Hockley Area Action Plan Options Report

Search representations

Results for Anglian Water Services Ltd search

New search New search

Comment

Hockley Area Action Plan Options Report

5. Option 1

Representation ID: 27759

Received: 03/02/2011

Respondent: Anglian Water Services Ltd

Representation Summary:

Spatial Option 1:- This option has no major impact to the foul network or the WwTW. Surface water should comply with PPS25 and be removed from the public surface water (SW) system where possible.

Full text:

Thank you for the opportunity to comment on the Hockley Area Action Plan document.

The area covered in the Hockley AAP is served by Rochford Wastewater Treatment Works (WwTW) where there is adequate capacity to accommodate the proposed flows from all three Spatial Options. Currently there are no significant issues with the sewerage network.

Spatial Option 1:- This option has no major impact to the foul network or the WwTW. Surface water should comply with PPS25 and be removed from the public surface water (SW) system where possible.

Spatial Option 2:- This proposal includes for 56 new properties. This option has no major impact to the foul network or the WwTW. Surface water should comply with PPS25 and be removed from the public SW system where possible.

Spatial Option 3:- This proposal includes for a total of 159 properties (95 flats and 54 houses). The full impact to the foul network will have to be properly assessed to determine if infrastructure upgrades will be required prior to connection. Surface water should comply with PPS25 and be removed from the public SW system where possible.

Spatial Option 3a:- This proposal includes for a total of 107 properties (82 flats and 25 houses). The full impact to the foul network will have to be properly assessed to determine if infrastructure upgrades will be required prior to connection. Surface water should comply with PPS25 and be removed from the public SW system where possible.

Comment

Hockley Area Action Plan Options Report

6. Option 2

Representation ID: 27760

Received: 03/02/2011

Respondent: Anglian Water Services Ltd

Representation Summary:

Spatial Option 2:- This proposal includes for 56 new properties. This option has no major impact to the foul network or the WwTW. Surface water should comply with PPS25 and be removed from the public SW system where possible.

Full text:

Thank you for the opportunity to comment on the Hockley Area Action Plan document.

The area covered in the Hockley AAP is served by Rochford Wastewater Treatment Works (WwTW) where there is adequate capacity to accommodate the proposed flows from all three Spatial Options. Currently there are no significant issues with the sewerage network.

Spatial Option 1:- This option has no major impact to the foul network or the WwTW. Surface water should comply with PPS25 and be removed from the public surface water (SW) system where possible.

Spatial Option 2:- This proposal includes for 56 new properties. This option has no major impact to the foul network or the WwTW. Surface water should comply with PPS25 and be removed from the public SW system where possible.

Spatial Option 3:- This proposal includes for a total of 159 properties (95 flats and 54 houses). The full impact to the foul network will have to be properly assessed to determine if infrastructure upgrades will be required prior to connection. Surface water should comply with PPS25 and be removed from the public SW system where possible.

Spatial Option 3a:- This proposal includes for a total of 107 properties (82 flats and 25 houses). The full impact to the foul network will have to be properly assessed to determine if infrastructure upgrades will be required prior to connection. Surface water should comply with PPS25 and be removed from the public SW system where possible.

Comment

Hockley Area Action Plan Options Report

7. Option 3

Representation ID: 27761

Received: 03/02/2011

Respondent: Anglian Water Services Ltd

Representation Summary:

Spatial Option 3a:- This proposal includes for a total of 107 properties (82 flats and 25 houses). The full impact to the foul network will have to be properly assessed to determine if infrastructure upgrades will be required prior to connection. Surface water should comply with PPS25 and be removed from the public SW system where possible.

Full text:

Thank you for the opportunity to comment on the Hockley Area Action Plan document.

The area covered in the Hockley AAP is served by Rochford Wastewater Treatment Works (WwTW) where there is adequate capacity to accommodate the proposed flows from all three Spatial Options. Currently there are no significant issues with the sewerage network.

Spatial Option 1:- This option has no major impact to the foul network or the WwTW. Surface water should comply with PPS25 and be removed from the public surface water (SW) system where possible.

Spatial Option 2:- This proposal includes for 56 new properties. This option has no major impact to the foul network or the WwTW. Surface water should comply with PPS25 and be removed from the public SW system where possible.

Spatial Option 3:- This proposal includes for a total of 159 properties (95 flats and 54 houses). The full impact to the foul network will have to be properly assessed to determine if infrastructure upgrades will be required prior to connection. Surface water should comply with PPS25 and be removed from the public SW system where possible.

Spatial Option 3a:- This proposal includes for a total of 107 properties (82 flats and 25 houses). The full impact to the foul network will have to be properly assessed to determine if infrastructure upgrades will be required prior to connection. Surface water should comply with PPS25 and be removed from the public SW system where possible.