New Local Plan: Spatial Options Document 2021

Search representations

Results for Folly Chase Frontagers Committee search

New search New search

Object

New Local Plan: Spatial Options Document 2021

Q58b. With reference to Figure 46 and your preferred Strategy Option, do you think any of the land edged blue should be made available for any of the following uses?

Representation ID: 41734

Received: 20/09/2021

Respondent: Folly Chase Frontagers Committee

Number of people: 2

Representation Summary:

Dear Sirs, I am e mailing on behalf of the Folly Chase Road Frontagers Committee ( FCRFC) to express our concerns about Material Planning Concerns relating to the potential development of the sites detailed above. We are aware that these sites have been identified following the call for sites but wish to point out their unsuitability for development due to the inadequate road infrastructure. The FCRFC intend only to comment on the material planning concerns regarding the road itself and access to it, as to widen the scope of our response is beyond the agreed remit of the committee.

The only apparent access to both sites appears to be via Folly Chase, a small unadopted road off of the already congested and unsuitable Folly Lane. Folly Lane itself has seen an unreasonable increase in traffic as it is used to access the recent new housing developments in Pond Chase and Church Road as well as the previously existing housing estate. It is now seeing additional increases in traffic flow caused by the significant housing development in Hullbridge as it is the only direct two way road access from Hullbridge to Hockley. The road is frequently difficult to get through with parked cars along both sides and heavier traffic flows in both directions. This is not helped by it’s layout with three 90 degree bends and one c 45 degree bend along its relatively short length. These bends are difficult for larger traffic, especially the type of traffic used in construction, and a drain cover on one bend is broken several times a year by lorries having to ride up on to the kerb in order to get around the bend. Generally the speed of the ‘through’ traffic is too high and I have witnessed many near misses on the bends as vehicles either cut the corners or are forced to breach the centre of the road due to parked cars. A serious head on accident is now inevitable down this road, and the prospect of further development off of it will make matters even worse as the scale of the housing for the two sites identified in the plan would equate to approximately another 500 cars using Folly Lane just to access the developed sites. This would likely equate to an average of approximately 1000 to 2000 extra car movements a day on a road that is already inadequate.

A far as Folly Chase is concerned it is so limited in its capacity that it simply cannot be deemed suitable for access for either construction traffic or the eventual increase in residential access traffic. The Chase is not a through road, terminating at a footpath leading into designated Ancient Woodland, carrying HC1 Wildlife Site designation. Folly Chase has no significant base as it was unmade until the 1980s. The current road has been constructed and maintained by the Folly Chase Road Frontagers Committee on behalf of residents. A layer of bitumen and gravel was utilised over a thin layer of type 1 hardcore that is sufficient for the low traffic flow associated with 25 houses and no through access, but will simply not support construction traffic or the flows commensurate with the potential development. The road itself has no surface drainage features, gullies, gutters or drains so all water runs over the surface to the bottom of the road. There are no footpaths, nor is there space to construct footpaths and is approximately only 9 feet wide at its narrowest point and cannot support two way traffic. The existing housing water, and gas supplies are very shallow beneath the surface and any increase in heavy traffic will almost certainly cause collapse of these and there are numerous points where the existing sewage pipes cross the road, again, at a very shallow depth and would be extremely vulnerable to increased traffic flows.

The recent adjacent Pond Chase development has well known problems with regards to access to sewerage, and whilst this is now complete and running it should be noted that the bored line of drains that traverse the bottom of Folly Chase from Pond Chase, across to the field that is site CFS064 to the Hockley Community centre have already caused significant sinking of our road surface. The nearby development in Church Road has also had significant sewage and surface water issues and any further development adding onto the existing surface water and sewage infrastructure will only increase the pressure on existing infrastructure, potentially to the point of failure, with significant public health concerns.

Folly Chase is Private Road with an undefined Public Footpath running down it. Ownership of the road isn’t registered and absent any contrary evidence each land owner owns up to the mid- point of the road. There are some private rights of way that have been established by usage and by deed but the Committee has not investigated these as to do so would be time consuming and expensive, but it is apparent that the ownership issue is complex and fragmented and the Committees discussions with some residents shows the large majority would be unwilling to enter into any negotiation to depart from current use and access.

The Committee does not believe the two sites detailed above warrant further inclusion in the Plan and should be removed for the next stage as it is clear that there are many other more suitable sites without the access and infrastructure issues detailed in this response.

Full text:

The only apparent access to both sites appears to be via Folly Chase, a small unadopted road off of the already congested and unsuitable Folly Lane. Folly Lane itself has seen an unreasonable increase in traffic as it is used to access the recent new housing developments in Pond Chase and Church Road as well as the previously existing housing estate. It is now seeing additional increases in traffic flow caused by the significant housing development in Hullbridge as it is the only direct two way road access from Hullbridge to Hockley. The road is frequently difficult to get through with parked cars along both sides and heavier traffic flows in both directions. This is not helped by it’s layout with three 90 degree bends and one c 45 degree bend along its relatively short length. These bends are difficult for larger traffic, especially the type of traffic used in construction, and a drain cover on one bend is broken several times a year by lorries having to ride up on to the kerb in order to get around the bend. Generally the speed of the ‘through’ traffic is too high and I have witnessed many near misses on the bends as vehicles either cut the corners or are forced to breach the centre of the road due to parked cars. A serious head on accident is now inevitable down this road, and the prospect of further development off of it will make matters even worse as the scale of the housing for the two sites identified in the plan would equate to approximately another 500 cars using Folly Lane just to access the developed sites. This would likely equate to an average of approximately 1000 to 2000 extra car movements a day on a road that is already inadequate.

A far as Folly Chase is concerned it is so limited in its capacity that it simply cannot be deemed suitable for access for either construction traffic or the eventual increase in residential access traffic. The Chase is not a through road, terminating at a footpath leading into designated Ancient Woodland, carrying HC1 Wildlife Site designation. Folly Chase has no significant base as it was unmade until the 1980s. The current road has been constructed and maintained by the Folly Chase Road Frontagers Committee on behalf of residents. A layer of bitumen and gravel was utilised over a thin layer of type 1 hardcore that is sufficient for the low traffic flow associated with 25 houses and no through access, but will simply not support construction traffic or the flows commensurate with the potential development. The road itself has no surface drainage features, gullies, gutters or drains so all water runs over the surface to the bottom of the road. There are no footpaths, nor is there space to construct footpaths and is approximately only 9 feet wide at its narrowest point and cannot support two way traffic. The existing housing water, and gas supplies are very shallow beneath the surface and any increase in heavy traffic will almost certainly cause collapse of these and there are numerous points where the existing sewage pipes cross the road, again, at a very shallow depth and would be extremely vulnerable to increased traffic flows.

The recent adjacent Pond Chase development has well known problems with regards to access to sewerage, and whilst this is now complete and running it should be noted that the bored line of drains that traverse the bottom of Folly Chase from Pond Chase, across to the field that is site CFS064 to the Hockley Community centre have already caused significant sinking of our road surface. The nearby development in Church Road has also had significant sewage and surface water issues and any further development adding onto the existing surface water and sewage infrastructure will only increase the pressure on existing infrastructure, potentially to the point of failure, with significant public health concerns.

Folly Chase is Private Road with an undefined Public Footpath running down it. Ownership of the road isn’t registered and absent any contrary evidence each land owner owns up to the mid- point of the road. There are some private rights of way that have been established by usage and by deed but the Committee has not investigated these as to do so would be time consuming and expensive, but it is apparent that the ownership issue is complex and fragmented and the Committees discussions with some residents shows the large majority would be unwilling to enter into any negotiation to depart from current use and access.

The Committee does not believe the two sites detailed above warrant further inclusion in the Plan and should be removed for the next stage as it is clear that there are many other more suitable sites without the access and infrastructure issues detailed in this response.

For instructions on how to use the system and make comments, please see our help guide.