Object
Allocations: Schedule of modifications
Representation ID: 33080
Received: 12/01/2014
Respondent: Mrs Ann Wisken
T his 5% cap should be kept. The whole core process strategy and consultation process has been based on these figures, and to allow a possible unlimited increase in these figures at such a late stage makes the whole process flawed. In addition the north of London road site is so problematic, in terms of highways, drainage and obsolescence of Ragleigh and Rawreth, that a cap is particularly appropriate here
T his 5% cap should be kept. The whole core process strategy and consultation process has been based on these figures, and to allow a possible unlimited increase in these figures at such a late stage makes the whole process flawed. In addition the north of London road site is so problematic, in terms of highways, drainage and obsolescence of Ragleigh and Rawreth, that a cap is particularly appropriate here