Policy E5 - Development of Area 1A - Saxon Business Park

Showing comments and forms 31 to 60 of 87

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 7979

Received: 11/04/2009

Respondent: Mrs Shirley Emery

Representation Summary:

I object due to infrastructure already fully stretched/environment and the fact that there are already so many empty business facilities in and around Southend.

Full text:

I object due to infrastructure already fully stretched/environment and the fact that there are already so many empty business facilities in and around Southend.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 8105

Received: 14/04/2009

Respondent: mr peter allwright

Representation Summary:

no

Full text:

no

Support

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 8299

Received: 17/04/2009

Respondent: MRS CAROL BENTLEY-SIMPSON

Representation Summary:

I think anything that will bring jobs in is good! It is better than housing because the essential services couldnt cope and the schools, transport system couldnt ether. so a business park will bring jobs for people already living here. It must be offered to locals though

Full text:

I think anything that will bring jobs in is good! It is better than housing because the essential services couldnt cope and the schools, transport system couldnt ether. so a business park will bring jobs for people already living here. It must be offered to locals though

Support

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 8474

Received: 18/04/2009

Respondent: mr Peter Chandler

Representation Summary:

agree

Full text:

agree

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 8515

Received: 19/04/2009

Respondent: Rory Emery

Representation Summary:

Strongly Object on the gorunds of:
(1) Living directly under the flightpath my quality life will be severely impacted
(2) Thought the government / councils were meant to improve the environment and not poison it
(3) Road connections to Southend are already over congested
(4) All promises of increased employment opportunities in other regional airport development have never been met.
(5) The SE already has 4 international airports for passenger travel.
(6) Investing in air travel can only be short term given oil becoming scarce / expensive in the next 10 years.

Full text:

Strongly Object on the gorunds of:
(1) Living directly under the flightpath my quality life will be severely impacted
(2) Thought the government / councils were meant to improve the environment and not poison it
(3) Road connections to Southend are already over congested
(4) All promises of increased employment opportunities in other regional airport development have never been met.
(5) The SE already has 4 international airports for passenger travel.
(6) Investing in air travel can only be short term given oil becoming scarce / expensive in the next 10 years.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 8638

Received: 20/04/2009

Respondent: Mrs susie Ash

Representation Summary:

I strongly object to ALL the proposals for the Airport expansion & redevelopment of the surrounding areas. The infrastructure will NOT support the planned numbers of passengers, and expansion of roads will only add to an already crowded environment. What will Cuckoo Corner and the A127 be like then????
Traffic in this whole area is already at total gridlock, and the airport expansion will certainly make this worse.

The increased noise & environmental pollution will affect thousands of local people.

I don't care how many new jobs they say will be created, they are not needed for this type of BAD PLANNING...

Full text:

I strongly object to ALL the proposals for the Airport expansion & redevelopment of the surrounding areas. The infrastructure will NOT support the planned numbers of passengers, and expansion of roads will only add to an already crowded environment. What will Cuckoo Corner and the A127 be like then????
Traffic in this whole area is already at total gridlock, and the airport expansion will certainly make this worse.

The increased noise & environmental pollution will affect thousands of local people.

I don't care how many new jobs they say will be created, they are not needed for this type of BAD PLANNING...

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 9090

Received: 26/04/2009

Respondent: mr David Holmes

Representation Summary:

What really worries me is that the council have agreed to most of this in advance, which is why Stobart Group have invested so heavily.

How many councillors live under the flight-path or in the areas affected potentially by more HGV traffic?

The jobs for the airport are likely to be skilled and very few will go locally, meaning more traffic in and out of the area.

The council believes that a business park will create over 6000 jobs. It took 2 years to find anyone for Cherry Orchard and that was before the recession.

An ill-conceived plan



Full text:

What really worries me is that the council have agreed to most of this in advance, which is why Stobart Group have invested so heavily.

How many councillors live under the flight-path or in the areas affected potentially by more HGV traffic?

The jobs for the airport are likely to be skilled and very few will go locally, meaning more traffic in and out of the area.

The council believes that a business park will create over 6000 jobs. It took 2 years to find anyone for Cherry Orchard and that was before the recession.

An ill-conceived plan



Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 9174

Received: 27/04/2009

Respondent: Chris Poole

Representation Summary:

I strongly object to the whole concept of this Saxon Business park since there are many empty 'brown field sites within Southend, which should be considered first.

This proposed development should not be linked to the airport expansion.

Full text:

I strongly object to the whole concept of this Saxon Business park since there are many empty 'brown field sites within Southend, which should be considered first.

This proposed development should not be linked to the airport expansion.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 9343

Received: 28/04/2009

Respondent: Mrs Siobhan Thomas

Representation Summary:

Too many business parks already

Full text:

Too many business parks already

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 9552

Received: 30/04/2009

Respondent: S Ewing

Representation Summary:

the area cannot cope with additonal traffic and pollution irrespective of new local roads built the trunk system cannot cope as is let alone adding to it

Full text:

the area cannot cope with additonal traffic and pollution irrespective of new local roads built the trunk system cannot cope as is let alone adding to it

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 9590

Received: 01/05/2009

Respondent: mrs linda matthews

Representation Summary:

i do not want increased air traffic over my house, and i dont think the infrastructure around the airport could cope with the increase in use.

Full text:

i do not want increased air traffic over my house, and i dont think the infrastructure around the airport could cope with the increase in use.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 9628

Received: 01/05/2009

Respondent: Mrs Loraine Thompson

Representation Summary:

I love taking my grandchildren and dogs for walks around this area, but sadly if you have your way we will be walking on concrete. At this rate there will be nowhere for dogs and children to run free.

Full text:

I love taking my grandchildren and dogs for walks around this area, but sadly if you have your way we will be walking on concrete. At this rate there will be nowhere for dogs and children to run free.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 9816

Received: 04/05/2009

Respondent: mr Paul Fox

Representation Summary:

With global warming we do not want a larger airport or more aeroplanes.

Full text:

With global warming we do not want a larger airport or more aeroplanes.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 9875

Received: 07/05/2009

Respondent: mrs lilian fleming

Representation Summary:

another pie in the sky!

Full text:

another pie in the sky!

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 10105

Received: 06/05/2009

Respondent: mrs sarah brill

Representation Summary:

I believe your fundementally wrong projection for activity for these area is wrong

Full text:

I believe your fundementally wrong projection for activity for these area is wrong

Support

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 10187

Received: 08/05/2009

Respondent: Mr. Terence DAVIES

Representation Summary:

E5.

I fully support the development of Area 1A - Saxon Business Park as detailed in Policy E5.

Full text:

E5.

I fully support the development of Area 1A - Saxon Business Park as detailed in Policy E5.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 10276

Received: 07/05/2009

Respondent: MRS SUSAN THORN

Representation Summary:

OBJECT

Full text:

OBJECT

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 10315

Received: 07/05/2009

Respondent: MR STEVEN THORN

Representation Summary:

object

Full text:

object

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 10355

Received: 07/05/2009

Respondent: mr kevin Mahony

Representation Summary:

I object to expansion of Southend aiport.

Full text:

I object to expansion of Southend aiport.

Support

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 10565

Received: 11/05/2009

Respondent: Renaissance Southend

Representation Summary:

The Saxon Business Park should be the subject of a detailed Development Brief to deal with the provision of infrastructure and utilities prior to any detailed planning application.

Full text:

The Saxon Business Park should be the subject of a detailed Development Brief to deal with the provision of infrastructure and utilities prior to any detailed planning application.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 10646

Received: 08/05/2009

Respondent: Peter Mack

Representation Summary:

I object on the grounds of loss of green belt and an increase road traffic.

Full text:

I object on the grounds of loss of green belt and an increase road traffic.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 10664

Received: 08/05/2009

Respondent: Mrs Susan Mack

Representation Summary:

I object to the proposed development of Southend Airport on the grounds of
increased noise, road traffic, night flights, loss of green belt, pollution
and the loss of amenity of thousands of residents in the surrounding area
to enjoy their homes and gardens.

Full text:

I object to the proposed development of Southend Airport on the grounds of
increased noise, road traffic, night flights, loss of green belt, pollution
and the loss of amenity of thousands of residents in the surrounding area
to enjoy their homes and gardens.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 10718

Received: 08/05/2009

Respondent: Mr GEORGE COX

Representation Summary:

I do not agree the over 7,000 jobs will be created by the expansion plans. In fact, when the job survey was carried, the country was not in a financial mess and therefore I would dispute the accuracy of those figures. I doubt more than a handful of jobs would be created. The survey must be carried out again in light of the country's financial situation.

Full text:

I do not agree the over 7,000 jobs will be created by the expansion plans. In fact, when the job survey was carried, the country was not in a financial mess and therefore I would dispute the accuracy of those figures. I doubt more than a handful of jobs would be created. The survey must be carried out again in light of the country's financial situation.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 10739

Received: 08/05/2009

Respondent: Mrs Louisa Reynolds

Representation Summary:

Do we really need another business park? In the current climate with so many firms going under, who is going to occupy it?

Full text:

Do we really need another business park? In the current climate with so many firms going under, who is going to occupy it?

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 10781

Received: 08/05/2009

Respondent: Mr Andrew Reynolds

Representation Summary:

I object to this plan.

Full text:

I object to this plan.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 10844

Received: 09/05/2009

Respondent: clive Davison

Representation Summary:

I object to expanding developing this area.

Southend is over crowded as it is - traffic appalling, too many flats being built, Town Centre is a no-go area in the evening.

Houses will be de-valued as has been seen around Stansted and the noise from the airport at night is already unacceptable.

Full text:

I object to expanding developing this area.

Southend is over crowded as it is - traffic appalling, too many flats being built, Town Centre is a no-go area in the evening.

Houses will be de-valued as has been seen around Stansted and the noise from the airport at night is already unacceptable.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 10946

Received: 10/05/2009

Respondent: Lynn Pooley

Representation Summary:

Please see previous objetions.

Full text:

Please see previous objetions.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 10989

Received: 10/05/2009

Respondent: Mrs Shelley Chamberlain

Representation Summary:

The airport extension plan wrong. It is not needed in this corner of Essex. Therefore, the development of the business park is not necessary.

Full text:

The airport extension plan wrong. It is not needed in this corner of Essex. Therefore, the development of the business park is not necessary.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 11041

Received: 10/05/2009

Respondent: Adam Mack

Representation Summary:

I object on the following basis:
Noise pollution
Air traffic
Air pollution
Quality of life to local residents
Loss of Green Belt land
CO2 emissions/Global Warming

Full text:

I object on the following basis:
Noise pollution
Air traffic
Air pollution
Quality of life to local residents
Loss of Green Belt land
CO2 emissions/Global Warming

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 11086

Received: 10/05/2009

Respondent: Natalie Carter

Representation Summary:

I object on the following basis:
Noise pollution
Air traffic
Air pollution
Quality of life to local residents
Loss of Green Belt land
CO2 emissions/Global Warming

Full text:

I object on the following basis:
Noise pollution
Air traffic
Air pollution
Quality of life to local residents
Loss of Green Belt land
CO2 emissions/Global Warming