Comment

Issues and Options Document

Representation ID: 34880

Received: 19/02/2018

Respondent: mr john surgett

Representation Summary:

With regard to the proposed new Local Plan, the submitted Map A for the local Hullbridge area shows the majority of the proposed larger sites are in the Green Belt with the exception of a portion of CFS100 Brownfield Site being a lorry/heavy goods breakers yard, formerly a car breakers yard, which is obviously now a highly contaminated site.

Full text:

With regard to the proposed new Local Plan, the submitted Map A for the local Hullbridge area shows the majority of the proposed larger sites are in the Green Belt with the exception of a portion of CFS100 Brownfield Site being a lorry/heavy goods breakers yard, formerly a car breakers yard, which is obviously now a highly contaminated site.
Sites CFS006, CFS138, CFS149, CFS099, GY01 and GY02 are not located in Hullbridge Parish but are actually in Rawreth Parish but will obviously still use all the facilities in Hullbridge including the Riverside Surgery which is already overstretched. These sites will obviously require access off the existing narrow, weight restricted Watery Lane/Beeches Road, and
will merge the villages of Rawreth and Hullbridge. CFS015 has 50% of the
site in the flood plain.
CFS151 will require access off the existing single track in Long Lane and CFS120, CFS 026, CFS107, CFS106, CFS110, CFS108 & CFS109 will require access off the unmade single track in Kingsway, all of which will require a major upgrade to provide the required road widths including footpaths/cycle ways as recommended by the Essex Design Guide Highway Standards.

SUMMARY

RDC have not assessed, previously, any alternatives in terms of major impacts and sustainability especially in connection with the Malyons site in Hullbridge and all the other major developments recently completed or under construction, we therefore have no confidence that this will change
in any future emerging new Local Plan for this district. ECC report
concludes that housing targets cannot be matched by infrastructure provisions due to a massive shortfall of £billions in funding (ECC/AECOM GIF Report 2016).
RDC need to take into account further carbon emissions, overcrowding, traffic congestion, flooding and further drains on the existing infrastructure.