6. Option 2
Object
Hockley Area Action Plan Options Report
Representation ID: 27338
Received: 27/01/2011
Respondent: Mr Arnold Hodges
This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
HAAP Consultation January 2011
I wish to register the following objections regarding the above consultation:
Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.
Option 1: Object: Insufficient benefits.
Option 2a: Object: Inappropriate changes and missed opportunities.
Options 3: Object: Inappropriate changes and over development.
Options 3a: Object: Inappropriate changes and over development.
Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.
Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
Object
Hockley Area Action Plan Options Report
Representation ID: 27345
Received: 27/01/2011
Respondent: Mr David West
This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
HAAP Consultation January 2011
I wish to register the following objections regarding the above consultation:
Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.
Option 1: Object: Insufficient benefits.
Option 2a: Object: Inappropriate changes and missed opportunities.
Options 3: Object: Inappropriate changes and over development.
Options 3a: Object: Inappropriate changes and over development.
Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.
Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
Object
Hockley Area Action Plan Options Report
Representation ID: 27352
Received: 27/01/2011
Respondent: Mr P Mackenzie
This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
HAAP Consultation January 2011
I wish to register the following objections regarding the above consultation:
Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.
Option 1: Object: Insufficient benefits.
Option 2a: Object: Inappropriate changes and missed opportunities.
Options 3: Object: Inappropriate changes and over development.
Options 3a: Object: Inappropriate changes and over development.
Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.
Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
Object
Hockley Area Action Plan Options Report
Representation ID: 27359
Received: 27/01/2011
Respondent: Mr and Mrs Isherwood
This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
HAAP Consultation January 2011
I wish to register the following objections regarding the above consultation:
Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.
Option 1: Object: Insufficient benefits.
Option 2a: Object: Inappropriate changes and missed opportunities.
Options 3: Object: Inappropriate changes and over development.
Options 3a: Object: Inappropriate changes and over development.
Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.
Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
Object
Hockley Area Action Plan Options Report
Representation ID: 27366
Received: 27/01/2011
Respondent: M Punt and D Needham
This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
HAAP Consultation January 2011
I wish to register the following objections regarding the above consultation:
Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.
Option 1: Object: Insufficient benefits.
Option 2a: Object: Inappropriate changes and missed opportunities.
Options 3: Object: Inappropriate changes and over development.
Options 3a: Object: Inappropriate changes and over development.
Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.
Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
Object
Hockley Area Action Plan Options Report
Representation ID: 27373
Received: 27/01/2011
Respondent: Mr and Mrs Hanna
This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
HAAP Consultation January 2011
I wish to register the following objections regarding the above consultation:
Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.
Option 1: Object: Insufficient benefits.
Option 2a: Object: Inappropriate changes and missed opportunities.
Options 3: Object: Inappropriate changes and over development.
Options 3a: Object: Inappropriate changes and over development.
Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.
Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
Object
Hockley Area Action Plan Options Report
Representation ID: 27380
Received: 28/01/2011
Respondent: Ms A Baucutt
This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
HAAP Consultation January 2011
I wish to register the following objections regarding the above consultation:
Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.
Option 1: Object: Insufficient benefits.
Option 2a: Object: Inappropriate changes and missed opportunities.
Options 3: Object: Inappropriate changes and over development.
Options 3a: Object: Inappropriate changes and over development.
Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.
Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
Object
Hockley Area Action Plan Options Report
Representation ID: 27387
Received: 28/01/2011
Respondent: Mrs Irene Hutchins
This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
HAAP Consultation January 2011
I wish to register the following objections regarding the above consultation:
Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.
Option 1: Object: Insufficient benefits.
Option 2a: Object: Inappropriate changes and missed opportunities.
Options 3: Object: Inappropriate changes and over development.
Options 3a: Object: Inappropriate changes and over development.
Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.
Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
Object
Hockley Area Action Plan Options Report
Representation ID: 27394
Received: 28/01/2011
Respondent: Ms J Brining
This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
HAAP Consultation January 2011
I wish to register the following objections regarding the above consultation:
Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.
Option 1: Object: Insufficient benefits.
Option 2a: Object: Inappropriate changes and missed opportunities.
Options 3: Object: Inappropriate changes and over development.
Options 3a: Object: Inappropriate changes and over development.
Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.
Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
Object
Hockley Area Action Plan Options Report
Representation ID: 27401
Received: 28/01/2011
Respondent: Mr Alex Brining
This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
HAAP Consultation January 2011
I wish to register the following objections regarding the above consultation:
Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.
Option 1: Object: Insufficient benefits.
Option 2a: Object: Inappropriate changes and missed opportunities.
Options 3: Object: Inappropriate changes and over development.
Options 3a: Object: Inappropriate changes and over development.
Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.
Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
Object
Hockley Area Action Plan Options Report
Representation ID: 27408
Received: 31/01/2011
Respondent: Mrs B Boshell
This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
HAAP Consultation January 2011
I wish to register the following objections regarding the above consultation:
Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.
Option 1: Object: Insufficient benefits.
Option 2a: Object: Inappropriate changes and missed opportunities.
Options 3: Object: Inappropriate changes and over development.
Options 3a: Object: Inappropriate changes and over development.
Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.
Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
Object
Hockley Area Action Plan Options Report
Representation ID: 27415
Received: 12/01/2011
Respondent: Mrs Patricia Dunnage
This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
HAAP Consultation January 2011
I wish to register the following objections regarding the above consultation:
Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.
Option 1: Object: Insufficient benefits.
Option 2a: Object: Inappropriate changes and missed opportunities.
Options 3: Object: Inappropriate changes and over development.
Options 3a: Object: Inappropriate changes and over development.
Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.
Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
Object
Hockley Area Action Plan Options Report
Representation ID: 27422
Received: 17/01/2011
Respondent: J A Howorth
This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
HAAP Consultation January 2011
I wish to register the following objections regarding the above consultation:
Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.
Option 1: Object: Insufficient benefits.
Option 2a: Object: Inappropriate changes and missed opportunities.
Options 3: Object: Inappropriate changes and over development.
Options 3a: Object: Inappropriate changes and over development.
Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.
Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
Object
Hockley Area Action Plan Options Report
Representation ID: 27429
Received: 17/01/2011
Respondent: Mrs J Jeffery
This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
HAAP Consultation January 2011
I wish to register the following objections regarding the above consultation:
Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.
Option 1: Object: Insufficient benefits.
Option 2a: Object: Inappropriate changes and missed opportunities.
Options 3: Object: Inappropriate changes and over development.
Options 3a: Object: Inappropriate changes and over development.
Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.
Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
Object
Hockley Area Action Plan Options Report
Representation ID: 27436
Received: 27/01/2011
Respondent: Mr & Mrs B Smith
This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
HAAP Consultation January 2011
I wish to register the following objections regarding the above consultation:
Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.
Option 1: Object: Insufficient benefits.
Option 2a: Object: Inappropriate changes and missed opportunities.
Options 3: Object: Inappropriate changes and over development.
Options 3a: Object: Inappropriate changes and over development.
Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.
Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
Object
Hockley Area Action Plan Options Report
Representation ID: 27443
Received: 04/02/2011
Respondent: Mrs Gill Young
This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
HAAP Consultation January 2011
I wish to register the following objections regarding the above consultation:
Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.
Option 1: Object: Insufficient benefits.
Option 2a: Object: Inappropriate changes and missed opportunities.
Options 3: Object: Inappropriate changes and over development.
Options 3a: Object: Inappropriate changes and over development.
Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.
Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
Object
Hockley Area Action Plan Options Report
Representation ID: 27450
Received: 12/01/2011
Respondent: Mr and Mrs Lawrence
This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
HAAP Consultation January 2011
I wish to register the following objections regarding the above consultation:
Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.
Option 1: Object: Insufficient benefits.
Option 2a: Object: Inappropriate changes and missed opportunities.
Options 3: Object: Inappropriate changes and over development.
Options 3a: Object: Inappropriate changes and over development.
Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.
Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
Object
Hockley Area Action Plan Options Report
Representation ID: 27457
Received: 07/01/2011
Respondent: Mr Patrick Christian
This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
HAAP Consultation January 2011
I wish to register the following objections regarding the above consultation:
Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.
Option 1: Object: Insufficient benefits.
Option 2a: Object: Inappropriate changes and missed opportunities.
Options 3: Object: Inappropriate changes and over development.
Options 3a: Object: Inappropriate changes and over development.
Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.
Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
Object
Hockley Area Action Plan Options Report
Representation ID: 27464
Received: 10/01/2011
Respondent: Mrs M Leonard
This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
HAAP Consultation January 2011
I wish to register the following objections regarding the above consultation:
Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.
Option 1: Object: Insufficient benefits.
Option 2a: Object: Inappropriate changes and missed opportunities.
Options 3: Object: Inappropriate changes and over development.
Options 3a: Object: Inappropriate changes and over development.
Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.
Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
Object
Hockley Area Action Plan Options Report
Representation ID: 27471
Received: 12/01/2011
Respondent: Mr and Mrs Bailey
This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
HAAP Consultation January 2011
I wish to register the following objections regarding the above consultation:
Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.
Option 1: Object: Insufficient benefits.
Option 2a: Object: Inappropriate changes and missed opportunities.
Options 3: Object: Inappropriate changes and over development.
Options 3a: Object: Inappropriate changes and over development.
Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.
Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
Object
Hockley Area Action Plan Options Report
Representation ID: 27478
Received: 13/01/2011
Respondent: Mr A D Newman
This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
HAAP Consultation January 2011
I wish to register the following objections regarding the above consultation:
Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.
Option 1: Object: Insufficient benefits.
Option 2a: Object: Inappropriate changes and missed opportunities.
Options 3: Object: Inappropriate changes and over development.
Options 3a: Object: Inappropriate changes and over development.
Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.
Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
Object
Hockley Area Action Plan Options Report
Representation ID: 27485
Received: 12/01/2011
Respondent: Mrs K Deedman
This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
HAAP Consultation January 2011
I wish to register the following objections regarding the above consultation:
Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.
Option 1: Object: Insufficient benefits.
Option 2a: Object: Inappropriate changes and missed opportunities.
Options 3: Object: Inappropriate changes and over development.
Options 3a: Object: Inappropriate changes and over development.
Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.
Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
Object
Hockley Area Action Plan Options Report
Representation ID: 27492
Received: 14/01/2011
Respondent: Ms S Pearce
This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
HAAP Consultation January 2011
I wish to register the following objections regarding the above consultation:
Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.
Option 1: Object: Insufficient benefits.
Option 2a: Object: Inappropriate changes and missed opportunities.
Options 3: Object: Inappropriate changes and over development.
Options 3a: Object: Inappropriate changes and over development.
Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.
Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
Object
Hockley Area Action Plan Options Report
Representation ID: 27499
Received: 14/01/2011
Respondent: Mrs Margaret Kennedy
This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
HAAP Consultation January 2011
I wish to register the following objections regarding the above consultation:
Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.
Option 1: Object: Insufficient benefits.
Option 2a: Object: Inappropriate changes and missed opportunities.
Options 3: Object: Inappropriate changes and over development.
Options 3a: Object: Inappropriate changes and over development.
Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.
Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
Object
Hockley Area Action Plan Options Report
Representation ID: 27506
Received: 17/01/2011
Respondent: Ms P James
This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
HAAP Consultation January 2011
I wish to register the following objections regarding the above consultation:
Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.
Option 1: Object: Insufficient benefits.
Option 2a: Object: Inappropriate changes and missed opportunities.
Options 3: Object: Inappropriate changes and over development.
Options 3a: Object: Inappropriate changes and over development.
Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.
Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
Object
Hockley Area Action Plan Options Report
Representation ID: 27513
Received: 17/01/2011
Respondent: Mrs Maureen Martin
This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
HAAP Consultation January 2011
I wish to register the following objections regarding the above consultation:
Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.
Option 1: Object: Insufficient benefits.
Option 2a: Object: Inappropriate changes and missed opportunities.
Options 3: Object: Inappropriate changes and over development.
Options 3a: Object: Inappropriate changes and over development.
Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.
Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
Object
Hockley Area Action Plan Options Report
Representation ID: 27520
Received: 21/01/2011
Respondent: Derek Sparrow
This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
HAAP Consultation January 2011
I wish to register the following objections regarding the above consultation:
Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.
Option 1: Object: Insufficient benefits.
Option 2a: Object: Inappropriate changes and missed opportunities.
Options 3: Object: Inappropriate changes and over development.
Options 3a: Object: Inappropriate changes and over development.
Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.
Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
Object
Hockley Area Action Plan Options Report
Representation ID: 27527
Received: 24/01/2011
Respondent: Susan Measor
This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
HAAP Consultation January 2011
I wish to register the following objections regarding the above consultation:
Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.
Option 1: Object: Insufficient benefits.
Option 2a: Object: Inappropriate changes and missed opportunities.
Options 3: Object: Inappropriate changes and over development.
Options 3a: Object: Inappropriate changes and over development.
Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.
Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
Object
Hockley Area Action Plan Options Report
Representation ID: 27534
Received: 31/01/2011
Respondent: Mrs B Thorogood
This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
HAAP Consultation January 2011
I wish to register the following objections regarding the above consultation:
Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.
Option 1: Object: Insufficient benefits.
Option 2a: Object: Inappropriate changes and missed opportunities.
Options 3: Object: Inappropriate changes and over development.
Options 3a: Object: Inappropriate changes and over development.
Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.
Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
Object
Hockley Area Action Plan Options Report
Representation ID: 27541
Received: 01/02/2011
Respondent: Mr and Mrs Marsh
This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
HAAP Consultation January 2011
I wish to register the following objections regarding the above consultation:
Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.
Option 1: Object: Insufficient benefits.
Option 2a: Object: Inappropriate changes and missed opportunities.
Options 3: Object: Inappropriate changes and over development.
Options 3a: Object: Inappropriate changes and over development.
Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.
Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):
Roads (key priority and subject to viability confirmation)
Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge
Parking:
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station
Building changes
Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.
General
Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road