Policy E3 - Saxon Business Park

Showing comments and forms 1 to 30 of 145

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 4526

Received: 17/02/2009

Respondent: Mr K Sanders

Representation Summary:

In the current economic climate it is ridiculous to suggest that this amount of jobs will be created. In addition there is no guarantee that any jobs created will be for local people so could just result in a greater influx of people to an already crowded district.

Full text:

In the current economic climate it is ridiculous to suggest that this amount of jobs will be created. In addition there is no guarantee that any jobs created will be for local people so could just result in a greater influx of people to an already crowded district.

Support

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 4577

Received: 19/02/2009

Respondent: MR J GRANGER

Representation Summary:

This would be a fantastic addition to the area. The skills and training opportunities for local people would be invaluable.
Yes it would attract people from outside the area with the required skills. But if they are contributing to the economy as a whole and likely training local people, I can't see that as a negative aspect at all.

Full text:

This would be a fantastic addition to the area. The skills and training opportunities for local people would be invaluable.
Yes it would attract people from outside the area with the required skills. But if they are contributing to the economy as a whole and likely training local people, I can't see that as a negative aspect at all.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 4585

Received: 19/02/2009

Respondent: Mr Clifford Haddy

Representation Summary:

Where is the infrastucture to support all of this. We are already being strangled by trafic congestion.

Full text:

Where is the infrastucture to support all of this. We are already being strangled by trafic congestion.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 4817

Received: 03/03/2009

Respondent: Mr Ian Towler

Representation Summary:

Either the permission will be restricted to classes B1 and B2 or not. To say that non B1 /B2 uses may be acceptable to support the operation means that in practice there are no restrictions. This policy is therefore worthless.
Also this is inconsistent with policy E2 in which all applications will be required to make financial provision for walking and cycling facilities. Here it is only "expected". This has no meaning or weight at all!

Full text:

Either the permission will be restricted to classes B1 and B2 or not. To say that non B1 /B2 uses may be acceptable to support the operation means that in practice there are no restrictions. This policy is therefore worthless.
Also this is inconsistent with policy E2 in which all applications will be required to make financial provision for walking and cycling facilities. Here it is only "expected". This has no meaning or weight at all!

Comment

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 4872

Received: 05/03/2009

Respondent: Environment Agency

Representation Summary:

Policy E3: Saxon Business Park

This area is mainly Greenfield land. SUDS should be incorporated for all new development. This would not only ensure reduction in surface water run-off but would also improve the water quality. There may be biodiversity benefits as well, depending on the type of SUDS selected, e.g. swales and attenuation ponds.

Full text:

Policy E3: Saxon Business Park

This area is mainly Greenfield land. SUDS should be incorporated for all new development. This would not only ensure reduction in surface water run-off but would also improve the water quality. There may be biodiversity benefits as well, depending on the type of SUDS selected, e.g. swales and attenuation ponds.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 4970

Received: 08/03/2009

Respondent: Stephen Shanks

Representation Summary:

what is a 'high-quality business park' and what are the 'eco-friendly business start-up units? It sounds like a crass sweetener to allow for the removal of the environmental protection of the green-belt?
Sadly, the town is already full of empty businesses and business parks.

Full text:

what is a 'high-quality business park' and what are the 'eco-friendly business start-up units? It sounds like a crass sweetener to allow for the removal of the environmental protection of the green-belt?
Sadly, the town is already full of empty businesses and business parks.

Support

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 5001

Received: 09/03/2009

Respondent: Mr K Meikle

Representation Summary:

Fully Support

Full text:

Fully Support

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 5055

Received: 10/03/2009

Respondent: Mr Peter Moss

Representation Summary:

Who will want use the country park, cycle tracks and footpaths, with aircraft zooming overhead every 10 minutes, polluting the air this a descration of a great facility

Full text:

Who will want use the country park, cycle tracks and footpaths, with aircraft zooming overhead every 10 minutes, polluting the air this a descration of a great facility

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 5081

Received: 10/03/2009

Respondent: Mrt Lee Heley

Representation Summary:

The number of jobs directly related to airport expansion does not justify the increase in environmental pollution and noise pollution consequent to airport expansion.

Full text:

The overall expansion of the airport is justified on the basis of an increase in jobs, but the document does not specify how many additional jobs the expansion of the airport brings, compared to the increase in size of the business park, which is possible to achieve without growing the airport. i.e. how many jobs will there be in MRO and small operators themselves. It is likely to be in the hundreds. This number of jobs needs to be put against the environmental consequences of carbon intensive travel, and the noise pollution for many thousands of people living under the flight path. It does not add up to a good deal for Southend.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 5095

Received: 11/03/2009

Respondent: Mrs D Davies

Representation Summary:

Once again 'it is expected' has been used so NOTHING is definite. Such airy fairly terms should NOT be used in a 'consultation' document. As for walking & cycling in the area, who will want to indulge in these activities with the noise & pollution of low flying aircraft directly overhead.

Full text:

Once again 'it is expected' has been used so NOTHING is definite. Such airy fairly terms should NOT be used in a 'consultation' document. As for walking & cycling in the area, who will want to indulge in these activities with the noise & pollution of low flying aircraft directly overhead.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 5150

Received: 12/03/2009

Respondent: Mr Graham Whitehead

Representation Summary:

Again the generalalities of "expected" a "contribution" , "overly prescriptive" mean this is what we want you to think you will get, but you wont.
In the current ecconomical climate, who in there right minds is going to take up these business premises that come with additional costs to fund the bike rides & walk ways.
There are plenty of empty industrial sites that are crying out for tennents without the rental premium of the parks & walks.

Full text:

Again the generalalities of "expected" a "contribution" , "overly prescriptive" mean this is what we want you to think you will get, but you wont.
In the current ecconomical climate, who in there right minds is going to take up these business premises that come with additional costs to fund the bike rides & walk ways.
There are plenty of empty industrial sites that are crying out for tennents without the rental premium of the parks & walks.

Comment

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 5162

Received: 13/03/2009

Respondent: Mr Terry Waine

Representation Summary:

There are footpaths used by the public that run to the right of the building works and left of the rugby pitches.They proceed across fields,past pillboxes and at the north of the airfield head towards the golf course.What is the plan to protect this walk, and will there be a pedestrian bridge over the new dual carriagemwy?

Full text:

There are footpaths used by the public that run to the right of the building works and left of the rugby pitches.They proceed across fields,past pillboxes and at the north of the airfield head towards the golf course.What is the plan to protect this walk, and will there be a pedestrian bridge over the new dual carriagemwy?

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 5171

Received: 13/03/2009

Respondent: Mr B Jones

Representation Summary:

STRONGLY OBJECT TO ALL EXPANSION. Do minimum or preferably no expansion.The increase in aircraft noise for us residents will become intolerable, emissions will increase. The road system cannot cope with current traffic levels. If 2m passenger movements are reached this will require about 4000 extra car journeys per day!!! Imagine the road upgrading work for the next few years that would be required. This area has a high percentage of elderly people who hardly fly. Who will the expansion benefit, people flying from outside the region and the business people and major shareholders who will make millions of pounds.

Full text:

STRONGLY OBJECT TO ALL EXPANSION. Do minimum or preferably no expansion.The increase in aircraft noise for us residents will become intolerable, emissions will increase. The road system cannot cope with current traffic levels. If 2m passenger movements are reached this will require about 4000 extra car journeys per day!!! Imagine the road upgrading work for the next few years that would be required. This area has a high percentage of elderly people who hardly fly. Who will the expansion benefit, people flying from outside the region and the business people and major shareholders who will make millions of pounds.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 5308

Received: 19/03/2009

Respondent: Mr Peter Moss

Representation Summary:

There is no proven demand for the additional space and could have the effect of drawing businesses from other industrial thereby damaging existing occupation. Negating the claim of extra jobs.Jeopardising the previously fiercely protected greenbelt is unjustified.

Full text:

There is no proven demand for the additional space and could have the effect of drawing businesses from other industrial thereby damaging existing occupation. Negating the claim of extra jobs.Jeopardising the previously fiercely protected greenbelt is unjustified.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 5326

Received: 19/03/2009

Respondent: Mr terence white

Representation Summary:

The floorspace might be available but what industries are you planning to house there ????

Full text:

The floorspace might be available but what industries are you planning to house there ????

Support

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 5405

Received: 25/03/2009

Respondent: Mrs A Wate

Representation Summary:

agreed, we need the better jobs i would not be too inflexable in respect of numbers etc

Full text:

agreed, we need the better jobs i would not be too inflexable in respect of numbers etc

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 5500

Received: 24/03/2009

Respondent: Mr Mark Davis

Representation Summary:

In addtion to my comments aboput the roads. I note that it states would not be too prescriptive in the use of this land. Reading between the lines this must mean the intention would more than likely be used for more retail units. Which would cause more pressure on existing retailers in Southend.

Full text:

In addtion to my comments aboput the roads. I note that it states would not be too prescriptive in the use of this land. Reading between the lines this must mean the intention would more than likely be used for more retail units. Which would cause more pressure on existing retailers in Southend.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 5503

Received: 24/03/2009

Respondent: karen sutherland

Representation Summary:

Yet more green belt being taken, and for no good purpose with so many industrial units in the area vacant. Just how eco friendly will the units be given that they have been built on green belt land and are subjected to huge amounts of noise and pollution and who is going to want to walk and cycle out there?

Full text:

Yet more green belt being taken, and for no good purpose with so many industrial units in the area vacant. Just how eco friendly will the units be given that they have been built on green belt land and are subjected to huge amounts of noise and pollution and who is going to want to walk and cycle out there?

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 5607

Received: 25/03/2009

Respondent: natalie mcallister

Representation Summary:

Will there be any businesses to fill the eco friendly start up units or other available floor space in the present economic climate? Who will want to cycle or walk around the airport with the noise and pollution all around? The economic details have no substance.

Full text:

Will there be any businesses to fill the eco friendly start up units or other available floor space in the present economic climate? Who will want to cycle or walk around the airport with the noise and pollution all around? The economic details have no substance.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 5707

Received: 26/03/2009

Respondent: Allan Trower

Representation Summary:

This will have a negative on:-

1. Environment (noise and pollution)
2. Wildlife and greenbelt
3. Surrounding residential properties
4. Public Services (Health and Education)
5. Infrastructure (congestion)

I dont believe the sweetner on job creation given the current climate so dont be fooled by this one. I can't see many companies wanting to invest in this proposal.

Full text:

This will have a negative on:-

1. Environment (noise and pollution)
2. Wildlife and greenbelt
3. Surrounding residential properties
4. Public Services (Health and Education)
5. Infrastructure (congestion)

I dont believe the sweetner on job creation given the current climate so dont be fooled by this one. I can't see many companies wanting to invest in this proposal.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 5772

Received: 26/03/2009

Respondent: Gemma Cudlipp

Representation Summary:

I strongly object to this airport, and ask you to consider local residents quality of life - there are a high proportion of young families in this area and to be blighted by this expansion seems grossly unfair just so someone can make a quick buck. Most of the reasons given to support the expansion are spurious and I hope a lot of people at Eddie Stobart are losing sleep thinking of the misery their plans would cause to thousands of local residents. Please reconsider.

Full text:

I strongly object to this airport, and ask you to consider local residents quality of life - there are a high proportion of young families in this area and to be blighted by this expansion seems grossly unfair just so someone can make a quick buck. Most of the reasons given to support the expansion are spurious and I hope a lot of people at Eddie Stobart are losing sleep thinking of the misery their plans would cause to thousands of local residents. Please reconsider.

Support

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 5796

Received: 27/03/2009

Respondent: Mr T Clark

Representation Summary:

It is good to see both Rochford and Southend Councils looking ahead and facilitating the employment opportunities that will be needed in the area in the coming years.
Aviation related businesses should be particularly encouraged, both to help underscore the viability of the airport, and in providing an 'aviation cluster' centre of excellence.

Full text:

It is good to see both Rochford and Southend Councils looking ahead and facilitating the employment opportunities that will be needed in the area in the coming years.
Aviation related businesses should be particularly encouraged, both to help underscore the viability of the airport, and in providing an 'aviation cluster' centre of excellence.

Comment

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 5870

Received: 28/03/2009

Respondent: MR JEREMY DAVENPORT

Representation Summary:

Road infrastructure needs to be funded by those seeking planning permission

Full text:

Road infrastructure needs to be funded by those seeking planning permission

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 5990

Received: 29/03/2009

Respondent: Mr Derek Waddy-Smith

Representation Summary:

Object if only on the grounds that one can't destroy an area for a few maybes. There are no positive certainties for the local community, but there are very significant negative ones.

Full text:

Object if only on the grounds that one can't destroy an area for a few maybes. There are no positive certainties for the local community, but there are very significant negative ones.

Support

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 6045

Received: 30/03/2009

Respondent: Mr Rick Jackson

Representation Summary:

As someone who works in Southend and lives in Rochford, the economic and employment benefits of the airport development far outweigh any of the objections put forward.

Full text:

As someone who works in Southend and lives in Rochford, the economic and employment benefits of the airport development far outweigh any of the objections put forward.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 6097

Received: 31/03/2009

Respondent: Mrs Joanna Spencer

Representation Summary:

More business parks, if we look around at the empty offices blocks along victoria avenue and surrounding areas, why would we want to build more. Take more of the land away, as it is we now have more car show rooms blotting our nice open space.

Full text:

More business parks, if we look around at the empty offices blocks along victoria avenue and surrounding areas, why would we want to build more. Take more of the land away, as it is we now have more car show rooms blotting our nice open space.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 6159

Received: 31/03/2009

Respondent: Mr Jon Spencer

Representation Summary:

Business park, once again job figures are given, I am assuming these figures are for spaces available for jobs to be created, are there any companies willing to take on more staff and create more jobs, or are we just simply closing down other esates and moving people around. We already have green space, this is just to make the paperwork look good

Full text:

Business park, once again job figures are given, I am assuming these figures are for spaces available for jobs to be created, are there any companies willing to take on more staff and create more jobs, or are we just simply closing down other esates and moving people around. We already have green space, this is just to make the paperwork look good

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 6204

Received: 01/04/2009

Respondent: Mark Piper

Representation Summary:

These numbers are just seating guidelines for the areas not actual jobs. There is already plenty of empty office space in the area. This is a very misleading statement.

Full text:

These numbers are just seating guidelines for the areas not actual jobs. There is already plenty of empty office space in the area. This is a very misleading statement.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 6219

Received: 06/04/2009

Respondent: Mr Neil Taylor

Representation Summary:

This represents excessive commercial development and is symptomatic of the inexorable development and infilling in the Southend area. The loss of green areas including green belt land to industrial estates does not enhance the quality of the environment.

Full text:

This represents excessive commercial development and is symptomatic of the inexorable development and infilling in the Southend area. The loss of green areas including green belt land to industrial estates does not enhance the quality of the environment.

Support

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 6368

Received: 02/04/2009

Respondent: Mr Jeffrey Pacey

Representation Summary:

A high quality business park will be an asset and any funding towards walking and cycling paths should be encouraged.

Full text:

A high quality business park will be an asset and any funding towards walking and cycling paths should be encouraged.