Q49. Should we continue to restrict appropriate uses within town centres, including primary and secondary shopping frontages within those centres? If yes, what uses should be restricted? [Please state reasoning]

Representation ID: 43196

Received: 14/09/2021

Respondent: Hullbridge Parish Council

Representation Summary:

Some existing ok but links to, e.g., Clements Hall from Hullbridge non-existent.

Businesses cannot be forced into staying unless benefits outlined in Q47 are adhered to which may encourage some business opportunities and current business to remain.

Comment

New Local Plan: Spatial Options Document 2021

Q50. With reference to your preferred Strategy Option, are there opportunities for growth to deliver improved retail and leisure services in the District? [Please state reasoning]

Representation ID: 43198

Received: 14/09/2021

Respondent: Hullbridge Parish Council

Representation Summary:

Spatial strategy 3a will give the most opportunity to expand retail both in terms of including retail space and bringing customers into the town centres nearest to the new developments. The document mentions a cinema. The best site for this would be Saxon Business Park. A bowling alley would work well with this alongside some eateries.

Comment

New Local Plan: Spatial Options Document 2021

Q51. With reference to the options above, or your own options, how do you feel we can best address our transport and connectivity needs through the plan?

Representation ID: 43199

Received: 14/09/2021

Respondent: Hullbridge Parish Council

Representation Summary:

Certainly, prepare an Infrastructure Delivery Plan that would deliver meaningful improvement to transport networks, including but not exclusively, cycle routes, walking pathways, public transport and roads. However, all these modes are currently completely stretched; modernisation and improvements to all need to happen before future housing developments are built. It should be noted that following the last developments in the Core Strategy, as far as Hullbridge is concerned (and almost certainly elsewhere also), the promised improvements have either not materialised, been completed or proven
to be inadequate.

The plan needs to deliver improvements to public transport by working with bus companies to reestablish bus routes to isolated communities that have been either been terminated or severely curtailed. For example, ‘The Dome’ has a bus service twice a week. Residents regularly complain that they are isolated from everywhere else. It is also claimed that Hullbridge has its own bus service that runs 4 - 7 times a day. This is not the experience of Hullbridge residents and it only needs the slightest issue along Hullbridge Road for the service to either be even further curtailed or suspended entirely.
RDC need to continue to work with Government, Highways England, Essex CC etc to deliver meaningful
road improvements to both the main road arteries and to the local road network. However, any large-scale bypass scheme such as the "Southend Outer Bypass" scheme needs to be opposed. Not only would it cut directly through the Green Belt but it would increase development along its course, which in turn would have enormous negative impact on the Green Belt itself, natural habitats and the environment generally

Comment

New Local Plan: Spatial Options Document 2021

Q52. Are there areas where improvements to transport connections are needed?

Representation ID: 43207

Received: 14/09/2021

Respondent: Hullbridge Parish Council

Representation Summary:

Whilst some improvements are shortly to commence at the Fairglen Interchange and A130, further improvements are needed to the Junction of Rawreth Lane and the A1245. Perhaps also the A127 could be widened along its length from four lanes to six lanes.

Additionally, the bus service between Hullbridge and Rayleigh can be cut with the slightest issue along
Hullbridge Road and this needs to be addressed urgently. When this happens it consequently results
in more vehicles using Hullbridge road, which in turn exacerbates traffic congestion and leads to other
problems such as pollution.

A bus service between Rochford and Rayleigh via Hullbridge and Hockley and Rayleigh via Hullbridge
would serve to reduce traffic congestion along Lower Road, especially at "rush" hours. This would benefit residents of the Dome as well as properties along the length of Lower Road. It would also serve to provide access for Hullbridge students to access the Greensward Academy that does not exist currently.

Comment

New Local Plan: Spatial Options Document 2021

Q53. With reference to your preferred Strategy Option, are there opportunities for growth to deliver new transport connections, such as link roads or rapid transit? What routes and modes should these take? [walking, cycling, rail, bus, road etc.]

Representation ID: 43209

Received: 14/09/2021

Respondent: Hullbridge Parish Council

Representation Summary:

Improvements to existing road networks. Large scale bypass schemes, such as the “Southend Outer”
bypass would be unacceptable because of the hugely detrimental impact on the Green Belt and its
physical and natural environment.

Small low top busses to link smaller communities with larger ones. Trams not a viable option for the more rural areas as roads are too narrow and winding; additionally, would increase congestion on existing roads.

Improvements to the cycle path network, extending and linking the network as and where appropriate and safe.

Support

New Local Plan: Spatial Options Document 2021

Q54. Do you feel that the plan should identify rural exception sites? If so, where should these be located and what forms of housing or employment do you feel need to be provided?

Representation ID: 43210

Received: 14/09/2021

Respondent: Hullbridge Parish Council

Representation Summary:

Yes, but not within the Green Belt and Rural and Village life must be safeguarded. Any such sites must be small scale and have developments that prioritise genuinely "Affordable" homes and/or Social Housing that would benefit local residents/families most.

Comment

New Local Plan: Spatial Options Document 2021

Q55. Are there any other ways that you feel the plan should be planning for the needs of rural communities?

Representation ID: 43211

Received: 14/09/2021

Respondent: Hullbridge Parish Council

Representation Summary:

Support changes that would require developers of 10 units or less to pay something akin to s.106/CIL monies, that would go towards infrastructure improvements, particularly those affecting rural communities.

Comment

New Local Plan: Spatial Options Document 2021

Q60a. Do you agree with our vision for Hullbridge?

Representation ID: 43212

Received: 14/09/2021

Respondent: Hullbridge Parish Council

Representation Summary:

We do not agree with the wording or the aims of the provided vision statement for Hullbridge and have
instead drafted our own (see below). We were sceptical about the suggestion that the river could be used for transport without consideration on the viability or environmental impact of this proposal.

Hullbridge will have expanded on its already self-reliant nature, boasting impressive local businesses and amenities – providing a perfect space for those who wish to enjoy their retirement as well as those with young families. Through small, localised and respectable developments, the thriving community and riverside aesthetic of the village remains as strong as ever; all of this has been achieved through the transparency and openness of different local authorities, residents, businesses and developers on any and all developments going forward.

Comment

New Local Plan: Spatial Options Document 2021

Q60b. With reference to Figure 48 and your preferred Strategy Option, do you think any of the land edged blue should be made available for any of the following uses?

Representation ID: 43213

Received: 14/09/2021

Respondent: Hullbridge Parish Council

Representation Summary:

The biggest issue with further development in Hullbridge is the distinct lack of infrastructure – whether that be roads, schools, transport and other general services – and so, without even mentioning the fact that many sites lay within the projected 2050 flood plains, the suggestion that further development can take place on any considerable scale is untenable. Any consideration of commercial or community infrastructure, such as youth services, care facilities, or local businesses would equally need to be subject to the same discussion and scrutiny.

Comment

New Local Plan: Spatial Options Document 2021

Q59c. Are there areas in Hullbridge that development should generally be presumed appropriate?

Representation ID: 43214

Received: 14/09/2021

Respondent: Hullbridge Parish Council

Representation Summary:

Significant portions of Hullbridge remain vital for local wildlife, its habitats, and the natural environment. As such, any and all developments along the River Crouch, the surrounding areas of Kendal Park and those that lie north of Lower Road should be protected from development.