Comment
Core Strategy Preferred Options (Revised October 2008)
Representation ID: 3704
Received: 15/12/2008
Respondent: Mr John Worden
Representation Summary:
I have significant concerns regarding the system of standard charges attaching to specific developments. The level of charges should be proportionate to the increased value of that property as a result of planning permission being granted.
More detail is required on how these will be calculated and levied.
Full text:
I have significant concerns regarding the system of standard charges attaching to specific developments. The level of charges should be proportionate to the increased value of that property as a result of planning permission being granted.
More detail is required on how these will be calculated and levied.