Support

London Southend Airport & Environs Joint Area Action Plan Issues & Options Paper

Representation ID: 1868

Received: 06/08/2008

Respondent: London Southend Airport

Representation Summary:

Area vi, the Northern Maintenance Zone, should include all the land up to the edge of the runway strip as shown on the Block Land Use Plan of the Master Plan.

Similarly, area vii should be redefined as in the Master Plan to go up to the runway strip, up to and including Taxiway B and also to include the existing terminal area. It would be better titled 'Passenger terminal area development zone'.

Similarly, area viii should be redefined to go up to the runway strip and up to Taxiway B. It should be called 'Southern Maintenance and Support Zone'

Full text:

Area vi, the Northern Maintenance Zone, should include all the land up to the edge of the runway strip as shown on the Block Land Use Plan of the Master Plan.

Similarly, area vii should be redefined as in the Master Plan to go up to the runway strip, up to and including Taxiway B and also to include the existing terminal area. It would be better titled 'Passenger terminal area development zone'.

Similarly, area viii should be redefined to go up to the runway strip and up to Taxiway B. It should be called 'Southern Maintenance and Support Zone'