Object
Allocations: Schedule of modifications
Representation ID: 33268
Received: 16/01/2014
Respondent: Mrs Angie Rose
Representation Summary:
This is an increase to the original plan and it to much for the size and dynamics of the village. A gradual increase could work but a block increase like this will cause an imbalance. Will the facilities supplied to the village be reviewed to cope with this sizeable increase to the population? ie school, roads, transport
Full text:
This is an increase to the original plan and it to much for the size and dynamics of the village. A gradual increase could work but a block increase like this will cause an imbalance. Will the facilities supplied to the village be reviewed to cope with this sizeable increase to the population? ie school, roads, transport