Object

Allocations: Schedule of modifications

Representation ID: 33085

Received: 12/01/2014

Respondent: mrs joanne williams

Representation Summary:

This 5% cap should be kept. The whole core strategy and consultation process has been based on these figures, and to allow a possible unlimited increase in these figures at such a late stage makes the whole process flawed. In addition the North of London Road site is so problematic, in terms of highways, drainage and coalescence of Rayleigh and Rawreth, that a cap is particularly appropriate here.

Full text:

This 5% cap should be kept. The whole core strategy and consultation process has been based on these figures, and to allow a possible unlimited increase in these figures at such a late stage makes the whole process flawed. In addition the North of London Road site is so problematic, in terms of highways, drainage and coalescence of Rayleigh and Rawreth, that a cap is particularly appropriate here.