Issues and Options Document

Search representations

Results for Arebray Ltd search

New search New search

Comment

Issues and Options Document

D. A number of fewer larger extensions to the existing residential area

Representation ID: 35518

Received: 07/03/2018

Respondent: Arebray Ltd

Representation Summary:

Large sites can provide a useful long term delivery strategy further in the plan period, however large sites are complicated to get going, requiring heavy infrastructure upgrades

Full text:

Large sites can provide a useful long term delivery strategy further in the plan period, however large sites are complicated to get going, requiring heavy infrastructure upgrades. They could take 2-3 years before they start delivering units and then they are restricted to the maximum speed of build/sales. In my experience the most a single outlet can produce is 80 houses a year. A large site may have more than one developer, but the more completion there is, the slower the sales go. So if there were 2, each would deliver 60 units if there were 3, then each would deliver 50 and so on.

Comment

Issues and Options Document

E. A new settlement

Representation ID: 35519

Received: 07/03/2018

Respondent: Arebray Ltd

Representation Summary:

This can be planned for the end of the plan period but the land assembly along will render this option un-viable in the first 10 years of the plan period.

Full text:

This can be planned for the end of the plan period but the land assembly along will render this option un-viable in the first 10 years of the plan period.

Support

Issues and Options Document

A. Retain the current policy on types of homes, which takes a flexible, market-driven approach to types

Representation ID: 35520

Received: 07/03/2018

Respondent: Arebray Ltd

Representation Summary:

Each site has different constraints and will attract different purchasers. EG a site in a town venture will have a very different purchaser to an out of town scheme. It could be appropriate to have a requirement for a single purchaser group to be accommodated as a minimum eg. first time buyers/downsizers.

Full text:

Each site has different constraints and will attract different purchasers. EG a site in a town venture will have a very different purchaser to an out of town scheme. It could be appropriate to have a requirement for a single purchaser group to be accommodated as a minimum eg. first time buyers/downsizers.

Object

Issues and Options Document

B. Include specific reference to the size and types of homes referred to the South Essex SHMA

Representation ID: 35524

Received: 07/03/2018

Respondent: Arebray Ltd

Representation Summary:

By prescribing a fixed mix on each site ensures that the design of a scheme becomes contrived, particularly where it is apartments on a small site. The effect is less of an issue on site over 50 units. or on family houses.

My clients are having huge issues trying to squeeze 3 bedroom units in schemes in Southend On Sea, often employing me to argue why adding them is un-viable.

Full text:

By prescribing a fixed mix on each site ensures that the design of a scheme becomes contrived, particularly where it is apartments on a small site. The effect is less of an issue on site over 50 units. or on family houses.

My clients are having huge issues trying to squeeze 3 bedroom units in schemes in Southend On Sea, often employing me to argue why adding them is un-viable.

Support

Issues and Options Document

C. Continue to require new homes to meet the National Technical Housing Standards - nationally described space standards

Representation ID: 35527

Received: 07/03/2018

Respondent: Arebray Ltd

Representation Summary:

However some flexibility should be given for town center starter homes where the idea is to keep the price as low as possible.It is likely that these will not be occupied by families and the purchasers will move frequently. Perhaps these can be defined and classified as a separate form of housing for planning purposes..

Full text:

However some flexibility should be given for town center starter homes where the idea is to keep the price as low as possible.It is likely that these will not be occupied by families and the purchasers will move frequently. Perhaps these can be defined and classified as a separate form of housing for planning purposes..

Support

Issues and Options Document

E. Consider a proportion of new homes delivered as part of larger schemes, above a certain threshold, to be bungalows

Representation ID: 35529

Received: 07/03/2018

Respondent: Arebray Ltd

Representation Summary:

This should only be applied to sites over a certain size or it could lead to a contrive looking scheme.

Full text:

This should only be applied to sites over a certain size or it could lead to a contrive looking scheme.

Support

Issues and Options Document

G. Retain the current policy on density of schemes

Representation ID: 35531

Received: 07/03/2018

Respondent: Arebray Ltd

Representation Summary:

Whilst maintaining flexibility

Full text:

Whilst maintaining flexibility

Object

Issues and Options Document

H. Include specific criteria on circumstances when density should be greater than the minimum

Representation ID: 35532

Received: 07/03/2018

Respondent: Arebray Ltd

Representation Summary:

In such circumstances market forces will dictate an increase in density.

Full text:

In such circumstances market forces will dictate an increase in density.

Object

Issues and Options Document

A. Reduce the threshold for the provision of affordable homes as part of a scheme (potentially in line with emerging national policy and guidance)

Representation ID: 35542

Received: 07/03/2018

Respondent: Arebray Ltd

Representation Summary:

It is very difficult to get RP's to commit to take on a couple of units in a scheme, particularly where they are part of a larger single accommodation block. It is highly likely that this will result in many more scheme coming forward will be subject to viability testing. Perhaps another solution is for a financial contribution to be made between 10 and 15 units, the level of this could be via a formula or viability based.

Full text:

It is very difficult to get RP's to commit to take on a couple of units in a scheme, particularly where they are part of a larger single accommodation block. It is highly likely that this will result in many more scheme coming forward will be subject to viability testing. Perhaps another solution is for a financial contribution to be made between 10 and 15 units, the level of this could be via a formula or viability based.

Support

Issues and Options Document

B. Retain the current threshold for the provision of affordable homes as part of a development scheme

Representation ID: 35545

Received: 07/03/2018

Respondent: Arebray Ltd

Representation Summary:

Small infill sites often have a higher cost to develop due to high existing use values or demolition/decontamination costs. Limiting affordable housing on these sites will make more brownfield land viable for development.

Full text:

Small infill sites often have a higher cost to develop due to high existing use values or demolition/decontamination costs. Limiting affordable housing on these sites will make more brownfield land viable for development.

For instructions on how to use the system and make comments, please see our help guide.