Comment
Core Strategy Preferred Options (Revised October 2008)
Representation ID: 3759
Received: 12/12/2008
Respondent: The National Trust Rayleigh Mount Local Committee
Representation Summary:
A higher standard should be required. The planning authority should seek to ensure that code level 6 is achieved by developments by 2010.
Why accept a lower standard?
Full text:
A higher standard should be required. The planning authority should seek to ensure that code level 6 is achieved by developments by 2010.
Why accept a lower standard?