2 Assets, Opportunities and Constraints

Showing comments and forms 91 to 108 of 108

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 14143

Received: 01/06/2009

Respondent: K Theobald

Representation Summary:

(para 6)
'...a need to release the potential of Southend's land and buildings...' Since nine-tenths of the land within the airport belongs to Rochford to what buildings does this part of the document refer? Buildings which stand directly opposite Southend's Council Offices have been neglected, run-down and empty for years. Given the constrains of budget, surely they should look closer to home to invest the taxpayer's money.

Full text:

Comments and Objections
The regeneration of London Southend Airport cannot be achieved by building a business park. Nor does a business park depend upon the extension of the runway.
Set out specific standards which will be applied to the area. Standards of what, exactly? - behaviour? - building control? - road width? - signage?
The JAAP takes into account the impact of the proposals on other parts of Southend Borough Council areas, I don't think it does, there are at least 60,000 people and pupils in 10 schools likely to be adversely affected by increasing the flight capacity of the airport. Some of the aircraft may well be quieter than others, but there is no such thing as a quiet aeroplane. The higher a plane goes on take-off, by using a longer runway and a steeper ascent, the wider the 'noise footprint' will be. Surely that is a matter of basic physics. To attain the greater speed on the runway, the number of revs will increase, creating greater ground noise than at present. Also, as one aircraft is taking off, another will be preparing for take-off at peak times, a constant noise for all the houses around the take-off area.'Impact on...the existing built environment...' A possible 6 houses demolished for the runway to Eastwoodbury Lane and the brickfield cottages on Cherry Orchard Lane demolished for the business park. '...including listed buildings.' The church of St Laurence is a Grade One listed building, accepted by the CAA as a hazard. It is in constant use. The vibration caused by aircraft movements could surely endanger this beautful old church. The (admittedly remote) chance that a plane could strike the church and 130 worshippers must also be considered.
The 'Issues and Options' report was quietly introduced in the summer of 2008. It was not trumpeted loudly, but hidden in a website backwater for comments from those that could find it.
'The feedback...has been carefully considered and used'. The analysis was published in March 2009. When SAEN queried the statement on the penultimate page of the document, 'most respondents did not favour the high-growth option, they were told that 'this is not a referendum; it is a consultation'. So it would seem that views were asked for and then ignored. No wonder people say that the whole thing is a foregone conclusion!
'The economic benefits of the expansion in air travel' should be re-examined in the light of falling figures relating to air travel. The only airline operating regularly from Southend Airport has already gone into liquidation last winter - a victim of the credit crunch, not a victim of a runway that was too short.
The growing pressure on airports in the South-East is a pressure generated by the huge success of Stansted airport as a passenger terminal. Stansted is one hour away from Southend on the X30 bus; a comfortable journey with room for your luggage also, and a frequent service from the town.
Another pressure will be that the London Southend Airport has to consider that a drop-off point is now not to be too near a terminal building and other forms of security need to be addressed. There may be a 6 foot fence on the southern boundary, but a footpath that actually crosses the disused short runway to the north would have to be considered a security threat.
'Significant job opportunities' is a statement which must be challenged. There will not be any significant job opportunities connected to the airport until the airport starts to cater for millions of passengers. The jobs referred to in the booklet will almost exclusively provided by units in the Saxon Business Park. 'The Region's competitve strength and attractiveness as a business location and tourism destination.' Before Southend sees itself as a business location or a tourism destination, it needs to take a long hard look at what it does want to be. For some decades now. Southend Borough Council has been drying to ignore the fact that it is a seaside town. It is not a centre of things, it is on the coast. It is already well served by two rail lines for those who wish to come to the beach. It is only safe to swim when the tide is coming in (which it does twice a day), not when it is going out. When the tide is out, what should the visitor do? Visit the Pier? Why? There hasn't been enough cash in the kitty for years to develop the pier into a going concern, mostly due to an overspend on expensive consultants and lack of competent decision making. Visit the penny arcades, the pubs the shopping centre, visit Leigh and buy cockles go to the fun fair? Yes, but the airport is 3 miles away from all that, so after your flight, you will need a bus, (there are still a few left still running) or a taxi to the seaside. On the way, you may pass the remains of the Ecko site, the town's once-huge industry, or you pay pass the muli-storey buildings in Victoria Avenue, now derelict and unused, no longer the centres of commerce that they once were.
So, before Southend Borough Council addresses the question of the airport, which is 90% in Rochford anyway, perhaps they should expend a little effort, time and money considering the town's identity - you cant ignore the fact that it is a seaside town; commerce has failed hugely and manufacture is not what it once was, probably due to European influence and computer networking.
How does the local policy framework foresee Southend airport acting as a key driver for economic development? There is not enough detail given in the document.
With expansion of the airport'... issues of congestion and accessibility in and around the JAAP area...need to be addressed. And it will all have to be done at the same time. Public accounts of any difficulties experienced whilst getting to the airport are more than likely to be negative. People accept the good inherent in things but complain loudly when they are confronted by obstacles!
'Local policies support the growth of the airport' but local opinion, whilst largely embracing the airport as it is at present, is not generally in favour of the extension. The MRO sector should be safeguarded. However as the number of passengers increases towards 2 million, as proposed, the opportunity to test planes on the runway will necessarily decrease, pushing these older, noisier planes into times when passenger movements are less, that is to say, evenings and night times.
I object to the wording in this paragraph because it implies that London Southend Airport will be providing significant employment opportunities, when the facts are that the employment opportunities will arise when the Saxon Business Park is completed. Even then, there are several respondents to SAEN who understand that the jobs are not being created, but for the most part are jobs which will move from Hockley, where a number of business properties are to be demolished and moved to Rochford as part of the Hockley Area Action Plan.
Development of the airport...will not start delivering jobs until passengers exceed one million. Statistics collected from other airports will corroborate this; there are already enough people employed directly by the airport to cater for the first million people through the doors.
'...a need to release the potential of Southend's land and buildings...' Since nine-tenths of the land within the airport belongs to Rochford to what buildings does this part of the document refer? Buildings which stand directly opposite Southend's Council Offices have been neglected, run-down and empty for years. Given the constrains of budget, surely they should look closer to home to invest the taxpayer's money.
'...growth on London Southend Airport...attracts high technology businesses' - if the businesses are going next to the airport, why does this imply that the airport has to grow in order for the businesses to succeed. I object to the misleading way this paragraph has been written.
'...sustainable and high value employment' is a meaningless phrase to the layman. I object to this phrase as misleading 'spin'.
'...Passengers will travel on quiet, fuel efficient lanes...'There is no such thing as a quiet aeroplane! there are planes that are quieter than they were in the past, but it will take a very long time for airlines to ensure that all their aircraft are quieter than those they presently use. It would be too expensive for them to ditch the aircraft, until they have finished their natural life, which could be upto to 30 years. As to fuel efficiency, 'peak oil' may already have been reached so fuel efficient or not, prices will soon begin to rise again and put most flights beyond the reach of the man on the street. Why not reconsider the phrase 'quiet, fuel efficient plane's when they are quiet and fuel efficient, running on solar power?
The penultimate sentence seems to contradict itself:-'...the runway extension is a key factor in...aeroplanes (which) can take off in shorter distances.' If the planes take off in shorter distances, they do not need a longer runway! Or could it be that, because of the proximity of the railway line, the planes need to make a landing further away from the Rochford end of the railway, transferring the nuisance to the Southend end of the runway.
The MRO should be allowed to continue, but surely if passenger numbers are allowed to increase, the time available for landing, testing and take-off will be severely limited due to the number of passenger flights. Will this facility be moved to evenings and nights?'...there will be restrictions on night flights through a noise quota system.' That is good news! Why was the actual number for the quota not quoted here?
The Saxon Business Park could be good news. Common speculation, tying in the Hockley Action Plan with the Southend/Rochford Plan would indicate that many of the jobs will actually be moving from Hockley to the new site, along with some of the units that will be cleared to make way for other development, But I am sure there will be some new jobs created.
'...a new route will have been provided from Nestuda Way...etc'. The words make this sound like simplicity itself. Living here will not be simple for a very long time. The current runway and the proposed entension are over the place where the village of Eastwood once stood. Archaeological surveys will have to be done before work is carried out, local opinioin must be satisfied before work is carried out, explanations to those east of the church as to how they may obtain access to the church and churchyard will have to be given and the necessary funding found for the job. these are just a few of the obstacles in the way of progress with the extension of the runway. And yet here it is dismissed in a few simple words.
It is impossible to equate 2012 with the figure of 1 million passengers given the promises in the previous section. The quiet fuel efficient planes will not be in place entirely,the longer runway will not be in place, the infrastructure (i.e crowded roads, particularly Progress Road, Sadlers Farm will not have been addressed, since there is not enough time in 3 years to address all these things. At present there is not an airline lined up which is to provide a passenger service. They will surely not rely on promises, they have a business to run!
'The preferred option' as selected by joint councils is not the one chosen by the respondents to the first part of this consultation. On the penultimate page of the summary of responses, it is stated that the high-growth scenario was not favoured by the majority. When this was questioned by members of SAEN and other unrelated individuals, the response was that 'this is not a referendum, it is a consultation!' So the statements on many lips - 'Well the council will do what they like!' and 'It's only a paper exercise - it's a foregone conclusion!' may well be correct. Our views have not been taken into consideration so far, and there is no reason to think that we will be considered in this round, either. '...aircraft...fully laden...'must present more of a danger for the residents of the Mendip Estate, to the south-west of the runway. We cannot countenance a Lockerbie situation here in Westcliff. The houses are far too close to the runway now, before an extension is granted. Southend Council has allowed building to take place right up to the outskirts of the airport boundary over the last few years; this includes an enormous Tesco store and the huge building of the Royal bank of Scotland - landing and take-off procedures leave very little margin for error with so many people in the vicinity.
The promise of 6,200 jobs is a good one. It does not depend on the extension of the runway. It is however not clear what is meant by 'classes B1 and B2.'
'...environmental impacts (noise and air quality) will need to be carefully considered and assessed as a result of the increased aircraft movements and traffic in the area.'...'considering controls on airport operation to ensure quality of life is maintained for residents...minimise traffic impacts.' The way in which these measures are to be taken should be better described in this document; they are crucial to the quality of life of residents, old people and children being particularly vulnerable to noise and air pollutiion.
It is interesting to see that there are plans to improve public transport in Southend (or is it in Rochford?-it is not clear). Public transport has been in decline in Southend for some years, and it is apparent that the planning office has no idea how to deal with it all. There are current plans to demolish a multi-storey car park in the centre of Southend and replace it with a library for the university students. Yet alongside that, there seem to be no plans to improve access to the centre of the town by public transport.
It is not clear whether the Brickwork's cottages are to remain as part of an industrial area or whether they are intended for demolition.
Taking agricultural land for business and employment activity might seem a little unwise, Southend has already run out of agricultural land, and it now seems as if Rochford wants to go the same way. Has the term 'Green Belt' become so abused that it no longer means 'land that is green and cannot be built on'?
This is already a green lung and should remain so. Will there be any safeguards to stop this area becoming the next stage of development?
It is not clear whether this is meant as a compulsory purchase option! Were the current businesses asked for their views.
This is already an open space and provides a lovely green area which is currently well used. Redirecting Eastwoodbury Lane is going to devastate the area so that no one will want to use it as a public park.
The flying Clubs have been the core of the airport activity for a very long time, training pilots and ensuring sustainability - will they be given a new area from which to function.
It is good to know that this is to be another green buffer. And good to know that the powers that be are capable of changing their minds. A couple of years ago, the plan was to make this into a car park. No-one is fooled by this apparent charitable act today!
The Park and Ride facility would be on a good place to commute to Southend by bus, if it were not for the fact that it is right under the flight path. Is it legal to have a bus stop within the Safety Zone.
'...sustainable drainage...'. It is not clear what is meant by this term. There are problems of drainage already in the Southend Road; during wet weather the Horse and Groom public house is frequently overwhelmed by water. Is there a guarantee that the situation will not worsen and that water will be drained off into the correct direction? There must be some sort of ruling governing the safety issues of rain/large areas of tarmac. Have these been fully investigated, and do we have assurances?
This data implies that there will be 1180 jobs directly related to the airport. Research into previous claims for directly-related airport jobs has proved that these predictions are grossly inflated. When 2 million passengers go through, there may be direct jobs for 100 people, but 1000 has to be seen as an optimistic exaggeration.
It is encouraging to see that there are to be new walking/cycling routes incorporated into the JAAP.
The brickwork cottages are now unique and should be preserved as part of the brickfield development in Essex over many hundreds of years.
An impressive entrance will make no difference to the quality of what goes on in the business park.
'...the business park will need to...deliver a visual presence to the A127.' It is not clear what is meant by this statement.
'Expansion is...only acceptable if...subject to environmental constraints...' Expansion plans were vetoed in the Nineteen-sixties because it was not environmentally viable. What can possibly have changed since then?
A baseline of noise levels can be set anywhere and it does not appear to be in the power of the local authority to set this baseline or to object to it after it is implemented. A Noise Evaluation Statement is just that. It does not promise to do anything about it. There are at least 60,000 people living under the flight path and they are the ones who can evaluate the noise levels for you. Heavy aircraft taking off or landing at night have not been a feature whilst the JAAP is in the balance, but as soon as the consultation is over, it is entirely possible that these will resume. Added to the daytime flights interrupting the sleep of night workers and the work of children in ten schools directly under the flight path, the noise levels will become an intolerable burden.
The added CO2 in the atmosphere is not easy to offsett given the limited amount of green space within the borough of Southend, school green areas having been sold off and built upon and former agricultural land now being seen as business parks. So the quality of life for all these people will be sadly reduced. Not to mention the prices of their houses falling, because no-one in their right mind will want to live close to an expanding airport.
There is currently opposition to expansion of airports within the Government and Opposition benches. Is it hoped that all this permission for the Rochford/Southend JAAP will slip under the wire before it becomes law to limit the use of airports.
(see London Southend Airport Introduction (para 3)
Why is there no printed plan yet available for the PSZ if and when the runway is extended? Will this entail further disruption and compulsory purchase?
'The airport operator will be required to...make a contribution towards construction...'what percentage of this will the operator be expected to pay. It does not seem fair that the public should be expected to pay anything towards these changes; why not ask the operator to pay for the lot. Southend taxpayers can not expect to get anything out of the proposals except noise, disruption and poor air quality. Is it fair to ask them to pay anything towards the cost of local taxes?
The hours of predicted air travel are far too wide. Children whose sleep patterns are likely to be affected by flights will be in bed by 8pm and that is when the flights should stop. We should not be accepting flights from London City Airport either. It is simply another way of raising income for the operator and does not benefit the town.
The closure of Eastwoodbury Lane and the provision of a new road will mean that all the traffic that currently uses the Lane as a back way in to Southend will have to travel along the A127 or Nestuda Way. It will add about a mile to the journey into Southend, so most people will not turn in to the new road but will attempt to continue their journey along the A127, putting intolerable strain on the junction at the Bell and Rochford Road junction. There will be more traffic movements also, connected with the new jobs planned for the Saxon Business Park. The current infrastructure is bulging with overuse and really cannot take any more. the proposed Park and Ride can take only a little of the traffic away. And if it is intended for long term use for the airport, it will be of no use to the daily commuter.
What time span is this to take? And surely this is the same piece of road - why is it taking two separate policies.
It is not clear why a new junction will be required at Aviation Way and Eastwoodbury Lane - there is already an adequate roundabout there.
It is noted that improvements in public transport are needed within the JAAP. They are needed throughout Southend in many areas not covered by The JAAP also.
I note with dismay that a Green Belt is not what it was designed to. It should not provide flexibility...to accomodate growth. It should provide a barrier between urban and rural areas that is sacrosanct and inviolable.
This is already an open space and provides a lovely green area which is currenty well used. Redirecting Eastwoodbury Lane is going to devastate the area so that no one will want to use it as a public park.
It is good to know that this is to be another green buffer. And good to know that the powers that be are capable of changing their minds. A couple of years ago, the plan was to make this into a car park. No-one is fooled by this apparent charitable act today.
'The success will be limited if, etc.' For whom?

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 14144

Received: 01/06/2009

Respondent: K Theobald

Representation Summary:

(para 9)
'...growth on London Southend Airport...attracts high technology businesses' - if the businesses are going next to the airport, why does this imply that the airport has to grow in order for the businesses to succeed. I object to the misleading way this paragraph has been written.

Full text:

Comments and Objections
The regeneration of London Southend Airport cannot be achieved by building a business park. Nor does a business park depend upon the extension of the runway.
Set out specific standards which will be applied to the area. Standards of what, exactly? - behaviour? - building control? - road width? - signage?
The JAAP takes into account the impact of the proposals on other parts of Southend Borough Council areas, I don't think it does, there are at least 60,000 people and pupils in 10 schools likely to be adversely affected by increasing the flight capacity of the airport. Some of the aircraft may well be quieter than others, but there is no such thing as a quiet aeroplane. The higher a plane goes on take-off, by using a longer runway and a steeper ascent, the wider the 'noise footprint' will be. Surely that is a matter of basic physics. To attain the greater speed on the runway, the number of revs will increase, creating greater ground noise than at present. Also, as one aircraft is taking off, another will be preparing for take-off at peak times, a constant noise for all the houses around the take-off area.'Impact on...the existing built environment...' A possible 6 houses demolished for the runway to Eastwoodbury Lane and the brickfield cottages on Cherry Orchard Lane demolished for the business park. '...including listed buildings.' The church of St Laurence is a Grade One listed building, accepted by the CAA as a hazard. It is in constant use. The vibration caused by aircraft movements could surely endanger this beautful old church. The (admittedly remote) chance that a plane could strike the church and 130 worshippers must also be considered.
The 'Issues and Options' report was quietly introduced in the summer of 2008. It was not trumpeted loudly, but hidden in a website backwater for comments from those that could find it.
'The feedback...has been carefully considered and used'. The analysis was published in March 2009. When SAEN queried the statement on the penultimate page of the document, 'most respondents did not favour the high-growth option, they were told that 'this is not a referendum; it is a consultation'. So it would seem that views were asked for and then ignored. No wonder people say that the whole thing is a foregone conclusion!
'The economic benefits of the expansion in air travel' should be re-examined in the light of falling figures relating to air travel. The only airline operating regularly from Southend Airport has already gone into liquidation last winter - a victim of the credit crunch, not a victim of a runway that was too short.
The growing pressure on airports in the South-East is a pressure generated by the huge success of Stansted airport as a passenger terminal. Stansted is one hour away from Southend on the X30 bus; a comfortable journey with room for your luggage also, and a frequent service from the town.
Another pressure will be that the London Southend Airport has to consider that a drop-off point is now not to be too near a terminal building and other forms of security need to be addressed. There may be a 6 foot fence on the southern boundary, but a footpath that actually crosses the disused short runway to the north would have to be considered a security threat.
'Significant job opportunities' is a statement which must be challenged. There will not be any significant job opportunities connected to the airport until the airport starts to cater for millions of passengers. The jobs referred to in the booklet will almost exclusively provided by units in the Saxon Business Park. 'The Region's competitve strength and attractiveness as a business location and tourism destination.' Before Southend sees itself as a business location or a tourism destination, it needs to take a long hard look at what it does want to be. For some decades now. Southend Borough Council has been drying to ignore the fact that it is a seaside town. It is not a centre of things, it is on the coast. It is already well served by two rail lines for those who wish to come to the beach. It is only safe to swim when the tide is coming in (which it does twice a day), not when it is going out. When the tide is out, what should the visitor do? Visit the Pier? Why? There hasn't been enough cash in the kitty for years to develop the pier into a going concern, mostly due to an overspend on expensive consultants and lack of competent decision making. Visit the penny arcades, the pubs the shopping centre, visit Leigh and buy cockles go to the fun fair? Yes, but the airport is 3 miles away from all that, so after your flight, you will need a bus, (there are still a few left still running) or a taxi to the seaside. On the way, you may pass the remains of the Ecko site, the town's once-huge industry, or you pay pass the muli-storey buildings in Victoria Avenue, now derelict and unused, no longer the centres of commerce that they once were.
So, before Southend Borough Council addresses the question of the airport, which is 90% in Rochford anyway, perhaps they should expend a little effort, time and money considering the town's identity - you cant ignore the fact that it is a seaside town; commerce has failed hugely and manufacture is not what it once was, probably due to European influence and computer networking.
How does the local policy framework foresee Southend airport acting as a key driver for economic development? There is not enough detail given in the document.
With expansion of the airport'... issues of congestion and accessibility in and around the JAAP area...need to be addressed. And it will all have to be done at the same time. Public accounts of any difficulties experienced whilst getting to the airport are more than likely to be negative. People accept the good inherent in things but complain loudly when they are confronted by obstacles!
'Local policies support the growth of the airport' but local opinion, whilst largely embracing the airport as it is at present, is not generally in favour of the extension. The MRO sector should be safeguarded. However as the number of passengers increases towards 2 million, as proposed, the opportunity to test planes on the runway will necessarily decrease, pushing these older, noisier planes into times when passenger movements are less, that is to say, evenings and night times.
I object to the wording in this paragraph because it implies that London Southend Airport will be providing significant employment opportunities, when the facts are that the employment opportunities will arise when the Saxon Business Park is completed. Even then, there are several respondents to SAEN who understand that the jobs are not being created, but for the most part are jobs which will move from Hockley, where a number of business properties are to be demolished and moved to Rochford as part of the Hockley Area Action Plan.
Development of the airport...will not start delivering jobs until passengers exceed one million. Statistics collected from other airports will corroborate this; there are already enough people employed directly by the airport to cater for the first million people through the doors.
'...a need to release the potential of Southend's land and buildings...' Since nine-tenths of the land within the airport belongs to Rochford to what buildings does this part of the document refer? Buildings which stand directly opposite Southend's Council Offices have been neglected, run-down and empty for years. Given the constrains of budget, surely they should look closer to home to invest the taxpayer's money.
'...growth on London Southend Airport...attracts high technology businesses' - if the businesses are going next to the airport, why does this imply that the airport has to grow in order for the businesses to succeed. I object to the misleading way this paragraph has been written.
'...sustainable and high value employment' is a meaningless phrase to the layman. I object to this phrase as misleading 'spin'.
'...Passengers will travel on quiet, fuel efficient lanes...'There is no such thing as a quiet aeroplane! there are planes that are quieter than they were in the past, but it will take a very long time for airlines to ensure that all their aircraft are quieter than those they presently use. It would be too expensive for them to ditch the aircraft, until they have finished their natural life, which could be upto to 30 years. As to fuel efficiency, 'peak oil' may already have been reached so fuel efficient or not, prices will soon begin to rise again and put most flights beyond the reach of the man on the street. Why not reconsider the phrase 'quiet, fuel efficient plane's when they are quiet and fuel efficient, running on solar power?
The penultimate sentence seems to contradict itself:-'...the runway extension is a key factor in...aeroplanes (which) can take off in shorter distances.' If the planes take off in shorter distances, they do not need a longer runway! Or could it be that, because of the proximity of the railway line, the planes need to make a landing further away from the Rochford end of the railway, transferring the nuisance to the Southend end of the runway.
The MRO should be allowed to continue, but surely if passenger numbers are allowed to increase, the time available for landing, testing and take-off will be severely limited due to the number of passenger flights. Will this facility be moved to evenings and nights?'...there will be restrictions on night flights through a noise quota system.' That is good news! Why was the actual number for the quota not quoted here?
The Saxon Business Park could be good news. Common speculation, tying in the Hockley Action Plan with the Southend/Rochford Plan would indicate that many of the jobs will actually be moving from Hockley to the new site, along with some of the units that will be cleared to make way for other development, But I am sure there will be some new jobs created.
'...a new route will have been provided from Nestuda Way...etc'. The words make this sound like simplicity itself. Living here will not be simple for a very long time. The current runway and the proposed entension are over the place where the village of Eastwood once stood. Archaeological surveys will have to be done before work is carried out, local opinioin must be satisfied before work is carried out, explanations to those east of the church as to how they may obtain access to the church and churchyard will have to be given and the necessary funding found for the job. these are just a few of the obstacles in the way of progress with the extension of the runway. And yet here it is dismissed in a few simple words.
It is impossible to equate 2012 with the figure of 1 million passengers given the promises in the previous section. The quiet fuel efficient planes will not be in place entirely,the longer runway will not be in place, the infrastructure (i.e crowded roads, particularly Progress Road, Sadlers Farm will not have been addressed, since there is not enough time in 3 years to address all these things. At present there is not an airline lined up which is to provide a passenger service. They will surely not rely on promises, they have a business to run!
'The preferred option' as selected by joint councils is not the one chosen by the respondents to the first part of this consultation. On the penultimate page of the summary of responses, it is stated that the high-growth scenario was not favoured by the majority. When this was questioned by members of SAEN and other unrelated individuals, the response was that 'this is not a referendum, it is a consultation!' So the statements on many lips - 'Well the council will do what they like!' and 'It's only a paper exercise - it's a foregone conclusion!' may well be correct. Our views have not been taken into consideration so far, and there is no reason to think that we will be considered in this round, either. '...aircraft...fully laden...'must present more of a danger for the residents of the Mendip Estate, to the south-west of the runway. We cannot countenance a Lockerbie situation here in Westcliff. The houses are far too close to the runway now, before an extension is granted. Southend Council has allowed building to take place right up to the outskirts of the airport boundary over the last few years; this includes an enormous Tesco store and the huge building of the Royal bank of Scotland - landing and take-off procedures leave very little margin for error with so many people in the vicinity.
The promise of 6,200 jobs is a good one. It does not depend on the extension of the runway. It is however not clear what is meant by 'classes B1 and B2.'
'...environmental impacts (noise and air quality) will need to be carefully considered and assessed as a result of the increased aircraft movements and traffic in the area.'...'considering controls on airport operation to ensure quality of life is maintained for residents...minimise traffic impacts.' The way in which these measures are to be taken should be better described in this document; they are crucial to the quality of life of residents, old people and children being particularly vulnerable to noise and air pollutiion.
It is interesting to see that there are plans to improve public transport in Southend (or is it in Rochford?-it is not clear). Public transport has been in decline in Southend for some years, and it is apparent that the planning office has no idea how to deal with it all. There are current plans to demolish a multi-storey car park in the centre of Southend and replace it with a library for the university students. Yet alongside that, there seem to be no plans to improve access to the centre of the town by public transport.
It is not clear whether the Brickwork's cottages are to remain as part of an industrial area or whether they are intended for demolition.
Taking agricultural land for business and employment activity might seem a little unwise, Southend has already run out of agricultural land, and it now seems as if Rochford wants to go the same way. Has the term 'Green Belt' become so abused that it no longer means 'land that is green and cannot be built on'?
This is already a green lung and should remain so. Will there be any safeguards to stop this area becoming the next stage of development?
It is not clear whether this is meant as a compulsory purchase option! Were the current businesses asked for their views.
This is already an open space and provides a lovely green area which is currently well used. Redirecting Eastwoodbury Lane is going to devastate the area so that no one will want to use it as a public park.
The flying Clubs have been the core of the airport activity for a very long time, training pilots and ensuring sustainability - will they be given a new area from which to function.
It is good to know that this is to be another green buffer. And good to know that the powers that be are capable of changing their minds. A couple of years ago, the plan was to make this into a car park. No-one is fooled by this apparent charitable act today!
The Park and Ride facility would be on a good place to commute to Southend by bus, if it were not for the fact that it is right under the flight path. Is it legal to have a bus stop within the Safety Zone.
'...sustainable drainage...'. It is not clear what is meant by this term. There are problems of drainage already in the Southend Road; during wet weather the Horse and Groom public house is frequently overwhelmed by water. Is there a guarantee that the situation will not worsen and that water will be drained off into the correct direction? There must be some sort of ruling governing the safety issues of rain/large areas of tarmac. Have these been fully investigated, and do we have assurances?
This data implies that there will be 1180 jobs directly related to the airport. Research into previous claims for directly-related airport jobs has proved that these predictions are grossly inflated. When 2 million passengers go through, there may be direct jobs for 100 people, but 1000 has to be seen as an optimistic exaggeration.
It is encouraging to see that there are to be new walking/cycling routes incorporated into the JAAP.
The brickwork cottages are now unique and should be preserved as part of the brickfield development in Essex over many hundreds of years.
An impressive entrance will make no difference to the quality of what goes on in the business park.
'...the business park will need to...deliver a visual presence to the A127.' It is not clear what is meant by this statement.
'Expansion is...only acceptable if...subject to environmental constraints...' Expansion plans were vetoed in the Nineteen-sixties because it was not environmentally viable. What can possibly have changed since then?
A baseline of noise levels can be set anywhere and it does not appear to be in the power of the local authority to set this baseline or to object to it after it is implemented. A Noise Evaluation Statement is just that. It does not promise to do anything about it. There are at least 60,000 people living under the flight path and they are the ones who can evaluate the noise levels for you. Heavy aircraft taking off or landing at night have not been a feature whilst the JAAP is in the balance, but as soon as the consultation is over, it is entirely possible that these will resume. Added to the daytime flights interrupting the sleep of night workers and the work of children in ten schools directly under the flight path, the noise levels will become an intolerable burden.
The added CO2 in the atmosphere is not easy to offsett given the limited amount of green space within the borough of Southend, school green areas having been sold off and built upon and former agricultural land now being seen as business parks. So the quality of life for all these people will be sadly reduced. Not to mention the prices of their houses falling, because no-one in their right mind will want to live close to an expanding airport.
There is currently opposition to expansion of airports within the Government and Opposition benches. Is it hoped that all this permission for the Rochford/Southend JAAP will slip under the wire before it becomes law to limit the use of airports.
(see London Southend Airport Introduction (para 3)
Why is there no printed plan yet available for the PSZ if and when the runway is extended? Will this entail further disruption and compulsory purchase?
'The airport operator will be required to...make a contribution towards construction...'what percentage of this will the operator be expected to pay. It does not seem fair that the public should be expected to pay anything towards these changes; why not ask the operator to pay for the lot. Southend taxpayers can not expect to get anything out of the proposals except noise, disruption and poor air quality. Is it fair to ask them to pay anything towards the cost of local taxes?
The hours of predicted air travel are far too wide. Children whose sleep patterns are likely to be affected by flights will be in bed by 8pm and that is when the flights should stop. We should not be accepting flights from London City Airport either. It is simply another way of raising income for the operator and does not benefit the town.
The closure of Eastwoodbury Lane and the provision of a new road will mean that all the traffic that currently uses the Lane as a back way in to Southend will have to travel along the A127 or Nestuda Way. It will add about a mile to the journey into Southend, so most people will not turn in to the new road but will attempt to continue their journey along the A127, putting intolerable strain on the junction at the Bell and Rochford Road junction. There will be more traffic movements also, connected with the new jobs planned for the Saxon Business Park. The current infrastructure is bulging with overuse and really cannot take any more. the proposed Park and Ride can take only a little of the traffic away. And if it is intended for long term use for the airport, it will be of no use to the daily commuter.
What time span is this to take? And surely this is the same piece of road - why is it taking two separate policies.
It is not clear why a new junction will be required at Aviation Way and Eastwoodbury Lane - there is already an adequate roundabout there.
It is noted that improvements in public transport are needed within the JAAP. They are needed throughout Southend in many areas not covered by The JAAP also.
I note with dismay that a Green Belt is not what it was designed to. It should not provide flexibility...to accomodate growth. It should provide a barrier between urban and rural areas that is sacrosanct and inviolable.
This is already an open space and provides a lovely green area which is currenty well used. Redirecting Eastwoodbury Lane is going to devastate the area so that no one will want to use it as a public park.
It is good to know that this is to be another green buffer. And good to know that the powers that be are capable of changing their minds. A couple of years ago, the plan was to make this into a car park. No-one is fooled by this apparent charitable act today.
'The success will be limited if, etc.' For whom?

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 14145

Received: 01/06/2009

Respondent: K Theobald

Representation Summary:

2.2 (para 2)
'...sustainable and high value employment' is a meaningless phrase to the layman. I object to this phrase as misleading 'spin'.

Full text:

Comments and Objections
The regeneration of London Southend Airport cannot be achieved by building a business park. Nor does a business park depend upon the extension of the runway.
Set out specific standards which will be applied to the area. Standards of what, exactly? - behaviour? - building control? - road width? - signage?
The JAAP takes into account the impact of the proposals on other parts of Southend Borough Council areas, I don't think it does, there are at least 60,000 people and pupils in 10 schools likely to be adversely affected by increasing the flight capacity of the airport. Some of the aircraft may well be quieter than others, but there is no such thing as a quiet aeroplane. The higher a plane goes on take-off, by using a longer runway and a steeper ascent, the wider the 'noise footprint' will be. Surely that is a matter of basic physics. To attain the greater speed on the runway, the number of revs will increase, creating greater ground noise than at present. Also, as one aircraft is taking off, another will be preparing for take-off at peak times, a constant noise for all the houses around the take-off area.'Impact on...the existing built environment...' A possible 6 houses demolished for the runway to Eastwoodbury Lane and the brickfield cottages on Cherry Orchard Lane demolished for the business park. '...including listed buildings.' The church of St Laurence is a Grade One listed building, accepted by the CAA as a hazard. It is in constant use. The vibration caused by aircraft movements could surely endanger this beautful old church. The (admittedly remote) chance that a plane could strike the church and 130 worshippers must also be considered.
The 'Issues and Options' report was quietly introduced in the summer of 2008. It was not trumpeted loudly, but hidden in a website backwater for comments from those that could find it.
'The feedback...has been carefully considered and used'. The analysis was published in March 2009. When SAEN queried the statement on the penultimate page of the document, 'most respondents did not favour the high-growth option, they were told that 'this is not a referendum; it is a consultation'. So it would seem that views were asked for and then ignored. No wonder people say that the whole thing is a foregone conclusion!
'The economic benefits of the expansion in air travel' should be re-examined in the light of falling figures relating to air travel. The only airline operating regularly from Southend Airport has already gone into liquidation last winter - a victim of the credit crunch, not a victim of a runway that was too short.
The growing pressure on airports in the South-East is a pressure generated by the huge success of Stansted airport as a passenger terminal. Stansted is one hour away from Southend on the X30 bus; a comfortable journey with room for your luggage also, and a frequent service from the town.
Another pressure will be that the London Southend Airport has to consider that a drop-off point is now not to be too near a terminal building and other forms of security need to be addressed. There may be a 6 foot fence on the southern boundary, but a footpath that actually crosses the disused short runway to the north would have to be considered a security threat.
'Significant job opportunities' is a statement which must be challenged. There will not be any significant job opportunities connected to the airport until the airport starts to cater for millions of passengers. The jobs referred to in the booklet will almost exclusively provided by units in the Saxon Business Park. 'The Region's competitve strength and attractiveness as a business location and tourism destination.' Before Southend sees itself as a business location or a tourism destination, it needs to take a long hard look at what it does want to be. For some decades now. Southend Borough Council has been drying to ignore the fact that it is a seaside town. It is not a centre of things, it is on the coast. It is already well served by two rail lines for those who wish to come to the beach. It is only safe to swim when the tide is coming in (which it does twice a day), not when it is going out. When the tide is out, what should the visitor do? Visit the Pier? Why? There hasn't been enough cash in the kitty for years to develop the pier into a going concern, mostly due to an overspend on expensive consultants and lack of competent decision making. Visit the penny arcades, the pubs the shopping centre, visit Leigh and buy cockles go to the fun fair? Yes, but the airport is 3 miles away from all that, so after your flight, you will need a bus, (there are still a few left still running) or a taxi to the seaside. On the way, you may pass the remains of the Ecko site, the town's once-huge industry, or you pay pass the muli-storey buildings in Victoria Avenue, now derelict and unused, no longer the centres of commerce that they once were.
So, before Southend Borough Council addresses the question of the airport, which is 90% in Rochford anyway, perhaps they should expend a little effort, time and money considering the town's identity - you cant ignore the fact that it is a seaside town; commerce has failed hugely and manufacture is not what it once was, probably due to European influence and computer networking.
How does the local policy framework foresee Southend airport acting as a key driver for economic development? There is not enough detail given in the document.
With expansion of the airport'... issues of congestion and accessibility in and around the JAAP area...need to be addressed. And it will all have to be done at the same time. Public accounts of any difficulties experienced whilst getting to the airport are more than likely to be negative. People accept the good inherent in things but complain loudly when they are confronted by obstacles!
'Local policies support the growth of the airport' but local opinion, whilst largely embracing the airport as it is at present, is not generally in favour of the extension. The MRO sector should be safeguarded. However as the number of passengers increases towards 2 million, as proposed, the opportunity to test planes on the runway will necessarily decrease, pushing these older, noisier planes into times when passenger movements are less, that is to say, evenings and night times.
I object to the wording in this paragraph because it implies that London Southend Airport will be providing significant employment opportunities, when the facts are that the employment opportunities will arise when the Saxon Business Park is completed. Even then, there are several respondents to SAEN who understand that the jobs are not being created, but for the most part are jobs which will move from Hockley, where a number of business properties are to be demolished and moved to Rochford as part of the Hockley Area Action Plan.
Development of the airport...will not start delivering jobs until passengers exceed one million. Statistics collected from other airports will corroborate this; there are already enough people employed directly by the airport to cater for the first million people through the doors.
'...a need to release the potential of Southend's land and buildings...' Since nine-tenths of the land within the airport belongs to Rochford to what buildings does this part of the document refer? Buildings which stand directly opposite Southend's Council Offices have been neglected, run-down and empty for years. Given the constrains of budget, surely they should look closer to home to invest the taxpayer's money.
'...growth on London Southend Airport...attracts high technology businesses' - if the businesses are going next to the airport, why does this imply that the airport has to grow in order for the businesses to succeed. I object to the misleading way this paragraph has been written.
'...sustainable and high value employment' is a meaningless phrase to the layman. I object to this phrase as misleading 'spin'.
'...Passengers will travel on quiet, fuel efficient lanes...'There is no such thing as a quiet aeroplane! there are planes that are quieter than they were in the past, but it will take a very long time for airlines to ensure that all their aircraft are quieter than those they presently use. It would be too expensive for them to ditch the aircraft, until they have finished their natural life, which could be upto to 30 years. As to fuel efficiency, 'peak oil' may already have been reached so fuel efficient or not, prices will soon begin to rise again and put most flights beyond the reach of the man on the street. Why not reconsider the phrase 'quiet, fuel efficient plane's when they are quiet and fuel efficient, running on solar power?
The penultimate sentence seems to contradict itself:-'...the runway extension is a key factor in...aeroplanes (which) can take off in shorter distances.' If the planes take off in shorter distances, they do not need a longer runway! Or could it be that, because of the proximity of the railway line, the planes need to make a landing further away from the Rochford end of the railway, transferring the nuisance to the Southend end of the runway.
The MRO should be allowed to continue, but surely if passenger numbers are allowed to increase, the time available for landing, testing and take-off will be severely limited due to the number of passenger flights. Will this facility be moved to evenings and nights?'...there will be restrictions on night flights through a noise quota system.' That is good news! Why was the actual number for the quota not quoted here?
The Saxon Business Park could be good news. Common speculation, tying in the Hockley Action Plan with the Southend/Rochford Plan would indicate that many of the jobs will actually be moving from Hockley to the new site, along with some of the units that will be cleared to make way for other development, But I am sure there will be some new jobs created.
'...a new route will have been provided from Nestuda Way...etc'. The words make this sound like simplicity itself. Living here will not be simple for a very long time. The current runway and the proposed entension are over the place where the village of Eastwood once stood. Archaeological surveys will have to be done before work is carried out, local opinioin must be satisfied before work is carried out, explanations to those east of the church as to how they may obtain access to the church and churchyard will have to be given and the necessary funding found for the job. these are just a few of the obstacles in the way of progress with the extension of the runway. And yet here it is dismissed in a few simple words.
It is impossible to equate 2012 with the figure of 1 million passengers given the promises in the previous section. The quiet fuel efficient planes will not be in place entirely,the longer runway will not be in place, the infrastructure (i.e crowded roads, particularly Progress Road, Sadlers Farm will not have been addressed, since there is not enough time in 3 years to address all these things. At present there is not an airline lined up which is to provide a passenger service. They will surely not rely on promises, they have a business to run!
'The preferred option' as selected by joint councils is not the one chosen by the respondents to the first part of this consultation. On the penultimate page of the summary of responses, it is stated that the high-growth scenario was not favoured by the majority. When this was questioned by members of SAEN and other unrelated individuals, the response was that 'this is not a referendum, it is a consultation!' So the statements on many lips - 'Well the council will do what they like!' and 'It's only a paper exercise - it's a foregone conclusion!' may well be correct. Our views have not been taken into consideration so far, and there is no reason to think that we will be considered in this round, either. '...aircraft...fully laden...'must present more of a danger for the residents of the Mendip Estate, to the south-west of the runway. We cannot countenance a Lockerbie situation here in Westcliff. The houses are far too close to the runway now, before an extension is granted. Southend Council has allowed building to take place right up to the outskirts of the airport boundary over the last few years; this includes an enormous Tesco store and the huge building of the Royal bank of Scotland - landing and take-off procedures leave very little margin for error with so many people in the vicinity.
The promise of 6,200 jobs is a good one. It does not depend on the extension of the runway. It is however not clear what is meant by 'classes B1 and B2.'
'...environmental impacts (noise and air quality) will need to be carefully considered and assessed as a result of the increased aircraft movements and traffic in the area.'...'considering controls on airport operation to ensure quality of life is maintained for residents...minimise traffic impacts.' The way in which these measures are to be taken should be better described in this document; they are crucial to the quality of life of residents, old people and children being particularly vulnerable to noise and air pollutiion.
It is interesting to see that there are plans to improve public transport in Southend (or is it in Rochford?-it is not clear). Public transport has been in decline in Southend for some years, and it is apparent that the planning office has no idea how to deal with it all. There are current plans to demolish a multi-storey car park in the centre of Southend and replace it with a library for the university students. Yet alongside that, there seem to be no plans to improve access to the centre of the town by public transport.
It is not clear whether the Brickwork's cottages are to remain as part of an industrial area or whether they are intended for demolition.
Taking agricultural land for business and employment activity might seem a little unwise, Southend has already run out of agricultural land, and it now seems as if Rochford wants to go the same way. Has the term 'Green Belt' become so abused that it no longer means 'land that is green and cannot be built on'?
This is already a green lung and should remain so. Will there be any safeguards to stop this area becoming the next stage of development?
It is not clear whether this is meant as a compulsory purchase option! Were the current businesses asked for their views.
This is already an open space and provides a lovely green area which is currently well used. Redirecting Eastwoodbury Lane is going to devastate the area so that no one will want to use it as a public park.
The flying Clubs have been the core of the airport activity for a very long time, training pilots and ensuring sustainability - will they be given a new area from which to function.
It is good to know that this is to be another green buffer. And good to know that the powers that be are capable of changing their minds. A couple of years ago, the plan was to make this into a car park. No-one is fooled by this apparent charitable act today!
The Park and Ride facility would be on a good place to commute to Southend by bus, if it were not for the fact that it is right under the flight path. Is it legal to have a bus stop within the Safety Zone.
'...sustainable drainage...'. It is not clear what is meant by this term. There are problems of drainage already in the Southend Road; during wet weather the Horse and Groom public house is frequently overwhelmed by water. Is there a guarantee that the situation will not worsen and that water will be drained off into the correct direction? There must be some sort of ruling governing the safety issues of rain/large areas of tarmac. Have these been fully investigated, and do we have assurances?
This data implies that there will be 1180 jobs directly related to the airport. Research into previous claims for directly-related airport jobs has proved that these predictions are grossly inflated. When 2 million passengers go through, there may be direct jobs for 100 people, but 1000 has to be seen as an optimistic exaggeration.
It is encouraging to see that there are to be new walking/cycling routes incorporated into the JAAP.
The brickwork cottages are now unique and should be preserved as part of the brickfield development in Essex over many hundreds of years.
An impressive entrance will make no difference to the quality of what goes on in the business park.
'...the business park will need to...deliver a visual presence to the A127.' It is not clear what is meant by this statement.
'Expansion is...only acceptable if...subject to environmental constraints...' Expansion plans were vetoed in the Nineteen-sixties because it was not environmentally viable. What can possibly have changed since then?
A baseline of noise levels can be set anywhere and it does not appear to be in the power of the local authority to set this baseline or to object to it after it is implemented. A Noise Evaluation Statement is just that. It does not promise to do anything about it. There are at least 60,000 people living under the flight path and they are the ones who can evaluate the noise levels for you. Heavy aircraft taking off or landing at night have not been a feature whilst the JAAP is in the balance, but as soon as the consultation is over, it is entirely possible that these will resume. Added to the daytime flights interrupting the sleep of night workers and the work of children in ten schools directly under the flight path, the noise levels will become an intolerable burden.
The added CO2 in the atmosphere is not easy to offsett given the limited amount of green space within the borough of Southend, school green areas having been sold off and built upon and former agricultural land now being seen as business parks. So the quality of life for all these people will be sadly reduced. Not to mention the prices of their houses falling, because no-one in their right mind will want to live close to an expanding airport.
There is currently opposition to expansion of airports within the Government and Opposition benches. Is it hoped that all this permission for the Rochford/Southend JAAP will slip under the wire before it becomes law to limit the use of airports.
(see London Southend Airport Introduction (para 3)
Why is there no printed plan yet available for the PSZ if and when the runway is extended? Will this entail further disruption and compulsory purchase?
'The airport operator will be required to...make a contribution towards construction...'what percentage of this will the operator be expected to pay. It does not seem fair that the public should be expected to pay anything towards these changes; why not ask the operator to pay for the lot. Southend taxpayers can not expect to get anything out of the proposals except noise, disruption and poor air quality. Is it fair to ask them to pay anything towards the cost of local taxes?
The hours of predicted air travel are far too wide. Children whose sleep patterns are likely to be affected by flights will be in bed by 8pm and that is when the flights should stop. We should not be accepting flights from London City Airport either. It is simply another way of raising income for the operator and does not benefit the town.
The closure of Eastwoodbury Lane and the provision of a new road will mean that all the traffic that currently uses the Lane as a back way in to Southend will have to travel along the A127 or Nestuda Way. It will add about a mile to the journey into Southend, so most people will not turn in to the new road but will attempt to continue their journey along the A127, putting intolerable strain on the junction at the Bell and Rochford Road junction. There will be more traffic movements also, connected with the new jobs planned for the Saxon Business Park. The current infrastructure is bulging with overuse and really cannot take any more. the proposed Park and Ride can take only a little of the traffic away. And if it is intended for long term use for the airport, it will be of no use to the daily commuter.
What time span is this to take? And surely this is the same piece of road - why is it taking two separate policies.
It is not clear why a new junction will be required at Aviation Way and Eastwoodbury Lane - there is already an adequate roundabout there.
It is noted that improvements in public transport are needed within the JAAP. They are needed throughout Southend in many areas not covered by The JAAP also.
I note with dismay that a Green Belt is not what it was designed to. It should not provide flexibility...to accomodate growth. It should provide a barrier between urban and rural areas that is sacrosanct and inviolable.
This is already an open space and provides a lovely green area which is currenty well used. Redirecting Eastwoodbury Lane is going to devastate the area so that no one will want to use it as a public park.
It is good to know that this is to be another green buffer. And good to know that the powers that be are capable of changing their minds. A couple of years ago, the plan was to make this into a car park. No-one is fooled by this apparent charitable act today.
'The success will be limited if, etc.' For whom?

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 14146

Received: 01/06/2009

Respondent: K Theobald

Representation Summary:

2.3 (para 2)
'...Passengers will travel on quiet, fuel efficient lanes...'There is no such thing as a quiet aeroplane! there are planes that are quieter than they were in the past, but it will take a very long time for airlines to ensure that all their aircraft are quieter than those they presently use. It would be too expensive for them to ditch the aircraft, until they have finished their natural life, which could be upto to 30 years. As to fuel efficiency, 'peak oil' may already have been reached so fuel efficient or not, prices will soon begin to rise again and put most flights beyond the reach of the man on the street. Why not reconsider the phrase 'quiet, fuel efficient plane's when they are quiet and fuel efficient, running on solar power?
The penultimate sentence seems to contradict itself:-'...the runway extension is a key factor in...aeroplanes (which) can take off in shorter distances.' If the planes take off in shorter distances, they do not need a longer runway! Or could it be that, because of the proximity of the railway line, the planes need to make a landing further away from the Rochford end of the railway, transferring the nuisance to the Southend end of the runway.

Full text:

Comments and Objections
The regeneration of London Southend Airport cannot be achieved by building a business park. Nor does a business park depend upon the extension of the runway.
Set out specific standards which will be applied to the area. Standards of what, exactly? - behaviour? - building control? - road width? - signage?
The JAAP takes into account the impact of the proposals on other parts of Southend Borough Council areas, I don't think it does, there are at least 60,000 people and pupils in 10 schools likely to be adversely affected by increasing the flight capacity of the airport. Some of the aircraft may well be quieter than others, but there is no such thing as a quiet aeroplane. The higher a plane goes on take-off, by using a longer runway and a steeper ascent, the wider the 'noise footprint' will be. Surely that is a matter of basic physics. To attain the greater speed on the runway, the number of revs will increase, creating greater ground noise than at present. Also, as one aircraft is taking off, another will be preparing for take-off at peak times, a constant noise for all the houses around the take-off area.'Impact on...the existing built environment...' A possible 6 houses demolished for the runway to Eastwoodbury Lane and the brickfield cottages on Cherry Orchard Lane demolished for the business park. '...including listed buildings.' The church of St Laurence is a Grade One listed building, accepted by the CAA as a hazard. It is in constant use. The vibration caused by aircraft movements could surely endanger this beautful old church. The (admittedly remote) chance that a plane could strike the church and 130 worshippers must also be considered.
The 'Issues and Options' report was quietly introduced in the summer of 2008. It was not trumpeted loudly, but hidden in a website backwater for comments from those that could find it.
'The feedback...has been carefully considered and used'. The analysis was published in March 2009. When SAEN queried the statement on the penultimate page of the document, 'most respondents did not favour the high-growth option, they were told that 'this is not a referendum; it is a consultation'. So it would seem that views were asked for and then ignored. No wonder people say that the whole thing is a foregone conclusion!
'The economic benefits of the expansion in air travel' should be re-examined in the light of falling figures relating to air travel. The only airline operating regularly from Southend Airport has already gone into liquidation last winter - a victim of the credit crunch, not a victim of a runway that was too short.
The growing pressure on airports in the South-East is a pressure generated by the huge success of Stansted airport as a passenger terminal. Stansted is one hour away from Southend on the X30 bus; a comfortable journey with room for your luggage also, and a frequent service from the town.
Another pressure will be that the London Southend Airport has to consider that a drop-off point is now not to be too near a terminal building and other forms of security need to be addressed. There may be a 6 foot fence on the southern boundary, but a footpath that actually crosses the disused short runway to the north would have to be considered a security threat.
'Significant job opportunities' is a statement which must be challenged. There will not be any significant job opportunities connected to the airport until the airport starts to cater for millions of passengers. The jobs referred to in the booklet will almost exclusively provided by units in the Saxon Business Park. 'The Region's competitve strength and attractiveness as a business location and tourism destination.' Before Southend sees itself as a business location or a tourism destination, it needs to take a long hard look at what it does want to be. For some decades now. Southend Borough Council has been drying to ignore the fact that it is a seaside town. It is not a centre of things, it is on the coast. It is already well served by two rail lines for those who wish to come to the beach. It is only safe to swim when the tide is coming in (which it does twice a day), not when it is going out. When the tide is out, what should the visitor do? Visit the Pier? Why? There hasn't been enough cash in the kitty for years to develop the pier into a going concern, mostly due to an overspend on expensive consultants and lack of competent decision making. Visit the penny arcades, the pubs the shopping centre, visit Leigh and buy cockles go to the fun fair? Yes, but the airport is 3 miles away from all that, so after your flight, you will need a bus, (there are still a few left still running) or a taxi to the seaside. On the way, you may pass the remains of the Ecko site, the town's once-huge industry, or you pay pass the muli-storey buildings in Victoria Avenue, now derelict and unused, no longer the centres of commerce that they once were.
So, before Southend Borough Council addresses the question of the airport, which is 90% in Rochford anyway, perhaps they should expend a little effort, time and money considering the town's identity - you cant ignore the fact that it is a seaside town; commerce has failed hugely and manufacture is not what it once was, probably due to European influence and computer networking.
How does the local policy framework foresee Southend airport acting as a key driver for economic development? There is not enough detail given in the document.
With expansion of the airport'... issues of congestion and accessibility in and around the JAAP area...need to be addressed. And it will all have to be done at the same time. Public accounts of any difficulties experienced whilst getting to the airport are more than likely to be negative. People accept the good inherent in things but complain loudly when they are confronted by obstacles!
'Local policies support the growth of the airport' but local opinion, whilst largely embracing the airport as it is at present, is not generally in favour of the extension. The MRO sector should be safeguarded. However as the number of passengers increases towards 2 million, as proposed, the opportunity to test planes on the runway will necessarily decrease, pushing these older, noisier planes into times when passenger movements are less, that is to say, evenings and night times.
I object to the wording in this paragraph because it implies that London Southend Airport will be providing significant employment opportunities, when the facts are that the employment opportunities will arise when the Saxon Business Park is completed. Even then, there are several respondents to SAEN who understand that the jobs are not being created, but for the most part are jobs which will move from Hockley, where a number of business properties are to be demolished and moved to Rochford as part of the Hockley Area Action Plan.
Development of the airport...will not start delivering jobs until passengers exceed one million. Statistics collected from other airports will corroborate this; there are already enough people employed directly by the airport to cater for the first million people through the doors.
'...a need to release the potential of Southend's land and buildings...' Since nine-tenths of the land within the airport belongs to Rochford to what buildings does this part of the document refer? Buildings which stand directly opposite Southend's Council Offices have been neglected, run-down and empty for years. Given the constrains of budget, surely they should look closer to home to invest the taxpayer's money.
'...growth on London Southend Airport...attracts high technology businesses' - if the businesses are going next to the airport, why does this imply that the airport has to grow in order for the businesses to succeed. I object to the misleading way this paragraph has been written.
'...sustainable and high value employment' is a meaningless phrase to the layman. I object to this phrase as misleading 'spin'.
'...Passengers will travel on quiet, fuel efficient lanes...'There is no such thing as a quiet aeroplane! there are planes that are quieter than they were in the past, but it will take a very long time for airlines to ensure that all their aircraft are quieter than those they presently use. It would be too expensive for them to ditch the aircraft, until they have finished their natural life, which could be upto to 30 years. As to fuel efficiency, 'peak oil' may already have been reached so fuel efficient or not, prices will soon begin to rise again and put most flights beyond the reach of the man on the street. Why not reconsider the phrase 'quiet, fuel efficient plane's when they are quiet and fuel efficient, running on solar power?
The penultimate sentence seems to contradict itself:-'...the runway extension is a key factor in...aeroplanes (which) can take off in shorter distances.' If the planes take off in shorter distances, they do not need a longer runway! Or could it be that, because of the proximity of the railway line, the planes need to make a landing further away from the Rochford end of the railway, transferring the nuisance to the Southend end of the runway.
The MRO should be allowed to continue, but surely if passenger numbers are allowed to increase, the time available for landing, testing and take-off will be severely limited due to the number of passenger flights. Will this facility be moved to evenings and nights?'...there will be restrictions on night flights through a noise quota system.' That is good news! Why was the actual number for the quota not quoted here?
The Saxon Business Park could be good news. Common speculation, tying in the Hockley Action Plan with the Southend/Rochford Plan would indicate that many of the jobs will actually be moving from Hockley to the new site, along with some of the units that will be cleared to make way for other development, But I am sure there will be some new jobs created.
'...a new route will have been provided from Nestuda Way...etc'. The words make this sound like simplicity itself. Living here will not be simple for a very long time. The current runway and the proposed entension are over the place where the village of Eastwood once stood. Archaeological surveys will have to be done before work is carried out, local opinioin must be satisfied before work is carried out, explanations to those east of the church as to how they may obtain access to the church and churchyard will have to be given and the necessary funding found for the job. these are just a few of the obstacles in the way of progress with the extension of the runway. And yet here it is dismissed in a few simple words.
It is impossible to equate 2012 with the figure of 1 million passengers given the promises in the previous section. The quiet fuel efficient planes will not be in place entirely,the longer runway will not be in place, the infrastructure (i.e crowded roads, particularly Progress Road, Sadlers Farm will not have been addressed, since there is not enough time in 3 years to address all these things. At present there is not an airline lined up which is to provide a passenger service. They will surely not rely on promises, they have a business to run!
'The preferred option' as selected by joint councils is not the one chosen by the respondents to the first part of this consultation. On the penultimate page of the summary of responses, it is stated that the high-growth scenario was not favoured by the majority. When this was questioned by members of SAEN and other unrelated individuals, the response was that 'this is not a referendum, it is a consultation!' So the statements on many lips - 'Well the council will do what they like!' and 'It's only a paper exercise - it's a foregone conclusion!' may well be correct. Our views have not been taken into consideration so far, and there is no reason to think that we will be considered in this round, either. '...aircraft...fully laden...'must present more of a danger for the residents of the Mendip Estate, to the south-west of the runway. We cannot countenance a Lockerbie situation here in Westcliff. The houses are far too close to the runway now, before an extension is granted. Southend Council has allowed building to take place right up to the outskirts of the airport boundary over the last few years; this includes an enormous Tesco store and the huge building of the Royal bank of Scotland - landing and take-off procedures leave very little margin for error with so many people in the vicinity.
The promise of 6,200 jobs is a good one. It does not depend on the extension of the runway. It is however not clear what is meant by 'classes B1 and B2.'
'...environmental impacts (noise and air quality) will need to be carefully considered and assessed as a result of the increased aircraft movements and traffic in the area.'...'considering controls on airport operation to ensure quality of life is maintained for residents...minimise traffic impacts.' The way in which these measures are to be taken should be better described in this document; they are crucial to the quality of life of residents, old people and children being particularly vulnerable to noise and air pollutiion.
It is interesting to see that there are plans to improve public transport in Southend (or is it in Rochford?-it is not clear). Public transport has been in decline in Southend for some years, and it is apparent that the planning office has no idea how to deal with it all. There are current plans to demolish a multi-storey car park in the centre of Southend and replace it with a library for the university students. Yet alongside that, there seem to be no plans to improve access to the centre of the town by public transport.
It is not clear whether the Brickwork's cottages are to remain as part of an industrial area or whether they are intended for demolition.
Taking agricultural land for business and employment activity might seem a little unwise, Southend has already run out of agricultural land, and it now seems as if Rochford wants to go the same way. Has the term 'Green Belt' become so abused that it no longer means 'land that is green and cannot be built on'?
This is already a green lung and should remain so. Will there be any safeguards to stop this area becoming the next stage of development?
It is not clear whether this is meant as a compulsory purchase option! Were the current businesses asked for their views.
This is already an open space and provides a lovely green area which is currently well used. Redirecting Eastwoodbury Lane is going to devastate the area so that no one will want to use it as a public park.
The flying Clubs have been the core of the airport activity for a very long time, training pilots and ensuring sustainability - will they be given a new area from which to function.
It is good to know that this is to be another green buffer. And good to know that the powers that be are capable of changing their minds. A couple of years ago, the plan was to make this into a car park. No-one is fooled by this apparent charitable act today!
The Park and Ride facility would be on a good place to commute to Southend by bus, if it were not for the fact that it is right under the flight path. Is it legal to have a bus stop within the Safety Zone.
'...sustainable drainage...'. It is not clear what is meant by this term. There are problems of drainage already in the Southend Road; during wet weather the Horse and Groom public house is frequently overwhelmed by water. Is there a guarantee that the situation will not worsen and that water will be drained off into the correct direction? There must be some sort of ruling governing the safety issues of rain/large areas of tarmac. Have these been fully investigated, and do we have assurances?
This data implies that there will be 1180 jobs directly related to the airport. Research into previous claims for directly-related airport jobs has proved that these predictions are grossly inflated. When 2 million passengers go through, there may be direct jobs for 100 people, but 1000 has to be seen as an optimistic exaggeration.
It is encouraging to see that there are to be new walking/cycling routes incorporated into the JAAP.
The brickwork cottages are now unique and should be preserved as part of the brickfield development in Essex over many hundreds of years.
An impressive entrance will make no difference to the quality of what goes on in the business park.
'...the business park will need to...deliver a visual presence to the A127.' It is not clear what is meant by this statement.
'Expansion is...only acceptable if...subject to environmental constraints...' Expansion plans were vetoed in the Nineteen-sixties because it was not environmentally viable. What can possibly have changed since then?
A baseline of noise levels can be set anywhere and it does not appear to be in the power of the local authority to set this baseline or to object to it after it is implemented. A Noise Evaluation Statement is just that. It does not promise to do anything about it. There are at least 60,000 people living under the flight path and they are the ones who can evaluate the noise levels for you. Heavy aircraft taking off or landing at night have not been a feature whilst the JAAP is in the balance, but as soon as the consultation is over, it is entirely possible that these will resume. Added to the daytime flights interrupting the sleep of night workers and the work of children in ten schools directly under the flight path, the noise levels will become an intolerable burden.
The added CO2 in the atmosphere is not easy to offsett given the limited amount of green space within the borough of Southend, school green areas having been sold off and built upon and former agricultural land now being seen as business parks. So the quality of life for all these people will be sadly reduced. Not to mention the prices of their houses falling, because no-one in their right mind will want to live close to an expanding airport.
There is currently opposition to expansion of airports within the Government and Opposition benches. Is it hoped that all this permission for the Rochford/Southend JAAP will slip under the wire before it becomes law to limit the use of airports.
(see London Southend Airport Introduction (para 3)
Why is there no printed plan yet available for the PSZ if and when the runway is extended? Will this entail further disruption and compulsory purchase?
'The airport operator will be required to...make a contribution towards construction...'what percentage of this will the operator be expected to pay. It does not seem fair that the public should be expected to pay anything towards these changes; why not ask the operator to pay for the lot. Southend taxpayers can not expect to get anything out of the proposals except noise, disruption and poor air quality. Is it fair to ask them to pay anything towards the cost of local taxes?
The hours of predicted air travel are far too wide. Children whose sleep patterns are likely to be affected by flights will be in bed by 8pm and that is when the flights should stop. We should not be accepting flights from London City Airport either. It is simply another way of raising income for the operator and does not benefit the town.
The closure of Eastwoodbury Lane and the provision of a new road will mean that all the traffic that currently uses the Lane as a back way in to Southend will have to travel along the A127 or Nestuda Way. It will add about a mile to the journey into Southend, so most people will not turn in to the new road but will attempt to continue their journey along the A127, putting intolerable strain on the junction at the Bell and Rochford Road junction. There will be more traffic movements also, connected with the new jobs planned for the Saxon Business Park. The current infrastructure is bulging with overuse and really cannot take any more. the proposed Park and Ride can take only a little of the traffic away. And if it is intended for long term use for the airport, it will be of no use to the daily commuter.
What time span is this to take? And surely this is the same piece of road - why is it taking two separate policies.
It is not clear why a new junction will be required at Aviation Way and Eastwoodbury Lane - there is already an adequate roundabout there.
It is noted that improvements in public transport are needed within the JAAP. They are needed throughout Southend in many areas not covered by The JAAP also.
I note with dismay that a Green Belt is not what it was designed to. It should not provide flexibility...to accomodate growth. It should provide a barrier between urban and rural areas that is sacrosanct and inviolable.
This is already an open space and provides a lovely green area which is currenty well used. Redirecting Eastwoodbury Lane is going to devastate the area so that no one will want to use it as a public park.
It is good to know that this is to be another green buffer. And good to know that the powers that be are capable of changing their minds. A couple of years ago, the plan was to make this into a car park. No-one is fooled by this apparent charitable act today.
'The success will be limited if, etc.' For whom?

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 14147

Received: 01/06/2009

Respondent: K Theobald

Representation Summary:

(para3)
The MRO should be allowed to continue, but surely if passenger numbers are allowed to increase, the time available for landing, testing and take-off will be severely limited due to the number of passenger flights. Will this facility be moved to evenings and nights?'...there will be restrictions on night flights through a noise quota system.' That is good news! Why was the actual number for the quota not quoted here?

Full text:

Comments and Objections
The regeneration of London Southend Airport cannot be achieved by building a business park. Nor does a business park depend upon the extension of the runway.
Set out specific standards which will be applied to the area. Standards of what, exactly? - behaviour? - building control? - road width? - signage?
The JAAP takes into account the impact of the proposals on other parts of Southend Borough Council areas, I don't think it does, there are at least 60,000 people and pupils in 10 schools likely to be adversely affected by increasing the flight capacity of the airport. Some of the aircraft may well be quieter than others, but there is no such thing as a quiet aeroplane. The higher a plane goes on take-off, by using a longer runway and a steeper ascent, the wider the 'noise footprint' will be. Surely that is a matter of basic physics. To attain the greater speed on the runway, the number of revs will increase, creating greater ground noise than at present. Also, as one aircraft is taking off, another will be preparing for take-off at peak times, a constant noise for all the houses around the take-off area.'Impact on...the existing built environment...' A possible 6 houses demolished for the runway to Eastwoodbury Lane and the brickfield cottages on Cherry Orchard Lane demolished for the business park. '...including listed buildings.' The church of St Laurence is a Grade One listed building, accepted by the CAA as a hazard. It is in constant use. The vibration caused by aircraft movements could surely endanger this beautful old church. The (admittedly remote) chance that a plane could strike the church and 130 worshippers must also be considered.
The 'Issues and Options' report was quietly introduced in the summer of 2008. It was not trumpeted loudly, but hidden in a website backwater for comments from those that could find it.
'The feedback...has been carefully considered and used'. The analysis was published in March 2009. When SAEN queried the statement on the penultimate page of the document, 'most respondents did not favour the high-growth option, they were told that 'this is not a referendum; it is a consultation'. So it would seem that views were asked for and then ignored. No wonder people say that the whole thing is a foregone conclusion!
'The economic benefits of the expansion in air travel' should be re-examined in the light of falling figures relating to air travel. The only airline operating regularly from Southend Airport has already gone into liquidation last winter - a victim of the credit crunch, not a victim of a runway that was too short.
The growing pressure on airports in the South-East is a pressure generated by the huge success of Stansted airport as a passenger terminal. Stansted is one hour away from Southend on the X30 bus; a comfortable journey with room for your luggage also, and a frequent service from the town.
Another pressure will be that the London Southend Airport has to consider that a drop-off point is now not to be too near a terminal building and other forms of security need to be addressed. There may be a 6 foot fence on the southern boundary, but a footpath that actually crosses the disused short runway to the north would have to be considered a security threat.
'Significant job opportunities' is a statement which must be challenged. There will not be any significant job opportunities connected to the airport until the airport starts to cater for millions of passengers. The jobs referred to in the booklet will almost exclusively provided by units in the Saxon Business Park. 'The Region's competitve strength and attractiveness as a business location and tourism destination.' Before Southend sees itself as a business location or a tourism destination, it needs to take a long hard look at what it does want to be. For some decades now. Southend Borough Council has been drying to ignore the fact that it is a seaside town. It is not a centre of things, it is on the coast. It is already well served by two rail lines for those who wish to come to the beach. It is only safe to swim when the tide is coming in (which it does twice a day), not when it is going out. When the tide is out, what should the visitor do? Visit the Pier? Why? There hasn't been enough cash in the kitty for years to develop the pier into a going concern, mostly due to an overspend on expensive consultants and lack of competent decision making. Visit the penny arcades, the pubs the shopping centre, visit Leigh and buy cockles go to the fun fair? Yes, but the airport is 3 miles away from all that, so after your flight, you will need a bus, (there are still a few left still running) or a taxi to the seaside. On the way, you may pass the remains of the Ecko site, the town's once-huge industry, or you pay pass the muli-storey buildings in Victoria Avenue, now derelict and unused, no longer the centres of commerce that they once were.
So, before Southend Borough Council addresses the question of the airport, which is 90% in Rochford anyway, perhaps they should expend a little effort, time and money considering the town's identity - you cant ignore the fact that it is a seaside town; commerce has failed hugely and manufacture is not what it once was, probably due to European influence and computer networking.
How does the local policy framework foresee Southend airport acting as a key driver for economic development? There is not enough detail given in the document.
With expansion of the airport'... issues of congestion and accessibility in and around the JAAP area...need to be addressed. And it will all have to be done at the same time. Public accounts of any difficulties experienced whilst getting to the airport are more than likely to be negative. People accept the good inherent in things but complain loudly when they are confronted by obstacles!
'Local policies support the growth of the airport' but local opinion, whilst largely embracing the airport as it is at present, is not generally in favour of the extension. The MRO sector should be safeguarded. However as the number of passengers increases towards 2 million, as proposed, the opportunity to test planes on the runway will necessarily decrease, pushing these older, noisier planes into times when passenger movements are less, that is to say, evenings and night times.
I object to the wording in this paragraph because it implies that London Southend Airport will be providing significant employment opportunities, when the facts are that the employment opportunities will arise when the Saxon Business Park is completed. Even then, there are several respondents to SAEN who understand that the jobs are not being created, but for the most part are jobs which will move from Hockley, where a number of business properties are to be demolished and moved to Rochford as part of the Hockley Area Action Plan.
Development of the airport...will not start delivering jobs until passengers exceed one million. Statistics collected from other airports will corroborate this; there are already enough people employed directly by the airport to cater for the first million people through the doors.
'...a need to release the potential of Southend's land and buildings...' Since nine-tenths of the land within the airport belongs to Rochford to what buildings does this part of the document refer? Buildings which stand directly opposite Southend's Council Offices have been neglected, run-down and empty for years. Given the constrains of budget, surely they should look closer to home to invest the taxpayer's money.
'...growth on London Southend Airport...attracts high technology businesses' - if the businesses are going next to the airport, why does this imply that the airport has to grow in order for the businesses to succeed. I object to the misleading way this paragraph has been written.
'...sustainable and high value employment' is a meaningless phrase to the layman. I object to this phrase as misleading 'spin'.
'...Passengers will travel on quiet, fuel efficient lanes...'There is no such thing as a quiet aeroplane! there are planes that are quieter than they were in the past, but it will take a very long time for airlines to ensure that all their aircraft are quieter than those they presently use. It would be too expensive for them to ditch the aircraft, until they have finished their natural life, which could be upto to 30 years. As to fuel efficiency, 'peak oil' may already have been reached so fuel efficient or not, prices will soon begin to rise again and put most flights beyond the reach of the man on the street. Why not reconsider the phrase 'quiet, fuel efficient plane's when they are quiet and fuel efficient, running on solar power?
The penultimate sentence seems to contradict itself:-'...the runway extension is a key factor in...aeroplanes (which) can take off in shorter distances.' If the planes take off in shorter distances, they do not need a longer runway! Or could it be that, because of the proximity of the railway line, the planes need to make a landing further away from the Rochford end of the railway, transferring the nuisance to the Southend end of the runway.
The MRO should be allowed to continue, but surely if passenger numbers are allowed to increase, the time available for landing, testing and take-off will be severely limited due to the number of passenger flights. Will this facility be moved to evenings and nights?'...there will be restrictions on night flights through a noise quota system.' That is good news! Why was the actual number for the quota not quoted here?
The Saxon Business Park could be good news. Common speculation, tying in the Hockley Action Plan with the Southend/Rochford Plan would indicate that many of the jobs will actually be moving from Hockley to the new site, along with some of the units that will be cleared to make way for other development, But I am sure there will be some new jobs created.
'...a new route will have been provided from Nestuda Way...etc'. The words make this sound like simplicity itself. Living here will not be simple for a very long time. The current runway and the proposed entension are over the place where the village of Eastwood once stood. Archaeological surveys will have to be done before work is carried out, local opinioin must be satisfied before work is carried out, explanations to those east of the church as to how they may obtain access to the church and churchyard will have to be given and the necessary funding found for the job. these are just a few of the obstacles in the way of progress with the extension of the runway. And yet here it is dismissed in a few simple words.
It is impossible to equate 2012 with the figure of 1 million passengers given the promises in the previous section. The quiet fuel efficient planes will not be in place entirely,the longer runway will not be in place, the infrastructure (i.e crowded roads, particularly Progress Road, Sadlers Farm will not have been addressed, since there is not enough time in 3 years to address all these things. At present there is not an airline lined up which is to provide a passenger service. They will surely not rely on promises, they have a business to run!
'The preferred option' as selected by joint councils is not the one chosen by the respondents to the first part of this consultation. On the penultimate page of the summary of responses, it is stated that the high-growth scenario was not favoured by the majority. When this was questioned by members of SAEN and other unrelated individuals, the response was that 'this is not a referendum, it is a consultation!' So the statements on many lips - 'Well the council will do what they like!' and 'It's only a paper exercise - it's a foregone conclusion!' may well be correct. Our views have not been taken into consideration so far, and there is no reason to think that we will be considered in this round, either. '...aircraft...fully laden...'must present more of a danger for the residents of the Mendip Estate, to the south-west of the runway. We cannot countenance a Lockerbie situation here in Westcliff. The houses are far too close to the runway now, before an extension is granted. Southend Council has allowed building to take place right up to the outskirts of the airport boundary over the last few years; this includes an enormous Tesco store and the huge building of the Royal bank of Scotland - landing and take-off procedures leave very little margin for error with so many people in the vicinity.
The promise of 6,200 jobs is a good one. It does not depend on the extension of the runway. It is however not clear what is meant by 'classes B1 and B2.'
'...environmental impacts (noise and air quality) will need to be carefully considered and assessed as a result of the increased aircraft movements and traffic in the area.'...'considering controls on airport operation to ensure quality of life is maintained for residents...minimise traffic impacts.' The way in which these measures are to be taken should be better described in this document; they are crucial to the quality of life of residents, old people and children being particularly vulnerable to noise and air pollutiion.
It is interesting to see that there are plans to improve public transport in Southend (or is it in Rochford?-it is not clear). Public transport has been in decline in Southend for some years, and it is apparent that the planning office has no idea how to deal with it all. There are current plans to demolish a multi-storey car park in the centre of Southend and replace it with a library for the university students. Yet alongside that, there seem to be no plans to improve access to the centre of the town by public transport.
It is not clear whether the Brickwork's cottages are to remain as part of an industrial area or whether they are intended for demolition.
Taking agricultural land for business and employment activity might seem a little unwise, Southend has already run out of agricultural land, and it now seems as if Rochford wants to go the same way. Has the term 'Green Belt' become so abused that it no longer means 'land that is green and cannot be built on'?
This is already a green lung and should remain so. Will there be any safeguards to stop this area becoming the next stage of development?
It is not clear whether this is meant as a compulsory purchase option! Were the current businesses asked for their views.
This is already an open space and provides a lovely green area which is currently well used. Redirecting Eastwoodbury Lane is going to devastate the area so that no one will want to use it as a public park.
The flying Clubs have been the core of the airport activity for a very long time, training pilots and ensuring sustainability - will they be given a new area from which to function.
It is good to know that this is to be another green buffer. And good to know that the powers that be are capable of changing their minds. A couple of years ago, the plan was to make this into a car park. No-one is fooled by this apparent charitable act today!
The Park and Ride facility would be on a good place to commute to Southend by bus, if it were not for the fact that it is right under the flight path. Is it legal to have a bus stop within the Safety Zone.
'...sustainable drainage...'. It is not clear what is meant by this term. There are problems of drainage already in the Southend Road; during wet weather the Horse and Groom public house is frequently overwhelmed by water. Is there a guarantee that the situation will not worsen and that water will be drained off into the correct direction? There must be some sort of ruling governing the safety issues of rain/large areas of tarmac. Have these been fully investigated, and do we have assurances?
This data implies that there will be 1180 jobs directly related to the airport. Research into previous claims for directly-related airport jobs has proved that these predictions are grossly inflated. When 2 million passengers go through, there may be direct jobs for 100 people, but 1000 has to be seen as an optimistic exaggeration.
It is encouraging to see that there are to be new walking/cycling routes incorporated into the JAAP.
The brickwork cottages are now unique and should be preserved as part of the brickfield development in Essex over many hundreds of years.
An impressive entrance will make no difference to the quality of what goes on in the business park.
'...the business park will need to...deliver a visual presence to the A127.' It is not clear what is meant by this statement.
'Expansion is...only acceptable if...subject to environmental constraints...' Expansion plans were vetoed in the Nineteen-sixties because it was not environmentally viable. What can possibly have changed since then?
A baseline of noise levels can be set anywhere and it does not appear to be in the power of the local authority to set this baseline or to object to it after it is implemented. A Noise Evaluation Statement is just that. It does not promise to do anything about it. There are at least 60,000 people living under the flight path and they are the ones who can evaluate the noise levels for you. Heavy aircraft taking off or landing at night have not been a feature whilst the JAAP is in the balance, but as soon as the consultation is over, it is entirely possible that these will resume. Added to the daytime flights interrupting the sleep of night workers and the work of children in ten schools directly under the flight path, the noise levels will become an intolerable burden.
The added CO2 in the atmosphere is not easy to offsett given the limited amount of green space within the borough of Southend, school green areas having been sold off and built upon and former agricultural land now being seen as business parks. So the quality of life for all these people will be sadly reduced. Not to mention the prices of their houses falling, because no-one in their right mind will want to live close to an expanding airport.
There is currently opposition to expansion of airports within the Government and Opposition benches. Is it hoped that all this permission for the Rochford/Southend JAAP will slip under the wire before it becomes law to limit the use of airports.
(see London Southend Airport Introduction (para 3)
Why is there no printed plan yet available for the PSZ if and when the runway is extended? Will this entail further disruption and compulsory purchase?
'The airport operator will be required to...make a contribution towards construction...'what percentage of this will the operator be expected to pay. It does not seem fair that the public should be expected to pay anything towards these changes; why not ask the operator to pay for the lot. Southend taxpayers can not expect to get anything out of the proposals except noise, disruption and poor air quality. Is it fair to ask them to pay anything towards the cost of local taxes?
The hours of predicted air travel are far too wide. Children whose sleep patterns are likely to be affected by flights will be in bed by 8pm and that is when the flights should stop. We should not be accepting flights from London City Airport either. It is simply another way of raising income for the operator and does not benefit the town.
The closure of Eastwoodbury Lane and the provision of a new road will mean that all the traffic that currently uses the Lane as a back way in to Southend will have to travel along the A127 or Nestuda Way. It will add about a mile to the journey into Southend, so most people will not turn in to the new road but will attempt to continue their journey along the A127, putting intolerable strain on the junction at the Bell and Rochford Road junction. There will be more traffic movements also, connected with the new jobs planned for the Saxon Business Park. The current infrastructure is bulging with overuse and really cannot take any more. the proposed Park and Ride can take only a little of the traffic away. And if it is intended for long term use for the airport, it will be of no use to the daily commuter.
What time span is this to take? And surely this is the same piece of road - why is it taking two separate policies.
It is not clear why a new junction will be required at Aviation Way and Eastwoodbury Lane - there is already an adequate roundabout there.
It is noted that improvements in public transport are needed within the JAAP. They are needed throughout Southend in many areas not covered by The JAAP also.
I note with dismay that a Green Belt is not what it was designed to. It should not provide flexibility...to accomodate growth. It should provide a barrier between urban and rural areas that is sacrosanct and inviolable.
This is already an open space and provides a lovely green area which is currenty well used. Redirecting Eastwoodbury Lane is going to devastate the area so that no one will want to use it as a public park.
It is good to know that this is to be another green buffer. And good to know that the powers that be are capable of changing their minds. A couple of years ago, the plan was to make this into a car park. No-one is fooled by this apparent charitable act today.
'The success will be limited if, etc.' For whom?

Comment

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 14148

Received: 01/06/2009

Respondent: K Theobald

Representation Summary:

(para 4)
The Saxon Business Park could be good news. Common speculation, tying in the Hockley Action Plan with the Southend/Rochford Plan would indicate that many of the jobs will actually be moving from Hockley to the new site, along with some of the units that will be cleared to make way for other development, But I am sure there will be some new jobs created.

Full text:

Comments and Objections
The regeneration of London Southend Airport cannot be achieved by building a business park. Nor does a business park depend upon the extension of the runway.
Set out specific standards which will be applied to the area. Standards of what, exactly? - behaviour? - building control? - road width? - signage?
The JAAP takes into account the impact of the proposals on other parts of Southend Borough Council areas, I don't think it does, there are at least 60,000 people and pupils in 10 schools likely to be adversely affected by increasing the flight capacity of the airport. Some of the aircraft may well be quieter than others, but there is no such thing as a quiet aeroplane. The higher a plane goes on take-off, by using a longer runway and a steeper ascent, the wider the 'noise footprint' will be. Surely that is a matter of basic physics. To attain the greater speed on the runway, the number of revs will increase, creating greater ground noise than at present. Also, as one aircraft is taking off, another will be preparing for take-off at peak times, a constant noise for all the houses around the take-off area.'Impact on...the existing built environment...' A possible 6 houses demolished for the runway to Eastwoodbury Lane and the brickfield cottages on Cherry Orchard Lane demolished for the business park. '...including listed buildings.' The church of St Laurence is a Grade One listed building, accepted by the CAA as a hazard. It is in constant use. The vibration caused by aircraft movements could surely endanger this beautful old church. The (admittedly remote) chance that a plane could strike the church and 130 worshippers must also be considered.
The 'Issues and Options' report was quietly introduced in the summer of 2008. It was not trumpeted loudly, but hidden in a website backwater for comments from those that could find it.
'The feedback...has been carefully considered and used'. The analysis was published in March 2009. When SAEN queried the statement on the penultimate page of the document, 'most respondents did not favour the high-growth option, they were told that 'this is not a referendum; it is a consultation'. So it would seem that views were asked for and then ignored. No wonder people say that the whole thing is a foregone conclusion!
'The economic benefits of the expansion in air travel' should be re-examined in the light of falling figures relating to air travel. The only airline operating regularly from Southend Airport has already gone into liquidation last winter - a victim of the credit crunch, not a victim of a runway that was too short.
The growing pressure on airports in the South-East is a pressure generated by the huge success of Stansted airport as a passenger terminal. Stansted is one hour away from Southend on the X30 bus; a comfortable journey with room for your luggage also, and a frequent service from the town.
Another pressure will be that the London Southend Airport has to consider that a drop-off point is now not to be too near a terminal building and other forms of security need to be addressed. There may be a 6 foot fence on the southern boundary, but a footpath that actually crosses the disused short runway to the north would have to be considered a security threat.
'Significant job opportunities' is a statement which must be challenged. There will not be any significant job opportunities connected to the airport until the airport starts to cater for millions of passengers. The jobs referred to in the booklet will almost exclusively provided by units in the Saxon Business Park. 'The Region's competitve strength and attractiveness as a business location and tourism destination.' Before Southend sees itself as a business location or a tourism destination, it needs to take a long hard look at what it does want to be. For some decades now. Southend Borough Council has been drying to ignore the fact that it is a seaside town. It is not a centre of things, it is on the coast. It is already well served by two rail lines for those who wish to come to the beach. It is only safe to swim when the tide is coming in (which it does twice a day), not when it is going out. When the tide is out, what should the visitor do? Visit the Pier? Why? There hasn't been enough cash in the kitty for years to develop the pier into a going concern, mostly due to an overspend on expensive consultants and lack of competent decision making. Visit the penny arcades, the pubs the shopping centre, visit Leigh and buy cockles go to the fun fair? Yes, but the airport is 3 miles away from all that, so after your flight, you will need a bus, (there are still a few left still running) or a taxi to the seaside. On the way, you may pass the remains of the Ecko site, the town's once-huge industry, or you pay pass the muli-storey buildings in Victoria Avenue, now derelict and unused, no longer the centres of commerce that they once were.
So, before Southend Borough Council addresses the question of the airport, which is 90% in Rochford anyway, perhaps they should expend a little effort, time and money considering the town's identity - you cant ignore the fact that it is a seaside town; commerce has failed hugely and manufacture is not what it once was, probably due to European influence and computer networking.
How does the local policy framework foresee Southend airport acting as a key driver for economic development? There is not enough detail given in the document.
With expansion of the airport'... issues of congestion and accessibility in and around the JAAP area...need to be addressed. And it will all have to be done at the same time. Public accounts of any difficulties experienced whilst getting to the airport are more than likely to be negative. People accept the good inherent in things but complain loudly when they are confronted by obstacles!
'Local policies support the growth of the airport' but local opinion, whilst largely embracing the airport as it is at present, is not generally in favour of the extension. The MRO sector should be safeguarded. However as the number of passengers increases towards 2 million, as proposed, the opportunity to test planes on the runway will necessarily decrease, pushing these older, noisier planes into times when passenger movements are less, that is to say, evenings and night times.
I object to the wording in this paragraph because it implies that London Southend Airport will be providing significant employment opportunities, when the facts are that the employment opportunities will arise when the Saxon Business Park is completed. Even then, there are several respondents to SAEN who understand that the jobs are not being created, but for the most part are jobs which will move from Hockley, where a number of business properties are to be demolished and moved to Rochford as part of the Hockley Area Action Plan.
Development of the airport...will not start delivering jobs until passengers exceed one million. Statistics collected from other airports will corroborate this; there are already enough people employed directly by the airport to cater for the first million people through the doors.
'...a need to release the potential of Southend's land and buildings...' Since nine-tenths of the land within the airport belongs to Rochford to what buildings does this part of the document refer? Buildings which stand directly opposite Southend's Council Offices have been neglected, run-down and empty for years. Given the constrains of budget, surely they should look closer to home to invest the taxpayer's money.
'...growth on London Southend Airport...attracts high technology businesses' - if the businesses are going next to the airport, why does this imply that the airport has to grow in order for the businesses to succeed. I object to the misleading way this paragraph has been written.
'...sustainable and high value employment' is a meaningless phrase to the layman. I object to this phrase as misleading 'spin'.
'...Passengers will travel on quiet, fuel efficient lanes...'There is no such thing as a quiet aeroplane! there are planes that are quieter than they were in the past, but it will take a very long time for airlines to ensure that all their aircraft are quieter than those they presently use. It would be too expensive for them to ditch the aircraft, until they have finished their natural life, which could be upto to 30 years. As to fuel efficiency, 'peak oil' may already have been reached so fuel efficient or not, prices will soon begin to rise again and put most flights beyond the reach of the man on the street. Why not reconsider the phrase 'quiet, fuel efficient plane's when they are quiet and fuel efficient, running on solar power?
The penultimate sentence seems to contradict itself:-'...the runway extension is a key factor in...aeroplanes (which) can take off in shorter distances.' If the planes take off in shorter distances, they do not need a longer runway! Or could it be that, because of the proximity of the railway line, the planes need to make a landing further away from the Rochford end of the railway, transferring the nuisance to the Southend end of the runway.
The MRO should be allowed to continue, but surely if passenger numbers are allowed to increase, the time available for landing, testing and take-off will be severely limited due to the number of passenger flights. Will this facility be moved to evenings and nights?'...there will be restrictions on night flights through a noise quota system.' That is good news! Why was the actual number for the quota not quoted here?
The Saxon Business Park could be good news. Common speculation, tying in the Hockley Action Plan with the Southend/Rochford Plan would indicate that many of the jobs will actually be moving from Hockley to the new site, along with some of the units that will be cleared to make way for other development, But I am sure there will be some new jobs created.
'...a new route will have been provided from Nestuda Way...etc'. The words make this sound like simplicity itself. Living here will not be simple for a very long time. The current runway and the proposed entension are over the place where the village of Eastwood once stood. Archaeological surveys will have to be done before work is carried out, local opinioin must be satisfied before work is carried out, explanations to those east of the church as to how they may obtain access to the church and churchyard will have to be given and the necessary funding found for the job. these are just a few of the obstacles in the way of progress with the extension of the runway. And yet here it is dismissed in a few simple words.
It is impossible to equate 2012 with the figure of 1 million passengers given the promises in the previous section. The quiet fuel efficient planes will not be in place entirely,the longer runway will not be in place, the infrastructure (i.e crowded roads, particularly Progress Road, Sadlers Farm will not have been addressed, since there is not enough time in 3 years to address all these things. At present there is not an airline lined up which is to provide a passenger service. They will surely not rely on promises, they have a business to run!
'The preferred option' as selected by joint councils is not the one chosen by the respondents to the first part of this consultation. On the penultimate page of the summary of responses, it is stated that the high-growth scenario was not favoured by the majority. When this was questioned by members of SAEN and other unrelated individuals, the response was that 'this is not a referendum, it is a consultation!' So the statements on many lips - 'Well the council will do what they like!' and 'It's only a paper exercise - it's a foregone conclusion!' may well be correct. Our views have not been taken into consideration so far, and there is no reason to think that we will be considered in this round, either. '...aircraft...fully laden...'must present more of a danger for the residents of the Mendip Estate, to the south-west of the runway. We cannot countenance a Lockerbie situation here in Westcliff. The houses are far too close to the runway now, before an extension is granted. Southend Council has allowed building to take place right up to the outskirts of the airport boundary over the last few years; this includes an enormous Tesco store and the huge building of the Royal bank of Scotland - landing and take-off procedures leave very little margin for error with so many people in the vicinity.
The promise of 6,200 jobs is a good one. It does not depend on the extension of the runway. It is however not clear what is meant by 'classes B1 and B2.'
'...environmental impacts (noise and air quality) will need to be carefully considered and assessed as a result of the increased aircraft movements and traffic in the area.'...'considering controls on airport operation to ensure quality of life is maintained for residents...minimise traffic impacts.' The way in which these measures are to be taken should be better described in this document; they are crucial to the quality of life of residents, old people and children being particularly vulnerable to noise and air pollutiion.
It is interesting to see that there are plans to improve public transport in Southend (or is it in Rochford?-it is not clear). Public transport has been in decline in Southend for some years, and it is apparent that the planning office has no idea how to deal with it all. There are current plans to demolish a multi-storey car park in the centre of Southend and replace it with a library for the university students. Yet alongside that, there seem to be no plans to improve access to the centre of the town by public transport.
It is not clear whether the Brickwork's cottages are to remain as part of an industrial area or whether they are intended for demolition.
Taking agricultural land for business and employment activity might seem a little unwise, Southend has already run out of agricultural land, and it now seems as if Rochford wants to go the same way. Has the term 'Green Belt' become so abused that it no longer means 'land that is green and cannot be built on'?
This is already a green lung and should remain so. Will there be any safeguards to stop this area becoming the next stage of development?
It is not clear whether this is meant as a compulsory purchase option! Were the current businesses asked for their views.
This is already an open space and provides a lovely green area which is currently well used. Redirecting Eastwoodbury Lane is going to devastate the area so that no one will want to use it as a public park.
The flying Clubs have been the core of the airport activity for a very long time, training pilots and ensuring sustainability - will they be given a new area from which to function.
It is good to know that this is to be another green buffer. And good to know that the powers that be are capable of changing their minds. A couple of years ago, the plan was to make this into a car park. No-one is fooled by this apparent charitable act today!
The Park and Ride facility would be on a good place to commute to Southend by bus, if it were not for the fact that it is right under the flight path. Is it legal to have a bus stop within the Safety Zone.
'...sustainable drainage...'. It is not clear what is meant by this term. There are problems of drainage already in the Southend Road; during wet weather the Horse and Groom public house is frequently overwhelmed by water. Is there a guarantee that the situation will not worsen and that water will be drained off into the correct direction? There must be some sort of ruling governing the safety issues of rain/large areas of tarmac. Have these been fully investigated, and do we have assurances?
This data implies that there will be 1180 jobs directly related to the airport. Research into previous claims for directly-related airport jobs has proved that these predictions are grossly inflated. When 2 million passengers go through, there may be direct jobs for 100 people, but 1000 has to be seen as an optimistic exaggeration.
It is encouraging to see that there are to be new walking/cycling routes incorporated into the JAAP.
The brickwork cottages are now unique and should be preserved as part of the brickfield development in Essex over many hundreds of years.
An impressive entrance will make no difference to the quality of what goes on in the business park.
'...the business park will need to...deliver a visual presence to the A127.' It is not clear what is meant by this statement.
'Expansion is...only acceptable if...subject to environmental constraints...' Expansion plans were vetoed in the Nineteen-sixties because it was not environmentally viable. What can possibly have changed since then?
A baseline of noise levels can be set anywhere and it does not appear to be in the power of the local authority to set this baseline or to object to it after it is implemented. A Noise Evaluation Statement is just that. It does not promise to do anything about it. There are at least 60,000 people living under the flight path and they are the ones who can evaluate the noise levels for you. Heavy aircraft taking off or landing at night have not been a feature whilst the JAAP is in the balance, but as soon as the consultation is over, it is entirely possible that these will resume. Added to the daytime flights interrupting the sleep of night workers and the work of children in ten schools directly under the flight path, the noise levels will become an intolerable burden.
The added CO2 in the atmosphere is not easy to offsett given the limited amount of green space within the borough of Southend, school green areas having been sold off and built upon and former agricultural land now being seen as business parks. So the quality of life for all these people will be sadly reduced. Not to mention the prices of their houses falling, because no-one in their right mind will want to live close to an expanding airport.
There is currently opposition to expansion of airports within the Government and Opposition benches. Is it hoped that all this permission for the Rochford/Southend JAAP will slip under the wire before it becomes law to limit the use of airports.
(see London Southend Airport Introduction (para 3)
Why is there no printed plan yet available for the PSZ if and when the runway is extended? Will this entail further disruption and compulsory purchase?
'The airport operator will be required to...make a contribution towards construction...'what percentage of this will the operator be expected to pay. It does not seem fair that the public should be expected to pay anything towards these changes; why not ask the operator to pay for the lot. Southend taxpayers can not expect to get anything out of the proposals except noise, disruption and poor air quality. Is it fair to ask them to pay anything towards the cost of local taxes?
The hours of predicted air travel are far too wide. Children whose sleep patterns are likely to be affected by flights will be in bed by 8pm and that is when the flights should stop. We should not be accepting flights from London City Airport either. It is simply another way of raising income for the operator and does not benefit the town.
The closure of Eastwoodbury Lane and the provision of a new road will mean that all the traffic that currently uses the Lane as a back way in to Southend will have to travel along the A127 or Nestuda Way. It will add about a mile to the journey into Southend, so most people will not turn in to the new road but will attempt to continue their journey along the A127, putting intolerable strain on the junction at the Bell and Rochford Road junction. There will be more traffic movements also, connected with the new jobs planned for the Saxon Business Park. The current infrastructure is bulging with overuse and really cannot take any more. the proposed Park and Ride can take only a little of the traffic away. And if it is intended for long term use for the airport, it will be of no use to the daily commuter.
What time span is this to take? And surely this is the same piece of road - why is it taking two separate policies.
It is not clear why a new junction will be required at Aviation Way and Eastwoodbury Lane - there is already an adequate roundabout there.
It is noted that improvements in public transport are needed within the JAAP. They are needed throughout Southend in many areas not covered by The JAAP also.
I note with dismay that a Green Belt is not what it was designed to. It should not provide flexibility...to accomodate growth. It should provide a barrier between urban and rural areas that is sacrosanct and inviolable.
This is already an open space and provides a lovely green area which is currenty well used. Redirecting Eastwoodbury Lane is going to devastate the area so that no one will want to use it as a public park.
It is good to know that this is to be another green buffer. And good to know that the powers that be are capable of changing their minds. A couple of years ago, the plan was to make this into a car park. No-one is fooled by this apparent charitable act today.
'The success will be limited if, etc.' For whom?

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 14149

Received: 01/06/2009

Respondent: K Theobald

Representation Summary:

(para 5)
'...a new route will have been provided from Nestuda Way...etc'. The words make this sound like simplicity itself. Living here will not be simple for a very long time. The current runway and the proposed entension are over the place where the village of Eastwood once stood. Archaeological surveys will have to be done before work is carried out, local opinioin must be satisfied before work is carried out, explanations to those east of the church as to how they may obtain access to the church and churchyard will have to be given and the necessary funding found for the job. these are just a few of the obstacles in the way of progress with the extension of the runway. And yet here it is dismissed in a few simple words.

Full text:

Comments and Objections
The regeneration of London Southend Airport cannot be achieved by building a business park. Nor does a business park depend upon the extension of the runway.
Set out specific standards which will be applied to the area. Standards of what, exactly? - behaviour? - building control? - road width? - signage?
The JAAP takes into account the impact of the proposals on other parts of Southend Borough Council areas, I don't think it does, there are at least 60,000 people and pupils in 10 schools likely to be adversely affected by increasing the flight capacity of the airport. Some of the aircraft may well be quieter than others, but there is no such thing as a quiet aeroplane. The higher a plane goes on take-off, by using a longer runway and a steeper ascent, the wider the 'noise footprint' will be. Surely that is a matter of basic physics. To attain the greater speed on the runway, the number of revs will increase, creating greater ground noise than at present. Also, as one aircraft is taking off, another will be preparing for take-off at peak times, a constant noise for all the houses around the take-off area.'Impact on...the existing built environment...' A possible 6 houses demolished for the runway to Eastwoodbury Lane and the brickfield cottages on Cherry Orchard Lane demolished for the business park. '...including listed buildings.' The church of St Laurence is a Grade One listed building, accepted by the CAA as a hazard. It is in constant use. The vibration caused by aircraft movements could surely endanger this beautful old church. The (admittedly remote) chance that a plane could strike the church and 130 worshippers must also be considered.
The 'Issues and Options' report was quietly introduced in the summer of 2008. It was not trumpeted loudly, but hidden in a website backwater for comments from those that could find it.
'The feedback...has been carefully considered and used'. The analysis was published in March 2009. When SAEN queried the statement on the penultimate page of the document, 'most respondents did not favour the high-growth option, they were told that 'this is not a referendum; it is a consultation'. So it would seem that views were asked for and then ignored. No wonder people say that the whole thing is a foregone conclusion!
'The economic benefits of the expansion in air travel' should be re-examined in the light of falling figures relating to air travel. The only airline operating regularly from Southend Airport has already gone into liquidation last winter - a victim of the credit crunch, not a victim of a runway that was too short.
The growing pressure on airports in the South-East is a pressure generated by the huge success of Stansted airport as a passenger terminal. Stansted is one hour away from Southend on the X30 bus; a comfortable journey with room for your luggage also, and a frequent service from the town.
Another pressure will be that the London Southend Airport has to consider that a drop-off point is now not to be too near a terminal building and other forms of security need to be addressed. There may be a 6 foot fence on the southern boundary, but a footpath that actually crosses the disused short runway to the north would have to be considered a security threat.
'Significant job opportunities' is a statement which must be challenged. There will not be any significant job opportunities connected to the airport until the airport starts to cater for millions of passengers. The jobs referred to in the booklet will almost exclusively provided by units in the Saxon Business Park. 'The Region's competitve strength and attractiveness as a business location and tourism destination.' Before Southend sees itself as a business location or a tourism destination, it needs to take a long hard look at what it does want to be. For some decades now. Southend Borough Council has been drying to ignore the fact that it is a seaside town. It is not a centre of things, it is on the coast. It is already well served by two rail lines for those who wish to come to the beach. It is only safe to swim when the tide is coming in (which it does twice a day), not when it is going out. When the tide is out, what should the visitor do? Visit the Pier? Why? There hasn't been enough cash in the kitty for years to develop the pier into a going concern, mostly due to an overspend on expensive consultants and lack of competent decision making. Visit the penny arcades, the pubs the shopping centre, visit Leigh and buy cockles go to the fun fair? Yes, but the airport is 3 miles away from all that, so after your flight, you will need a bus, (there are still a few left still running) or a taxi to the seaside. On the way, you may pass the remains of the Ecko site, the town's once-huge industry, or you pay pass the muli-storey buildings in Victoria Avenue, now derelict and unused, no longer the centres of commerce that they once were.
So, before Southend Borough Council addresses the question of the airport, which is 90% in Rochford anyway, perhaps they should expend a little effort, time and money considering the town's identity - you cant ignore the fact that it is a seaside town; commerce has failed hugely and manufacture is not what it once was, probably due to European influence and computer networking.
How does the local policy framework foresee Southend airport acting as a key driver for economic development? There is not enough detail given in the document.
With expansion of the airport'... issues of congestion and accessibility in and around the JAAP area...need to be addressed. And it will all have to be done at the same time. Public accounts of any difficulties experienced whilst getting to the airport are more than likely to be negative. People accept the good inherent in things but complain loudly when they are confronted by obstacles!
'Local policies support the growth of the airport' but local opinion, whilst largely embracing the airport as it is at present, is not generally in favour of the extension. The MRO sector should be safeguarded. However as the number of passengers increases towards 2 million, as proposed, the opportunity to test planes on the runway will necessarily decrease, pushing these older, noisier planes into times when passenger movements are less, that is to say, evenings and night times.
I object to the wording in this paragraph because it implies that London Southend Airport will be providing significant employment opportunities, when the facts are that the employment opportunities will arise when the Saxon Business Park is completed. Even then, there are several respondents to SAEN who understand that the jobs are not being created, but for the most part are jobs which will move from Hockley, where a number of business properties are to be demolished and moved to Rochford as part of the Hockley Area Action Plan.
Development of the airport...will not start delivering jobs until passengers exceed one million. Statistics collected from other airports will corroborate this; there are already enough people employed directly by the airport to cater for the first million people through the doors.
'...a need to release the potential of Southend's land and buildings...' Since nine-tenths of the land within the airport belongs to Rochford to what buildings does this part of the document refer? Buildings which stand directly opposite Southend's Council Offices have been neglected, run-down and empty for years. Given the constrains of budget, surely they should look closer to home to invest the taxpayer's money.
'...growth on London Southend Airport...attracts high technology businesses' - if the businesses are going next to the airport, why does this imply that the airport has to grow in order for the businesses to succeed. I object to the misleading way this paragraph has been written.
'...sustainable and high value employment' is a meaningless phrase to the layman. I object to this phrase as misleading 'spin'.
'...Passengers will travel on quiet, fuel efficient lanes...'There is no such thing as a quiet aeroplane! there are planes that are quieter than they were in the past, but it will take a very long time for airlines to ensure that all their aircraft are quieter than those they presently use. It would be too expensive for them to ditch the aircraft, until they have finished their natural life, which could be upto to 30 years. As to fuel efficiency, 'peak oil' may already have been reached so fuel efficient or not, prices will soon begin to rise again and put most flights beyond the reach of the man on the street. Why not reconsider the phrase 'quiet, fuel efficient plane's when they are quiet and fuel efficient, running on solar power?
The penultimate sentence seems to contradict itself:-'...the runway extension is a key factor in...aeroplanes (which) can take off in shorter distances.' If the planes take off in shorter distances, they do not need a longer runway! Or could it be that, because of the proximity of the railway line, the planes need to make a landing further away from the Rochford end of the railway, transferring the nuisance to the Southend end of the runway.
The MRO should be allowed to continue, but surely if passenger numbers are allowed to increase, the time available for landing, testing and take-off will be severely limited due to the number of passenger flights. Will this facility be moved to evenings and nights?'...there will be restrictions on night flights through a noise quota system.' That is good news! Why was the actual number for the quota not quoted here?
The Saxon Business Park could be good news. Common speculation, tying in the Hockley Action Plan with the Southend/Rochford Plan would indicate that many of the jobs will actually be moving from Hockley to the new site, along with some of the units that will be cleared to make way for other development, But I am sure there will be some new jobs created.
'...a new route will have been provided from Nestuda Way...etc'. The words make this sound like simplicity itself. Living here will not be simple for a very long time. The current runway and the proposed entension are over the place where the village of Eastwood once stood. Archaeological surveys will have to be done before work is carried out, local opinioin must be satisfied before work is carried out, explanations to those east of the church as to how they may obtain access to the church and churchyard will have to be given and the necessary funding found for the job. these are just a few of the obstacles in the way of progress with the extension of the runway. And yet here it is dismissed in a few simple words.
It is impossible to equate 2012 with the figure of 1 million passengers given the promises in the previous section. The quiet fuel efficient planes will not be in place entirely,the longer runway will not be in place, the infrastructure (i.e crowded roads, particularly Progress Road, Sadlers Farm will not have been addressed, since there is not enough time in 3 years to address all these things. At present there is not an airline lined up which is to provide a passenger service. They will surely not rely on promises, they have a business to run!
'The preferred option' as selected by joint councils is not the one chosen by the respondents to the first part of this consultation. On the penultimate page of the summary of responses, it is stated that the high-growth scenario was not favoured by the majority. When this was questioned by members of SAEN and other unrelated individuals, the response was that 'this is not a referendum, it is a consultation!' So the statements on many lips - 'Well the council will do what they like!' and 'It's only a paper exercise - it's a foregone conclusion!' may well be correct. Our views have not been taken into consideration so far, and there is no reason to think that we will be considered in this round, either. '...aircraft...fully laden...'must present more of a danger for the residents of the Mendip Estate, to the south-west of the runway. We cannot countenance a Lockerbie situation here in Westcliff. The houses are far too close to the runway now, before an extension is granted. Southend Council has allowed building to take place right up to the outskirts of the airport boundary over the last few years; this includes an enormous Tesco store and the huge building of the Royal bank of Scotland - landing and take-off procedures leave very little margin for error with so many people in the vicinity.
The promise of 6,200 jobs is a good one. It does not depend on the extension of the runway. It is however not clear what is meant by 'classes B1 and B2.'
'...environmental impacts (noise and air quality) will need to be carefully considered and assessed as a result of the increased aircraft movements and traffic in the area.'...'considering controls on airport operation to ensure quality of life is maintained for residents...minimise traffic impacts.' The way in which these measures are to be taken should be better described in this document; they are crucial to the quality of life of residents, old people and children being particularly vulnerable to noise and air pollutiion.
It is interesting to see that there are plans to improve public transport in Southend (or is it in Rochford?-it is not clear). Public transport has been in decline in Southend for some years, and it is apparent that the planning office has no idea how to deal with it all. There are current plans to demolish a multi-storey car park in the centre of Southend and replace it with a library for the university students. Yet alongside that, there seem to be no plans to improve access to the centre of the town by public transport.
It is not clear whether the Brickwork's cottages are to remain as part of an industrial area or whether they are intended for demolition.
Taking agricultural land for business and employment activity might seem a little unwise, Southend has already run out of agricultural land, and it now seems as if Rochford wants to go the same way. Has the term 'Green Belt' become so abused that it no longer means 'land that is green and cannot be built on'?
This is already a green lung and should remain so. Will there be any safeguards to stop this area becoming the next stage of development?
It is not clear whether this is meant as a compulsory purchase option! Were the current businesses asked for their views.
This is already an open space and provides a lovely green area which is currently well used. Redirecting Eastwoodbury Lane is going to devastate the area so that no one will want to use it as a public park.
The flying Clubs have been the core of the airport activity for a very long time, training pilots and ensuring sustainability - will they be given a new area from which to function.
It is good to know that this is to be another green buffer. And good to know that the powers that be are capable of changing their minds. A couple of years ago, the plan was to make this into a car park. No-one is fooled by this apparent charitable act today!
The Park and Ride facility would be on a good place to commute to Southend by bus, if it were not for the fact that it is right under the flight path. Is it legal to have a bus stop within the Safety Zone.
'...sustainable drainage...'. It is not clear what is meant by this term. There are problems of drainage already in the Southend Road; during wet weather the Horse and Groom public house is frequently overwhelmed by water. Is there a guarantee that the situation will not worsen and that water will be drained off into the correct direction? There must be some sort of ruling governing the safety issues of rain/large areas of tarmac. Have these been fully investigated, and do we have assurances?
This data implies that there will be 1180 jobs directly related to the airport. Research into previous claims for directly-related airport jobs has proved that these predictions are grossly inflated. When 2 million passengers go through, there may be direct jobs for 100 people, but 1000 has to be seen as an optimistic exaggeration.
It is encouraging to see that there are to be new walking/cycling routes incorporated into the JAAP.
The brickwork cottages are now unique and should be preserved as part of the brickfield development in Essex over many hundreds of years.
An impressive entrance will make no difference to the quality of what goes on in the business park.
'...the business park will need to...deliver a visual presence to the A127.' It is not clear what is meant by this statement.
'Expansion is...only acceptable if...subject to environmental constraints...' Expansion plans were vetoed in the Nineteen-sixties because it was not environmentally viable. What can possibly have changed since then?
A baseline of noise levels can be set anywhere and it does not appear to be in the power of the local authority to set this baseline or to object to it after it is implemented. A Noise Evaluation Statement is just that. It does not promise to do anything about it. There are at least 60,000 people living under the flight path and they are the ones who can evaluate the noise levels for you. Heavy aircraft taking off or landing at night have not been a feature whilst the JAAP is in the balance, but as soon as the consultation is over, it is entirely possible that these will resume. Added to the daytime flights interrupting the sleep of night workers and the work of children in ten schools directly under the flight path, the noise levels will become an intolerable burden.
The added CO2 in the atmosphere is not easy to offsett given the limited amount of green space within the borough of Southend, school green areas having been sold off and built upon and former agricultural land now being seen as business parks. So the quality of life for all these people will be sadly reduced. Not to mention the prices of their houses falling, because no-one in their right mind will want to live close to an expanding airport.
There is currently opposition to expansion of airports within the Government and Opposition benches. Is it hoped that all this permission for the Rochford/Southend JAAP will slip under the wire before it becomes law to limit the use of airports.
(see London Southend Airport Introduction (para 3)
Why is there no printed plan yet available for the PSZ if and when the runway is extended? Will this entail further disruption and compulsory purchase?
'The airport operator will be required to...make a contribution towards construction...'what percentage of this will the operator be expected to pay. It does not seem fair that the public should be expected to pay anything towards these changes; why not ask the operator to pay for the lot. Southend taxpayers can not expect to get anything out of the proposals except noise, disruption and poor air quality. Is it fair to ask them to pay anything towards the cost of local taxes?
The hours of predicted air travel are far too wide. Children whose sleep patterns are likely to be affected by flights will be in bed by 8pm and that is when the flights should stop. We should not be accepting flights from London City Airport either. It is simply another way of raising income for the operator and does not benefit the town.
The closure of Eastwoodbury Lane and the provision of a new road will mean that all the traffic that currently uses the Lane as a back way in to Southend will have to travel along the A127 or Nestuda Way. It will add about a mile to the journey into Southend, so most people will not turn in to the new road but will attempt to continue their journey along the A127, putting intolerable strain on the junction at the Bell and Rochford Road junction. There will be more traffic movements also, connected with the new jobs planned for the Saxon Business Park. The current infrastructure is bulging with overuse and really cannot take any more. the proposed Park and Ride can take only a little of the traffic away. And if it is intended for long term use for the airport, it will be of no use to the daily commuter.
What time span is this to take? And surely this is the same piece of road - why is it taking two separate policies.
It is not clear why a new junction will be required at Aviation Way and Eastwoodbury Lane - there is already an adequate roundabout there.
It is noted that improvements in public transport are needed within the JAAP. They are needed throughout Southend in many areas not covered by The JAAP also.
I note with dismay that a Green Belt is not what it was designed to. It should not provide flexibility...to accomodate growth. It should provide a barrier between urban and rural areas that is sacrosanct and inviolable.
This is already an open space and provides a lovely green area which is currenty well used. Redirecting Eastwoodbury Lane is going to devastate the area so that no one will want to use it as a public park.
It is good to know that this is to be another green buffer. And good to know that the powers that be are capable of changing their minds. A couple of years ago, the plan was to make this into a car park. No-one is fooled by this apparent charitable act today.
'The success will be limited if, etc.' For whom?

Comment

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 14186

Received: 01/06/2009

Respondent: Go-East

Representation Summary:

The Vision and Objectives of the JAAP are carried forward from the Issue and Optiions stage. They are supported by a new section. What will the JAAP area look like in 2021? (para 2.3) The new section provides descriptive specifity and is a positive contribution to the vision.

Full text:

Thankyou for your letter of 16 February inviting Government Office to comment on the Southend Airport Joint Area Action Plan Preferred Options DPD.
Steve Bateman provided comments on an earlier version of the consultation document, in his letter to you dated 17 July 2008. He provided you with advice on progressing the DPD through the consultation and examination process under the revised PPS12, the amended Town and Country Planning (Local Development) Regulations and the Habitats Directive. I will not repeat Steve's procedural, nor his regulatory advice in this letter.
The Local Development Framework system is intended to produce concise and easily understood documents. They should set out a positive approach to managing new, spatial development. The Preferred Options document is clear and written in accessible, easily-understood language. However, the document elaborates the preferred option without explaining reasons why it was chosen, nor why alternatives were dismissed. It is very important to link the preferred option to the evidence that justifies its choice. Evidence should have emerged from previous consultation, the sustainability appraisal and existing or commissioned studies.
The Preferred Options document asserts particular directions of travel, particularly in its policy statements. In doing so, it constrains opportunities for Members to adopt any flexibility in their decisioin-making and approach to development.

Comment

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 14221

Received: 17/12/2008

Respondent: Mr J Bramble

Representation Summary:

Paragraph 2.1 - Vision and Paragraph 2.2 Objectives of the JAAP.
Words like 'ensuring the quality of life for its residents....' (2.1) and achieving 'the quality of life for all its citizens' (Southend on Sea core strategy (adopted December 2007)) are consistent with one of the objectives of the JAAP (2.2) which is 'to ensure a high quality environment for residents' initially give grounds for believing that residents interest will be safeguarded. Sadly that belief lasts only as far as para 2.3.

Full text:

I write with the reference to your letter dated 3rd November 2008 which enclosed a questionnaire relating to the above exercise. I have to say I was a little surprised to receive your letter in as much as I reside within the Borough of Southend and normally look to Southend Council to consult me on any planning applications likely to effect me.
I can only think that your letter to me may have been the result of the correspondence I have had over the years with your good selves, amongst others, on the proposals of the expansion of Southend Airport. Living as we do on the flight path to and from the airport this remains a vital issue for us and our future quality of life; and we feel strongly that it is only right and proper that we (and residents in a similar position to us) are directly invited to have our say on whatever conclusions the working party reach as the result of there consideration of the consultation exercise on the Joint Area Action Plan. We felt very aggrieved that we were not directly included in this exercise having only become aware through a relatively small item in the Southend Standard. I wrote to the leader of Southend Council as the result of this and was assured by him that opportunity would be given to all interested parties of all contribute.
We are particularly in a difficult position relating to the airport issue inasmuch as we reside in the area under the jurisdiction of Southend Council but, of course, the airport and issue relating to it fall in the responsibility of Rochford District Council. I would therefore welcome your assurance that we will be invited to contribute before proposals are set in stone and your advice as to when such an invitation is likely to be sent out and from which council.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 14222

Received: 17/12/2008

Respondent: Mr J Bramble

Representation Summary:

Paragraph 2.3. What will the JAAP Area look like in 2021.
Any optimism initially arising from paras 2.1 and 2.2 does not last beyond a minimal examination of the details given in paragraph 2.3 which, I note, carefully (and no doubt deliberately) avoids giving any indication of the number of passenger flights projected. I have done a few calculations myself. Based on 2,000,000 passengers per annum and planes carrying 150 passengers and, on the reasonable assumption that 75% of holiday flights would take place in the 6 month summer season I calculate that there would be around 60 passenger flights each and every day for 6 months. Thus any residents, schools etc, under or close to the flight path would be subjected to the noise of planes flying low over their roof tops - there are no low-flying restrictions on planes landing or taking off - approximately every 10 minutes over a 10 hour period each day. Even the small (but important to many) pleasure of being able to spend a peaceful hour or two in the back garden on a sunny summer's evening would be denied them. Perhaps the councils could explain how this would amount to 'ensuring a high quality of life for their residents'!

Full text:

I write with the reference to your letter dated 3rd November 2008 which enclosed a questionnaire relating to the above exercise. I have to say I was a little surprised to receive your letter in as much as I reside within the Borough of Southend and normally look to Southend Council to consult me on any planning applications likely to effect me.
I can only think that your letter to me may have been the result of the correspondence I have had over the years with your good selves, amongst others, on the proposals of the expansion of Southend Airport. Living as we do on the flight path to and from the airport this remains a vital issue for us and our future quality of life; and we feel strongly that it is only right and proper that we (and residents in a similar position to us) are directly invited to have our say on whatever conclusions the working party reach as the result of there consideration of the consultation exercise on the Joint Area Action Plan. We felt very aggrieved that we were not directly included in this exercise having only become aware through a relatively small item in the Southend Standard. I wrote to the leader of Southend Council as the result of this and was assured by him that opportunity would be given to all interested parties of all contribute.
We are particularly in a difficult position relating to the airport issue inasmuch as we reside in the area under the jurisdiction of Southend Council but, of course, the airport and issue relating to it fall in the responsibility of Rochford District Council. I would therefore welcome your assurance that we will be invited to contribute before proposals are set in stone and your advice as to when such an invitation is likely to be sent out and from which council.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 14223

Received: 17/12/2008

Respondent: Mr J Bramble

Representation Summary:

Paragraph 2.3
What will the JAAP area look like in 2021.
One further but fundamental point requiring comment: I can understand why the authors of the report couch it in the most conciliatory language they can to support their 'preferred option' but using words like 'quiet' to describe planes really stretches their credibility. According to my Chambers dictionary 'quiet' means 'free from noise'. The planes will manifestly not be free from noise; they might, as claimed, be marginally less noisy than their predecessors but everyone who lives close to or under the flightpath would stlll be subject to considerable and repetitive noise throughout each day. Despite all the modern technology now available, by far the best way of actually testing the acceptability of repetitive daily noise is actually to experience it first hand. If the Councils are really serious about their grand pronouncements concerning preservation of quality of life, Councillors will no doubt be only too pleased to spend a day with one or two residents in (say) the playground of Blenheim School and arrange for planes to fly in/out at about 10 minute intervals. Perhaps Mr Scrutton, Mr Welch and the two local MPs would also consider taking part. The experiment would not be perfect but it would at least provide a picture of what residents, schools etc, would be subjected to on an ongoing daily basis and enable them to make decisions from a rather more informed point of view.

Full text:

I write with the reference to your letter dated 3rd November 2008 which enclosed a questionnaire relating to the above exercise. I have to say I was a little surprised to receive your letter in as much as I reside within the Borough of Southend and normally look to Southend Council to consult me on any planning applications likely to effect me.
I can only think that your letter to me may have been the result of the correspondence I have had over the years with your good selves, amongst others, on the proposals of the expansion of Southend Airport. Living as we do on the flight path to and from the airport this remains a vital issue for us and our future quality of life; and we feel strongly that it is only right and proper that we (and residents in a similar position to us) are directly invited to have our say on whatever conclusions the working party reach as the result of there consideration of the consultation exercise on the Joint Area Action Plan. We felt very aggrieved that we were not directly included in this exercise having only become aware through a relatively small item in the Southend Standard. I wrote to the leader of Southend Council as the result of this and was assured by him that opportunity would be given to all interested parties of all contribute.
We are particularly in a difficult position relating to the airport issue inasmuch as we reside in the area under the jurisdiction of Southend Council but, of course, the airport and issue relating to it fall in the responsibility of Rochford District Council. I would therefore welcome your assurance that we will be invited to contribute before proposals are set in stone and your advice as to when such an invitation is likely to be sent out and from which council.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 14225

Received: 02/06/2009

Respondent: Mr Michael Downer

Representation Summary:

2.1 - The Southend on Sea Core Strategy (Adopted December 2007) has as its aim,'-----. To do this there is a need to release the potential of Southend's land and buildings to achieve measurable improvements in the town's economic prosperity,-----' The Council could start with looking out of its windows at the empty buildings opposite along Victoria Avenue and ask itself some simple questions, such as why are they empty?

Full text:

Formal Objection.
Preamble - I notice that Southend on Sea Borough Council have signed up to the Nottingham Declaration. I presume that they have studied the contents. That being the case I am puzzled that they appear to see no contradiction in signing it and persisting with their preferred options on the JAAP.
I am equally puzzled by the absence of any mention of Climate Change or Peak Oil in the JAAP. It is as if these things did not exist and it is 'Business as usual'. Surely I should not need to emphasise the contribution that any expansion in flying will make towards Greenhouse Gas Emissions and the need to reduce such gases under the Climate Change Act.
Of equal concern is the failure to confront the onset of Peak Oil. If and when the World economy ceases to slow then the demand for oil will resume. The International Energy Agency is of the opinion that the combination of ageing fields, no new major oil provinces (apart from Brazil's deep sea one) and under investment will mean a peak in oil production of below 100 million barrels/day. That is that supply will not meet world demand for much longer. Some experts put a date of 2011-2013. The argument being that new oil coming on stream from discoveries made over the preceding decade will begin dropping and will compounded by accelerating depletion of the many old fields propping up much of global production today. This will result in either a 'Plateau' or 'Descent' scenario (or even a 'Collapse') in oil production. The Price Mechanism assumption that higher oil prices should lead to more exploration and discoveries has failed. In this situation the UK would have to persuade oil producing nations to favour it with a growing quota of inputs. This is because North Sea Oil (which peaked in 1999) will continue to decline at a best-case rate of 5% year.
This leaves the Aviation industry exposed in a way that other forms of transport are not, in that they can find alternative energy sources to continue operations.
In the face of the necessity to reduce Greenhouse Gases and the approach of Peak Oil it seems criminal to pursue a JAAP based on the expansion of Southend Airport and I strongly oppose it on the basis of the evidence above.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 14226

Received: 02/06/2009

Respondent: Mr Michael Downer

Representation Summary:

2.2 - It is significant that since the new owner moved in many airport and airport related jobs have been lost. 'The creation of sustainable and high value employment' will inevitably lead to an influx of employees from outside the two towns and therefore of little benefit to the existing residents with little employment gain. The remaining bullet points, including the absurd claim of protecting Green Space whilst actually reducing it are typlical 'Planning speak'.

Full text:

Formal Objection.
Preamble - I notice that Southend on Sea Borough Council have signed up to the Nottingham Declaration. I presume that they have studied the contents. That being the case I am puzzled that they appear to see no contradiction in signing it and persisting with their preferred options on the JAAP.
I am equally puzzled by the absence of any mention of Climate Change or Peak Oil in the JAAP. It is as if these things did not exist and it is 'Business as usual'. Surely I should not need to emphasise the contribution that any expansion in flying will make towards Greenhouse Gas Emissions and the need to reduce such gases under the Climate Change Act.
Of equal concern is the failure to confront the onset of Peak Oil. If and when the World economy ceases to slow then the demand for oil will resume. The International Energy Agency is of the opinion that the combination of ageing fields, no new major oil provinces (apart from Brazil's deep sea one) and under investment will mean a peak in oil production of below 100 million barrels/day. That is that supply will not meet world demand for much longer. Some experts put a date of 2011-2013. The argument being that new oil coming on stream from discoveries made over the preceding decade will begin dropping and will compounded by accelerating depletion of the many old fields propping up much of global production today. This will result in either a 'Plateau' or 'Descent' scenario (or even a 'Collapse') in oil production. The Price Mechanism assumption that higher oil prices should lead to more exploration and discoveries has failed. In this situation the UK would have to persuade oil producing nations to favour it with a growing quota of inputs. This is because North Sea Oil (which peaked in 1999) will continue to decline at a best-case rate of 5% year.
This leaves the Aviation industry exposed in a way that other forms of transport are not, in that they can find alternative energy sources to continue operations.
In the face of the necessity to reduce Greenhouse Gases and the approach of Peak Oil it seems criminal to pursue a JAAP based on the expansion of Southend Airport and I strongly oppose it on the basis of the evidence above.

Comment

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 14227

Received: 02/06/2009

Respondent: Mr Michael Downer

Representation Summary:

2.3 - Well it will certainly be worth a lot more money than its current occupier paid for it (always assuming that Peak Oil has not bitten deep into its activities). The document does not describe looks as such but is aspirational regarding activities. The only part I would support is the thriving MRO facilities. That something can win awards before conception seems to be the destiny marked out for the Saxon Business Park, which despite its name, will provide modern and again that word 'sustainable' spacious office accomodation. Why one asks is this not currently available in Victoria Avenue? Further, we are told 'the estate' will provide space for a range of high-tech businesses, but with an emphasis on the environment technologies. I do not think any irony is intended. However, I would support this but again suspect that it will attract outsiders in the absence of suitable local candidates.

Full text:

Formal Objection.
Preamble - I notice that Southend on Sea Borough Council have signed up to the Nottingham Declaration. I presume that they have studied the contents. That being the case I am puzzled that they appear to see no contradiction in signing it and persisting with their preferred options on the JAAP.
I am equally puzzled by the absence of any mention of Climate Change or Peak Oil in the JAAP. It is as if these things did not exist and it is 'Business as usual'. Surely I should not need to emphasise the contribution that any expansion in flying will make towards Greenhouse Gas Emissions and the need to reduce such gases under the Climate Change Act.
Of equal concern is the failure to confront the onset of Peak Oil. If and when the World economy ceases to slow then the demand for oil will resume. The International Energy Agency is of the opinion that the combination of ageing fields, no new major oil provinces (apart from Brazil's deep sea one) and under investment will mean a peak in oil production of below 100 million barrels/day. That is that supply will not meet world demand for much longer. Some experts put a date of 2011-2013. The argument being that new oil coming on stream from discoveries made over the preceding decade will begin dropping and will compounded by accelerating depletion of the many old fields propping up much of global production today. This will result in either a 'Plateau' or 'Descent' scenario (or even a 'Collapse') in oil production. The Price Mechanism assumption that higher oil prices should lead to more exploration and discoveries has failed. In this situation the UK would have to persuade oil producing nations to favour it with a growing quota of inputs. This is because North Sea Oil (which peaked in 1999) will continue to decline at a best-case rate of 5% year.
This leaves the Aviation industry exposed in a way that other forms of transport are not, in that they can find alternative energy sources to continue operations.
In the face of the necessity to reduce Greenhouse Gases and the approach of Peak Oil it seems criminal to pursue a JAAP based on the expansion of Southend Airport and I strongly oppose it on the basis of the evidence above.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 14451

Received: 14/05/2009

Respondent: Mr J Marshall

Representation Summary:

A dramatic increase in aircraft traffic will result in far greater noise.

Reading the JAAP 'preferred options' I note the comment about 'quiet fuel efficient aircraft' (page 8 - 2.3 2nd paragraph).
Is any aircraft quiet? I fear not, particularly after take off or landing.

Full text:

I am writing to you about my concerns for the planned expansion of Southend Airport.

My main objection is:

NOISE (Health concerns)

A dramatic increase in aircraft traffic will result in far greater noise.

Reading the JAAP 'preferred options' I note the comment about 'quiet fuel efficient aircraft' (page 8 - 2.3 2nd paragraph).
Is any aircraft quiet? I fear not, particularly after take off or landing.

Page 22 LS7 of the JAAP 'preferred options' - 'Operation of new runway', mentions there will be no passenger flights between
the hours of 11 pm and 6.30 am but cargo flights will be agreed by
a noise quota.

I can only conclude therefore the reason for this is you expect there WILL BE
noise from aircraft.

This will result in sleep deprivation not only for younger children and
the elderly but also very many working people who as likely as not will have retired to bed well before the 11 pm deadline.

I fear this will have an adverse affect on our quality of life.

What assurances can the Councils give us that we will not be living below a busy flight path?

+

Another point that concerns me is:

POSSIBLE DEVALUATION OF HOUSE PRICES

I am concerned that house prices could be devalued as a result of a
huge increase in the volume of aircraft.
For 20 years we have lived in this house on the Marine estate in Leigh-on-sea quite peacfully.
Would we have purchased the house if we had suspected one day we
would be living below a busy flight path? Emphatically NO.

As mentioned above, can the Councils give an assurance we will not be living below a busy flight path?

The points I have raised above are of concern to me.

Support

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 14456

Received: 14/05/2009

Respondent: Essex County Council

Representation Summary:

A. Vision and Objectives

Essex County Council supports the Vision for the future development of London Southend Airport and its environs to realise its potential as a driver for the sub-regional economy. Also supported are the six objectives relating to creation of sustainable high value employment; maximising economic benefits; improving sustainable transport accessibility; high quality environment; attraction of inward investment; and efficient use of employment land.

Through its membership of Thames Gateway South Essex Partnership, the County Council has signed up to a series of priority actions contained within the TGSEP Economic Strategy published November 2007. The economic strategy identifies 5 spatial drivers for regeneration and growth, one of which is London Southend Airport. In order for South Essex to achieve jobs led regeneration and growth the economic strategy identifies specific actions for the Airport. The strategy suggests that the Joint Area Action Plan (JAAP) should support the expansion plans for the Airport and should include an economic component including demand analysis for a training centre to support the MRO activities at the airport and business retention activities as part of a package for inward investment. The high-tech engineering and manufacturing sector and in particular the successful cluster around the airport is important to the South Essex economy because of the number of highly skilled well-paid jobs (around 1,000) that it brings to the sub-region. It is recognised that the ongoing pressure that the sector faces requires well coordinated action to achieve business retention and growth. The Full Time Equivalent jobs that could be created with the growth of the Airport is also a key component for achieving sub-regional jobs targets. In addition, it is recognised that a fully functioning regional airport would service business travel requirements of the local business base and would have a catalytic affect on the image of Southend placing it on an international stage. Nevertheless, expansion of the Airport and the MRO activities should be accommodated with the minimum environmental and amenity impact.

Further from the perspective of the 2012 Olympics, and related and legacy activities, London Southend Airport offers opportunities for,

• use as a gateway to tourists based in Essex, not just as another airport near to London;
• having new routes operational in time for the 2012 Games (or even better for the test events in 2011) and having routes that would be popular for Games-time travellers;
• access for activity trips as a potential future market as identified in The Essex Tourism strategy. It is therefore important that Southend and the airline carriers are geared up to be able to handle sports equipment that may come with these tourists in a way that is customer friendly e.g. bikes, sailing equipment;
• getting routes that will maximise these potential tourism markets e.g. for cycling breaks, by, for instance targeting routes from the Holland/Belgium/France;
• Ensuring that the regulations associated with routes will allow flights by freight, passenger and VIP jets to give the ability to accommodate for the 2012 Olympics a range of flights that can include both VIP flights for the Games and freight journeys (particularly for sports equipment).

Full text:

A. Vision and Objectives

Essex County Council supports the Vision for the future development of London Southend Airport and its environs to realise its potential as a driver for the sub-regional economy. Also supported are the six objectives relating to creation of sustainable high value employment; maximising economic benefits; improving sustainable transport accessibility; high quality environment; attraction of inward investment; and efficient use of employment land.

Through its membership of Thames Gateway South Essex Partnership, the County Council has signed up to a series of priority actions contained within the TGSEP Economic Strategy published November 2007. The economic strategy identifies 5 spatial drivers for regeneration and growth, one of which is London Southend Airport. In order for South Essex to achieve jobs led regeneration and growth the economic strategy identifies specific actions for the Airport. The strategy suggests that the Joint Area Action Plan (JAAP) should support the expansion plans for the Airport and should include an economic component including demand analysis for a training centre to support the MRO activities at the airport and business retention activities as part of a package for inward investment. The high-tech engineering and manufacturing sector and in particular the successful cluster around the airport is important to the South Essex economy because of the number of highly skilled well-paid jobs (around 1,000) that it brings to the sub-region. It is recognised that the ongoing pressure that the sector faces requires well coordinated action to achieve business retention and growth. The Full Time Equivalent jobs that could be created with the growth of the Airport is also a key component for achieving sub-regional jobs targets. In addition, it is recognised that a fully functioning regional airport would service business travel requirements of the local business base and would have a catalytic affect on the image of Southend placing it on an international stage. Nevertheless, expansion of the Airport and the MRO activities should be accommodated with the minimum environmental and amenity impact.

Further from the perspective of the 2012 Olympics, and related and legacy activities, London Southend Airport offers opportunities for,

• use as a gateway to tourists based in Essex, not just as another airport near to London;
• having new routes operational in time for the 2012 Games (or even better for the test events in 2011) and having routes that would be popular for Games-time travellers;
• access for activity trips as a potential future market as identified in The Essex Tourism strategy. It is therefore important that Southend and the airline carriers are geared up to be able to handle sports equipment that may come with these tourists in a way that is customer friendly e.g. bikes, sailing equipment;
• getting routes that will maximise these potential tourism markets e.g. for cycling breaks, by, for instance targeting routes from the Holland/Belgium/France;
• Ensuring that the regulations associated with routes will allow flights by freight, passenger and VIP jets to give the ability to accommodate for the 2012 Olympics a range of flights that can include both VIP flights for the Games and freight journeys (particularly for sports equipment).

B. Future Development and Role of London Southend Airport
The Preferred Option for the future of the airport is supported, provided that the environmental implications of extending the runway to accommodate larger aircraft are fully addressed. The Option is based on the principles outlined in the Airport Masterplan 2005, but with the additional proposal of increasing the length of the runway to 1,799 metres (current runway 1,610 metres). The lengthening of the runway across Eastwoodbury Lane improves the capacity potential of the airport and its attractiveness to airline operators. It will enable aircraft with a seating capacity of 100-150 to be operated fully laden out of the airport. This would also allow use of the airport by the modern generation of medium sized aircraft which are quieter and more fuel efficient, with lower environmental impact. However, it can be expected that the Airport will continue to be used by existing aircraft and their continuing impact should be addressed.

A longer runway, with improved Airport facilities, would increase the operational capability of the Airport and facilitate its use by larger aircraft and increase the potential attraction of aviation companies (both passenger and MRO). Such improvements would accelerate the growth and range of passenger services and routes from the Airport. The availability of international air passenger services from the Airport would raise the profile of the Airport. As a result, it would stimulate the broader based economic development of the area which is being sought. Proposed extension of the employment area north of Aviation Way to accommodate a business park style development would broaden the range of premises and sites available to business in the area. The scale and nature of the proposals within the Preferred Option would also assist and support achievement of a range of transport and environmental improvements within the area.

Nevertheless, the first sentence of Policy LS6 (Runway Extension) is felt to be an inappropriate form of policy wording in advance of submission of a planning application for the runway extension. It is suggested that the first sentence of Policy LS6 which currently reads, 'Planning permission for the extension of the runway to the south so as to provide an operational runway of 1,799 metres will be supported.', should be amended by replacing the words 'will be supported' by the words 'is acceptable in principle'. This would better enable the joint authorities to consider a planning application on its merits without prejudice.

Also, Policy LS2 (Development at London Southend Airport) seeks to limit noise impact from development at the airport and makes reference to 'any accompanying Environmental Impact Assessment'. This approach is supported but the Policy should require the scope of any Environmental Impact Assessment to be broader. For instance, impacts (noise, traffic and air quality) on schools and pre-schools and residential areas should be identified and mitigated in full. The development of a noise contour limit (similar to that which operates at Stansted) as part of a future planning application is an essential pre-requisite to ensure noise issues are controlled.

C. Highways and Transportation
The Preferred Options propose various changes to the highway network, including new links (east - west, Eastwoodbury Lane to Nestuda Way) and junctions. The County Council, as Highway Authority, would have to be satisfied that the proposals could be accommodated on the network without having a detrimental impact on the existing situation and additionally would be able to accommodate future growth generated by the Preferred Options. This evidence should be provided through traffic assessments, modelling and design. Also, changes in development will require, where necessary, mitigation works to the network to accommodate increases in traffic flow. These may be those outlined in the consultation document and/or other measures deemed necessary by the Highway Authority following analysis of trip generation.

Policy T3 (Upgrade to Cherry Orchard Way) states, 'it is expected that the upgrade proposals will be incorporated in the Essex LTP'. It would be more appropriate to replace this phrase in Policy T3 with, 'Improved access to the proposed employment areas and the airport in order to accommodate planned future growth will be supported in the Essex LTP3'. LTP guidance expects local authorities to concentrate on challenges and issues rather than identifying specific infrastructure solutions, especially where funding for this is unclear. It is also probable that a scheme such as the one referred to in Policy T3 would be classified as major and therefore fall outside the LTP funding process.

Policy T6 (Green Travel Plans) should be expanded to include reference to promotion of sustainable transport, as well as managing the journeys of staff.

Policy T5 (Park and Ride) should be expanded to include a requirement for contributions from development for the establishment and running of the facility. This would be consistent with the approach of Policy T7 (Public Transport) and Policy T8 (Walking and Cycling) in seeking contributions from development.

D. Urban Design
Policy E5 (Development of Area 1A Saxon Business Park) makes specific reference to the inclusion of a landmark building and entrance feature. This is welcomed, as is the reference in Policy E8 to buildings delivering a visual presence to the A127. Bearing in mind that Area 1A, Area 1B and the MRO Northern Extension will each abut the new Green Belt boundary similar consideration should be given to the design of buildings and treatment of these important development edges. It is suggested that Policy E5, Policy E6 and Policy MRO2 could each incorporate the phrase 'The design and layout of development where it abuts the Green Belt will need to be carefully considered in order to achieve an appropriate edge to the urban area'.

E. Historic Environment
The Preferred Options make no mention of cultural heritage/historic environment issues and impacts and this should be addressed.

The Rochford Historic Environment Characteristion (HEC) document commissioned by Rochford District Council provides an overall assessment of the District's historic environment including the study area for the JAAP and its relevance should be highlighted at this stage. The HEC document was produced in order to provide an overview of the historic environment for the LDF process and particularly to be used at an early stage for identifying the possible choice of development sites, the impact of potential development and an informed approach to conservation, enhancement and mitigation. Within the Rochford HEC the relevant Historic Environment Character Zones (HECZ) are 17, 18 and 22. The scoring table provided in the report and GIS project for each zone provides an assessment of seven specific criteria, diversity, survival, documentation, potential, group value association, sensitivity to change and amenity value.

The area outlined within the Preferred Options document is one which although partially disturbed through construction of the airport, golf course, quarrying and modern industrial buildings retains a significant archaeological and more general historic environment potential. In addition to specific known sites such as the medieval church of St. Lawrence and All Saints and a post-medieval brickworks and associated housing along Cherry Orchard Way, there are further finds, particularly in the west of the site which indicate prehistoric activity, evidence of which is likely to survive. The airfield was established by the RFC during WWI and was later requisitioned to become RAF Rochford, part of Fighter Command during WWII. The airfield was heavily defended and the study area contains a large number of extant features relating to the security of the airfield. It is important that the cultural heritage potential of the study area is taken into account at this early stage in order to ensure that opportunities for pro-active management and enhancement of the historic environment are considered at all stages of the development plan.

The JAAP should also address the mitigation of noise/smell impacts from the Airport on properties in the surrounding area. Many of the properties that would be affected are listed buildings which are unable to accommodate improvements, such as double glazing.

The comments of the County Council given as response to the previous consultation on the Issues and Options document remain relevant and should be considered alongside the above comments.

F. Minerals and Waste
It should be noted that there is an outstanding planning condition attached to Cherry Orchard Brickworks under the IDO consent. This would need to be addressed through the plan process.

G. Conclusions

In conclusion,

• Development of London Southend Airport, including the proposed runway extension, together with the proposed additional employment areas within and adjacent to the airport, is supported;

• Changes to the highway network and other transport initiatives should be considered jointly by the highway authorities of Southend-on-Sea and Essex to ensure that they positively assist both the development proposals of the Plan and existing movements in the area;

• The opportunity should be taken to achieve high quality design of the proposed development areas, incorporating available features from the historic environment, to give the area a clear and unique identity.

• The environment and amenity of people living around the Airport should be protected.

Comment

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 14506

Received: 15/05/2009

Respondent: EEDA

Representation Summary:

The vision statement as set out is positive and the reference to the wider impacts on the Thames Gateway is welcomed. It is perhaps slightly surprising that there is no reference to the airport explicitly in the vision statement and this might be beneficially added. The objectives highlight the important economic role of the airport and para 2.3 onwards provides a real sense of the potential of the airport.

Full text:

London Southend Airport and Environs Joint Area Action Plan - Preferred Option Consultation

Thank you for the opportunity to comment on the proposed preferred option for London Southend Airport and Environs Joint Area Action Plan (JAAP) (your letter dated 13th February 2009).
EEDA receives a number of requests of this kind, as a statutory consultee, and our experience to date suggests a number of points on Core Strategy documents which your authority may wish to consider.
EEDA's principal role is to improve the East of England region's economic performance. Our main concern with Core Strategy documents is therefore that they will help deliver, and provide the spatial framework for:
• sustainable economic development and regeneration in the East of England, and in particular,
• the new Regional Economic Strategy (Inventing the Future - Collective Action for a sustainable economy, 2008).

Planning Policy Statement 1 'Delivering Sustainable Development', 2005 reminds local authorities that in preparing local development plans they should seek to provide a positive planning framework for sustainable growth in support of the Regional Economic Strategy (RES). The RES advocates a region that is internationally competitive with a global reputation for innovation and business growth that harnesses and develops the talents and creativity of all and is at the forefront of a low carbon and resource efficient economy.


In addition, Planning Policy Statement 12 'Creating Strong Safe and Prosperous Communities through Local Spatial Planning', 2008 recognises that spatial planning is a critical element in relation to economic growth and regeneration. The RES supports and complements the East of England Plan and EEDA supports the implementation of policies within that strategy.

EEDA previously commented on the Issues and Options stage of the JAAP and the comments set out here develop these comments.

Policy Context

There is a strong level of strategic support for the development of Southend Airport. The Government's Air Transport White Paper identifies the important role that smaller airports can provide in meeting the demand for air travel. In addition, it identifies the important role that such airports can play in contributing to regional economic development, and in the case of Southend specifically the white paper also promotes the development of additional capacity for business aviation.

The Regional Spatial Strategy reiterates the support in the White Paper for the growth of Southend Airport to meet local demand and to contribute to local economic development, particularly in niche markets such as business aviation, passenger routes not served by larger airports and employment uses that would benefit from an airport location. The RSS also notes the importance of ensuring that proposals for airport expansion take account of the needs of surface access provision and the shift towards more sustainable travel modes.

The Regional Economic Strategy

The RES recognises this area as a priority for regeneration and growth as it lies within the Thames Gateway Growth Area. Goal 8 of the RES - The Spatial Economy sets out the aspirations for the Thames Gateway South Essex 'engine of growth'. Importantly, this includes the need to realise and harness the potential of London Southend Airport as a key transport gateway by improving operational capacity, surface access and supporting business development, particularly in engineering and maintenance. The RES also identifies the importance of Southend as an urban driver for growth and the pressures on transport infrastructure that exist, with particular reference to the A130/A13 junction and the A127.

EEDA is also a core funder of Renaissance Southend and is providing expertise and resources to develop and implement key regeneration strategies for Southend.

Comments

EEDA supports the proposed expansion of the airport as articulated through the JAAP. By maximising the benefits of the airport location to develop further employment opportunities, the Council's will not only be seeking to implement the Air Transport White Paper, but also providing a significant contribution towards the regions economy and job growth targets.

In our previous comments to you, EEDA identified that in supporting the growth of the airport and delivering the scale of ambition as stated, the aspiration must be to ultimately deliver a High Growth scenario. We welcome the fact that these comments have been reflected in the preferred option and that the Council's are taking a positive approach to the future of this key location.
We also identified that the use of the airport and the potential for significant new business development is currently significantly constrained by a range of issues including the facilities, the scale of the runway and access to the airport itself. In order to fully address these issues in a sustainable manner, then the critical mass of development associated with a comprehensive approach is likely to be required.

The vision statement as set out is positive and the reference to the wider impacts on the Thames Gateway is welcomed. It is perhaps slightly surprising that there is no reference to the airport explicitly in the vision statement and this might be beneficially added. The objectives highlight the important economic role of the airport and para 2.3 onwards provides a real sense of the potential of the airport.

EEDA welcome the approach to the future of the area in employment terms and recognise that a pro-active role in encouraging employment for aviation related growth and targeting the delivery of accommodation for high tech industries and offices should maximise the role of this location as an economic driver for the sub-region. It is also positive to see these aspirations being balanced against a consideration of the environmental impacts of growth and the principles of sustainable place making which lie at the heart of the RES. However, in justifying the scale and nature of development proposed, the document could to be much clearer on the evidence of demand for airport based businesses and indeed, wider employment opportunities in this location. For example, reference to the Roger Tym & Partners work carried out in support of the Regeneration Framework and the Core Strategy might be appropriate.

EEDA welcome the fact that the JAAP has identified the location and distribution of employment development at the airport. In our previous comments we set out that consideration also needs to be given to potential conflicts between the different users of the airport, particularly given the aspirations to grow passenger numbers. Care must be taken to ensure that in maximising the benefits of additional passenger flights, the niche business opportunities at the airport such as the business flights and the maintenance / repair industries are not compromised. This appears to have been reflected in the preferred option and aviation oriented jobs have been largely grouped in one place with room for expansion. It is also good to see explicit support for the airport to continue to grow its maintenance, repair and overhaul facilities through policies MR01, 02 and 03.

The preferred option also includes reference to the more efficient and effective use of existing employment land at the airport. This will be a potentially key argument in terms of the justification for reviewing green belt and the allocation of additional land for development, as well as forming a key part of the sustainable credentials of the approach.

The JAAP rightly notes that the development of the preferred option will have environmental impacts on the local area and in particular, will require some reconsideration of green belt boundaries to the north. The provision of high quality open space and leisure facilities that not only act as a resource in themselves but also act as effective green infrastructure links such as that proposed to connect the country park, business parks and Rochford town centre will be an important element of the approach. Moreover, linked to the points above, a strong case linking demand to the requirement for green belt land will need to be made.

EEDA are happy to see that the JAAP is seeking to mitigate environmental impacts. The promotion of more fuel efficient planes, facilitated through the approach that includes an expanded runway is a particularly positive step in this regard as is the provision of significant open space. Key to success in this regard will be the ability to enforce these aspirations through the plan's implementation.

Goal 7 of the RES - Transport identifies the importance of increasing the economic benefits to the region of our international gateways whilst mitigating local impacts. Priority 2 of this Goal also identifies the importance of sustained economic investment for transport in key strategic corridors. Critically, this includes the A127 and A13. In addition, the recent TEES study carried out by EEDA also identifies this corridor as being of particular importance to the region in economic terms. EEDA broadly welcomes the approach to transport connectivity as set out in the JAAP. It appears to be a balanced response that marries the need for road investment with improvements to public transport, including a park and ride and SERT, and a commitment to green travel planning. However, the detailed implementation of the plan will be the test as to whether the sustainable travel patterns aspired to will be achieved. Importantly, the delivery of any rail improvements will need to be agreed with Network Rail.

If you would like to discuss any of these matters in further detail, please do not hesitate to contact me at the above address.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 14578

Received: 11/05/2009

Respondent: Mr G R & Mrs J S Gillham

Representation Summary:

I object to area regeneration being centered around Southend Airport.
In recent years and as far as I can see in the immediate future any airport will have very little change of expanding its flying activity and/or gaining any increase in passenger numbers.
Any regeneration of the area should be centered around the neglected and run down industrial areas already in existance. This also includes the road and rail systems which should be a major concern.
No major growth of regional airport which is surrounded on three sides by large residential areas should be considered as a priority!

Full text:

As you can see in the above heading I have added "Neighbouring Residential Areas" which I feel is far more important and is not given enought emphasis in JAAP Commercial development on the other hand is, and appears to be, the underlying real reason for this unfortunate proposal. I object to the assumption that "environmental improvements" in the area can be obtained by increasing the airport runway length and allowing larger jets/aircraft with greater fuel capacity, and/or greater cargo/passenger capacity to make use of an airport that is already surrounded by dense residental areas very close to the existing airport boundary! It would appear to me that a runway exension towards a major road backed by rising ground covered with housing is a dangerous move! I object to the use of jet aircraft, large or small for increased night flights which will, I am sure, be the outcome of the increased runway length, as the company now running the airport is essentially a freight oriented transporting concern. On the subject of air flights in general I would point out that Southend/Rochford and its environs have not experienced major air operations on a 24 hour basis for 30 years or more!!. There is no such thing as a quite aircraft. Luton Council. Beds, has just lodged a complaint against Luton Airport operators asking for reductions in night flights. The Luton area now suffers more night flights than Heathrow. These have steadily increased over recent years! It is a well known fact that night flying restrictions in force in this country at the moment allow for nearly continuous flying apart from possibly a one/two hour break in the early hours, which can be broke at any time if incoming flight schedules have been interrupted. I object to the proposed scale of commercial development surrounding the airport bounday, it is obvious that the proposed development is being used as an inducement to seek approval of the runway extension and also a source of revenue for the developers regardless as to the actual necessity of the development. I object to any loss of "green areas" surrounding the airport site and I most strongly object to any compulsory purchase of property, on moral grounds if for no other reason. I object to any increase in road traffic to and from the airport on the existing road network, ie A13/A127 and all minor rounds which surround the airport site. Should there be development of these roads into possibly 3 or 4 lane mini-motorways, I doubt if there would be any easing of congestion at presently experienced, let alone any extra caused by the coming and going from the airport. NOISE! If Southempton Airport is used as a model: It has been recorded as having one aircraft movement ie landing/take-off every 10 minutes at peak! Aircraft engines are ground run for testing! POLLUTION! Stench of jet fuel (kerosene) is continuous. Travels on the wind! Will be more noticeable on warm days i.e when people have their windows open more often! TRAFFIC CONGESTION! Access of airport: One road bridge: NARROW. All roads to airport are close to or throught residential areas. Road freight traffic will find it difficult to negotiate narrow roads! RUNWAY OVERRUN: If the proposal goes ahead the overrun area would be very much reduced. Any aircraft overrunning or crash-landing would be nearer or on the A127 or housing areas! EMERGENCY SERVICES: Will the services be adequate for large scale incidents? Finally I would like to express my concern that not enough publicity, information on the proposals etc have been given to all residents of all areas. I was told during a telephone conversation with a Southend Council employee that only residents directly under the flight path were sent written information! Not good enough!! A mailing of all information to every resident of all areas should have been made. Full page adverts in local papers (last minute decision I was told!) and postcards from Airport management are not good enough!