Core Strategy Submission Document
Search representations
Results for Hockley Under Threat search
New searchObject
Core Strategy Submission Document
Policy T2 - Highways Improvements
Representation ID: 16751
Received: 02/11/2009
Respondent: Hockley Under Threat
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
Policy T3 CLT1 Appendix CLT1 T1 & T2
Public transport RDC admits this is in the private sector. In Hockley, operator has cut No 7 service to one per hour from Ashingdon Schools, claiming it is unviable beyond. This is unlikely to change as Hockley is car dependant. No 8 bus through Hawkwell is cut to one per hour to Rayleigh, for same reason as No 7. Proposed planning agreements with developers can't run: e.g., a community centre or classroom given by a developer remains once he has moved on - how can that apply for an on-going bus service?
Object
Core Strategy Submission Document
Policy ED3 - Existing Employment Land
Representation ID: 16752
Received: 02/11/2009
Respondent: Hockley Under Threat
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
Policy ED3 Core Strategy preferred Options 2008 hinted at possible housing in Eldon Way site. June 2009 Submission version, without consultation, said Eldon Way would be housing (map included Foundry, not the text). September 2009 Submission said redevelopment would be in HAAP (which apart from the Issues/Options version, is unfinished. Judging from results of JAAP Preferred Options where biggest option is chosen, though most respondents were against it, site will be housing, without consultation.
Object
Core Strategy Submission Document
1.25
Representation ID: 16753
Received: 02/11/2009
Respondent: Hockley Under Threat
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
Note CH.1 Introduction to CS Submission 2009 para.1.25 East England Plan requires 3000 additional jobs, presumably to 2021. Revised Southend Airport is expected to drive Economic development. But at para. 11.32 Eldon Way-Foundry estate is planned to be more suitably utilized. "..alternative land will be required to accommodated employment uses so displaced" - ie jobs sent to eg new site near Southend Airport - not new jobs.
Object
Core Strategy Submission Document
11.32
Representation ID: 16754
Received: 02/11/2009
Respondent: Hockley Under Threat
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
Note CH.1 Introduction to CS Submission 2009 para.1.25 East England Plan requires 3000 additional jobs, presumably to 2021. Revised Southend Airport is expected to drive Economic development. But at para. 11.32 Eldon Way-Foundry estate is planned to be more suitably utilized. "..alternative land will be required to accommodated employment uses so displaced" - ie jobs sent to eg new site near Southend Airport - not new jobs.
Object
Core Strategy Submission Document
Policy ED4 - Future Employment Allocations
Representation ID: 16755
Received: 02/11/2009
Respondent: Hockley Under Threat
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
Policy states Council will allocate 18ha of land to make up for de-allocations in ED3 - that proves point above.
Proposals for moving employment to out of town locations with no existing transport links are contrary to government policies PPG4, PPS1 and PPS4 and Core Strategy Policy T1.
Evidence Base is ignored by contravening Hockley Parish Plan 2007 and ignoring resents' views on HAAP Issues/Options. Next stage of HAAP Preferred Options is pre-empted and rendered irrelevant.
Core Strategy plans to relocate Eldon Way Foundry estate to Greenfield site with no nearby bus or railway. RDC plans to upgrade the nearest road to dual carriageway, though the connecting B1013 (through Hockley) will stay single, said by ECC Highways statistics to be 72% capacity. Airport bosses and council cannot suggest there will be no traffic growth from JAAP and new industrial site.
Move to new industrial site near airport contravenes PPPS4:
EC7.3C "out of centre sites, with preference given to sites..well served by choice of..transport and..close to centre and..high likelihood of forming links with centre". There is no current public transport and links with centres is unlikely".
EC 7.5.1 "whether the site is or will be accessible and well served by choice of transport, public transport, walking and cycling, as well as by car..". Remote location, narrow busy B1013 makes the site unsuitable for access by cycle or on foot.
It also contravenes PPS1 (27vii).."reduce need to travel, encourage accessible public transport provision to secure more sustainable patterns of transport..Planning should actively manage patterns of urban growth to make fullest use of public transport and focus development in existing centres, near to major public transport interchanges". Core Strategy undermines its own policy Transport and Highways policy T1 and is unsound.
Object
Core Strategy Submission Document
Policy T1 - Highways
Representation ID: 16756
Received: 02/11/2009
Respondent: Hockley Under Threat
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
Policy states Council will allocate 18ha of land to make up for de-allocations in ED3 - that proves point above.
Proposals for moving employment to out of town locations with no existing transport links are contrary to government policies PPG4, PPS1 and PPS4 and Core Strategy Policy T1.
Evidence Base is ignored by contravening Hockley Parish Plan 2007 and ignoring resents' views on HAAP Issues/Options. Next stage of HAAP Preferred Options is pre-empted and rendered irrelevant.
Core Strategy plans to relocate Eldon Way Foundry estate to Greenfield site with no nearby bus or railway. RDC plans to upgrade the nearest road to dual carriageway, though the connecting B1013 (through Hockley) will stay single, said by ECC Highways statistics to be 72% capacity. Airport bosses and council cannot suggest there will be no traffic growth from JAAP and new industrial site.
Move to new industrial site near airport contravenes PPPS4:
EC7.3C "out of centre sites, with preference given to sites..well served by choice of..transport and..close to centre and..high likelihood of forming links with centre". There is no current public transport and links with centres is unlikely".
EC 7.5.1 "whether the site is or will be accessible and well served by choice of transport, public transport, walking and cycling, as well as by car..". Remote location, narrow busy B1013 makes the site unsuitable for access by cycle or on foot.
It also contravenes PPS1 (27vii).."reduce need to travel, encourage accessible public transport provision to secure more sustainable patterns of transport..Planning should actively manage patterns of urban growth to make fullest use of public transport and focus development in existing centres, near to major public transport interchanges". Core Strategy undermines its own policy Transport and Highways policy T1 and is unsound.
Object
Core Strategy Submission Document
Policy T2 - Highways Improvements
Representation ID: 16757
Received: 02/11/2009
Respondent: Hockley Under Threat
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
Policy states Council will allocate 18ha of land to make up for de-allocations in ED3 - that proves point above.
Proposals for moving employment to out of town locations with no existing transport links are contrary to government policies PPG4, PPS1 and PPS4 and Core Strategy Policy T1.
Evidence Base is ignored by contravening Hockley Parish Plan 2007 and ignoring resents' views on HAAP Issues/Options. Next stage of HAAP Preferred Options is pre-empted and rendered irrelevant.
Core Strategy plans to relocate Eldon Way Foundry estate to Greenfield site with no nearby bus or railway. RDC plans to upgrade the nearest road to dual carriageway, though the connecting B1013 (through Hockley) will stay single, said by ECC Highways statistics to be 72% capacity. Airport bosses and council cannot suggest there will be no traffic growth from JAAP and new industrial site.
Move to new industrial site near airport contravenes PPPS4:
EC7.3C "out of centre sites, with preference given to sites..well served by choice of..transport and..close to centre and..high likelihood of forming links with centre". There is no current public transport and links with centres is unlikely".
EC 7.5.1 "whether the site is or will be accessible and well served by choice of transport, public transport, walking and cycling, as well as by car..". Remote location, narrow busy B1013 makes the site unsuitable for access by cycle or on foot.
It also contravenes PPS1 (27vii).."reduce need to travel, encourage accessible public transport provision to secure more sustainable patterns of transport..Planning should actively manage patterns of urban growth to make fullest use of public transport and focus development in existing centres, near to major public transport interchanges". Core Strategy undermines its own policy Transport and Highways policy T1 and is unsound.
Object
Core Strategy Submission Document
Policy T1 - Highways
Representation ID: 16758
Received: 02/11/2009
Respondent: Hockley Under Threat
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
Policy states Council will allocate 18ha of land to make up for de-allocations in ED3 - that proves point above.
Proposals for moving employment to out of town locations with no existing transport links are contrary to government policies PPG4, PPS1 and PPS4 and Core Strategy Policy T1.
Evidence Base is ignored by contravening Hockley Parish Plan 2007 and ignoring resents' views on HAAP Issues/Options. Next stage of HAAP Preferred Options is pre-empted and rendered irrelevant.
Core Strategy plans to relocate Eldon Way Foundry estate to Greenfield site with no nearby bus or railway. RDC plans to upgrade the nearest road to dual carriageway, though the connecting B1013 (through Hockley) will stay single, said by ECC Highways statistics to be 72% capacity. Airport bosses and council cannot suggest there will be no traffic growth from JAAP and new industrial site.
Move to new industrial site near airport contravenes PPPS4:
EC7.3C "out of centre sites, with preference given to sites..well served by choice of..transport and..close to centre and..high likelihood of forming links with centre". There is no current public transport and links with centres is unlikely".
EC 7.5.1 "whether the site is or will be accessible and well served by choice of transport, public transport, walking and cycling, as well as by car..". Remote location, narrow busy B1013 makes the site unsuitable for access by cycle or on foot.
It also contravenes PPS1 (27vii).."reduce need to travel, encourage accessible public transport provision to secure more sustainable patterns of transport..Planning should actively manage patterns of urban growth to make fullest use of public transport and focus development in existing centres, near to major public transport interchanges". Core Strategy undermines its own policy Transport and Highways policy T1 and is unsound.
Object
Core Strategy Submission Document
Policy H1 - The efficient use of land for housing
Representation ID: 16759
Received: 02/11/2009
Respondent: Hockley Under Threat
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
Although shown on accompanying drawing in earlier versions, there was no prior textual mention of Foundry industrial estate (next to Eldon Way) for redevelopment until current CS 2009 Submission. In recent amendment to the CS this was stated to be due to a typing error!
Object
Core Strategy Submission Document
Policy RTC6 - Hockley Town Centre
Representation ID: 16760
Received: 02/11/2009
Respondent: Hockley Under Threat
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
Although shown on accompanying drawing in earlier versions, there was no prior textual mention of Foundry industrial estate (next to Eldon Way) for redevelopment until current CS 2009 Submission. In recent amendment to the CS this was stated to be due to a typing error!