Object

Development Management DPD Preferred Policy Options Document

Representation ID: 28285

Received: 08/02/2012

Respondent: Barratt Eastern Counties

Agent: Kember Loudon Williams Ltd

Representation Summary:

Policy CP1 of the Core Strategy explains that "the Essex Design Guide will help provide guidance without being overly prescriptive." Draft Policy DM1 reflects this in its policy by explaining that schemes should "have regard to the guidance in Essex Design."

The supporting text should explain that Essex Design is not SPD as it has not been subject to the consultation requirements of PPS12. It should be explained that Essex Design is useful contextual advice but that it is not a prescriptive piece of policy. This would ensure that the draft Policy ties in with Core Strategy CP1.

Full text:

Policy CP1 of the Core Strategy explains that "the Essex Design Guide will help provide guidance without being overly prescriptive." Draft Policy DM1 reflects this in its policy by explaining that schemes should "have regard to the guidance in Essex Design."

The supporting text should explain that Essex Design is not SPD as it has not been subject to the consultation requirements of PPS12. It should be explained that Essex Design is useful contextual advice but that it is not a prescriptive piece of policy. This would ensure that the draft Policy ties in with Core Strategy CP1.