Issues and Options Document

Introduction

Representation ID: 37224

Received: 06/03/2018

Respondent: Hullbridge Residents Association

Representation Summary:

*THIS REPRESENTATION INCLUDES SEVERAL ATTACHMENTS*

New Local Plan 2018. Issues and Options Documents

The Hullbridge Residents Association have viewed the Issues and Options Document and are pleased to give the views of the 5385 (extrapolated) Residents. This submission is also considered to be our Statement of Community Involvement.

Section 1. Introduction
1.1 States this is a new document, yet information has been repeated from documents produced previously in 2011/2012.
We understand the need for additional homes but we are concerned that 'Infrastructure' always seems to be a secondary consideration, when it should be the first.

Comment

Issues and Options Document

Why do we need a new Local Plan?

Representation ID: 37225

Received: 06/03/2018

Respondent: Hullbridge Residents Association

Representation Summary:

Page 1. Clause 1.2
HRA produced and delivered to RDC a 45-page document pertaining to the Core Strategy, Land Development Framework and National Planning Policy Framework for a previous development, and altogether we submitted some 525 issues (un-answered) in criticism of the documents presented by RDC. Our main criticism lies with the lack of proper consultation and transparency, fearing another regretful experience, although we are asked to rely on the statements made by the Councillors that close consultation must be observed, we hope this will be recognised and our 'professional' views taken into consideration. We disagree with a statement made in clause 1.2 on page 1. Very few opportunities were given to the community to 'have their say'.

24 Sites.
To demonstrate our reasons for our rejection to allow developments of dwellings on the plans indicating 24 sites submitted for development and will apply the following clauses of the NPPF and CS:

NPFF - Core Planning Principles. Pages 1, 5-6, Clauses 1-2, 6-17.
NPPF 4 - Promoting Sustainable Transport.
NPPF 5 - Supporting high quality communications infrastructure. With roads/transport a priority.
NPPF 6 - Delivering a wide choice of high quality homes.
NPPF 7- Requiring Good Design.
NPPF 8 - Promoting Healthy communities.
NPPF 9 - Protecting the Green Belt land.
NPPF 10- Meeting the Challenge of Climate Change, Flooding & Coastal change.
NPPF 11- Conserving and enhancing the future environment.
NPPF Plan Making - Local Plans (p. 37).
NPPF Using a Proportionate evidence base- (p. 38).
NPPF Ensuring Viability and Deliverability- ( p. 41).
Section 1 (cont).

NPPF Decision taking - Pre-application engagement & front loading, (p. 45).
Technical Guidance to the NPPF- Flood risk on page 2. Sequential and Exceptional Tests p. 3 to 7.
NPPF - Sequential and Exceptional Tests -

Drainage
Sustainable drainage systems;
The existing drainage system needs substantial improvements prior to any links being provided to the new developments and should be part of the necessary required Infrastructure works.

Comment

Issues and Options Document

What is the Issues and Options Document?

Representation ID: 37226

Received: 06/03/2018

Respondent: Hullbridge Residents Association

Representation Summary:

Page 2.
Clause 1.7 Statement of Community Involvement.
Having been disappointed with the first Statement of Community Involvement document in 2013 we take the clause 1.7 on page 2 seriously and we are hoping that RDC will engage in speaking with HRA who represent the majority of the Hullbridge community.

Comment

Issues and Options Document

How have you assessed the sustainability impacts?

Representation ID: 37227

Received: 06/03/2018

Respondent: Hullbridge Residents Association

Representation Summary:

Clauses 1.8 & 1.9.
A plan indicating 24 additional sites in Hullbridge has been viewed by HRA. We consider the 24 sites will provide 2518 dwellings at a minimum density of 30 dwellings per hectare which has the potential of housing some 10,000 persons.
Having examined the plan we found that 6 sites are within the Rawreth Parish but not indicated in this section of this document namely- CFS006, CFS149, CFS099, GY 01, GY 02 and CFS 138. The total areas equate to 58.4 hectares = 1773 homes. 2 Sites are designated as Gipsy Sites providing a minimum of 18 homes. Our concerns are that this clause does not suit the "appropriate balance" between the environmental, economical and social factors stated in these clauses. These developments cannot be approved without consideration for the infrastructure. Sustainability of the infrastructure is the main ingredient to a successful community. HRA have been consistent in mentioning that the existing drainage and road network is in urgent need of maintenance and upgrading as lack of investment over the last 50 years has contributed to the reason for "Not fit for purpose" statements made by HRA previously.

Clause 1.10 is of special interest as it mentions "on-going consultation" at every stage. We did not have the opportunity to discuss 'The Draft Scoping Report which was published on the RDC websites, residents, businesses and other 'stakeholders' on the RDC mailing list were not consulted (HRA is a Stakeholder).

Comment

Issues and Options Document

How have you worked with key partners?

Representation ID: 37228

Received: 06/03/2018

Respondent: Hullbridge Residents Association

Representation Summary:

Clause 1.14 on page 4 is of special interest to us as we placed emphasis on the Localism Act (2011) with the Managing Director of RDC and were told that the Localism Act was irrelevant. Why is it now more relevant than before? We request this 'Act' to be included as it supports Human Rights.

Clause 1.15 suggests 'ultra-co-operation' with other Local Authorities but this statement is contradicted by statements made in the media some time ago of major disagreements particularly on the Southend Airport proposals.

Comment

Issues and Options Document

How can local communities get involved?

Representation ID: 37229

Received: 06/03/2018

Respondent: Hullbridge Residents Association

Representation Summary:

Clause 1.16. Only one 'workshop' was set up in Hullbridge Community Centre but not followed up. The attendance was low because it was held at a time during working hours, with majority of the residents working away from home. The Q & A sessions were set to suit the Councillor's knowledge of planning and who could not answer questions put to him by a professional member of the community.

Clause 1.17 HRA have particular knowledge that the Parish Council do not have the ability to conduct a 'neighbourhood plan' without assistance from external Consultants but the costs to implement this are prohibitive.

Section 1 (cont).

HRA offered to do the Neighbourhood Planning Group adopting the CPALC 'Constitution', but were rejected without considering our professional expertise. HRA provided the appropriate clauses via the Localism Act that if the Parish Council were unable to conduct this duty, then, provided there was ample
scope for this, it could be carried out by a local community group. The Parish Council are on record of having admitted they are not equipped financially or in 'the know' how to deal with the complexities of large scale developments. HRA have consistently provided ample evidence of professionalism since 2013.
HRA, team members are professionally qualified having worked in a professional capacity in most types of construction development and refurbishment work.

A Neighbourhood Development Order would not be able to fulfil the requirements of large-scale developments, particularly by a Parish Council who would be out of their depth and the District Council would not be able to sustain the financial burden that would entail.
We refer to the Laws empowering the community to use the Freedom of Information Act, Localism Act (2011). The National Planning Policy Framework as prescribed by the Communities and Local Government Act (March 2012) which also provides the framework with which local people can produce their own Distinctive Local and Neighbourhood Plans which affect the needs and priorities of their communities (April 2012). Particularly where it is proven that the Statutory Consultee (The Parish Council) are restricted in 'consultation' through lack of Planning knowledge and the lack of finance to employ the necessary professionals, and where it is proven that HRA, having the professional members who have proved their worth through the submissions made in respect of the previous outline planning approval for 500 dwellings with a total of 525 issues presented with the help of the regulations stipulated in the Core Strategy, Land Development Framework, NPPF etc as mentioned above.
Planning law requires that applications for planning permission must be determined in accordance with the development plan, unless material considerations indicate otherwise and includes the Regulations Governing Neighbourhood Planning Laws- NPPF 6 - Plans and Strategies - Part 6, Chapter 1, clauses 109 to 113,. Neighbourhood Planning - Part 6, chapter 3, clauses 116 to 121., and gives the community the right to Consultation - Part 6, chapter 4, clause 122.

This implies that the core strategy should be relevant, sustainable and 'Fit for Purpose':
* Positively prepared.
Our observation on the previous Local Plan that insufficient forward planning has been carried in accordance with the Core Strategy was adhered to. We hope that those policies will be repeated.
* Justified.
In view of the aforesaid we do not believe there was any justification to provide more dwellings on Green Belt land particularly as the Core Strategy expressly stipulates that Green belt land should only be used as a last resort, many issues which we have demonstrated have not been addressed sufficiently.
According to the Localism Act 2011, we have demonstrated that transparency and consultation were lacking with the community. This has to be rectified and included within the proposed Local Plan.
* Effective
The conditions for the development of the 24 Hullbridge sites will not be satisfied for the reasons given above, therefore we consider a complete review of these proposed developments and the Core Strategy allows for the community to raise these issues and get into meaningful dialogue with RDC.
* Consistent with National Policy
National policy insists that all the policies stated should be transparent, proper consultation pursued in relations to all the development criteria. We do not believe that proper feasibility studies, risk analysis have been conducted in order to satisfy the requirements of the National Planning Policy Framework. Most subjects referred to in this presentation will imply reasons for withdrawal, in view of Government legislation, i.e. the Localism Act 2011 Chapter 20.


Section 1 (cont).

Our 45 page submission in 2013 suggested meaningful dialogue with the HRA. Our residents asked what guarantees will be given to HRA that we have been listened to, not merely placing this document on RDC website. We require RDC Planning/Legal department to clarify.
Clauses 1.18 and 1.19 speaks of 'community-led planning' which is of interest to HRA but we were ignored. We have consistently placed great emphasis on 'community cohesion'. Which makes for good public awareness.

Comment

Issues and Options Document

How will the plan be evidenced?

Representation ID: 37230

Received: 06/03/2018

Respondent: Hullbridge Residents Association

Representation Summary:

Page 5.
Clauses 1.20 and 1.21
How can the RDC ensure that proposals within the New Local Plan can be supported by robust, up-to-date information when RDC are suffering a shortage of staff and funding to support Parish Councils to administer the Local Plan.

Clause 1.21 Infrastructure Delivery Plan (IDP) and the Community Infrastructure Levy (CIL) will be prepared to set out the circumstances that the CIL will be applied and the key infrastructure that the CIL will seek to fund.
The Council will seek to fund this through a 'Community levy'. This implies that the RDC are not protecting the community. What assessments are made to prove the viability?

The Essex County Council document "Greater Essex Growth" states that Greater Essex Growth and Infrastructure Framework 2016 is not listed or discussed. The Executive Summary says that Section 106 and 'Community Infrastructure Levy' will fall way short of expectations and other Government Funding will be in 'shortfall' to the tune of £ Billions (report produced by AECOM) who also produced the RDC "Sustainability Analysis", please explain why they did not cite this issue.

HRA object to the IDP and CIL because these should be RDC, ECC and Agency obligations and should not be an 'extra' burden which the authorities neglected to set aside funding for in the past. If this is allowed to come into force this will set a precedent for other forms of funding from the communities. The community are concerned by this new statement lacking in the Core Strategy and the Land Development Framework. This could be an 'Infrastructure Congestion Levy (ICL).

Comment

Issues and Options Document

Tell Us Your Views

Representation ID: 37231

Received: 06/03/2018

Respondent: Hullbridge Residents Association

Representation Summary:

Section 2. Pages 6 & 7. Tell Us Your Views.
We look forward to cohesive engagement throughout the timetable stated on page 7 clause 2.5 on the delivery of the New Local Plan. The HRA have the authority from the community of 5385 adults (97% extrapolated) who should be consulted and our views taken seriously to make the necessary amendments.

Comment

Issues and Options Document

Introduction

Representation ID: 37232

Received: 06/03/2018

Respondent: Hullbridge Residents Association

Representation Summary:

Section 3 Page 8. Rochford Characteristics.
Introduction. Item 3.1 No comment.
.

Comment

Issues and Options Document

Introduction

Representation ID: 37233

Received: 06/03/2018

Respondent: Hullbridge Residents Association

Representation Summary:

Page 9. Item 3.2. 24 Sites additional development Land.
The Land Mass measured and stated in this clause we find is possibly out of date because several hectares have already been built on since 2012 which should have been taken into consideration thus reducing the Land Mass area. Your review and consultation is necessary.

We have viewed the map showing 24 sites on MAP A of RDC Strategic Housing & Employment Land availability 2017 - Appendix B.


Section 3 (cont

The result of our examination provides the following information:
The total measure of 24 sites = 84 hectares (approximately) which will provide a capacity of 2517 dwellings at 30 dwellings per hectare. The range in terms of 30 to 60 dwellings per hectare can provide a range of 2517 to 5040 dwellings.

Boundary Line.
Further examination of the same map indicates that a large proportion of the land lies in the adjoining Rawreth Parish.
The result provides the following information:
The total measure of 6 sites = 59 hectares (approximately) will provide a capacity of 1773 dwellings at 30 dwellings per hectare. The range in terms of 30 to 60 dwellings per hectare can provide a range of 1773 to 3540 dwellings.
In our examination of the New Local Plan Document, we are unable to find any explanation for omitting this 'division'.
Using our previous submission in relation to the Boundary Line indicated in the Ordinance Survey shown and confirmed by the Local Boundary Commission correspondence on a new development recently given "Outline Planning Approval" for a development in Malyons Farm in Hullbridge Essex. We corresponded with Rochford District Council who on this issue but they refused to accept the existence of the Boundary line. At a meeting with Barratts (incumbent developer) we are informed that RDC will make arrangements to have the Council Tax collected by Hullbridge on behalf of Rawreth Parish without explanation about the differing postal address, and whether or not Rawreth will be amalgamated with Hullbridge but there is no correspondence from the Local Boundary Commission acknowledging this possible change. We can only assume that the same principle will apply on this land mentioned above which resides in Rawreth Parish, if so, this will be in conflict with the Boundary Commission England and the National Planning Policy Framework regulations.
We ask RDC for an urgent review of this New Local Plan.

For instructions on how to use the system and make comments, please see our help guide.