Core Strategy Submission Document

Search representations

Results for Iceni Projects search

New search New search

Object

Core Strategy Submission Document

Policy CLT2 - Primary Education, Early Years and Childcare Facilities

Representation ID: 17260

Received: 04/03/2010

Respondent: Iceni Projects

Legally compliant? No

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Iceni submitted representations to the Core Strategy Strategy Submission (CSS) document on behalf of Colonnade Land LLP (CLLLP) in October 2009. In reviewing the document, it was considered that the document consistently fails to meet the tests of soundness set out in the table following Paragraph 4.52 of PPS12 particularly with regard to the requirement to find the document justified, that is 'founded on a robust and credible evidence base'; effective, that is 'deliverable and flexible' and consistent with national policy. To clarify this matter further, the representations of CLLLP confirm that:
1. The plan fails to cover at least 15 years from the date of adoption since the CSS should look to plan for the provision of housing up to 2026 at the earliest.
2. At the time of the submission 0f representations to the CSS, the Strategic Housing Land Availability Assessment 2009 had not been published. As a consequence, representations to the CSS did not include an opportunity to comment on the information contained within this document. In this regard, the CSS consultation document was not supported by a robust, transparent and credible evidence base.
3. The Stambridge Mills site is identified within the CSS policy H1 for high density residential development. The site provided within the consultation package that the Sequential Test and the Exception Test have been aplied. The absence of an evidence base means that Policy H1 is not justified, effective, or consistent with national policy (in particular the requirements of paragraph 14-20 of PPS25).
4. The CS is not supported by a compliant Strategic Flood Risk Assessment 9SFRA). The CSS is reliant on the Thames Gateway South Essex SFRA which was produced in accordance with PPG25. In the absence of a PPS25 compliant SFRA, the CSS is neither 'justified' nor consistent with national policy and is therefore unsound.
5. As a consequence of the two point above, Stambridge Mills is not considered to be deliverable within the context of paragraph 54 of PPS3. Consequently the CSS is not consistent with PPS3 and is not flexible enough to ensure the CSS can meet minimum housing targets contained within the East of England Plan.

The full case of the CLLLP is set out in the representations to the CSS and separately in representations to the SHLAA which we understand were not registered by the Council.

It is also noted that representations submitted by the Environment Agency indicates similar concerns in relation to the Stambridge Mills site in the context of the lack of sufficient evidence to justify the underlying assumption that protecting Green Belt land should take preference to avoiding high density development in areas within Flood Zone 3 which would pose risk to life and property.

Object

Core Strategy Submission Document

Policy CLT3 - Secondary Education

Representation ID: 17261

Received: 04/03/2010

Respondent: Iceni Projects

Legally compliant? No

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Iceni submitted representations to the Core Strategy Strategy Submission (CSS) document on behalf of Colonnade Land LLP (CLLLP) in October 2009. In reviewing the document, it was considered that the document consistently fails to meet the tests of soundness set out in the table following Paragraph 4.52 of PPS12 particularly with regard to the requirement to find the document justified, that is 'founded on a robust and credible evidence base'; effective, that is 'deliverable and flexible' and consistent with national policy. To clarify this matter further, the representations of CLLLP confirm that:
1. The plan fails to cover at least 15 years from the date of adoption since the CSS should look to plan for the provision of housing up to 2026 at the earliest.
2. At the time of the submission 0f representations to the CSS, the Strategic Housing Land Availability Assessment 2009 had not been published. As a consequence, representations to the CSS did not include an opportunity to comment on the information contained within this document. In this regard, the CSS consultation document was not supported by a robust, transparent and credible evidence base.
3. The Stambridge Mills site is identified within the CSS policy H1 for high density residential development. The site provided within the consultation package that the Sequential Test and the Exception Test have been aplied. The absence of an evidence base means that Policy H1 is not justified, effective, or consistent with national policy (in particular the requirements of paragraph 14-20 of PPS25).
4. The CS is not supported by a compliant Strategic Flood Risk Assessment 9SFRA). The CSS is reliant on the Thames Gateway South Essex SFRA which was produced in accordance with PPG25. In the absence of a PPS25 compliant SFRA, the CSS is neither 'justified' nor consistent with national policy and is therefore unsound.
5. As a consequence of the two point above, Stambridge Mills is not considered to be deliverable within the context of paragraph 54 of PPS3. Consequently the CSS is not consistent with PPS3 and is not flexible enough to ensure the CSS can meet minimum housing targets contained within the East of England Plan.

The full case of the CLLLP is set out in the representations to the CSS and separately in representations to the SHLAA which we understand were not registered by the Council.

It is also noted that representations submitted by the Environment Agency indicates similar concerns in relation to the Stambridge Mills site in the context of the lack of sufficient evidence to justify the underlying assumption that protecting Green Belt land should take preference to avoiding high density development in areas within Flood Zone 3 which would pose risk to life and property.

Object

Core Strategy Submission Document

Policy CLT4 - Healthcare

Representation ID: 17262

Received: 04/03/2010

Respondent: Iceni Projects

Legally compliant? No

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Iceni submitted representations to the Core Strategy Strategy Submission (CSS) document on behalf of Colonnade Land LLP (CLLLP) in October 2009. In reviewing the document, it was considered that the document consistently fails to meet the tests of soundness set out in the table following Paragraph 4.52 of PPS12 particularly with regard to the requirement to find the document justified, that is 'founded on a robust and credible evidence base'; effective, that is 'deliverable and flexible' and consistent with national policy. To clarify this matter further, the representations of CLLLP confirm that:
1. The plan fails to cover at least 15 years from the date of adoption since the CSS should look to plan for the provision of housing up to 2026 at the earliest.
2. At the time of the submission 0f representations to the CSS, the Strategic Housing Land Availability Assessment 2009 had not been published. As a consequence, representations to the CSS did not include an opportunity to comment on the information contained within this document. In this regard, the CSS consultation document was not supported by a robust, transparent and credible evidence base.
3. The Stambridge Mills site is identified within the CSS policy H1 for high density residential development. The site provided within the consultation package that the Sequential Test and the Exception Test have been aplied. The absence of an evidence base means that Policy H1 is not justified, effective, or consistent with national policy (in particular the requirements of paragraph 14-20 of PPS25).
4. The CS is not supported by a compliant Strategic Flood Risk Assessment 9SFRA). The CSS is reliant on the Thames Gateway South Essex SFRA which was produced in accordance with PPG25. In the absence of a PPS25 compliant SFRA, the CSS is neither 'justified' nor consistent with national policy and is therefore unsound.
5. As a consequence of the two point above, Stambridge Mills is not considered to be deliverable within the context of paragraph 54 of PPS3. Consequently the CSS is not consistent with PPS3 and is not flexible enough to ensure the CSS can meet minimum housing targets contained within the East of England Plan.

The full case of the CLLLP is set out in the representations to the CSS and separately in representations to the SHLAA which we understand were not registered by the Council.

It is also noted that representations submitted by the Environment Agency indicates similar concerns in relation to the Stambridge Mills site in the context of the lack of sufficient evidence to justify the underlying assumption that protecting Green Belt land should take preference to avoiding high density development in areas within Flood Zone 3 which would pose risk to life and property.

Object

Core Strategy Submission Document

Policy T8 - Parking Standards

Representation ID: 17263

Received: 04/03/2010

Respondent: Iceni Projects

Legally compliant? No

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Iceni submitted representations to the Core Strategy Strategy Submission (CSS) document on behalf of Colonnade Land LLP (CLLLP) in October 2009. In reviewing the document, it was considered that the document consistently fails to meet the tests of soundness set out in the table following Paragraph 4.52 of PPS12 particularly with regard to the requirement to find the document justified, that is 'founded on a robust and credible evidence base'; effective, that is 'deliverable and flexible' and consistent with national policy. To clarify this matter further, the representations of CLLLP confirm that:
1. The plan fails to cover at least 15 years from the date of adoption since the CSS should look to plan for the provision of housing up to 2026 at the earliest.
2. At the time of the submission 0f representations to the CSS, the Strategic Housing Land Availability Assessment 2009 had not been published. As a consequence, representations to the CSS did not include an opportunity to comment on the information contained within this document. In this regard, the CSS consultation document was not supported by a robust, transparent and credible evidence base.
3. The Stambridge Mills site is identified within the CSS policy H1 for high density residential development. The site provided within the consultation package that the Sequential Test and the Exception Test have been aplied. The absence of an evidence base means that Policy H1 is not justified, effective, or consistent with national policy (in particular the requirements of paragraph 14-20 of PPS25).
4. The CS is not supported by a compliant Strategic Flood Risk Assessment 9SFRA). The CSS is reliant on the Thames Gateway South Essex SFRA which was produced in accordance with PPG25. In the absence of a PPS25 compliant SFRA, the CSS is neither 'justified' nor consistent with national policy and is therefore unsound.
5. As a consequence of the two point above, Stambridge Mills is not considered to be deliverable within the context of paragraph 54 of PPS3. Consequently the CSS is not consistent with PPS3 and is not flexible enough to ensure the CSS can meet minimum housing targets contained within the East of England Plan.

The full case of the CLLLP is set out in the representations to the CSS and separately in representations to the SHLAA which we understand were not registered by the Council.

It is also noted that representations submitted by the Environment Agency indicates similar concerns in relation to the Stambridge Mills site in the context of the lack of sufficient evidence to justify the underlying assumption that protecting Green Belt land should take preference to avoiding high density development in areas within Flood Zone 3 which would pose risk to life and property.

Object

Core Strategy Submission Document

Policy ED3 - Existing Employment Land

Representation ID: 17264

Received: 04/03/2010

Respondent: Iceni Projects

Legally compliant? No

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Iceni submitted representations to the Core Strategy Strategy Submission (CSS) document on behalf of Colonnade Land LLP (CLLLP) in October 2009. In reviewing the document, it was considered that the document consistently fails to meet the tests of soundness set out in the table following Paragraph 4.52 of PPS12 particularly with regard to the requirement to find the document justified, that is 'founded on a robust and credible evidence base'; effective, that is 'deliverable and flexible' and consistent with national policy. To clarify this matter further, the representations of CLLLP confirm that:
1. The plan fails to cover at least 15 years from the date of adoption since the CSS should look to plan for the provision of housing up to 2026 at the earliest.
2. At the time of the submission 0f representations to the CSS, the Strategic Housing Land Availability Assessment 2009 had not been published. As a consequence, representations to the CSS did not include an opportunity to comment on the information contained within this document. In this regard, the CSS consultation document was not supported by a robust, transparent and credible evidence base.
3. The Stambridge Mills site is identified within the CSS policy H1 for high density residential development. The site provided within the consultation package that the Sequential Test and the Exception Test have been aplied. The absence of an evidence base means that Policy H1 is not justified, effective, or consistent with national policy (in particular the requirements of paragraph 14-20 of PPS25).
4. The CS is not supported by a compliant Strategic Flood Risk Assessment 9SFRA). The CSS is reliant on the Thames Gateway South Essex SFRA which was produced in accordance with PPG25. In the absence of a PPS25 compliant SFRA, the CSS is neither 'justified' nor consistent with national policy and is therefore unsound.
5. As a consequence of the two point above, Stambridge Mills is not considered to be deliverable within the context of paragraph 54 of PPS3. Consequently the CSS is not consistent with PPS3 and is not flexible enough to ensure the CSS can meet minimum housing targets contained within the East of England Plan.

The full case of the CLLLP is set out in the representations to the CSS and separately in representations to the SHLAA which we understand were not registered by the Council.

It is also noted that representations submitted by the Environment Agency indicates similar concerns in relation to the Stambridge Mills site in the context of the lack of sufficient evidence to justify the underlying assumption that protecting Green Belt land should take preference to avoiding high density development in areas within Flood Zone 3 which would pose risk to life and property.

Object

Core Strategy Submission Document

Policy ED4 - Future Employment Allocations

Representation ID: 17265

Received: 04/03/2010

Respondent: Iceni Projects

Legally compliant? No

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Iceni submitted representations to the Core Strategy Strategy Submission (CSS) document on behalf of Colonnade Land LLP (CLLLP) in October 2009. In reviewing the document, it was considered that the document consistently fails to meet the tests of soundness set out in the table following Paragraph 4.52 of PPS12 particularly with regard to the requirement to find the document justified, that is 'founded on a robust and credible evidence base'; effective, that is 'deliverable and flexible' and consistent with national policy. To clarify this matter further, the representations of CLLLP confirm that:
1. The plan fails to cover at least 15 years from the date of adoption since the CSS should look to plan for the provision of housing up to 2026 at the earliest.
2. At the time of the submission 0f representations to the CSS, the Strategic Housing Land Availability Assessment 2009 had not been published. As a consequence, representations to the CSS did not include an opportunity to comment on the information contained within this document. In this regard, the CSS consultation document was not supported by a robust, transparent and credible evidence base.
3. The Stambridge Mills site is identified within the CSS policy H1 for high density residential development. The site provided within the consultation package that the Sequential Test and the Exception Test have been aplied. The absence of an evidence base means that Policy H1 is not justified, effective, or consistent with national policy (in particular the requirements of paragraph 14-20 of PPS25).
4. The CS is not supported by a compliant Strategic Flood Risk Assessment 9SFRA). The CSS is reliant on the Thames Gateway South Essex SFRA which was produced in accordance with PPG25. In the absence of a PPS25 compliant SFRA, the CSS is neither 'justified' nor consistent with national policy and is therefore unsound.
5. As a consequence of the two point above, Stambridge Mills is not considered to be deliverable within the context of paragraph 54 of PPS3. Consequently the CSS is not consistent with PPS3 and is not flexible enough to ensure the CSS can meet minimum housing targets contained within the East of England Plan.

The full case of the CLLLP is set out in the representations to the CSS and separately in representations to the SHLAA which we understand were not registered by the Council.

It is also noted that representations submitted by the Environment Agency indicates similar concerns in relation to the Stambridge Mills site in the context of the lack of sufficient evidence to justify the underlying assumption that protecting Green Belt land should take preference to avoiding high density development in areas within Flood Zone 3 which would pose risk to life and property.