Policy E4 - Phasing of Saxon Business Park

Showing comments and forms 1 to 30 of 118

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 4989

Received: 09/03/2009

Respondent: Lin Marshall-Smith

Representation Summary:

No phasing is needed as permission for a new business site is not needed in this area.Do not cram more unrequired business units in an alredy overcrowded area.

Full text:

No phasing is needed as permission for a new business site is not needed in this area.Do not cram more unrequired business units in an alredy overcrowded area.

Support

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 5002

Received: 09/03/2009

Respondent: Mr K Meikle

Representation Summary:

Fully Support.

Full text:

Fully Support.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 5172

Received: 13/03/2009

Respondent: Mr B Jones

Representation Summary:

STRONGLY OBJECT TO ALL EXPANSION. Do minimum or preferably no expansion.The increase in aircraft noise for us residents will become intolerable, emissions will increase. The road system cannot cope with current traffic levels. If 2m passenger movements are reached this will require about 4000 extra car journeys per day!!! Imagine the road upgrading work for the next few years that would be required. This area has a high percentage of elderly people who hardly fly. Who will the expansion benefit, people flying from outside the region and the business people and major shareholders who will make millions of pounds.

Full text:

STRONGLY OBJECT TO ALL EXPANSION. Do minimum or preferably no expansion.The increase in aircraft noise for us residents will become intolerable, emissions will increase. The road system cannot cope with current traffic levels. If 2m passenger movements are reached this will require about 4000 extra car journeys per day!!! Imagine the road upgrading work for the next few years that would be required. This area has a high percentage of elderly people who hardly fly. Who will the expansion benefit, people flying from outside the region and the business people and major shareholders who will make millions of pounds.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 5327

Received: 19/03/2009

Respondent: Mr terence white

Representation Summary:

Sufficient empty business parks already located in southend and rochford area.

Full text:

Sufficient empty business parks already located in southend and rochford area.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 5372

Received: 20/03/2009

Respondent: Amanda Barness

Representation Summary:

I strongly object to the airport expansion plans in terms of impact of noise levels, incrrased aircraft flying too near to houses, pollution, impact on traffic in the Southend area and impact on house prices.

I do not think that the results from the current consultation will be fully representative of the southend and rochford populations and would like to see a reprentative independent survey conducted about such an important matter that will impact all of our lives.

Full text:

I strongly object to the airport expansion plans in terms of impact of noise levels, incrrased aircraft flying too near to houses, pollution, impact on traffic in the Southend area and impact on house prices.

I do not think that the results from the current consultation will be fully representative of the southend and rochford populations and would like to see a reprentative independent survey conducted about such an important matter that will impact all of our lives.

Support

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 5406

Received: 25/03/2009

Respondent: Mrs A Wate

Representation Summary:

agree

Full text:

agree

Support

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 5407

Received: 25/03/2009

Respondent: Mrs A Wate

Representation Summary:

agree this makes some sort of sense

Full text:

agree this makes some sort of sense

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 5501

Received: 24/03/2009

Respondent: Mr Mark Davis

Representation Summary:

The removal of the Rubgy club will mean yet more green land is lost.

Full text:

The removal of the Rubgy club will mean yet more green land is lost.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 5508

Received: 24/03/2009

Respondent: karen sutherland

Representation Summary:

yet more industrial units to stand empty...IF there is such a huge demand in the area why haven't these buisness parks been built before? A runway extension is surely not needed to get people to yet another DIY superstore. And what of the people being forced out of the brickworks cottages?

Full text:

yet more industrial units to stand empty...IF there is such a huge demand in the area why haven't these buisness parks been built before? A runway extension is surely not needed to get people to yet another DIY superstore. And what of the people being forced out of the brickworks cottages?

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 5600

Received: 25/03/2009

Respondent: Mr Graham Whitehead

Representation Summary:

All this talk of the proposed business parks, units etc. Extending the runway is not a precursor. All that is needed is a clear need for these business premises. If they do not stand up on their own, why are they being lumped into the Extension of the runway?. If they are /were needed, then just do it, do not con the populace into thinking the runway extension will provide these opportunities & jobs.

Full text:

All this talk of the proposed business parks, units etc. Extending the runway is not a precursor. All that is needed is a clear need for these business premises. If they do not stand up on their own, why are they being lumped into the Extension of the runway?. If they are /were needed, then just do it, do not con the populace into thinking the runway extension will provide these opportunities & jobs.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 5708

Received: 26/03/2009

Respondent: Allan Trower

Representation Summary:

This will have a negative on:-

1. Environment (noise and pollution)
2. Wildlife and greenbelt
3. Surrounding residential properties
4. Public Services (Health and Education)
5. Infrastructure (congestion)

I dont believe the sweetner on job creation given the current climate so dont be fooled by this one. I can't see many companies wanting to invest in this proposal.

Full text:

This will have a negative on:-

1. Environment (noise and pollution)
2. Wildlife and greenbelt
3. Surrounding residential properties
4. Public Services (Health and Education)
5. Infrastructure (congestion)

I dont believe the sweetner on job creation given the current climate so dont be fooled by this one. I can't see many companies wanting to invest in this proposal.

Comment

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 5874

Received: 28/03/2009

Respondent: MR JEREMY DAVENPORT

Representation Summary:

There is insufficient allownce for treansport links.

Full text:

There is insufficient allownce for treansport links.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 5991

Received: 29/03/2009

Respondent: Mr Derek Waddy-Smith

Representation Summary:

No case has been made for the need for these business units so, without demand, how can you supply?

Full text:

No case has been made for the need for these business units so, without demand, how can you supply?

Support

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 6046

Received: 30/03/2009

Respondent: Mr Rick Jackson

Representation Summary:

As someone who works in Southend and lives in Rochford, the economic and employment benefits of the airport development far outweigh any of the objections put forward.

Full text:

As someone who works in Southend and lives in Rochford, the economic and employment benefits of the airport development far outweigh any of the objections put forward.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 6076

Received: 30/03/2009

Respondent: Mr Martin Birch

Representation Summary:

Southend airport is in the wrong location for anything other than low growth. The roads are congested and the area is overcrowded. Expanding the airport will give rise to more noise and air pollution. A restriction on night flights should be enforced.

Full text:

Southend airport is in the wrong location for anything other than low growth. The roads are congested and the area is overcrowded. Expanding the airport will give rise to more noise and air pollution. A restriction on night flights should be enforced.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 6098

Received: 31/03/2009

Respondent: Mrs Joanna Spencer

Representation Summary:

I hope the rugby club were told before they are being asked to re-locate and also the people that live in the cottages!!
Please somebody tell me why we need even more units that will sit empty?

Full text:

I hope the rugby club were told before they are being asked to re-locate and also the people that live in the cottages!!
Please somebody tell me why we need even more units that will sit empty?

Comment

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 6140

Received: 19/03/2009

Respondent: Arriva Southern Counties

Representation Summary:

New and expanded business parks - north of the airport

There does not appear to be sufficient emphasis on access to the proposed areas of business development.

Neither Aviation Way nor Cherry Orchard Way has a local bus service. Currently the nearest bus service is the 9 which serves Eastwoodbury Lane. The replacement of that section of Eastwoodbury Lane across the end of the runway with a new road to a new junction with Nestuda Way will result in the 9 omitting the section of Eastwoodbury Lane between Aviation Way and Nestuda Way which means a new bus service will be needed to serve the business parks.

Full text:

LONDON SOUTHEND AIRPORT & ENVIRONS JOINT AREA ACTION PLAN - PREFERRED OPTIONS

Thank you for sending us a copy of the above document.

We provide bus services on routes 7,8 and 9 which either border or go through the area under consideration.

These services run up to a 10 or 12 minute frequency during the daytime six days a week.

It is vital that every opportunity is taken to maximise the opportunities for travel by modes having the least impact on the area and the general recognition of that is welcomed.

New and expanded business parks - north of the airport

There does not appear to be sufficient emphasis on access to the proposed areas of business development.

Neither Aviation Way nor Cherry Orchard Way has a local bus service. Currently the nearest bus service is the 9 which serves Eastwoodbury Lane. The replacement of that section of Eastwoodbury Lane across the end of the runway with a new road to a new junction with Nestuda Way will result in the 9 omitting the section of Eastwoodbury Lane between Aviation Way and Nestuda Way which means a new bus service will be needed to serve the business parks.

Bus access to the airport

Previous discussions have suggested that the airport would be served by a minor rerouting of services 7 and 8 (Southend - Rochford - Hockley - Rayleigh) through the area immediately to the east of the proposed station. This area appears to be no longer available and clarification is needed as to how bus services will be able to serve the airport and station.

Park & Ride off Nestuda Way

It is unclear from the document if this proposal is intended to be a Park & Ride facility for the airport alone or as a means of access to Southend town centre. There would appear to be an opportunity here, subject to capacity, to provide a much needed facility for the latter. In either case it is important that the route followed by the Park & Ride bus service is, as far as possible, free of delay by other road traffic both to make the service attractive and to minimise the cost of provision.




Diversion of Eastwoodbury Lane to new junction with Nestuda Way

This link is a much better option than closing Eastwoodbury Lane and we would divert Service 9 accordingly. This brings a potential benefit for improved access to RBS offices, the Tesco store and the North Crescent and Feeches Road areas. I would suggest it would be beneficial if bus stops and a suitable pedestrian link can be provided in each direction on the new link with a suitable pedestrian path provided close to the corner of the RBS car park.

I trust my comments are clear and if you need any clarification please contact me.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 6160

Received: 31/03/2009

Respondent: Mr Jon Spencer

Representation Summary:

Has anybody asked the people in the brick cottages how they fill about losing there houses, or told the rugby club that they would have to relocate, or did they just have to wait for this report to come out.

Full text:

Has anybody asked the people in the brick cottages how they fill about losing there houses, or told the rugby club that they would have to relocate, or did they just have to wait for this report to come out.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 6238

Received: 02/04/2009

Respondent: mr david Moyse

Representation Summary:

I object to the demolition of the cottages to the west of the site and to the relocation of Westcliff Rugby club

Full text:

I object to the demolition of the cottages to the west of the site and to the relocation of Westcliff Rugby club

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 6417

Received: 03/04/2009

Respondent: Mrs J Greenwood

Representation Summary:

The loss of green areas at this location is not acceptable.

Full text:

The loss of green areas at this location is not acceptable.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 6480

Received: 04/04/2009

Respondent: David Emery

Representation Summary:

No expansion of any airport in the last 25 years has resulted in the expected increase in job opportunities. Any figures quoted are inevitably inflated to make the whole expansion in some way palatable! I object to every single proposal. In addition the process of objection is over complicated, confusing, time-consuming and strongly suggests it has been designed to statistically weaken any single objection! Rochford council should be ashamed of themselves!

Full text:

No expansion of any airport in the last 25 years has resulted in the expected increase in job opportunities. Any figures quoted are inevitably inflated to make the whole expansion in some way palatable! I object to every single proposal. In addition the process of objection is over complicated, confusing, time-consuming and strongly suggests it has been designed to statistically weaken any single objection! Rochford council should be ashamed of themselves!

Support

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 6525

Received: 04/04/2009

Respondent: Mr Mick Woolley

Representation Summary:

The area(s)would benifit from redevelopment.

Full text:

The area(s)would benifit from redevelopment.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 6559

Received: 04/04/2009

Respondent: Mr Brian Birnie

Representation Summary:

I feel let down already that work of some kind is in progress in the Southend Road location. It appears that a decision has been made by Rochford and Southend Councils already.

I strongly object to the expansion of Southend Airport and the changes that are associated with it. This list is a few of the reasons.
Increased pollution. Increased traffic on roads already congested. Increased noise 24 hours no guarantee to limits. Reduction in house values as can already be seen just with the expansion proposals. Increase in freight flights these planes won't be quieter than newer style passenger planes.

Full text:

I feel let down already that work of some kind is in progress in the Southend Road location. It appears that a decision has been made by Rochford and Southend Councils already.

I strongly object to the expansion of Southend Airport and the changes that are associated with it. This list is a few of the reasons.
Increased pollution. Increased traffic on roads already congested. Increased noise 24 hours no guarantee to limits. Reduction in house values as can already be seen just with the expansion proposals. Increase in freight flights these planes won't be quieter than newer style passenger planes.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 6632

Received: 05/04/2009

Respondent: Mrs Hilary Frances Bramble

Representation Summary:

Strongly object to the removal of the cottages, there is a shortage of housing, these should be replaced with quality starter homes.

Full text:

Strongly object to the removal of the cottages, there is a shortage of housing, these should be replaced with quality starter homes.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 6637

Received: 05/04/2009

Respondent: Mr Heath Aldridge

Representation Summary:

Traffic concerns

Full text:

Traffic concerns

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 6747

Received: 05/04/2009

Respondent: Mr David Thomas

Representation Summary:

I strongly object to the proposed Business Parks near Southend Airport being in linked with the proposed Airport Runway Extension.
There is no dependency between them suggested in either the new or old JAAP reports or anything else I have seen. According to the JAAP Report of the 7380 total jobs expected to be created 6200 jobs are due to the Business Parks, leaving only 1180 due to the Airport expansion. How many of these 1180 would be created without the runway extension is not given. These two proposals should be considered and voted on independently.

Full text:

I strongly object to the proposed Business Parks near Southend Airport being in linked with the proposed Airport Runway Extension.
There is no dependency between them suggested in either the new or old JAAP reports or anything else I have seen. According to the JAAP Report of the 7380 total jobs expected to be created 6200 jobs are due to the Business Parks, leaving only 1180 due to the Airport expansion. How many of these 1180 would be created without the runway extension is not given. These two proposals should be considered and voted on independently.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 6918

Received: 06/04/2009

Respondent: P Crawshaw

Representation Summary:

I strongly object to the runway extension and associated developments. They will blight the lives of many residents in the area due to the increase in noise, pollution and traffic to provide very limited benefits.

Full text:

I strongly object to the runway extension and associated developments. They will blight the lives of many residents in the area due to the increase in noise, pollution and traffic to provide very limited benefits.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 6971

Received: 06/04/2009

Respondent: Mr Peter Carson

Representation Summary:

Traffic limiting measures should be implemented on Whitehouse Road as part of the enabling works prior to building commencing as this unsuitable residential road will become a major feeder road to the industrial development.

Full text:

Traffic limiting measures should be implemented on Whitehouse Road as part of the enabling works prior to building commencing as this unsuitable residential road will become a major feeder road to the industrial development.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 7131

Received: 07/04/2009

Respondent: Mr A James

Representation Summary:

I am concerned about the considerable and unnecessary expansion of the industrial estate and the loss of greenbelt and good farmland.

Full text:

I am concerned about the considerable and unnecessary expansion of the industrial estate and the loss of greenbelt and good farmland.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 7305

Received: 07/04/2009

Respondent: Kylie Heath

Representation Summary:

The proposed airport extension would have an adverse effect on the local town. The area is simply too built up with local housing to support the extension. It is too late to try to extend the airport without ruining the quality of life of thousands of people.

Full text:

The proposed airport extension would have an adverse effect on the local town. The area is simply too built up with local housing to support the extension. It is too late to try to extend the airport without ruining the quality of life of thousands of people.