London Southend Airport & Environs Joint Area Action Plan Issues & Options Paper

Representation ID: 2531

Received: 08/08/2008

Respondent: Mr & Mrs Weir

Representation Summary:

Poor road infrastructure indicates scenario 1

Full text:

The main problem regarding development of the airport is the impact on the road infrastructure which has not been addressed by this report. The Cherry Orchard Way was constructed to allow easy access to Southend thus relieving the Ashingdon Road and Southend Road. It was promised that no new development would be allowed along it except the business park at the Southend end, which had already had permission and had been released from the green belt back in 1985. The Brickwork site was to be returned to arable land as per conditions in the original permission for brick earth extraction.

Rochford should not be called upon to relieve Southend of their obligations to provide employment land. The report says that there is scope for intensification of employment land. This should be done before any new land is released.

Since the expansion of Stansted and London City airports, Southend airport has declined it has also lost its airspace. There is little scope for improvement any new facilities proposed do not match Stansted which at least has the road infrastructure. The proposed diverting of Eastwoodbury Lane and dualing of Cherry Orchard Way and extra access points would cause traffic problems during construction and loss of arable land.

The only realistic scenario is option 1 low growth. The other scenario will have great environmental impact of traffic, pollution and visual to the detriment of Rochford District residents.