Object
Allocations: Schedule of modifications
Representation ID: 33079
Received: 12/01/2014
Respondent: Mrs Ann Wisken
This 5% cap should be kept. The whole core strategy and consultation process has been based on figures, and to allow a possible unlimited increase in these figures at such a late stag makes the whole process flawed. In addition the north of London road site is so problematic, in terms of high ways, drainage and obsolescence of Ragleigh and Rawreth, that a cap is particularly appropriate here.
This 5% cap should be kept. The whole core strategy and consultation process has been based on figures, and to allow a possible unlimited increase in these figures at such a late stag makes the whole process flawed. In addition the north of London road site is so problematic, in terms of high ways, drainage and obsolescence of Ragleigh and Rawreth, that a cap is particularly appropriate here.