Support
London Southend Airport & Environs Joint Area Action Plan Issues & Options Paper
Representation ID: 1573
Received: 30/07/2008
Respondent: Renaissance Southend
The Issues and Options Report has adequately considered all the options that may be applicable in respect of London Southend Airport. Given the various physical constraints and the issues of accessibility, some growth of the Airport can be achieved. The four scenarios set out what can be achieved however, there is an opportunity that an agreed growth option may be a combination of Scenarios 2b and 3, allowing for a high level growth to be achieved through a more managed/controlled criterion.
The Issues and Options Report has adequately considered all the options that may be applicable in respect of London Southend Airport. Given the various physical constraints and the issues of accessibility, some growth of the Airport can be achieved. The four scenarios set out what can be achieved however, there is an opportunity that an agreed growth option may be a combination of Scenarios 2b and 3, allowing for a high level growth to be achieved through a more managed/controlled criterion.