New Local Plan: Spatial Options Document 2021

Search representations

Results for Croudace Homes search

New search New search

Support

New Local Plan: Spatial Options Document 2021

Q18. With reference to your preferred Strategy Option, are there areas or sites in Rochford that you feel require a specific approach to housing types, size and tenure? What is required to meet housing needs in these areas?

Representation ID: 41530

Received: 21/09/2021

Respondent: Croudace Homes

Representation Summary:

For Sites CFS081 and CFS082 at Hall Road, Rochford, Strategy Option 2b would be suitable for the specific housing approach which would see a mix of 1 to 4 bedroom houses built on these parcels of land. The suitable housing tenure for these sites would be a mixture of owner occupation and affordable houses falling under affordable rented tenure and intermediate (shared ownership) homes. What is required to meet the housing needs in these areas are an increased land supply to provide more housing for Rochford. Rochford has become one of the most unaffordable district counties in the country, with house prices increasing by 70% in the past 15 years. The 2016 and 2017 South Essex SHMA calculated that Rochford district council needed to build at least 360 houses for the next 20 years, however, Rochford currently build on average 166 new houses per year, which falls below the government requirement set out in the SHMA. If Rochford continue to undersupply new dwellings, housing-related issues such homelessness and concealed homes, where young people are forced to stay or move back in with their parents longer than they would want to, will become an increasing issue within the district.

Comment

New Local Plan: Spatial Options Document 2021

Q23. With reference to the options listed above, or your own options, how do you feel we can best ensure that we meet our employment and skills needs through the plan?

Representation ID: 41531

Received: 21/09/2021

Respondent: Croudace Homes

Representation Summary:

By providing well designed, high quality and affordable housing Rochford will be able to attract more potential workers and businesses to the district and prevent young people moving away from the area in search of affordable housing. This will ensure a stable and able work force whilst also providing jobs to the local population during the construction period of the new dwellings.

Comment

New Local Plan: Spatial Options Document 2021

Q27. Are there other measures we can take through the plan to lay the foundations for long-term economic growth, e.g. skills or connectivity?

Representation ID: 41533

Received: 21/09/2021

Respondent: Croudace Homes

Representation Summary:

The foundations of long-term economic growth is through having affordable housing young people can afford. This will decrease the likelihood that they will move away, taking their skills with them, whilst also attracting potential businesses to the area to provide services. Providing this housing will also create new jobs during the construction phase which can up-skill workers over a prolonged period of time.

Comment

New Local Plan: Spatial Options Document 2021

Q31. Do you consider net gains for biodiversity are best delivered on-site or off-site? Are there specific locations or projects where net gain projects could be delivered?

Representation ID: 41534

Received: 21/09/2021

Respondent: Croudace Homes

Representation Summary:

We believe net gains for biodiversity are best delivered off-site. This ensures there are no unforeseen costs during a development and we believe it is more beneficial to the environment to have biodiversity in specific areas than have it spread through developments.

Comment

New Local Plan: Spatial Options Document 2021

Q46. With reference to the options listed above, or your own options, how do you think we can best plan for vibrant town centres in Rochford, Rayleigh and Hockley? How can we also ensure our village and neighbourhood centres remain vibrant? [Please state

Representation ID: 41535

Received: 21/09/2021

Respondent: Croudace Homes

Representation Summary:

We think the best plan to ensure Rochford’s town centre remains vibrant is through option 6, specifically providing sustainable connections from any large-scale new housing development to Rochford town centre. Building new housing developments within a 20 minute walk of the town centre is a method of providing sustainable connections to existing town centres, and sites CFS081 and CFS082 fall within these parameters. Additionally, providing accommodation for more residents will provide greater footfall to the businesses within the town centre, further sustaining the services and employment opportunities for Rochford district.

Support

New Local Plan: Spatial Options Document 2021

Q57a. Do you agree with our vision for Rochford and Ashingdon?

Representation ID: 41536

Received: 21/09/2021

Respondent: Croudace Homes

Representation Summary:

We agree with your vision for Rochford and Ashingdon, however, the allocation for housing has not been covered. Providing new housing will support Rochford and Ashingdon’s town centre business and provide more sustainability to services.

Support

New Local Plan: Spatial Options Document 2021

Q57b. With reference to Figure 45 and your preferred Strategy Option, do you think any of the land edged blue should be made available for any of the following uses?

Representation ID: 41537

Received: 21/09/2021

Respondent: Croudace Homes

Representation Summary:

We believe that site CFS081 and the eastern part of CFS082 (as shown on the attached plan) should be made available for housing market falling under Strategy Option 2b. This could improve the completeness of Rochford and Ashingdon by providing the required ‘critical mass’ in terms of housing density for additional services such as a more frequent bus services or an additional bus stop on the proposed site. This will improve the site assessments access to a bus service from a 1 to a 5 and improve the access to bus services assessment. Site CFS082 is missing from Figure 45 when it is included on the Interactive Consultation Map. We propose to build on half of the total site, preventing Rochford and Hawkwell coalescing and retaining and protecting part of the metropolitan green belt. With these two sites combined, over 600 houses could be delivered for Rochford, which would provide three main benefits. The first benefit would be to local businesses, as an increasing population would bring additional income to the business, which would allow local businesses to grow. The second benefit is that with an increasing population, other firms would view the district as a viable location to establish themselves in, further increasing employment opportunities in the district and providing more services to the area. The third benefit would be Rochford and Southend Borough District would avoid housing-related shortage issues such as homelessness and concealed households. Building more housing would also prevent young people moving away in search of housing they can afford, preventing an ageing demographic which would present its own challenges to the district.

Support

New Local Plan: Spatial Options Document 2021

Q57c. Are there areas in Rochford and Ashingdon that development should generally be presumed appropriate?

Representation ID: 41538

Received: 21/09/2021

Respondent: Croudace Homes

Representation Summary:

Sites CFS081 and the Eastern half of site CFS082 should be presumed appropriate for development as they are within sustainable walking distance to Rochford town centre, and therefore offer a highly sustainable way of accommodating the housing needs of the town, a factor which we believe has been given inadequate weight in the council’s published site assessments. As well as meeting housing needs, building these developments would provide jobs over the construction period and prevent homelessness and concealed households becoming an issue within the district. These developments would also increase footfall for local businesses, making local businesses more sustainable, and potential businesses seeing Rochford as a viable area to locate their business. These factors bring the added benefit of greater sustainability to the local businesses and employment opportunities to the wider community.
We acknowledge that sites CFS081 and the eastern half of CFS082 are currently in the green belt. As we are only proposing building on the eastern part of site CFS082, the green belt harm assessment should be re-examined for this site to ensure that it has been fairly appraised relative to all other sites being considered. Limiting development to the eastern part of CFS082 reduces the potential harm caused to green belt purposes, preventing Rochford and Hawkley merging into one another in line with paragraph 138 subsection b of the 2019 NPPF.
The recent development of 620 homes to the east of sites CFS081 and CFS082 has demonstrated that growth of Rochford town in this direction can be successfully accommodated. There is a strip of land along the western edge of that development which remains designated as green belt, providing public open space. We believe the council needs to assess sites CFS081 and CFS082 (east) in light of the fact that the open space there is now not countryside, but is meeting the open space needs of the urban area. If sites CFS081 and the eastern part of CFS082 were to be released from the green belt they would effectively continue the urban area around this open space.
We also question the impact on Built Heritage assessments for sites CFS081 and CFS082 labelled at 1 and 2 respectively. We can only conclude that this low score is due to the nearby Pelham’s Farmhouse, which is a grade II listed building. However, on a site the size of CFS081 there is scope to plan the open space on site so as to minimise direct impacts which may arise to that heritage asset.
We question the assessment for site CFS081 in regards to the access to bus stop being scored at 2. CFS082 assessment scored a 4 and we propose linking the two sites allowing site CFS081 better access to bus stop services, and the area is closer on foot to the town centre. CFS081 and the eastern part of CFS082 are also large enough that they would reasonably be expected to make contributions toward new bus stops and improving bus services. We would also like the access to bus services re-appraised if were given permission to develop on the two sites as the increase in population density may provide the ‘critical mass’ to make the sites viable for the Rochford SS4 1NL bus service to come more frequently then it currently does. This would improve the appraisal score and make the development more sustainable.
The access to secondary schools for site CFS081 is appraised at a level 4 whereas site CFS082 is appraised at the lowest level of 1. With these two sites side by side, with access to the same road network as each other, we question why site CFS082’s access to secondary schools was appraised so low. If needs be, we can provide a financial contribution to a local secondary school to improve the facilities and size of the local secondary school.

We would like the access to town centre for site CFS082 to be reappraised as it is only a level 1 whereas site CFS081 is appraised at a level 4. With the two sites being developed on, a pathway through site CFS081 could be created for site CFS082 allowing it better access to Rochford town centre. The two sites fall within a 20 minute walk of Rochford town centre which should mean the appraisal for site CFS082 is higher.
We also question the appraisal for the access to employment site for site CFS082 at level 2 when CFS081 is appraised at level 4. With both sites having access to the same road network, these appraisals should be the same. We also question if the town centre has been considered as an employment site as it often is a major source of employment within a town. The town centre is only a 15 minute, 1 mile walk away or a 3 minute drive so the access to employment site for site CFS082 should be appraised higher.
We question why both sites CFS081 and CFS082 are appraised at levels 3 and 2 respectively for distance to strategic road network when both have access to the A127 being only 6 minutes away and 2 miles in distance via Cherry Orchard Way.
We would also like the appraisal for access to train services for site CFS082 to be reappraised as site CFS081 is appraised at level 3 whereas the former is at level 2. Through the development, site CFS082 will have access to Rochford train station like site CFS081. Rochford station is only a 15 minute walk or 3 minute drive away from the sites, at a distance of 1 mile from both sites. We therefore argue that the appraisal for access to train services for both sites should be higher.
We would also like the appraisal for site CFS082 proximity to water apparatus to be reassessed as it is a level 1 whereas neighbouring site CFS081 is appraised at a level 5. The River Roach does flow south of both sites and there is Rochford Reservoir only 1 mile away.
The assessment for Critical Drainage Risk for site CFS082 can be improved from a level 2 with implemented drainage systems for the proposed development.
We also question the level two assessment of impact on Ancient Woodland for site CFS082 being at a level 2 when the site is currently used as an agricultural field with no Ancient Woodland currently existing on the site. Site CFS081 with no ancient woodland on it as well was assessed at level 5 for impact on Ancient Woodland.

For instructions on how to use the system and make comments, please see our help guide.