Core Strategy Preferred Options (Revised October 2008)

Search representations

Results for Natural England search

New search New search

Comment

Core Strategy Preferred Options (Revised October 2008)

Introduction

Representation ID: 4145

Received: 15/12/2008

Respondent: Natural England

Representation Summary:

Evidence Base
Natural England is pleased to note that the Essex Landscape Character Assessment (2003) and the Local Wildlife Site Review (2007) has been included under this heading.

Support

Core Strategy Preferred Options (Revised October 2008)

Vision

Representation ID: 4146

Received: 15/12/2008

Respondent: Natural England

Representation Summary:

Vision
Natural England supports the vision because it sets out the intention to retain the essential landscape characteristics of the district and the distinctiveness of both the natural and built environment. These are aspects which are compatible with our own objectives. We also support the recognition of the District's position within Thames Gateway South Essex to promote the District as the "green part" of the sub region.

Objectives
Whilst Natural England generally supports the objectives we would liked to have seen specific reference to "landscape" within the fourth bullet point. We also consider that there should be a stronger reference to climate change within the objectives, linked particularly to the transport objective (6th bullet point) by referring to the need to reduce carbon emissions. An additional objective should also be included on the issue of renewable energy and climate change, for example "to promote renewable energy and address the causes and potential impacts of climate change"

Support

Core Strategy Preferred Options (Revised October 2008)

GB2 Rural Diversification and Recreational Uses - Preferred Option

Representation ID: 4147

Received: 15/12/2008

Respondent: Natural England

Representation Summary:

GB2 Rural Diversification and Recreational Uses - Preferred Option
Natural England supports the Council's preferred option on this issue. We have recently assessed the case for a review of green belt policy where the role of the green belt is reconsidered. The value of the green belt should be judged on its contribution to quality of life, nature conservation, landscape protection, flood mitigation and the impact of a changing climate. Linked with this is a desire to improve the environmental quality of existing green belt. We would therefore support rural diversification within the green belt such as green tourism and outdoor recreation, provided these activities are linked with environmental enhancements and an increase in biodiversity.

Comment

Core Strategy Preferred Options (Revised October 2008)

ED1 London Southend Airport - Preferred Option

Representation ID: 4148

Received: 15/12/2008

Respondent: Natural England

Representation Summary:

ED1 London Southend Airport - Preferred Option
Natural England reiterate our previous comments on the London Southend Airport, that is we are concerned with the impact of the growth in the airport on air quality and on the disturbance of Natura 2000 sites. We also would actively encourage enhanced North South links including greenways, as envisaged in the Thames Gateway South Essex Greengrid

Comment

Core Strategy Preferred Options (Revised October 2008)

Protection and Enchancement of the Natural Landscape and Habitats

Representation ID: 4149

Received: 15/12/2008

Respondent: Natural England

Representation Summary:

Crouch and Roach Estuary Management Plan (Page 52, 4th paragraph)
In this paragraph a list of stakeholders is given who are working with Rochford District Council on the above plan. Natural England should also be actively involved in this project and listed accordingly.

All references to 'English Nature' should be changed to read 'Natural England', e.g. page 52, 1st paragraph.

Support

Core Strategy Preferred Options (Revised October 2008)

ENV1 Protection and Enhancement of the Natural Landscape and Habitats - Preferred Option

Representation ID: 4150

Received: 15/12/2008

Respondent: Natural England

Representation Summary:

ENV1 Protection and Enhancement of the Natural Landscape and Habitats - Preferred Option

Natural England supports the overall aims of the preferred option and we are pleased to note that the wording now includes "maintain, restore and enhance" rather than just protect. However we consider that the policy does not fully cover all aspects of the natural environment but concentrates on the protection and enhancement of designated sites. We therefore suggest that the policy is expanded to include the following points:

i. Wildlife Networks- Natural England would like the policy wording to encourage an approach to conservation management which is focussed not solely on individual site protection but which seeks to rebuild the fabric of the landscape in which individual sites sit. Actions such as reducing habitat fragmentation and creating green corridors for wildlife can help to achieve this. PPS9 states specifically at paragraph 12 that "Local authorities should aim to maintain networks by avoiding or repairing the fragmentation and isolation of natural habitats through policies in plans." This policy could link to a wider policy on Green Infrastructure. We would therefore suggest that the following point is added to the policy wording: "The Council will ensure the protection and enhancement of a network of local wildlife sites and wildlife corridors, links and stepping stones between areas of natural green space to avoid fragmentation of habitats".

ii. Designing in Wildlife - We would recommend the inclusion of designing in biodiversity measures within this policy. By incorporating ecologically sensitive design and features for biodiversity early on within a development scheme, significant improvements for biodiversity can be achieved, along with easier integration with wider environmental, design and planning aspects. For example designing for biodiversity can include the retention of sensitive or valuable habitats present, or enhancements for protected species that may be present, whilst integrating other development design requirements such as drainage and engineering. By addressing ecological aspects early on, design aspects such as site layout can be tailored to provide enhancements and improvements for biodiversity that may not be possible later on within the design process. Measures to encourage biodiversity can include green roofs, planting and landscaping using native species, setting up bird and bat boxes and sustainable urban drainage systems. We would suggest that the following point is added to the policy wording: "The Council will ensure development seeks to produce a net gain in biodiversity by designing in wildlife, and ensuring any unavoidable impacts are appropriately mitigated for."

iii. BAP Targets - We would suggest that this policy is linked to the Essex Biodiversity Strategy (1999) which has established targets to boost priority habitats and targets. The policy should therefore include the additional wording: "The Council will promote wildlife enhancements which will contribute to the habitat and species restoration targets set out in the Essex Biodiversity Strategy."

iv. Landscape Character - In addition this policy, although it mentions "natural landscape" in the title does not fully cover the protection and enhancement of landscape character and quality. The Landscape Character Assessment of Essex (2002) should be specifically mentioned in the policy wording. LCAs are a tool to understand the intrinsic character of the landscape and direct appropriate sustainable development and should be used as part of the evidence base to underpin planning and management decisions in the preparation of the LDF. We therefore suggest the insertion of wording which seeks to achieve the following: "The landscape character and local distinctiveness of the District will be protected, conserved and where possible enhanced. Proposals for development will take into account the local distinctiveness and sensitivity to change of distinctive landscape character types. These landscape character types are described in the Essex Landscape Character Assessment"

Support

Core Strategy Preferred Options (Revised October 2008)

ENV2 Coastal Protection Belt - Preferred Option

Representation ID: 4151

Received: 15/12/2008

Respondent: Natural England

Representation Summary:

ENV2 Coastal Protection Belt - Preferred Option
Whilst Natural England generally supports the aims of the preferred option and agrees with the overall approach of protecting the open character of the undeveloped coast and its important wildlife sites, we suggest that this policy should give explicit recognition to the implications of climate change and sea level rise, and the need for necessary adaptation. The current draft appears to defend a 'static' situation. We also draw your attention to policy SS9 of the East of England Plan, which states that LDDs should (inter alia):

• protect important coastal environmental assets, if practicable and sustainable without causing adverse impacts elsewhere. If it is not practicable to protect sites and habitats in situ, including sites of European or international importance for wildlife, shoreline management plans and development plans should include proposals for their long-term replacement and the recording of any lost historic assets; investigate and pursue opportunities for the creation of new coastal habitats, such as salt marsh and mudflat, in areas identified for managed realignment. New development should not be permitted in such areas.

Comment

Core Strategy Preferred Options (Revised October 2008)

ENV4 Sustainable Drainage Systems (SUDS) - Preferred Option

Representation ID: 4152

Received: 15/12/2008

Respondent: Natural England

Representation Summary:

ENV4 Sustainable Urban Drainage Systems (SUDS) - Preferred Option
Natural England agrees that Sustainable Urban Drainage Systems (SUDs) should be encouraged within new developments as part of sustainable design. SUDS can be used to provide open space and wildlife habitats around areas of vegetation, water channels and storage ponds which are positive steps to increasing biodiversity.

Comment

Core Strategy Preferred Options (Revised October 2008)

ENV6 Large Scale Renewable Energy Projects - Preferred Option

Representation ID: 4153

Received: 15/12/2008

Respondent: Natural England

Representation Summary:

ENV6 Large Scale Renewable Energy Projects - Preferred Option
Natural England agrees that large scale projects should only be considered where there is no significant adverse affect on the landscape or wildlife. We would also recommend that when considering locations for renewable energy installations that the Essex Landscape Character Assessment should be referred to. This will help to ensure that installations are located in places which will cause minimum impact on the surrounding landscape.

Notwithstanding the above, and the current policy wording to protect site integrity, we highlight to the Council the supplement to PPS1: Planning and Climate Change, which requires that: "19. In developing their core strategy and supporting local development documents, planning authorities should provide a framework that promotes and encourages renewable and low carbon energy generation. Policies should be designed to promote and not restrict renewable and low-carbon energy and supporting infrastructure."
And
"20. In particular, planning authorities should:.......
ensure any local approach to protecting landscape and townscape is consistent with PPS22 and does not preclude the supply of any type of renewable energy other than in the most exceptional circumstances"
Natural England therefore comments that an appropriate balance needs to be struck between site protection and the promotion of renewable and low-carbon energy generation projects. We also suggest that a fuller criteria-based policy is included in the Development Control Policies DPD.

Support

Core Strategy Preferred Options (Revised October 2008)

ENV7 Small Scale Renewable Energy Projects - Preferred Option

Representation ID: 4154

Received: 15/12/2008

Respondent: Natural England

Representation Summary:

ENV7 Small Scale Renewable Energy projects - Preferred Option

We are supportive of small scale energy projects as part of sustainable design and construction

For instructions on how to use the system and make comments, please see our help guide.