Object

London Southend Airport and Environs Joint Area Action Plan Submission Document

Representation ID: 32497

Received: 25/04/2013

Respondent: Mr Peter Symes

Legally compliant? No

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Again this appears to have been pre-decided by the authorities without taking into account the objections. Stobart have already indicated that they received such obliging terms for taking over the airport they couldn't refuse and have proceeded with development without consideration to local resident or in some instances planning requirements. RDC and SBC are not being open and transparent about their dealings with Stobart or why they are so keen to ignore residents. The document itself could have been written by Stobart - quiet aircraft, there really is no such thing at 3 a.m

Full text:

Again this appears to have been pre-decided by the authorities without taking into account the objections. Stobart have already indicated that they received such obliging terms for taking over the airport they couldn't refuse and have proceeded with development without consideration to local resident or in some instances planning requirements. RDC and SBC are not being open and transparent about their dealings with Stobart or why they are so keen to ignore residents. The document itself could have been written by Stobart - quiet aircraft, there really is no such thing at 3 a.m