scope of transport assessment should be explored with Essex County Council Highways, to include the site being served by public transport and designed to ensure that it is not used as a through route for private traffic.

c) Policy SER2: West Rochford
The precise site boundary of the proposed education facilities on the site has been agreed through a s106 agreement and could be indicated on Figure 8.

d) Policy SER5: East Ashingdon
Paragraph 3.141 should specifically identify the proposed improved access/egress to King Edmund School, which is the subject of a s106 agreement, and show the precise site boundary of the proposed new bus/car park for King Edmund School on Figure 11 (p53).

e) Policy SER6: South West Hullbridge
Paragraph 3.178 should be amended to note that highway improvements would focus on the strategic network, which includes the junction of Hullbridge Road/ Watery Lane. Watery Lane is not part of the strategic network and the reference to improvements should be deleted.

f) Policy SER8: South East Ashingdon
* In paragraph 3.218 the word 'access' should be amended to read 'accesses' because the proposed development is a minimum of 500 dwellings for which a single access is insufficient.
* Paragraph 3.240 should be extended to state that 'All internal layout options should be considered in line with the Essex Design Guide'.
* Paragraph 3.242, second sentence, should be amended to read 'Pedestrian and cycle routes to south of site.....'.

g) Policy SER9: West Great Wakering
Paragraph 3.277 should be amended to read 'Pedestrian and cycle routes to the north...'.

h) Policy EDU1: North of London Road, Rayleigh
The criteria listed in paragraph 7.5 are not exhaustive and omit some of the most key characteristics. Accordingly, the text of the paragraph should be deleted and replaced by cross reference to the full list provided in the Developers' Guide Education Supplement (Appendix D).

i) Policy EDU2: West Rochford
The criteria listed in paragraph 7.9 are not exhaustive and omit some of the most key characteristics. Accordingly, the text of each paragraph should be deleted and replaced by cross reference to the full list provided in the Developers' Guide Education Supplement (Appendix D).

j) Policy EDU3: King Edmund School
For ease of reference Figure 27 (p104) should also show the land south of Bray's Lane that has been secured by King Edmund for a new bus/car park.

k) Policy EDU4: Existing Primary and Secondary Schools
As Local Education Authority, the County Council welcomes acknowledgement in paragraph 7.15 that schools change and expand over time in order to meet local need. However, the proposals in paragraph 7.15 are potentially confusing and unduly restrictive because in most cases school expansion and/or re-modelling will extend beyond the existing built footprint on school sites. Retaining Green Belt status for school playing fields in their entirety would not offer sufficient flexibility to attain the policy intent due to some school expansion proposals necessarily straddling the Green Belt boundary.


ANNEX TO
ESEX COUNTY COUNCIL RESPONSE TO ROCHFORD ALLOCATIONS SUBMISSION DOCUMENT (NOVEMBER 2012)

Key Historic Environment Features and Requirements

This annex to the County Council response sets out additional detailed information on a site-specific basis that could usefully be added to the Document to ensure awareness of the key historic environment features and requirements associated with development of proposed sites. Reference to Historic Environment Zones (HECZ) within this Annex is taken from the Historic Characterisation Study for Rochford District.

A. Brownfield Residential land allocations

Policy BFR1 - Star Lane, Industrial Estate, Great Wakering.
The southern section is currently a disused brickworks. Although the site has now been cleared of all upstanding structures, without a historic building record being undertaken, the site still retains considerable archaeological potential for the study of the countys' industrial archaeology and in particular the development of brick making within the region (EHER 15369). Records depict this development from the use of brick clamps in the early post war period to oil fired down draught kilns by the 1970s and gas fired kilns by the 1990s. Whilst brickworks are not necessarily considered significant in purely architectural or aesthetic terms they represent an increasingly rare site and structure type which have been identified in the regional research agendas as being of particular interest. Any redevelopment should be preceded by archaeological desk-based research and investigation of surviving underground deposits.

Policy BFR3 - Stambridge Mills, Rochford
Stambridge Mill survives as a complex multi-period site comprising a wide range of buildings, structures and earthworks which together chart the development of an historic milling site dating from the 18th century or earlier. A building record of all surviving structures has been completed with no further archaeological conditions required.

Policy BFR4 - Rawreth Industrial Estate
A number of brick-built World War II accommodation huts survive at the southern end of the industrial estate. These were associated with the heavy anti-aircraft gunsite TN4 'Rayleigh' (EHER 20133) sited here during World War II and are a rare survival. Where possible these buildings should be retained within any development. However if this proves impossible to achieve they will require a historic building survey to record the complex prior to any demolition.

B. Settlement Extension Residential Allocations

Policy SER1 - North of London Road Rayleigh
A pre-determination assessment (by fieldwalking and geophysical survey) of the archaeology on-site is currently ongoing. Any future large scale housing development would require an agreed programme of work, depending on the present evaluation and any future trial trenching to ensure that the historic environment assets are either protected in situ or preserved by excavation.

Policy SER2 - West Rochford
A pre-determination assessment (by trenching) of the archaeology on-site has been completed. The results are expected shortly and will be used to ensure that there is appropriate management and/or a mitigation strategy agreed to protect the historic environment assets that will be impacted.

Policy SER3 - West Hockley
For those parts of the site not previously developed, a programme of archaeological evaluation should be undertaken to ensure that the Historic Environment is taken into account at an early stage and to make sure that opportunities for pro-active assessment, management and enhancement are fully considered. Consideration should also be given to the landscape character of the area and the woodland setting.

Policy SER4 - South Hawkwell
The proposed development south of Hawkwell lies within Historic Environment Characterisation Zone 26 (HECZ 26: Land between Hockley and Ashingdon). This area of predominantly rural landscape, sloping down to the Crouch Estuary between Hawkwell and Ashingdon, is noted for its dispersed settlement and the number of find spots, particularly of prehistoric material, and its potential for archaeological sites despite little formal investigation having been carried out. Any future housing development would require a programme of archaeological evaluation to ensure that the historic environment is taken into account at an early stage and to make sure that opportunities for pro-active assessment, management and enhancement are fully considered.

Policy SER6 - South West Hullbridge
The Historic Environment Character Zone (HECZ 36) for land west of Hullbridge states that whilst archaeological deposits are rare, prehistoric sites are present within the inter tidal zone and in general the area has potential for deposits to survive. Two known undated earthworks at Maylons and South of Maylons lie within the proposed development area while a medieval moated site is located close by. A programme of archaeological evaluation would be required to ensure that the historic environment is taken into account at an early stage and to make sure that opportunities for pro-active assessment, management and enhancement are fully considered.

Policy SER7 - South Canewdon
The Historic Environment Character Zone (HECZ 12) shows that Canewdon is an example of a late Saxon/early Medieval settlement focused on the church hall complex but surrounded by a wider dispersed pattern of manors. By comparison with similar settlements it is reasonable to assume that archaeological remains survive within, and in the proximity of, the historic settlement, particularly those historic assets associated with the coast and historic core. A programme of archaeological evaluation would be required to ensure that the historic environment is taken into account at an early stage and to make sure that opportunities for pro-active assessment, management and enhancement are fully considered.

Policy SER8 - South East Ashingdon
The site lies within Historic Environment Character Zone (HECZ 13) characterised by its landscape of dispersed and poly-focal settlements, church/hall complexes and historic farms. The medieval church/hall complex of Ashingdon Hall/St Andrews Church lies nearby while a number of halls, moated sites and farms including Apton Hall, Little Stambridge Hall, Moated site of Rectory Hall and Doggetts Farm are in close proximity. Roman material has also been identified to the west of Doggetts Farm. The zone is also noted for the many archaeological sites of a multi-period date and the potential for archaeological survival due to lack of development. Although there is limited archaeological knowledge within the limits of the proposed site, the area has been identified as being sensitive to change. A programme of archaeological evaluation would be required to ensure that the historic environment is taken into account at an early stage and to make sure that opportunities for pro-active assessment, management and enhancement are fully considered.

Policy SER9 - West Great Wakering
Options for West Great Wakering lie within Historic Environment Character Zone (HECZ 7) an area notable for its multi period landscape dating from the Middle Bronze Age. Brickearth quarrying has had a significant impact upon the historic environment although there remains a high potential for archaeological remains in those areas not previously subject to quarrying. For those areas not quarried there would be a requirement for a programme of archaeological evaluation to ensure that the historic environment is taken into account at an early stage and to make sure that opportunities for pro-active assessment, management and enhancement are fully considered.

C. New Employment Land Allocations

Policy NEL1 - South of London Road
The Rochford Historic Environment Character project identifies that the options for land West of Rayleigh lie within an area characterised by historic dispersed settlement retaining good potential for below ground deposits (HECZ 34). Any future development would require a programme of archaeological evaluation to ensure that the historic environment potential of the area is taken into account at an early stage.

Policy NEL2 - West of the A1245
The Rochford Historic Environment Character project identifies that the options for land West of Rayleigh lie within an area characterised by historic dispersed settlement retaining good potential for below ground deposits (HECZ 34). Any future development would require a programme of archaeological evaluation to ensure that the historic environment potential of the area is taken into account at an early stage.

Policy NEL3 - South of Great Wakering
Although the proposed development area has been subject to some quarrying, there is still potential that some archaeological features remain in situ. The Essex Historic Environment Record (EHER) lists a number of archaeological sites in the vicinity: cropmarks of a linear feature and a rectangular enclosure (EHER 11157) and find spots including a Bronze Age vessel (EHER 11085). A programme of archaeological evaluation would be required to ensure that the cultural heritage is taken into account at an early stage and to make sure that opportunities for pro-active assessment, management and enhancement are fully considered.

POLICY NEL4 - North of London Southend Airport
This area has a large amount of historic environment assets recorded on the EHER. Excavations to the east of Cherry Orchard Farmhouse identified the remains of a medieval or post medieval kiln (EHER 9744) during salvage excavations on the birckearth quarry. This kiln is clearly a precursor of the later Cherry Orchard Brickworks which continued production in to the early 21st century. The brickworks has now been demolished although there is potential for surviving deposits relating to the industry surviving beneath the ground. Cherry Orchard Farmhouse is a listed 17th century timber framed farmhouse which is nationally designated as a grade II listed building. Archaeological evaluation at Westbarrow Hall Farm (EHER17441) has recorded extensive multi-period archaeological deposits over a wide area. A number of military monuments relating to the defence of Southend Airport during World War II survive (including two examples of rare cantilever pillboxes). Detailed discussion will be required to produce a development proposal which protects the most significant deposits and provides for a mitigation strategy including excavation for any remains that cannot be preserved.

Object

Allocations Submission Document

Representation ID: 29064

Received: 25/01/2013

Respondent: Cogent Land LLP

Agent: Iceni Projects

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Cogent is concerned that the other proposed allocations in West Great Wakering - SER9b and NEL3 - are likely to be constrained by wildlife and other ecological matters related to the Star Lane Local Wildlife Site, would contribute to the potential coalescence of between Great Wakering and Shoeburyness and would encourage development in a locally sensitive landscape

Full text:

Cogent is concerned that the other proposed allocations in West Great Wakering - SER9b and NEL3 - are likely to be constrained by wildlife and other ecological matters related to the Star Lane Local Wildlife Site, would contribute to the potential coalescence of between Great Wakering and Shoeburyness and would encourage development in a locally sensitive landscape