Core Strategy Preferred Options (Revised October 2008)

Search representations

Results for Fairview New Homes Ltd search

New search New search

Comment

Core Strategy Preferred Options (Revised October 2008)

Vision

Representation ID: 4218

Received: 16/12/2008

Respondent: Fairview New Homes Ltd

Agent: Planning Potential

Representation Summary:

Whilst our client would like to provide support for the Council's key planning objectives, at present there are a number of aspects which are currently inconsistent or do not accurately reflect the sentiments of the Preferred Policies set out in the remainder of the draft Core Strategy.

Firstly, there is currently no recognition within the Council's key objectives of the most appropriate direction for development. Whilst it is understood that these are overarching aims, it is considered particularly important that locating future development within and adjacent to the Borough's existing larger settlements is essential in order to uphold national, regional and local sustainability aims. This requirement is in line with our further comments on this particular subject below.

Further, it should be made clear as part of objective six that the Green Belt boundary is to be re-defined. This provision will ensure that the objective is consistent with the allowances made in preferred Policy GB1 and the associated supporting text to release some Green Belt land where deemed appropriate and necessary.

Comment

Core Strategy Preferred Options (Revised October 2008)

Introduction

Representation ID: 4219

Received: 16/12/2008

Respondent: Fairview New Homes Ltd

Agent: Planning Potential

Representation Summary:

In response the Council's method regarding the location, type and timing of housing development, as set out on page 24 of the draft Core Strategy Document, care should be taken to ensure that the requirements stipulated at Paragraph 54 of PPS3 are adhered to. In particular, the deliverability of sites should be carefully considered when taking decisions on the timing of housing development, in that the site should be available, suitable and achievable, in order that the five year housing supply is realistic in its aims.

Support

Core Strategy Preferred Options (Revised October 2008)

H1 Distribution - Preferred Option

Representation ID: 4220

Received: 16/12/2008

Respondent: Fairview New Homes Ltd

Agent: Planning Potential

Representation Summary:

Our client would like to provide support to the realistic approach taken by the Council in respect of brownfield development within existing settlement boundaries. However, in order that the character of existing settlements can be maintained and Policy H1 can be adequately implemented, Policy GB1 relating to Green Belt protection will need to incorporate a sufficient level of flexibility to allow the release of Green Belt land where it is considered appropriate.

Comment

Core Strategy Preferred Options (Revised October 2008)

General Locations

Representation ID: 4221

Received: 16/12/2008

Respondent: Fairview New Homes Ltd

Agent: Planning Potential

Representation Summary:

At present, support cannot be provided to the Settlement hierarchy as set out on Page 26 of the draft Core Strategy Document. Whilst it is considered appropriate for Rayleigh to be designated as a Tier 1 settlement, the draft Core Strategy is currently not consistent throughout in this respect. It is noted on Page 20 of the Strategy that Rayleigh is the only first tier settlement which could be classed as a 'principle town centre'. Rayleigh is also considered to have the best access to services in the District. However, when considering the general locations for housing development there is no consideration of the higher order level of the settlement of Rayleigh. Rayleigh should be considered the priority direction for housing development given the greater level of services available and public transport connections, in line with the designation set out on Page 20. The greater concentration of services available within Rayleigh results in adequate capacity being available to support a higher level of resident development. In addition, directing development in this manner will act to support the Council's environmental and sustainability aims, particularly, Preferred Policies ENV1,2 and 3.

We, therefore, recommend on behalf of Fairview New Homes that the settlement hierarchy set out on Page 26 be amended in order to reflect the higher level order of Rayleigh.

Support

Core Strategy Preferred Options (Revised October 2008)

H2 General Locations and Phasing - Preferred Option

Representation ID: 4222

Received: 16/12/2008

Respondent: Fairview New Homes Ltd

Agent: Planning Potential

Representation Summary:

Fairview New Homes would like to offer strong support in response to Preferred Policy H2 as well as to the general housing locations as shown on the accompanying Key Diagram. In particular, it is requested that the intention to extend the existing settlement boundary in the south west area of Rayleigh is retained when formulating the Core Strategy Submission document. Our client has an interest in a large parcel of land in this location of Rayleigh which is available for redevelopment in the immediate future, therefore, reflecting the phasing option set out in Preferred Policy H2.

In addition, the retention of a flexible approach to the timing of the release of the areas of land set out in Policy H2 is particularly important in order that sites can come forward when available and required.

Support

Core Strategy Preferred Options (Revised October 2008)

H4 Affordable Housing - Preferred Option

Representation ID: 4223

Received: 16/12/2008

Respondent: Fairview New Homes Ltd

Agent: Planning Potential

Representation Summary:

The Council's realistic approach to securing affordable housing throughout the Borough is supported by Fairview New Homes. In particular, the flexibility and recognition that it may not be possible to provide the full requirement of affordable housing on all sites is offered strong support by our client. In this respect full consideration should be had towards individual locations and specific sites depending on the findings of the Strategic Housing Needs Assessment (PPS3 Paragraph 29 Part 3).

It is requested that the Council seek to retain an element of negotiation within Policy H4 when developing the Core Strategy to submission stage in order to allow a sensitive approach to local housing need as it fluctuates throughout the Council's administrative area rather than a blanket approached.

Further, the first part of the preferred policy requires that affordable housing be spread "(pepper potted)" throughout new development. Whilst my client is sure you are aware, management is a real issue for social landlords, and often it is not practical to adopt a 'pepper pot' approach, and further consideration should be had of the 'user' / 'management' requirements when developing the Core Strategy to Submission Stage.

Support

Core Strategy Preferred Options (Revised October 2008)

H6 Lifetime Homes - Preferred Option

Representation ID: 4224

Received: 16/12/2008

Respondent: Fairview New Homes Ltd

Agent: Planning Potential

Representation Summary:

In line with our comments in respect of Preferred Policy H4 Fairview New Homes would like to provide support to the recognition that in some instances the Lifetime Homes Standard will not be able to be met. It is requested that this level of flexibility is retained when developing the Core Strategy Submission Document.

Support

Core Strategy Preferred Options (Revised October 2008)

Protection of the Green Belt

Representation ID: 4225

Received: 16/12/2008

Respondent: Fairview New Homes Ltd

Agent: Planning Potential

Representation Summary:

Whilst it is recognised that there is a need to protect Green Belt land throughout the Borough, on behalf of our client, we would like to provide full support to the acknowledgement on Page 41 that a proportion of the currently allocated Green Belt land will need to be released for redevelopment. When considering areas of
land for release, those adjacent to the existing settlement boundary should be prioritised in order that settlements within the Borough are coherently extended.

In particular, the area of land to the South West of Rayleigh, designated as a general location for housing in Preferred Policy H2, should be a key priority for reallocation. This land is available for development and is sited in a particularly sustainable location, therefore, meeting with the wider aims of the draft Core Strategy, as well as contributing towards the Council's housing requirements for the Borough. Release of small areas of Green Belt surrounding larger settlements will allow a concentration of development in key areas. In addition, there is no risk of coalescence of settlements should Green Belt land be release to the south west of Rayleigh.

Further, our client would also like to support the provision set out on Page 42 of the Draft Core Strategy document for high density development on the areas of Green Belt land released for development in order that remaining Green Belt land is sufficiently protected.

Support

Core Strategy Preferred Options (Revised October 2008)

GB1 Green Belt Protection - Preferred Option

Representation ID: 4226

Received: 16/12/2008

Respondent: Fairview New Homes Ltd

Agent: Planning Potential

Representation Summary:

In line with our comments above, our client would like to endorse Policy GB1 in that some allowance remains within the policy to permit the release of Green Belt land where appropriate and necessary. This flexibility is essential in order that the Council are able to meet the housing provision requirements set out in the adopted East of England Plan in the plan period until 2021.

Comment

Core Strategy Preferred Options (Revised October 2008)

T7 Parking Standards - Preferred Option

Representation ID: 4227

Received: 16/12/2008

Respondent: Fairview New Homes Ltd

Agent: Planning Potential

Representation Summary:

At present our client is unable to support Preferred Policy T7 in its current form, due to the lack of coherence with national planning policy set out in PPG13. The first part of the preferred policy specifies the Council's intention to apply minimum parking standards to residential development. Paragraph 17 of PPG13 clearly states that parking policies should not be expressed as minimum standards. Considering this against advice set out in PPS12 at Paragraph 4.52, Local Planning Authorities should ensure that Core Strategies are consistent with National Policy in order that the document can be considered to be sound. As this is the case we are unable to endorse Preferred Policy T7 in this respect. Instead, it is requested that the Council seek to enforce a maximum parking standard to ensure that the sustainable aims of PPG13 are upheld.

For instructions on how to use the system and make comments, please see our help guide.