Protecting and Enhancing our Environment

Showing comments and forms 1 to 29 of 29

Comment

Issues and Options Document

Representation ID: 34559

Received: 17/12/2017

Respondent: Mr john hayter

Representation Summary:

Our countryside and Greenfield amenities are being destroyed by concreting over our District. The UK Government is £2.2 trillion in debt and has no money for corresponding infrastructure or public services. This madness of building homes on Green Belt with no corresponding infrastructure or public services must stop

Full text:



The Central Government will determine the amount of new homes to be built in Rochford District irrespective of the wishes and sensitivities of the local residents. The only power reposed in the Rochford District Council is where the homes are to be built.

The initial Government requirement is that 7500 new homes in Rochford District are to be built from 2017 to 2037 (375 homes a year). Those homes will be put largely on Green Belt and Greenfield sites.

Rochford District has neither the infrastructure nor the public services to sustain those homes. (The Government says that 45% is required by immigration).

Our roads in Rochford District are in disrepair; There are difficulties in getting a Doctor's appointment; First choice schools are becoming unavailable; the traffic is appalling; hospitals are incapable of dealing with the pressure of population growth; the price of homes(affordable homes as well as social housing) is beyond the reach of our youngsters; Developers want inevitably to build expensive properties to make most profit.

Our countryside and Greenfield amenities are being destroyed by concreting over our District. The UK Government is £2.2 trillion in debt and has no money for corresponding infrastructure or public services. This madness of building homes on Green Belt with no corresponding infrastructure or public services must stop.

Comment

Issues and Options Document

Representation ID: 34684

Received: 26/01/2018

Respondent: Lord David Deadman

Representation Summary:

People moved to or stayed in the area because they like the area. Another 9000 houses means that Rochford will lose its' identity. It will cease to be a 'nice' country town surrounded by countryside where people like to live. It will become a mass metropolis rapidly becoming a grid locked system of car parks!
I hope that everyone involved in this idiotic scheme will see sense, 'put their foot down', and say NO we don't want these extra houses. Don't let us become controlled by faceless government departments that don't live here. WE DO

Full text:

Having read the latest newsletter from Rochford District residents concerning the proposed local plan for housing etc., I am dumbfounded as to how the council thinks it can
Implement the scheme.
Up to 9000 new houses? In a town that can barely cope with the volume of people and traffic it already has? With the (already) built housing on Hall Road, around Clements Hall and others, the towns infrastructure is in danger of breaking at the seams. Ashingdon Road is already the busiest road in Essex, if not further afield. 9000 houses means a potential for a further 18000 more cars in the area! The roads will not cope.
Apart from the roads, the general infrastructure, sewage, drains, etc., is old and cannot handle any more. The council has already stated that due to already having 33,000 homes in the area, there is not the possibility to vastly improve these systems.
Use public transport we are told. How? When the bus companies seem to be oblivious to the fact that more houses means more passengers. More passengers means more buses are needed. At the moment the trend seems to be to cut timetables. Fewer buses means more people are going to need to use their cars! More congestion!
People moved to or stayed in the area because they like the area. Another 9000 houses means that Rochford will lose its' identity. It will cease to be a 'nice' country town surrounded by countryside where people like to live. It will become a mass metropolis rapidly becoming a grid locked system of car parks!
I hope that everyone involved in this idiotic scheme will see sense, 'put their foot down', and say NO we don't want these extra houses. Don't let us become controlled by faceless government departments that don't live here. WE DO!

Comment

Issues and Options Document

Representation ID: 34720

Received: 01/02/2018

Respondent: Richard Jarrard

Representation Summary:

Let's please protect Hockley's vacant spaces which makes up one of the reasons people want to live there in a suitable greener environment where possible.

Full text:

Although I am registered on line with Rochford District Council there appears to be a system problem to comment on the above.

Therefore I would like to register my non support of possible land availability at the above site to build new houses.

Reasons;

It is a metropolitan green belt - kindly recognise this protection or else there is the no point of such government coverage definition

The impact of introducing greater traffic to the immediate adjoining streets of Marylands , Merryfields and Plumberow plus others should not be underestimated if houses are built on this land.

Increased traffic impact to the surrounding residential area should be protected as people already living nearby matter for their quality of life.

This is a small piece of land but to build on it has big impact to others already in nearby location.

Let's please protect Hockley's vacant spaces which makes up one of the reasons people want to live there in a suitable greener environment where possible.

Comment

Issues and Options Document

Representation ID: 34781

Received: 07/02/2018

Respondent: Mr & Mrs Bryan E & K. D Chantry

Representation Summary:

Once the fields have been concreted over the ability to grow food for the increased population will be gone for good.

Full text:

To whom it may concern,

PLEASE, PLEASE stop this over development of Hawkwell, Hockley Rochford and Ashingdon. It is well documented that the air quality in this area is one of the worse in the country and the Council want to make it even worse. More children are now suffering from asthma with the increase in pollution. As it is we need an additional Hospital in this area to cope with the many thousands of people pouring in from outside of the area (many from the London boroughs) Once the fields have been concreted over the ability to grow food for the increased population will be gone for good.
Quality of life in this area is getting worse as the stress many residents are suffering just being stuck in traffic as they try to get to work let alone trying to get home again.

Where are the children that will live on Elizabeth Gardens going to go to school? Some surely will no doubt be going to Westering Primary. So how are those parents going to get them there? By car (no doubt) on already congested roads
I wonder if this is all about money and the additional Council Tax the Government will receive. As it is white lines on the roads have not been freshened up for years let alone getting the pot holes filled in.
Please Please listen to mine and the view of the majority of long standing (I have lived in this area all my life) residents in this area.

Comment

Issues and Options Document

Representation ID: 35407

Received: 21/02/2018

Respondent: Christine Stearman

Representation Summary:

I am concerned about the plans for the amount of new housing to be developed. My issues are around the following points:-

6. More rubbish and impact on waste collection

Full text:

I am concerned about the plans for the amount of new housing to be developed. My issues are around the following points:-

1. traffic will increase significantly
2. insufficient school capacity
3. commute increase in people travelling by train to either Southend or Liverpool Street
4. Insufficient GP surgeries with the capacity to cope
5. Subsequent pressure on Southend and Basildon Hospital
6. More rubbish and impact on waste collection
7. General deterioration of the area
8. Impact on wildlife

Comment

Issues and Options Document

Representation ID: 35409

Received: 21/02/2018

Respondent: Christine Stearman

Representation Summary:

I am concerned about the plans for the amount of new housing to be developed. My issues are around the following points:-

7. General deterioration of the area
8. Impact on wildlife

Full text:

I am concerned about the plans for the amount of new housing to be developed. My issues are around the following points:-

1. traffic will increase significantly
2. insufficient school capacity
3. commute increase in people travelling by train to either Southend or Liverpool Street
4. Insufficient GP surgeries with the capacity to cope
5. Subsequent pressure on Southend and Basildon Hospital
6. More rubbish and impact on waste collection
7. General deterioration of the area
8. Impact on wildlife

Comment

Issues and Options Document

Representation ID: 35426

Received: 21/02/2018

Respondent: mr Patrick Rogers

Representation Summary:

This narrow strip of land runs adjacent to the Nature Reserve, maintained by Hockley Parish Council, and if built on would have a detrimental effect on the current wildlife population which includes bats, woodpeckers etc.
One of our main objections, as we live adjacent to the site in question, is that this land is green belt and is subject to a TPO, ref no 02/00. If major tree clearance were to take place, this could have a serious effect on the stability of our property as was stated in Rochford District Council letter to us dated 23rd January 2001.

Full text:

We appreciate the need for increased housing in the area, however, releasing small pockets of green land is not alleviating true housing shortage but is changing the face of our village forever. Removing these small envelopes of green belt does not seem very productive. This site in particular is heavily wooded, would have a considerable cost element per hectare than one of the larger potential development sites which could provide more diverse housing. See our objections below:
Flooding
During heavy rain it is clear to see at the back of our property the field floods and the ditch overflows into our garden and the cul de sac at the end of Marylands Avenue floods encroaching into our drive and that of our opposite neighbour. Without the current woodland to absorb runoff, more serious flooding would occur.
Sewerage
Marylands Ave and Merryfields Road have a history of periodic sewerage overflow, as the system struggles to cope. It has not been updated since it was originally put in in the 1960's and is not maintained by the Council.
Nature
This narrow strip of land runs adjacent to the Nature Reserve, maintained by Hockley Parish Council, and if built on would have a detrimental effect on the current wildlife population which includes bats, woodpeckers etc.
One of our main objections, as we live adjacent to the site in question, is that this land is green belt and is subject to a TPO, ref no 02/00. If major tree clearance were to take place, this could have a serious effect on the stability of our property as was stated in Rochford District Council letter to us dated 23rd January 2001.
When the document is submitted for independent examination?
When the Inspectors Report is published?
When document is adopted?

Comment

Issues and Options Document

Representation ID: 35650

Received: 22/02/2018

Respondent: Samantha Herbert

Representation Summary:

With reference to site CFS001 and CFS102 on your local plan for future development sites in the Eastwood area.

We live in Rayleigh Avenue and our back gardens run along the side of these two sites, we strongly oppose to any changes in this area as there are badgers, bats, deer and a large range of birds living in the trees that are on the perimeter of this site that would be sadly affected if these unnecessary plans are carried out. Please take into consideration the wildlife that would be drastically affected by any change, not only that but we bought our bungalow because of our lovely outlook and so you would also be changing ours and our neighbours lives as well.

Full text:

With reference to site CFS001 and CFS102 on your local plan for future development sites in the Eastwood area.

We live in Rayleigh Avenue and our back gardens run along the side of these two sites, we strongly oppose to any changes in this area as there are badgers, bats, deer and a large range of birds living in the trees that are on the perimeter of this site that would be sadly affected if these unnecessary plans are carried out. Please take into consideration the wildlife that would be drastically affected by any change, not only that but we bought our bungalow because of our lovely outlook and so you would also be changing ours and our neighbours lives as well.

Object

Issues and Options Document

Representation ID: 35654

Received: 23/02/2018

Respondent: Elaine Vaughan

Representation Summary:

Reference: CFS024 Land North of Merryfields Avenue, Hockley, MAP G,119

I would like to object to plans to build on this land for the following reason:
1. This is Metropolitan Green Belt and as such it should be protected.
2. I am a regular user of the Marylands Nature reserve and have serious concerns about the impact the destruction of this woodland would have on the wildlife in the reserve.

Full text:

Reference: CFS024 Land North of Merryfields Avenue, Hockley, MAP G,119

I would like to object to plans to build on this land for the following reason:
1. This is Metropolitan Green Belt and as such it should be protected.
2. I am a regular user of the Marylands Nature reserve and have serious concerns about the impact the destruction of this woodland would have on the wildlife in the reserve.
3. The houses adjacent to the land are prone to flooding. My own neighbour has regular problems with the ground and rain water draining down Merryfields Avenue. The destruction of the woodland will exacerbate flooding problems and I certainly wouldn't want to buy any house built on the land.
4. The increased volumes of traffic, particularly construction traffic, travelling down Merryfields Avenue.
This development should not be approved.

Comment

Issues and Options Document

Representation ID: 35671

Received: 23/02/2018

Respondent: Mr and Mrs Riley

Representation Summary:

It is high time that councillors and planning officers at district council level looked beyond the increased revenue incentive received from the New Build Bonus grants issued by the central government and focus their attention on the long term effect that these proposals will have on the environment now being provided by local district councils for future generations to come.

Full text:

I strongly object to the planning proposal to flood this local authority district with a disproportionate and unacceptable volume of planning applications for residential accommodation
without any consideration to the effect this will have on the infrastructure needed to make these proposals sustainable. It is unacceptable that local district councils are permitted to give permissions to implement their housing policies and at the same time turn a blind eye and wash their hands on issues that can only be resolved at county council level so as to make these developments sustainable. It should be imperative that the two tiers of local authority organisations take a corporate approach and joint responsibility to ensure that the substantial increase in the number of houses to be developed will be sustainable in the environment as a whole.
B1013
1. Any competent planning officer with integrity and a feel for the concerns of the local community must already know that the B1013 road which runs between Rayleigh Weir and Rochford Town Centre is no longer fit for purpose. The need to reduce congestion and provide a free flow of traffic on this road demands that urgent proposals be put in place in the following areas so as to avoid the present slow moving, costly and time wasting movement of traffic causing unacceptable levels of atmospheric pollution in the environment;
The junction between Rayleigh High Street and Eastwood Road, the junction between Hockley Road and Websters Way, the junction between Hambro Hill and Hockley Road, the junction between Main Road Hockley and Buckingham Road, the junction between Southend Road, Spa Road and Main Road Hockley, the junction between Rectory Road and Hall Road and the junction between Hall Road and Bradley Way Rochford.
I understand that in future it is intended to build a substantial number of new houses on green field sites at Mount Bovers Lane, Ironwell Lane, Nursery Corner and Cherry Orchard Way. These developments have the potential of producing another approximately 3 500 vehicles, all of which which will need access to the B1013. In nineteen years time the demand for private motor cars serving these dwellings could easily rise to exceed an additional 7000. This is in addition to the demands already made from the recently built sites of 175 houses in Rectory Road and 600 houses in Hall Road.
I would be pleased to receive all the information that you may have concerning improvements to the B1013 to avoid any future grid lock occurring in this main access to several cccccccccc c local routes, so as to make the New Local Plan sustainable.
It is absurd and a planning folly of unmeasurable incompetence to inflict this number of additional vehicles on a road system which even now is unfit for purpose.
A possible solutions may be to provide two completely separate new access routes to the A127 and A130 to make these proposals sustainable and relieve congestion on the over-used B1013.
County Council Issues
2. In addition to providing an efficient and satisfactory transport network of highways to allow the free movement of traffic throughout the region, further measures will be needed to accommodate
the predicted increase in population by 2037. I would be obliged if you could inform me of the provision to be made for additional nursery, primary and secondary schools and college facilities in the wider area, to accommodate the predicted increase in children and young persons educational needs during the next 19 years.
3. As it is predicted that there will be an increase in the number of elderly people requiring care in the community, are additional measures being taken in the wider area for residential care homes to be provided to meet this need?
NHS Issues
4. With the predicted future increase in the population in 2037, the Mid&South Essex Hospital Trusts will need to assess the future requirements to provide a sufficient number of new hospitals and medical centres to meet the increase demand for these services.

It is high time that councillors and planning officers at district council level looked beyond the increased revenue incentive received from the New Build Bonus grants issued by the central government and focus their attention on the long term effect that these proposals will have on the environment now being provided by local district councils for future generations to come.

Object

Issues and Options Document

Representation ID: 35715

Received: 02/03/2018

Respondent: Mrs Joanne Mackenzie

Representation Summary:

We, as residents like living in our semi rural area. A project of this size would change our living environment to one that we did not choose, when we decided to live here. We like the feeling of open space and we enjoy driving through the countryside to get to one place or the other. We like to see trees and fields, hear birds sing, see horses in fields. We like feeling safe and knowing that we live in a settled, long standing community. A project like this would inevitably cause a lot of people to feel stressed, unsettled. A lot of people would move away. It would not be such a pleasant place to live anymore. The current resident's quality of life needs to be considered. The wildlife, nature, character of our district needs to be considered.
There simply isn't enough room, there isn't the infrastructure, amenities or utilities to consider a project of this scale. A few more houses may need to be built, but not to the detriment of the people already living here.

Full text:

Our first objection is to the strip of beautiful woodland at the end of Marylands Avenue, running behind Merryfields Avenue and adjacent to the Nature Reserve in Hockley, being offered up as a possible site to build houses on.

The reasons being:

1. This is Metropolitan Green Belt and is there to protect the countryside from being developed inappropriately. This land is also outside the existing settlement boundary.
2. The concern over the close proximity to the Nature reserve and the detrimental effect this will have on wildlife in this area. This land is teaming with wildlife and supports the nature reserve itself as it is undisturbed by humans and provides ideal nesting sites. Bats, a protected species, can often be seen circling around in the summer months. We have seen badgers in our garden on two occasions. My neighbour spotted a Muntjac deer, that she reported to yourselves. You said that you had seen footprints nearby in the Nature reserve. My neighbour also spotted a protected species of bird, a type of bullfinch, which is on the red danger list, near to extinction.
3. The trees are protected by a tree preservation order by yourselves, the council, we have been told by another neighbour.
4. Flooding: During heavy rain, excessive amounts of water streams down the hill and congregates at the end of Marylands Avenue which the gulleys cannot cope with. The woodland provides a natural soakaway.
5. Access to this site is too narrow by far. Marylands Avenue itself is a quiet, residential family orientated street and to have heavy traffic weaving it's way up and down this road is extremely dangerous and quite unthinkable and would impact on all residents lives.
Objection to 7500 houses being built in our area over the next 20 years, including using green belt land.

1. Funding/Infrastructure: Infrastructure cannot match the proposed growth due to high levels of underfunding (by a 2016 report issued by the ECC.)
2. Utilites: The privately operated Utility companies have not proven their ability, nor given formal commitment to meeting the extra demands for the Essex County target of 185,00 new homes - (water/electricity/gas/telecoms/waste treatment/recycle.)
3. Greenbelt law: The RDC area of responsibility is 74% classified as Green Belt status, a housing project of this size can only be achieved by sacrificing the GB principals, quote - "...to prevent urban sprawl and preclude one settlement coalescing into another."
4. Civic Amenities: The 10 years (so far) of an Austerity programme has eroded civic amenities and services to the point of crisis (health and care services.) This same situation is now starting to impact Education and Emergency services due to lack of capacity - the plus 30% loading is just not feasible or sustainable.
5. Commuting: Commuting out and into the District is the root cause of rush-hour congestion, this clearly underlines that the existing housing to local workplace ratio is out of balance. Obviating the need to long-distance commute by the generation of local employment must be one of the main drivers for a project of this nature and should limit the scale accordingly.
We, as residents like living in our semi rural area. A project of this size would change our living environment to one that we did not choose, when we decided to live here. We like the feeling of open space and we enjoy driving through the countryside to get to one place or the other. We like to see trees and fields, hear birds sing, see horses in fields. We like feeling safe and knowing that we live in a settled, long standing community. A project like this would inevitably cause a lot of people to feel stressed, unsettled. A lot of people would move away. It would not be such a pleasant place to live anymore. The current resident's quality of life needs to be considered. The wildlife, nature, character of our district needs to be considered.
There simply isn't enough room, there isn't the infrastructure, amenities or utilities to consider a project of this scale. A few more houses may need to be built, but not to the detriment of the people already living here.

I would appreciate a response to my objections please.

I trust you will take into consideration my feelings on this subject.

Object

Issues and Options Document

Representation ID: 35717

Received: 03/03/2018

Respondent: Mrs GILLIAN HINE

Representation Summary:

BECKNEY WOODS REF: CFS023/COL38 on the RDC Land Assessment 2017.


I strongly object to buildings being built on the land above. It is green belt and is important that it stays green belt. There is a variety of wildlife that rely on the natural habitat and without it would not survive. There are several badger sets and it is illegal to destroy these as per the law:

You could be sent to prison for up to 6 months and get an unlimited fine if you're found guilty of any of these offences:
damage, destroy or block access to their setts

I do hope Rochford County Council will not do the right thing and protect our every decreasing rural areas.

Full text:

BECKNEY WOODS REF: CFS023/COL38 on the RDC Land Assessment 2017.


I strongly object to buildings being built on the land above. It is green belt and is important that it stays green belt. There is a variety of wildlife that rely on the natural habitat and without it would not survive. There are several badger sets and it is illegal to destroy these as per the law:

You could be sent to prison for up to 6 months and get an unlimited fine if you're found guilty of any of these offences:
damage, destroy or block access to their setts

I do hope Rochford County Council will not do the right thing and protect our every decreasing rural areas.

Comment

Issues and Options Document

Representation ID: 35758

Received: 04/03/2018

Respondent: Mr Tony Hendrick

Representation Summary:

As an example of one of the greenbelt sites proposed I'd like to make points on the one that is closest to where I live. This would be the end of Victor gardens where I often walk my dog round Clements Hall itself and round to the playing fields beyond. I note that Greenacres and Meadowlands have put up their properties for development as well as the woodland to the left as you walk down the lane towards Clements Hall. This is, of course, a bridleway, so, firstly, how will the traffic created from such a development be conducive to the riders using this bridleway? Bridleways by definition are there to keep horses and riders away from the roads, so any development of the size proposed in this area will cause problems not only for the horses as the volume of traffic will be an issue for the whole of Victor Gardens - it's already a job for cars to negotiate their way up the
road because it is already full of parked cars and any further development will only create a bottleneck. My main concern, however, would be the removal of woodland that exists in this part of Victor Gardens. The survival of all our remaining woodland has to be a priority. Although this particular piece of woodland is privately owned , the very fact that people are not entering it allows the wildlife to exist as they should. On occasion I have heard owls in there and these little pockets or oasis's of woodland must be allowed to survive. It will be to our detriment if we don't look after it. I know that this part of Victor Gardens has had various planning applications put forward in the past and all have been rejected. These were based on far fewer houses than the current proposal, so if these were rejected how can this huge development plan be considered.

Full text:

I have taken the opportunity to have a look through the local plan which you currently have on your website. I would like to make some general comments and observations based mainly on the sustainability document and the proposed sites for development. it is mentioned that existing greenbelt and ancient woodland will be a consideration when making final decisions, but when viewing your maps it seems like most of the proposed sites are indeed on greenbelt, including area of woodland.

As an example of one of the greenbelt sites proposed I'd like to make points on the one that is closest to where I live. This would be the end of Victor gardens where I often walk my dog round Clements Hall itself and round to the playing fields beyond. I note that Greenacres and Meadowlands have put up their properties for development as well as the woodland to the left as you walk down the lane towards Clements Hall. This is, of course, a bridleway, so, firstly, how will the traffic created from such a development be conducive to the riders using this bridleway? Bridleways by definition are there to keep horses and riders away from the roads, so any development of the size proposed in this area will cause problems not only for the horses as the volume of traffic will be an issue for the whole of Victor Gardens - it's already a job for cars to negotiate their way up the
road because it is already full of parked cars and any further development will only create a bottleneck. My main concern, however, would be the removal of woodland that exists in this part of Victor Gardens. The survival of all our remaining woodland has to be a priority. Although this particular piece of woodland is privately owned , the very fact that people are not entering it allows the wildlife to exist as they should. On occasion I have heard owls in there and these little pockets or oasis's of woodland must be allowed to survive. It will be to our detriment if we don't look after it. I know that this part of Victor Gardens has had various planning applications put forward in the past and all have been rejected. These were based on far fewer houses than the current proposal, so if these were rejected how can this huge development plan be considered.

My overall observations on the developments we have had in the Rockford area so far is that the majority of the houses built are priced at the high end - where or, indeed, what is affordable housing? These houses are only accessible to high earners commuting to London or people moving out of London, Ilford, Romford etc. who can afford the very high prices being demanded for these properties. I see no chance for local people, who work locally being able to get anywhere near affording these properties. The people who benefit are the landowners and the developers, who obviously make a lot of money out of there developments. All we are doing is turning our greenbelt and communities into another superb of London. Sad but true.
Your document mentions a mix of houses to suit the needs of all sectors of the community. Well most of the developments I've seen - Beckley woods, the Christmas Tree Farm and Hall road a few examples - so very little evidence of this.

The Sustainability document goes on to mention the need for infrastructure requirements. The need to improve the local road network, to introduce new doctors surgery and schools. This is pretty obvious, but how can the local road system be improved? To my mind, and many others, it simply can't be improved. For example, Aldermans Hill and Hockley road is number to number every weekday evening from 4pm for a couple of hours at least. Road works with random traffic lights pop up everywhere and cause untold delays. In short, the local roads struggle to cope now - I see no way to avoid and escalation of this over the years.
We know doctors surgery are struggling to cope everywhere and I imagine existing schools will not be able to manage the intake of new pupils easily. I know there is a commitment to improved infrastructure, but there has been scant evidence of this in the developments we have had so far (Hall Road is a good example I believe) and I really wonder where the money for all this will come from. The developers? They have proved that they will do what they can to avoid this. The government? - nowhere near enough. Essex Count Council? - Again, nowhere near enough.

If anything, a village like development where schools, doctors and roads can be planned in conjunction with the building of the houses would be the most sensible approach, placing it in the most accessible location in the area. Brown field sites ( mostly old nurseries etc.) could also be developed. This will,obviously, always fall short of the 7,500 houses planned, but I think it's also obvious that the Rockford area can't sustain 7,500 houses, even if it is planned to take place over 20 years.

I know the council is just putting it out there and no sites have been confirmed, however, my conclusion is that the local plan appears to be no plan at all, and therefore I would like you to note my objection to this consultation at this stage.

Comment

Issues and Options Document

Representation ID: 35795

Received: 05/03/2018

Respondent: Marine Management Organisation

Representation Summary:

Marine Management Organisation Response

I have reviewed the Issues and Options document.

The MMO supports your reference in 10.38 to the emerging South East Marine Plan and the UK Marine Policy Statement until such a plan is adopted. In general, the process in the UK is called Marine Planning with resulting English Marine Plans, not 'Marine Management Plans'. As marine plan boundaries extend up to the level of the mean high water spring tides mark, there will be an overlap with terrestrial plans which generally extend to the mean low water springs mark. The MMO is likewise holding an engagement period on the South East Marine Plan Vision and Options stage which include issues and options on categories also found in your document, such as coastal change and houseboats. For more details see here http://goo.gl/H2Az9P.

As the South East Marine Plan continues to develop I hope to hold a Duty to Cooperate meeting with Rochford District Council before the Autumn this year, where I hope the meeting would be beneficial for both parties as it would cover marine planning, the south east marine plan, Rochford specific issues/priorities and the integration with terrestrial plans. For this engagement I usually come to you, if this is appropriate.

Please see below our general consultation response also.



General Consultation response- PLEASE READ

Response to your consultation

The Marine Management Organisation (MMO) is a non-departmental public body responsible for the management of England's marine area on behalf of the UK government. The MMO's delivery functions are; marine planning, marine licensing, wildlife licensing and enforcement, marine protected area management, marine emergencies, fisheries management and issuing European grants.

Marine Licensing

Activities taking place below the mean high water mark may require a marine licence in accordance with the Marine and Coastal Access Act (MCAA) 2009. Such activities include the construction, alteration or improvement of any works, dredging, or a deposit or removal of a substance or object below the mean high water springs mark or in any tidal river to the extent of the tidal influence. You can also apply to the MMO for consent under the Electricity Act 1989 (as amended) for offshore generating stations between 1 and 100 megawatts in England and parts of Wales. The MMO is also the authority responsible for processing and determining harbour orders in England, and for some ports in Wales, and for granting consent under various local Acts and orders regarding harbours. A wildlife licence is also required for activities that that would affect a UK or European protected marine species.

Also in terms of Marine Licensing we raise to your attention the Coastal Concordat. The Coastal Concordat provides a framework within which the separate processes for the consenting of coastal developments in England can be better coordinated. Where this refers to proposed works that contain aspects that fall both above and below mean high water springs. It offers benefits to applicants, regulators and advisors alike by reducing unnecessary regulatory duplication, providing better sign-posting, streamlining assessments and increasing transparency and consistency of advice. www.gov.uk/government/publications/a-coastal-concordat-for-england . In addition, the 25 Year Environment Plan (Department for Environmental, Food & Rural Affairs, 2018) states "All local authorities with a coastal interest will be signed up to the Coastal Concordat by 2021."

A simple guide to the marine licencing process for Local Planning Authorities (LPAs) has also been produced. The guide contains useful information that will enable LPAs to: (1)Better understand the marine licence application process;(2)Apply for marine licences more efficiently;(3)Provide information to their own applicants; and (4)Have access to useful contacts and relevant information. www.gov.uk/government/publications/marine-licensing-an-guide-for-local-planning-authorities-lpas/marine-licensing-an-guide-for-local-planning-authorities-lpas

Marine Planning

As the marine planning authority for England the MMO is responsible for preparing marine plans for English inshore and offshore waters. At its landward extent, a marine plan will apply up to the mean high water springs mark, which includes the tidal extent of any rivers. As marine plan boundaries extend up to the level of the mean high water spring tides mark, there will be an overlap with terrestrial plans which generally extend to the mean low water springs mark. Marine plans will inform and guide decision makers on development in marine and coastal areas.
The MMO is currently in the process of developing marine plans for the remaining 7 marine plan areas by 2021, including the South East Marine Plan.

Planning documents for areas with a coastal influence may wish to make reference to the MMO's licensing requirements and any relevant marine plans to ensure that necessary regulations are adhered to. For marine and coastal areas where a marine plan is not currently in place, we advise local authorities to refer to the Marine Policy Statement for guidance on any planning activity that includes a section of coastline or tidal river. All public authorities taking authorisation or enforcement decisions that affect or might affect the UK marine area must do so in accordance with the Marine and Coastal Access Act and the UK Marine Policy Statement unless relevant considerations indicate otherwise. Local authorities may also wish to refer to our online guidance and the Planning Advisory Service soundness self-assessment checklist.

Minerals and waste plans and local aggregate assessments

If you are consulting on a mineral/waste plan or local aggregate assessment, the MMO recommend reference to marine aggregates is included and reference to be made to the documents below:
* The Marine Policy Statement (MPS), section 3.5 which highlights the importance of marine aggregates and its supply to England's (and the UK) construction industry.
* The National Planning Policy Framework (NPPF) which sets out policies for national (England) construction minerals supply.
* The Managed Aggregate Supply System (MASS) which includes specific references to the role of marine aggregates in the wider portfolio of supply.
* The National and regional guidelines for aggregates provision in England 2005-2020 predict likely aggregate demand over this period including marine supply.
The NPPF informed MASS guidance requires local mineral planning authorities to prepare Local Aggregate Assessments, these assessments have to consider the opportunities and constraints of all mineral supplies into their planning regions - including marine. This means that even land-locked counties, may have to consider the role that marine sourced supplies (delivered by rail or river) play - particularly where land based resources are becoming increasingly constrained.

Full text:

Marine Management Organisation Response

I have reviewed the Issues and Options document.

The MMO supports your reference in 10.38 to the emerging South East Marine Plan and the UK Marine Policy Statement until such a plan is adopted. In general, the process in the UK is called Marine Planning with resulting English Marine Plans, not 'Marine Management Plans'. As marine plan boundaries extend up to the level of the mean high water spring tides mark, there will be an overlap with terrestrial plans which generally extend to the mean low water springs mark. The MMO is likewise holding an engagement period on the South East Marine Plan Vision and Options stage which include issues and options on categories also found in your document, such as coastal change and houseboats. For more details see here http://goo.gl/H2Az9P.

As the South East Marine Plan continues to develop I hope to hold a Duty to Cooperate meeting with Rochford District Council before the Autumn this year, where I hope the meeting would be beneficial for both parties as it would cover marine planning, the south east marine plan, Rochford specific issues/priorities and the integration with terrestrial plans. For this engagement I usually come to you, if this is appropriate.

Please see below our general consultation response also.



General Consultation response- PLEASE READ

Response to your consultation

The Marine Management Organisation (MMO) is a non-departmental public body responsible for the management of England's marine area on behalf of the UK government. The MMO's delivery functions are; marine planning, marine licensing, wildlife licensing and enforcement, marine protected area management, marine emergencies, fisheries management and issuing European grants.

Marine Licensing

Activities taking place below the mean high water mark may require a marine licence in accordance with the Marine and Coastal Access Act (MCAA) 2009. Such activities include the construction, alteration or improvement of any works, dredging, or a deposit or removal of a substance or object below the mean high water springs mark or in any tidal river to the extent of the tidal influence. You can also apply to the MMO for consent under the Electricity Act 1989 (as amended) for offshore generating stations between 1 and 100 megawatts in England and parts of Wales. The MMO is also the authority responsible for processing and determining harbour orders in England, and for some ports in Wales, and for granting consent under various local Acts and orders regarding harbours. A wildlife licence is also required for activities that that would affect a UK or European protected marine species.

Also in terms of Marine Licensing we raise to your attention the Coastal Concordat. The Coastal Concordat provides a framework within which the separate processes for the consenting of coastal developments in England can be better coordinated. Where this refers to proposed works that contain aspects that fall both above and below mean high water springs. It offers benefits to applicants, regulators and advisors alike by reducing unnecessary regulatory duplication, providing better sign-posting, streamlining assessments and increasing transparency and consistency of advice. www.gov.uk/government/publications/a-coastal-concordat-for-england . In addition, the 25 Year Environment Plan (Department for Environmental, Food & Rural Affairs, 2018) states "All local authorities with a coastal interest will be signed up to the Coastal Concordat by 2021."

A simple guide to the marine licencing process for Local Planning Authorities (LPAs) has also been produced. The guide contains useful information that will enable LPAs to: (1)Better understand the marine licence application process;(2)Apply for marine licences more efficiently;(3)Provide information to their own applicants; and (4)Have access to useful contacts and relevant information. www.gov.uk/government/publications/marine-licensing-an-guide-for-local-planning-authorities-lpas/marine-licensing-an-guide-for-local-planning-authorities-lpas

Marine Planning

As the marine planning authority for England the MMO is responsible for preparing marine plans for English inshore and offshore waters. At its landward extent, a marine plan will apply up to the mean high water springs mark, which includes the tidal extent of any rivers. As marine plan boundaries extend up to the level of the mean high water spring tides mark, there will be an overlap with terrestrial plans which generally extend to the mean low water springs mark. Marine plans will inform and guide decision makers on development in marine and coastal areas.
The MMO is currently in the process of developing marine plans for the remaining 7 marine plan areas by 2021, including the South East Marine Plan.

Planning documents for areas with a coastal influence may wish to make reference to the MMO's licensing requirements and any relevant marine plans to ensure that necessary regulations are adhered to. For marine and coastal areas where a marine plan is not currently in place, we advise local authorities to refer to the Marine Policy Statement for guidance on any planning activity that includes a section of coastline or tidal river. All public authorities taking authorisation or enforcement decisions that affect or might affect the UK marine area must do so in accordance with the Marine and Coastal Access Act and the UK Marine Policy Statement unless relevant considerations indicate otherwise. Local authorities may also wish to refer to our online guidance and the Planning Advisory Service soundness self-assessment checklist.

Minerals and waste plans and local aggregate assessments

If you are consulting on a mineral/waste plan or local aggregate assessment, the MMO recommend reference to marine aggregates is included and reference to be made to the documents below:
* The Marine Policy Statement (MPS), section 3.5 which highlights the importance of marine aggregates and its supply to England's (and the UK) construction industry.
* The National Planning Policy Framework (NPPF) which sets out policies for national (England) construction minerals supply.
* The Managed Aggregate Supply System (MASS) which includes specific references to the role of marine aggregates in the wider portfolio of supply.
* The National and regional guidelines for aggregates provision in England 2005-2020 predict likely aggregate demand over this period including marine supply.
The NPPF informed MASS guidance requires local mineral planning authorities to prepare Local Aggregate Assessments, these assessments have to consider the opportunities and constraints of all mineral supplies into their planning regions - including marine. This means that even land-locked counties, may have to consider the role that marine sourced supplies (delivered by rail or river) play - particularly where land based resources are becoming increasingly constrained.

Comment

Issues and Options Document

Representation ID: 36305

Received: 10/02/2018

Respondent: Mrs Claire Sumner

Representation Summary:

These areas are home to much wildlife and the green spaces should be protected wherever possible and more Brownfield sites used instead. The current plan does not offer enough recreational parks and protection of nature and the environment.

Full text:

Comments Form / found out via social media


Section: General Overview

I am strongly against what I believe to be an over development of this area. We are already facing total gridlock in many areas at peak times. Not enough is being done to tackle current issues of over population without adding hundreds/thousands of new homes.

I live in Hullbridge because I want to live in a village not a town. The village has very little infrastructure as it has no secondary school, no train station, only 1 bus service. Our dentist cannot even get NHS registration and our doctors surgery is often booked solid. There is only 1 road out of the village and the impact of large new housing developments has not been considered at all in my opinion.

These areas are home to much wildlife and the green spaces should be protected wherever possible and more Brownfield sites used instead. The current plan does not offer enough recreational parks and protection of nature and the environment.

I am very concerned that when my boys are ready to move on to secondary school there will be a shortage of places and all the local schools will be over subscribed.

Comment

Issues and Options Document

Representation ID: 36325

Received: 06/03/2018

Respondent: Mr Andy Barker

Representation Summary:

On page 121 of the IAO document, reference is made to national policy where 'planning should minimise vulnerability and provide resilience to impacts of climate change, flood risk, landscape etc The River Crouch is recognised for its wildlife and natural habitats and must retain its open rural character. The Ramsar Convention is just one directive in place to protect wildlife.
On page 131 the Essex Wildlfe Trust identify the River Crouch as 'living landscape' and it would be criminal to destroy such landscape. Land to the SW of Hullbridge is designated Coastal Protection Belt and therefore not available/ suitable for building upon. We are urged to 'protect and enhance our distinctive landscapes and plan for biodiversity', not cover them with concrete.
We are proud of our green landscape and wish to preserve it.
Pages 140 and 163 mention air quality and light pollution. How can these be managed now and in the future? Air quality is already very poor in some areas and would worsen if more houses and vehicles were introduced into an already densely populated area. This could affect health and well-being of residents, particularly the young and elderly.
Light pollution has a negative effect on ecology and wildlife, obscures vision of the stars, spoils the rural fell of the area and causes stress and anxiety.

All these concerns and more I am registering here. As a resident of Hullbridge, I am proud to live in a village and moved here to dwell in a village. I wish Hullbridge to remain a village and retain its unique character.

Full text:

I wish to object and/or comment on the following Strategic Priorities in the IAO document:

SP1:1. Homes and jobs needed in the area: the IAO document talks about 'prioritising the use of previously developed land i.e brownfield first'. However, there are already 500 new houses to be built in Hullbridge on previously undeveloped land so this priority has not been adhered to in this instance.

SP2:8 IAO refers to 'support continued use and sustainability of our village and neighbourhood centres'. How can we sustain the centre of Hullbridge when it will be put under immense pressure with the advent of 500 additional properties and therefore approximately 1,000 extra vehicles? The proposed dwellings in addition to the 500 would make the village situation untenable. Indeed, it would no longer be a village but a town. We want Hullbridge to remain a village.

SP3:9 IAO talks of ensuring 'that all new homes...are supported by appropriate, timely and necessary infrastructure including transport, utilities, .....flood risk, education, health etc. Where is the infrastructure that is talked about here? Hullbridge has no planned or prior infrastructure to support new homes.

SP3:10. IAO says there will be 'meaningful improvements to the local highway network'. Where are these improvements to be found to support the village of Hullbridge?

SP3:11. IAO talks of 'reducing out-commuting' but how is this possible for a village like Hullbridge which has little or no industry meaning that most residents have to travel by car to other larger towns for work? How can we deliver realistic and meaningful travel options for our communities like Hullbridge over the next 20 years?

SP3:13 How do we address water and flood risk management especially in our river and coastal regions? There remains flood risk on Watery Lane and environs despite intervention.

SP4: 14 IAO talks of 'access to good quality social and health and well-being services' but there is only one gp surgery in Hullbridge so how will this cope with the influx of people from 500 new houses, let alone any further proposed houses? Well-being is emphasised throughout the IAO document but there is such a long wait for counselling that I have had to pay privately to attend sessions.

SP5: 19 IAO speaks of the need 'to protect, maintain and enhance our natural environment... support wildlife'. However, hedges and trees have already been cut down along the approach to Hullbridge in readiness for building houses and these fields are home to an abundance of wildlife including foxes, squirrels, birds etc Where will these wild creatures go for their habitat?

SP5 20: IAO speaks of ensuring 'Green Belt retains openness of area, protecting valued landscapes, retaining physical separation between towns and villages'. In Hullbridge, we value our openness of area and have highly valued landscapes, particularly to the SW of the village which are in danger of being destroyed by building. Any further building will result in there being no separation between village and towns, just a merging of dwellings and a destruction of individual characteristics of place. How do we protect our beautiful natural habitats and meet the five Green Belt purposes?

SP5 22: the South Essex SHMA and The Environmental Capacity Study' are 'uncertain that the district has the capacity to accommodate the level of growth ' needed i.e 240 pus homes a year to 2025 and beyond.

Other points I wish to make are:

The Core Strategy has 'recognised congestion and capacity issues' in terms of traffic and that these 'could have a detrimental affect on environment and health' in the local area. It has been found that there is a 'lack of resilience on the local highway network with large volumes of traffic queuing at key junctions and stationery vehicles along main routes'. This has a negative impact on journey times and ability of residents to not only reach their destinations in a timely manner but also to leave their village or town. The residents of Hullbridge have expressed concern about being able to exit the village and on a number of occasions there has been gridlock meaning that I have been unable to get to work at all. The traffic issues are very stressful and would only become worse with additional homes and vehicles in the area. The Essex County Council's Sustainable Modes of Travel Strategy 2016 require residential travel plans for schemes of 250 plus new houses. Where can these be found? How can traffic management be improved?

On page 121 of the IAO document, reference is made to national policy where 'planning should minimise vulnerability and provide resilience to impacts of climate change, flood risk, landscape etc The River Crouch is recognised for its wildlife and natural habitats and must retain its open rural character. The Ramsar Convention is just one directive in place to protect wildlife.
On page 131 the Essex Wildlfe Trust identify the River Crouch as 'living landscape' and it would be criminal to destroy such landscape. Land to the SW of Hullbridge is designated Coastal Protection Belt and therefore not available/ suitable for building upon. We are urged to 'protect and enhance our distinctive landscapes and plan for biodiversity', not cover them with concrete.
We are proud of our green landscape and wish to preserve it.
Pages 140 and 163 mention air quality and light pollution. How can these be managed now and in the future? Air quality is already very poor in some areas and would worsen if more houses and vehicles were introduced into an already densely populated area. This could affect health and well-being of residents, particularly the young and elderly.
Light pollution has a negative effect on ecology and wildlife, obscures vision of the stars, spoils the rural fell of the area and causes stress and anxiety.

All these concerns and more I am registering here. As a resident of Hullbridge, I am proud to live in a village and moved here to dwell in a village. I wish Hullbridge to remain a village and retain its unique character.

Comment

Issues and Options Document

Representation ID: 36340

Received: 06/03/2018

Respondent: Mr Barry Hale

Representation Summary:

The Green Belt must be protected, and our green space, footpath access, historic and wildlife environments must be preserved to provide healthy leisure and recreational facilities and benefits, and to help sustain those environments for future generations to still enjoy. Relevant advice must be sought, and acted upon, from local and other wildlife and historical organisations in planning, improving and implementing such facilities, not overriding such concerns to the detriment of the community, our local (including examples of rare) wildlife and historical artefacts. Also, consider reopening and refurbishing former Wakering Sports Centre for recreation and sports facilities? (closed previously when under private ownership). There are few leisure/recreational facilities for teenagers within Wakering, and the limited bus services restrict their involvement further afield.

Full text:

Unfortunately, I was unable to attend the consultation meeting in Great Wakering recently and have only just learned of the online access to the Issues and Options Document. I offer my comments below:

The variety of housing stock must be of quality standard and must include affordable housing catering for first time buyers and a range of income and age levels.

Local employment opportunities should be encouraged to save travel time and costs.

Wakering is not served by a nearby rail station, and the bus service to surrounding areas is not adequate, particularly into the evening. Entrance roads to the village are single-carriageway, mostly unlit, and some are prone to flooding due to poor drainage and uncleared ditches. The nearest station is Shoeburyness and no continuous footpath is provided from Wakering to the station. Given additional housing development, car usage is likely to increase further, resulting in additional road congestion, pollution, and parking needs. The roads are potholed and poorly maintained, 'patched up' instead of a thorough rebuild for longer term sustainability.

Capacity at doctors' surgeries (including parking), schools and for telecommunications/broadband is already stretched and sufficient additional capacity must be provided before any new residential development is occupied, funded in part at least by the developers. Depending on pupil numbers, this may mean a (new or extended) larger primary school for Wakering, and possibly a new senior school in Wakering, as King Edmund School in Rochford would no longer meet solely the increased demands of the combined Rochford and Wakering senior school catchment area. Bus transport to/from (whichever) senior school would also be impacted, together with a suitable pick-up / drop-off system.

Sufficient extra provision should also be made in time for occupancy in respect of increased sewerage, drainage, and water and power supplies.

Given the current trend for narrow congested roads on new tightly-packed housing developments to maximise developers' profits, consideration must be given in planning for safe access for emergency and services vehicles and machinery, and delivery vehicles, as well as adequate residents' and visitors' parking facilities.

The Green Belt must be protected, and our green space, footpath access, historic and wildlife environments must be preserved to provide healthy leisure and recreational facilities and benefits, and to help sustain those environments for future generations to still enjoy. Relevant advice must be sought, and acted upon, from local and other wildlife and historical organisations in planning, improving and implementing such facilities, not overriding such concerns to the detriment of the community, our local (including examples of rare) wildlife and historical artefacts. Also, consider reopening and refurbishing former Wakering Sports Centre for recreation and sports facilities? (closed previously when under private ownership). There are few leisure/recreational facilities for teenagers within Wakering, and the limited bus services restrict their involvement further afield.

However well-intentioned the Rochford District New Local Plan, it is difficult to envisage how these competing demands can be sufficiently funded, resourced, and satisfactorily implemented for the benefit of the community, given central and local government pressures, and the commercial needs of the developers.

Overall, I would object to the plan unless the various infrastructure etc needs and improvements are put in place prior to development, and to a level commensurate with the scale of development eventually approved. Also developments south of Poynters Lane would result in Shoebury effectively joining up with Wakering, resulting in Wakering losing its attractive and historic village identity.

Comment

Issues and Options Document

Representation ID: 36345

Received: 07/03/2018

Respondent: Derek Hyde

Representation Summary:

(3)

Therefore request that this land be removed from the new local plan.

Would impact negatively on the local community.

Would adversely effect the environment, habitat, and wild life.

Destruction of the countryside

I look forward to receiving your reply.

Full text:

Objections to the new local plan, for the following reasons.

(1)

The land proposed for development is green belt land, and farmland, currently in use, for growing food for all of us,this is a basic requirement for sustaining life, and provides a basic and minimal need for humans to stay alive.

The loss of farmland at the current rate, posses a serious threat, and reduction of productive land, and will mean that we will not be able to provide food for our currant, and future, needs.

Doing so would be reckless, and deny the right to life.

Therefore request that a local and National impact study, should be carried out as a matter of urgency as this will show this policy is not sustainable, and not in the National and Public, Interest.

The expanding population will demand increased levels of food to be provided in the future, from the farming community, from current farmland, we therefore need to produce more food to meet those requirements not less

Once land has been taken out from food production, it becomes a permanent loss and can not be replaced in the future.

(2)

Public services are currently under pressure and are running at full capacity, strugling to meet present needs.

Schools are full to capacity in most areas.

Doctor surgeries are in the main booked out for two weeks.

Hospitals have a nine month waiting list in most instances with growing waiting lists.

There is no spare capacity.

The budget does not allow for a substantial increase in population.

(3)

Therefore request that this land be removed from the new local plan.

Would impact negatively on the local community.

Would adversely effect the environment, habitat, and wild life.

Destruction of the countryside

I look forward to receiving your reply.

Comment

Issues and Options Document

Representation ID: 36593

Received: 10/02/2018

Respondent: Mr Riyad Cajee

Representation Summary:

I am also concerned about the environmental impact to the area CSection 10, Option 10-10.72

Full text:

Section: 8
Option: 8.1/8.2

The current infrastructure needs to be developed and improved.

I am also concerned about the environmental impact to the area CSection 10, Option 10-10.72

Comment

Issues and Options Document

Representation ID: 36609

Received: 22/02/2018

Respondent: Nicola and Graham Harris

Representation Summary:

Greenbelt land as so called should remain to be protected so that we have open spaces, tree's that produce oxygen and greenery for wildlife, it is healthy for the environment cutting down on pollution and poisonous gases in the atmosphere.

Our grandchildren love our back garden overlooking fields and recognising different species of wildlife, we do not want to raise our children in a concrete jungle.

Full text:

Re: Planning Proposal (CFS054, CFS048, CFS044)

We are extremely concerned to learn of where the proposed designated area's of development could be in our immediate area. We have lived in South View Close for 35 years, over the passed 2 years the increase in traffic on the Eastwood Road and all surrounding area's of Rayleigh has dramatically increased causing severe congestion. Rayleigh was originally a village, the narrow roads in and out of this area are not built for this high volume of traffic, the schools and doctors in the vicinity are already at full capacity.

Greenbelt land as so called should remain to be protected so that we have open spaces, tree's that produce oxygen and greenery for wildlife, it is healthy for the environment cutting down on pollution and poisonous gases in the atmosphere.

Our grandchildren love our back garden overlooking fields and recognising different species of wildlife, we do not want to raise our children in a concrete jungle.

The area the council has designated for building has always been susceptible to flooding, please do not build more houses creating even more congestion, flooding and irreparable damage to the environment.

Comment

Issues and Options Document

Representation ID: 36735

Received: 07/03/2018

Respondent: Mr Nigel Holland

Representation Summary:

If we keep building on the fields which are good agriculture lands where will we eventually grow the crops?

Full text:

CFS 011, CFS 034, CFS 056, CFS 057, CFS 065, CFS 070 & CFS 097

I wish to register by objections to the above on the following grounds:
The additional traffic from any new developments going through already busy roads such as Bournes Green Junction and Shopland Road/Sutton Road junction. These roads are extremely congested at busy times already.

In the busiest times of the day the High Street in Great Wakering is extremely busy and can be very dangerous when walking along with a buggy as the pavements are so narrow.

Great Wakering Primary school is a very small and friendly school. The teachers know all the children and their families and the children know all the children in other years as well as their own. We don't want to see the ethos change.

We have not been given any information as to how the hundreds and hundreds of new school children of all ages will be schooled within their local area. Bearling in mind that the majority of year 7's and above from the Wakering area have to bussed to King Edmund School Rochford and, therefore, all the year 7's who will have to travel to get to school on buses along the same roads that are also expected to take hundreds if not thousands of additional cars each day if more houses are built.

With additional housing the Doctors will be taking on many hundreds of more patients onto their lists. At the moment it does not offer reasonably timed appointments.

If we keep building on the fields which are good agriculture lands where will we eventually grow the crops?

All building work has detrimental effect on wildlife.

Surely other areas such as Canewdon and Stambridge could have more houses built as I feel we have had more than our fair share of new buildings.

I found it difficult to get around the Rochford website, thus the paper copy.

Comment

Issues and Options Document

Representation ID: 36743

Received: 07/03/2018

Respondent: Mrs Marion Holland

Representation Summary:

If we keep building on the fields which are good agriculture lands where will we eventually grow the crops?

All building work has detrimental effect on wildlife.

Full text:

RE: CFS 011, CFS 034, CFS 056, CFS 057, CFS 065, CFS 070 & CFS 097
I wish to register by objections to the above on the following grounds:
The additional traffic from any new developments going through already busy roads such as Bournes Green Junction and Shopland Road/Sutton Road junction. These roads are extremely congested at busy times already.

In the busiest times of the day the High Street in Great Wakering is extremely busy and can be very dangerous when walking along with a buggy as the pavements are so narrow.

Great Wakering Primary school is a very small and friendly school. The teachers know all the children and their families and the children know all the children in other years as well as their own. We don't want to see the ethos change.

We have not been given any information as to how the hundreds and hundreds of new school children of all ages will be schooled within their local area. Bearing in mind that the majority of year 7's and above from the Wakering area have to be bussed to King Edmund School Rochford and therefore, all the year 7's who will have to travel to get to school on buses along the same roads that are also expected to take hundreds if not thousands of additional cars each day if more houses are built.

With additional housing the Doctors will be taking on many hundreds of more patients onto their lists. At the moment it does not offer reasonably timed appointments.

If we keep building on the fields which are good agriculture lands where will we eventually grow the crops?

All building work has detrimental effect on wildlife.


Comment

Issues and Options Document

Representation ID: 36822

Received: 21/02/2018

Respondent: Mr Kevin James

Representation Summary:

Ref: CFS023
3. Loss of Amenities
The proposed development would rob the residents of forty years of enjoyments and quality of life afforded by the views of fields and woodland. The steep gradient of the land will encroach on the privacy of residents as they would be totally overlooked. Traffic volume would increase with potential increases of both air and noise pollution that would be unable to clear due to lack of airflow in and around the buildings.

Full text:

Comments Form / found out via social media/word of mouth/leaflet

Ref: CFS023/COL38 Appendix B. Development of Land to the North and East of Malvern Road.
OBJECTIONS & SUGGESTIONS FOR ALTERNATIVES

Ref: CFS023
1. Green Belt
The area of land described being sloped at a steep gradient has for numerous years been used as grazing land for horses. No farming or growing of crops having taken place. No use of pesticides or chemical fertilizers. Un-polluted Green Belt.
Reducing the Green Belt of Beckney Woods (which is registered Ancient Woodland) would seriously damage the wood itself. Home for wild flora and fauna and the habitat for Pheasants, Herons, Bats, Sparrow Hawks, Owls, Buzzards, Muntjac deer, Adders, Grass Snakes, Badgers and Foxes. Blackbirds which are a protected species nest in the dens hedgerows that pass through the fields, safe from predators. All of this would be lost forever.
2. Infrastructure
The proposed number of houses required by RDC to be built would cause too high a demand on the current infrastructure and without substantial upgrading, demanding huge investment, systems would not cope.
Houses along Harrogate Drive are not on mains drainage, a major expense to any developer. Water pressure in the area, being maintained by pumps, would also require upgrading along with piping, all adding to the cost of development. Harrogate Drive would need to be built into a road as at the moment is unmade and huge potholes. Footpaths would be required and the road sidened to allow Blue Light services (Police, Fire & Ambulance) access to the area. A junction (roundabout) would be required to be built in Greensward Lane to allow vehicles to enter Harrogate Drive this would cause an already busy road to be busier raising the chances of accidents in a narrow part of the road.
Land drainage is a concern as previous flooding has taken place after extreme rain conditions (Fluvial flooding) due to Clay soil (Blue Clay), the lack of field drains and inadequate drainage.
3. Loss of Amenities
The proposed development would rob the residents of forty years of enjoyments and quality of life afforded by the views of fields and woodland. The steep gradient of the land will encroach on the privacy of residents as they would be totally overlooked. Traffic volume would increase with potential increases of both air and noise pollution that would be unable to clear due to lack of airflow in and around the buildings.
4. Alternative development areas
In the surrounding district of Gusted Hall & Stroud Green, Areas Ref: CFS074/CFS079/CFS081/CFS082/CFS083/CFS084 large areas for development of greater numbers, all with access to roads connecting to the feeder roads A127/A13. Disruption to normality would be minimized because traffic would not have to pass through Hockley and the bottlenecks of the Spa junction and Ashingdon Road.

Ref: COL38 The small plot of land Malvern Road "Play Area"
1. Designated Play Area
This area was designed for the residents of Malvern Road as a Children's Play Area and given to them as such due to the poor soil structure. Flooding occurs after heavy rainfall due to the clay content (Blue Clay high water content). Global Warming only making the possibility of flooding more frequent.
Recent proposal to class it as a bridal way were firmly rejected.
The inspector recording significant concerns expressed for the need to protect the public open space from development.
1. Access to Beckney Woods and beyond.
The path is used daily by a number of residents and dog walkers to access the woodland footpath.

Comment

Issues and Options Document

Representation ID: 36947

Received: 07/03/2018

Respondent: Ian Davidge

Representation Summary:

7. Section 10

I note the word "coalescence" is only used once anywhere in the document i.e. in connection with Brownfield sites (11.47)

Suggest that it is added to the other discussions in Section 10 where residential developments could risk leading the District to become directly "joined" with the other Authorities as mentioned in Section 3. A situation which risks prejudicing the unique character of the District.

Full text:

Dear Rochford Council Planning Policy Dept

Issues & Options Document - Public Consultation ending 7th March 2018


1. Introduction

The purpose of this letter is to provide comments under the current public consultation exercise for this document.

Please note, I have used italic text to offer my suggestions for your consideration.

2. Section 3

3.1 Map of District (Figure 1)

2.1.1 Implications for Great Wakering

What is striking about this is the significant disparity in characteristics between the west and east of the district, where Great Wakering is currently the ONLY major residential area in the East.

2.1.2 No River Roach?.

What is also noticeable about the Figure 1 Map is the absence of the River Roach, although it is shown in Figure 5.

I suggest feature be shown on the map, together with a discussion of the implications for the District Plan, that such a natural constraint places on the District. This is because it forms a significant natural barrier, effectively splitting the eastern side of the district in two i.e. in order to reach the other shore you always have to go inland to Rochford.

2.2 Table 1 (3.19)

The figures shown in the Table present a useful (historic) baseline for a discussion of planning issues.

But it is suggested that these be augmented by population figures calculated using the Districts housing density / dwelling occupancy assumptions for those developments either planned or actually in development, arising from the Districts Adopted Allocations documents.

This would give a more accurate CURRENT and FUTURE picture of the impacts already taking place or in the pipeline within the various Parishes.


3. Section 4

3.1 General Comment

There is no point in Central Government merely dictating to Local Councils that they MUST build more new homes if Central Government is not prepared to help councils provide the wherewithal in terms technical infrastructure, particularly road transport, and Social infrastructure in terms of local medical facilities.

It is unclear how local councils are expected to attract businesses and economic activity if it is virtually impossible to travel across the District predominantly during the Working / School Day?, because of the inadequacies of the transport infrastructure, be that managed at National, County or local level.

3.2 4.8 onwards

Figure 8 presents a useful view of the neighbouring Authorities that the District has to deal with, as amplified by the paragraphs which follow it.

3.2.1 Essex County Council (ECC),

One Authority missing from this analysis is Essex County Council (ECC), a significant player in the local planning scene. For example does ECC recognise South-East Essex as a defined Sub-Region within the broader ambit of the county?

In view of the importance of the county for local planning it is suggested that an analysis of the relationship between the District and ECC could usefully be provided in this document.

3.2.2 Southend

When considering the relationship with Southend you may wish to include some reference to the potential knock-on effects for the District of the Temple Farm / New Southend United Stadium / residential / retail development.

Given that if it ever happens, it will sit right on the border of the District and will have a significant impact on the local road infrastructure, for example making getting to the Airport more difficult from the east of the District.


3.2.3 London

One specific transport development which you might want to mention is the introduction later this year of CrossRail 1 / The Elizabeth Line.

Although being phased in over a couple of years this will result in trains running from Shenfield through Central London (Liverpool Street) and the West End, and out further west toward Heathrow and Reading.

If successful, it is unclear what latent demand this will release for both employment and recreational opportunities albeit outside the District itself. But it could place additional burdens for transport and parking on the railway stations across the District,


4. Delivering Homes and Jobs = Section 6

4.1 Realistic Options (6.48)

Options 1 -4 are all equally unattractive

Merely dumping new housing on existing locations risks creating "Development Ghettos" i.e. condemning residents in these locations to an endless diet of continuous development for decades to come

A further points applies here regarding the further development of existing locations i.e. Copeability

In spite of all the fine words about "contributing more to existing infrastructure(6.46.D) if the currently planned developments in WGW are anything to go by, then such improvements are largely invisible and illusory i.e. the roads in the East of the District can't cope now, just building more housing is only going to make matters worse.

Also where are the improvements to the Social infrastructure e.g. the schools, the medical services, coming from? Merely adding more buses to the procession of vehicles leaving the village each morning carrying secondary age pupils to KES hardly seems to be an improvement.

So my preferred option is 6.46E, as it would allow a proper strategic approach to be taken especially to the infrastructure required to support such a development, rather than the piecemeal, tactical approach implicit in the other 4 options here.


5. Section 8

5.1 8.37 and elsewhere

Cycling and Walking are not the same. They should be separated out, as pedestrians needs are quite different from those of cyclists.

For example in the Great Wakering area:

 There is a need to improve the width of footpath e.g. Poynters Lane from Star Lane to Angel Inn roundabout, as currently it is very narrow and scary to walk along.

 Install a proper pavement from Cupids Corner to North Shoebury Road and along Old Southend Road. It is wrong in this day and age for people to have to take their life in their hands by walking on the carriageways which is the only option in these cases.

 Improve local crossing points i.e Star Lane / Poynters Lane Junction which is currently a nightmare for pedestrians

I am sure that similar examples can be found right across the District. To stimulate people to take up Walking options, much more has to be done to make it attractive and SAFE.



6. Improve Road Infrastructure (Section 8)

6.1 General Point

The points made throughout the document about the vital importance of the road infrastructure to the current and future well-being of the District are well made.

My disappointment is that in the Options Table at 8.20, there is NO explicit reference to addressing any specific issues regarding difficulties in the East of the District. In particular identifying improvements to those roads and junctions which link Great Wakering to Rochford and beyond.

6.2 8.25 Bus Services Map

This is potentially open to mis-interpretation because it does not distinguish between the types of services.

 regular including = Daily / Monday =- Saturday Services, although even in this category many routes do NOT run on Sundays or are curtailed , and,

 irregular e.g The Barrow Hall Road service which I think runs only on two days per week.

Suggest it be modified to do so i.e. to provide a more accurate picture..

6.3 8.23

There have also been a number of cutbacks from the County recently which have further diminished some local bus services.

Given that nearly all the Services in the District also involve other Authorities particularly Southend, it is suggested that reference be specifically for cooperation between these Authorities with the respective Bus Operators to minimise future reductions and promote greater use of such services.


7. Section 10

I note the word "coalescence" is only used once anywhere in the document i.e. in connection with Brownfield sites (11.47)

Suggest that it is added to the other discussions in Section 10 where residential developments could risk leading the District to become directly "joined" with the other Authorities as mentioned in Section 3. A situation which risks prejudicing the unique character of the District.

8. Other point

I was surprised that I could find no mention of the implications of increased residential development on the Recycling of household waste. An area on which the District can be rightly proud of your record on tackling this.

Suggest you might wish to include wording to cover this aspect.


9. Conclusion

Of all the points made in your document, by far the major need for the District in my view is for a Strategic look at the Road Transport needs, if the current increasing pressure on this scarce resource (road-space) is not ultimately to lead to gridlock before ECC actually decides to do something about it.

In the meantime we all suffer, businesses, employment opportunities, residents, schools, emergency services and those they are trying to help.

Merely adding to the Residential housing stock no matter how laudable, whilst doing nothing much about the road infrastructure will only hasten this unfortunate eventuality.

The District needs and deserves better, hopefully ECC can be prevailed upon to "up their game" and start addressing this issue strategically rather than tactically on development-by-development basis, because at the moment there seems to be little evidence of any action by them on this at all.

Finally Thank You for providing the opportunity for residents to comment on your Plans.

Comment

Issues and Options Document

Representation ID: 36948

Received: 07/03/2018

Respondent: Ian Davidge

Representation Summary:

8. Other point

I was surprised that I could find no mention of the implications of increased residential development on the Recycling of household waste. An area on which the District can be rightly proud of your record on tackling this.

Suggest you might wish to include wording to cover this aspect.

Full text:

Dear Rochford Council Planning Policy Dept

Issues & Options Document - Public Consultation ending 7th March 2018


1. Introduction

The purpose of this letter is to provide comments under the current public consultation exercise for this document.

Please note, I have used italic text to offer my suggestions for your consideration.

2. Section 3

3.1 Map of District (Figure 1)

2.1.1 Implications for Great Wakering

What is striking about this is the significant disparity in characteristics between the west and east of the district, where Great Wakering is currently the ONLY major residential area in the East.

2.1.2 No River Roach?.

What is also noticeable about the Figure 1 Map is the absence of the River Roach, although it is shown in Figure 5.

I suggest feature be shown on the map, together with a discussion of the implications for the District Plan, that such a natural constraint places on the District. This is because it forms a significant natural barrier, effectively splitting the eastern side of the district in two i.e. in order to reach the other shore you always have to go inland to Rochford.

2.2 Table 1 (3.19)

The figures shown in the Table present a useful (historic) baseline for a discussion of planning issues.

But it is suggested that these be augmented by population figures calculated using the Districts housing density / dwelling occupancy assumptions for those developments either planned or actually in development, arising from the Districts Adopted Allocations documents.

This would give a more accurate CURRENT and FUTURE picture of the impacts already taking place or in the pipeline within the various Parishes.


3. Section 4

3.1 General Comment

There is no point in Central Government merely dictating to Local Councils that they MUST build more new homes if Central Government is not prepared to help councils provide the wherewithal in terms technical infrastructure, particularly road transport, and Social infrastructure in terms of local medical facilities.

It is unclear how local councils are expected to attract businesses and economic activity if it is virtually impossible to travel across the District predominantly during the Working / School Day?, because of the inadequacies of the transport infrastructure, be that managed at National, County or local level.

3.2 4.8 onwards

Figure 8 presents a useful view of the neighbouring Authorities that the District has to deal with, as amplified by the paragraphs which follow it.

3.2.1 Essex County Council (ECC),

One Authority missing from this analysis is Essex County Council (ECC), a significant player in the local planning scene. For example does ECC recognise South-East Essex as a defined Sub-Region within the broader ambit of the county?

In view of the importance of the county for local planning it is suggested that an analysis of the relationship between the District and ECC could usefully be provided in this document.

3.2.2 Southend

When considering the relationship with Southend you may wish to include some reference to the potential knock-on effects for the District of the Temple Farm / New Southend United Stadium / residential / retail development.

Given that if it ever happens, it will sit right on the border of the District and will have a significant impact on the local road infrastructure, for example making getting to the Airport more difficult from the east of the District.


3.2.3 London

One specific transport development which you might want to mention is the introduction later this year of CrossRail 1 / The Elizabeth Line.

Although being phased in over a couple of years this will result in trains running from Shenfield through Central London (Liverpool Street) and the West End, and out further west toward Heathrow and Reading.

If successful, it is unclear what latent demand this will release for both employment and recreational opportunities albeit outside the District itself. But it could place additional burdens for transport and parking on the railway stations across the District,


4. Delivering Homes and Jobs = Section 6

4.1 Realistic Options (6.48)

Options 1 -4 are all equally unattractive

Merely dumping new housing on existing locations risks creating "Development Ghettos" i.e. condemning residents in these locations to an endless diet of continuous development for decades to come

A further points applies here regarding the further development of existing locations i.e. Copeability

In spite of all the fine words about "contributing more to existing infrastructure(6.46.D) if the currently planned developments in WGW are anything to go by, then such improvements are largely invisible and illusory i.e. the roads in the East of the District can't cope now, just building more housing is only going to make matters worse.

Also where are the improvements to the Social infrastructure e.g. the schools, the medical services, coming from? Merely adding more buses to the procession of vehicles leaving the village each morning carrying secondary age pupils to KES hardly seems to be an improvement.

So my preferred option is 6.46E, as it would allow a proper strategic approach to be taken especially to the infrastructure required to support such a development, rather than the piecemeal, tactical approach implicit in the other 4 options here.


5. Section 8

5.1 8.37 and elsewhere

Cycling and Walking are not the same. They should be separated out, as pedestrians needs are quite different from those of cyclists.

For example in the Great Wakering area:

 There is a need to improve the width of footpath e.g. Poynters Lane from Star Lane to Angel Inn roundabout, as currently it is very narrow and scary to walk along.

 Install a proper pavement from Cupids Corner to North Shoebury Road and along Old Southend Road. It is wrong in this day and age for people to have to take their life in their hands by walking on the carriageways which is the only option in these cases.

 Improve local crossing points i.e Star Lane / Poynters Lane Junction which is currently a nightmare for pedestrians

I am sure that similar examples can be found right across the District. To stimulate people to take up Walking options, much more has to be done to make it attractive and SAFE.



6. Improve Road Infrastructure (Section 8)

6.1 General Point

The points made throughout the document about the vital importance of the road infrastructure to the current and future well-being of the District are well made.

My disappointment is that in the Options Table at 8.20, there is NO explicit reference to addressing any specific issues regarding difficulties in the East of the District. In particular identifying improvements to those roads and junctions which link Great Wakering to Rochford and beyond.

6.2 8.25 Bus Services Map

This is potentially open to mis-interpretation because it does not distinguish between the types of services.

 regular including = Daily / Monday =- Saturday Services, although even in this category many routes do NOT run on Sundays or are curtailed , and,

 irregular e.g The Barrow Hall Road service which I think runs only on two days per week.

Suggest it be modified to do so i.e. to provide a more accurate picture..

6.3 8.23

There have also been a number of cutbacks from the County recently which have further diminished some local bus services.

Given that nearly all the Services in the District also involve other Authorities particularly Southend, it is suggested that reference be specifically for cooperation between these Authorities with the respective Bus Operators to minimise future reductions and promote greater use of such services.


7. Section 10

I note the word "coalescence" is only used once anywhere in the document i.e. in connection with Brownfield sites (11.47)

Suggest that it is added to the other discussions in Section 10 where residential developments could risk leading the District to become directly "joined" with the other Authorities as mentioned in Section 3. A situation which risks prejudicing the unique character of the District.

8. Other point

I was surprised that I could find no mention of the implications of increased residential development on the Recycling of household waste. An area on which the District can be rightly proud of your record on tackling this.

Suggest you might wish to include wording to cover this aspect.


9. Conclusion

Of all the points made in your document, by far the major need for the District in my view is for a Strategic look at the Road Transport needs, if the current increasing pressure on this scarce resource (road-space) is not ultimately to lead to gridlock before ECC actually decides to do something about it.

In the meantime we all suffer, businesses, employment opportunities, residents, schools, emergency services and those they are trying to help.

Merely adding to the Residential housing stock no matter how laudable, whilst doing nothing much about the road infrastructure will only hasten this unfortunate eventuality.

The District needs and deserves better, hopefully ECC can be prevailed upon to "up their game" and start addressing this issue strategically rather than tactically on development-by-development basis, because at the moment there seems to be little evidence of any action by them on this at all.

Finally Thank You for providing the opportunity for residents to comment on your Plans.

Comment

Issues and Options Document

Representation ID: 36992

Received: 28/03/2018

Respondent: Maldon District Council

Representation Summary:

Speed Limits on the River Crouch With reference to the River Crouch, the Council seeks the acknowledgment of Rochford District Council with regard to the issues related to the omitted speed restrictions and a commitment to overcome these challenges. The sensitive shorelines of the River Crouch have been noted to be a high priority for conservation within Maldon District Council and therefore would like to form an open and productive dialogue with Rochford District Council to mitigate the relevant issues.

Full text:

Maldon District Council Comments on the Rochford District Council New Local Plan: Issues and Options Document 2017
Forming the first stage of the Local Plan review, the Issues and Options Document identifies a series of strategic priorities and objectives to support the draft vision for the future of Rochford District. These are supported by key planning issues that have been identified for a number of themes, and potential options to deal with these issues.
Document Page, Policy and/or Paragraph Number Comments
Our Vision and Strategic Objectives
5. Our Vision and Strategic Objectives 5.8 Maldon Council supports a number of key ideas and themes that have come from paragraph 5.8. Improving the strategic infrastructure network is a shared objective for both authorities; the Southminster branch line holds a significant relationship with the Southend train line, which must be safeguarded and enhanced.
Delivering Homes and Jobs
Pg. 32. Para. 6.9 The revised OAN now expresses a range of between 331 and 361 homes per year. To effectively meet the revised OAN, all possible options must be considered including a review of Green Belt land. With the current pressures on housing need as a national issue, there needs a balance between serving strategic housing allocations and mitigating the consequences, such as loss of greenfield land.
Pg. 39. Para. 6.31 Provided the national threshold for affordable housing is 10 units or 1000sqm, which has been widely adopted by most local authorities, it would seem appropriate to use this threshold as local policy given the pressures on affordable housing as a national issue.
Pg. 56. Para. 6.86 Retention of or amendments to strengthen the existing policy would be supported by the Council. Any amendments which would be detrimental to the landscape, ecology and/or biodiversity of the River Crouch would be objected to.
Pg. 58. Para. 6.91 With a revised OAN of 6620-7220 homes from 2017-2037, the assessed need of up to 16 hectares of 'new' employment land between 2016-2036 would need to be appropriately situated to align with a vision that seeks increased provisions for sustainable transport and sustainable communities.
Delivering Infrastructure
Pg. 85. Para. 8.26 Although there are limitations on the level of influence local planning authorities have on the level of provision with regard to public transport, the level of provision is based on the use of services. When identifying strategic housing allocations within the district, this must be taken into consideration.
Protecting and Enhancing our Environment
Pg. 127. Para. 10.26 It should be emphasised that there will be a close working relationship between all contributing authorities in the preparation and production of the Essex Coastal Recreational Avoidance and Mitigation Strategy and that there must be a Duty to Cooperate.
Pg. 127. Para. 10.27 Retaining or amending policy ENV1 to strengthen the current policy is supported.



Additional Comments
Reference to Wallasea Island in the Burnham-on-Crouch Neighbourhood Plan Referenced within the 'made' Burnham-on-Crouch Neighbourhood Development Plan, the town will encourage the RSPB to invest appropriately in facilities that will encourage visitors to travel sustainably between Burnham-on-Crouch and Wallasea. The Council supports the aspirations of the Burnham-on-Crouch Neighbourhood Plan in this regard and wishes these aspirations to be acknowledged by Rochford District Council.
Speed Limits on the River Crouch With reference to the River Crouch, the Council seeks the acknowledgment of Rochford District Council with regard to the issues related to the omitted speed restrictions and a commitment to overcome these challenges. The sensitive shorelines of the River Crouch have been noted to be a high priority for conservation within Maldon District Council and therefore would like to form an open and productive dialogue with Rochford District Council to mitigate the relevant issues.

Comment

Issues and Options Document

Representation ID: 36998

Received: 20/02/2018

Respondent: Mr John Chapman

Representation Summary:

4 And finally, the entry to the proposed site, at the junction of Marylands and Merryfields Avenues would provide access, indeed, the only practical access, to the agricultural land to the West of the site and to the North of Marylands Woods, opening that green belt land up to potential development. Rather than being seen as a buffer to prevent further encroachment into green belt land (as was asserted in the previous application), approval of this development application could be seen as encouraging such further encroachment.
As has been previously stated, the only acceptable outcome in relation for this land is for it to be acquired by Hockley Parish Council as an extension of the Nature Reserve. In this manner the Green Belt will enjoy permanent protection. This would also be an extension of the Council's current policy of acquiring land under threat, such as the land adjacent to St Peter's and St Paul's church and the land in Beckney Avenue.

Full text:


Land North of Merryfields Avenue, Hockley - Suitability Assessment CFS024
Formal notice of objection
I note, with some dismay, that the owners of the land North of Merryfields Avenue (previously referred to as Land North of Marylands Avenue) Hockley have again been put forward this land for development planning permission. It is well to note that this land has twice been proposed for planning permission (previously 93/00586/DP3; 00/00391/FUL and the last being LPA REF 11/00352/OUT) and has twice been, for good reason, refused. It has also been the subject of appeal - reference APP/B1550/A/12/2171825/NWF - which was also, for good reason, rejected.
I attach, for ease of reference, an objection written by myself and my son, James, in relation to an earlier application, although it is signed by him (as he was the originator and addressee in respect of correspondence with Greensward Academy. If it is easier for you, I will re-issue it in my own name.
In the absence of any meaningful information in relation to this application (CFS024), it is only possible to look back at the previous applications. Those applications included the fact that the land was designated as Greenfield and is Green Belt, there were inadequate safeguards in relation to the environment and statements that might be regarded as disingenuous. As such, the objections filed at that time remain valid - with the exceptions/additional matters noted below.
The matters referred to above are:
1 The previous application refers to Marylands Brook as a ditch. It is a watercourse with running water that, at the time of the previous application, primarily drained Marylands Woods and the agricultural land to the west of Marylands Avenue and runs into Marylands Nature Reserve. Since that time, drainage channels have been created to the north of the playing fields at Apex Corner, drainage pipes inserted around the edge of the playing field and exiting to the south of the playing field and, thence, via a new drainage channel though the Marylands Nature Reserve and exiting into Marylands Brook. As can be seen from the two photos taken on 19 Feb 2018 (coordinates below), this drainage is efficient and the channels contain running water, substantially increasing the catchment areas of the Brook by some 60 hectares.
Concern was previously expressed over the inadequacy of the proposals in relation to Marylands Brook and the existing danger of flooding. The increased water catchment significantly increases the danger and makes the previous proposals wholly inadequate and a clear and present danger to the properties to the South of the land in question - in addition to the new builds.
In the light of this, I find it very surprising that the application notes that the probability of annual flooding is less than 0.1% and that there are NO physical constraints e.g. flood risk. Despite that assertion, it should be noted that a recent house insurance application was rejected on the grounds that both Merryfield and Marylands we within a 'flood risk area'.
51.36'40.1" N 0.38'12.8" E looking North 51.36'33.8" N 0.39.23.2" E looking South
2 Secondly, in the previous application an environmental study was appended. Apart from the fact that this is now some 6 years old, it was conducted in a season when both reptiles and bats would be in hibernation. It should come as no surprise that none were detected (unless bats with severe insomnia were expected). As previously noted, I myself have witnessed bats flying in the area in the intervening period. Bats and their habitats are protected by law and must not be disturbed.
3 Thirdly, I note that all of the submissions state that they will have no impact on the environment or local infrastructure resources. While this may be true, individually - and that can be debated - it is clearly untrue if two or more of the submissions are agreed. I would submit that it is inappropriate to review each submission on its own and the submissions must be reviewed together. Roads, surgeries, hospitals, schools, emergency services (both access and usage) will be adversely impacted to the point of break-down.
4 And finally, the entry to the proposed site, at the junction of Marylands and Merryfields Avenues would provide access, indeed, the only practical access, to the agricultural land to the West of the site and to the North of Marylands Woods, opening that green belt land up to potential development. Rather than being seen as a buffer to prevent further encroachment into green belt land (as was asserted in the previous application), approval of this development application could be seen as encouraging such further encroachment.
As has been previously stated, the only acceptable outcome in relation for this land is for it to be acquired by Hockley Parish Council as an extension of the Nature Reserve. In this manner the Green Belt will enjoy permanent protection. This would also be an extension of the Council's current policy of acquiring land under threat, such as the land adjacent to St Peter's and St Paul's church and the land in Beckney Avenue.

Comment

Issues and Options Document

Representation ID: 37031

Received: 06/03/2018

Respondent: Essex County Council

Representation Summary:

Minerals and Waste Planning. ECC will engage with RDC in the site assessment process to ensure new allocations appropriately address the minerals and waste safeguarding policy requirements within the adopted Essex Minerals Local Plan and the Essex and Southend-on-Sea Waste Local Plan. ECC wishes to draw attention to the dual requirements of these Local Plans concerning minerals and waste safeguarding, operations, sustainable use of minerals in construction, and the location of waste management uses within employment areas.

Full text:

1. INTRODUCTION

Rochford District Council (RDC) is currently consulting on the Draft New Local Plan Issues and Options (the Draft Local Plan) Regulation 18 document. This consultation represents the first stage in preparing a new Local Plan for the District of Rochford. Once prepared, the Local Plan will include the required strategies, policies and proposals to guide future planning across the District; and will replace the current suite of Adopted Development Plans (up to 2025).

Essex County Council (ECC) supports the preparation of a new Local Plan for RDC and welcomes the opportunity to comment on the Issues and Options consultation. A Local Plan by setting out a specific vision and policies for the long-term planning and development of the District can provide a platform from which to secure a sustainable economic, social and environmental future to the benefit of residents, businesses and visitors.

A robust long-term strategy will provide a reliable basis on which RDC, ECC and its partners may plan and provide future service provision and required community infrastructure for which they are responsible. ECC will also use its best endeavours to assist on strategic and cross-boundary matters under the duty to cooperate, including engagement and co-operation with other organisations for which those issues may have relevance.

2. ECC Interest in the Issues and Options Consultation

ECC aims to ensure that local policies and related strategies provide the greatest benefit to deliver a buoyant economy for the existing and future population that live, work, visit and invest in Essex. As a result ECC is keen to understand, inform, support and help refine the formulation of any development strategy and policies delivered by Local Planning Authorities. Involvement is necessary and beneficial because of ECC's roles as:
a. a key partner within Greater Essex, the Association of South Essex Local Authorities (ASELA) and, Opportunity South Essex Partnership (OSE); promoting economic growth, regeneration, infrastructure delivery and sustainable new development;
b. major provider and commissioner of a wide range of local government services throughout the county;
c. the strategic highway and transport authority, including responsibility for the delivery of the Essex Local Transport Plan; Local Education Authority including early years and childcare; Minerals and Waste Planning Authority; Lead Local Flood Authority; lead advisors on public health; and adult social care in relation to the securing the right housing mix which takes account of the housing needs of older people; and d. as an infrastructure funding partner, that seeks to ensure that the proposals are realistic and do not place an unnecessary (or unacceptable) cost burden on ECC's Capital Programme.

3. DUTY TO CO-OPERATE

The duty to cooperate (the Duty) was introduced by the Localism Act in November 2011. The Act inserted a new Section 33A into the Planning and Compulsory Purchase Act 2004. This placed a legal duty on all local authorities and public bodies (defined in regulations) to 'engage constructively, actively and on an ongoing basis' to maximise the effectiveness of local and marine plan preparation relating to strategic cross boundary matters, and in particular with County Councils on strategic matters.

The National Planning Policy Framework (NPPF) provides detail on how strategic planning matters should be addressed in local plans (paragraphs 178-181). Local planning authorities are expected to work 'collaboratively with other bodies to ensure that strategic priorities across local authority boundaries are properly coordinated and clearly reflected in individual local plans' (paragraph 179). 'Strategic priorities' to which local planning authorities should have particular regard are set out in paragraph 156 of the NPPF.

Specific guidance on how the Duty should be applied is included in the Planning Practice Guidance (the PPG). This makes it clear that the Duty requires a proactive, ongoing and focussed approach to strategic matters. Constructive cooperation must be an integral part of plan preparation and result in clear policy outcomes which can be demonstrated through the examination process.

The PPG makes it clear that the Duty requires cooperation in two tier local planning authority areas and states 'Close cooperation between district local planning authorities and county councils in two tier local planning authority areas will be critical to ensure that both tiers are effective when planning for strategic matters such as minerals, waste, transport and education.
ECC will use its best endeavours to assist RDC on strategic and cross-boundary matters under the duty, including engagement and co-operation with other organisations for which those issues may have relevance e.g. Highways England. In accordance with the Duty, ECC will contribute cooperatively to the preparation of a new Rochford Local Plan, particularly within the following broad subject areas,
 ECC assets and services. Where relevant, advice on the current status of assets and services and the likely impact and implications of proposals in emerging Local Plans for the future operation and delivery of ECC services.
 Evidence base. Guidance with assembly and interpretation of the evidence base both for strategic/cross-boundary projects, for example, education provision and transport studies and modelling.
 Sub-regional and broader context. Assistance with identification of relevant information and its fit with broader strategic initiatives, and assessments of how emerging proposals for the District may impact on areas beyond and vice-versa.
 Policy development. Contributions on the relationship of the evidence base with the structure and content of emerging policies and proposals.
 Inter-relationship between Local Plans. Including the Essex Minerals Local Plan Adopted 2014 and the Essex and Southend-on-Sea Waste Local Plan Adopted 2017.

ECC acknowledges and supports the production of a new Local Plan by RDC ensuring an up-to-date Local Plan. This can facilitate new job opportunities, attract investment in new and improved infrastructure, protect the environment and ensure new homes meet the needs of a growing population, which are sustainably located, and achieve the right standards of quality and design.

RDC has already undertaken work with ECC under the Duty to Co-operate during the past year, in addition to the joint and regular meetings established with the South Essex authorities, including RDC and ECC, through specific South Essex Strategic Planning DTC Groups for Members and Officers respectively to explore cross boundary matters.

The on-going duty to co-operate work that RDC has undertaken with ECC to date is acknowledged and this consultation provides the first opportunity for ECC to review the emerging issues and options in their entirety. ECC shall continue to work with RDC and provide as appropriate the latest ECC strategies and evidence to inform and shape the draft Local Plan, which will require further changes as the spatial strategy emerges and the site allocations are considered and assessed both individually and cumulatively, to test and establish the infrastructure requirements. This includes but is not limited to ECC service areas such as Highways; Infrastructure Planning; Education and Early Years and Child Care provision; Independent Living; Flood and Water Management; Public Health; and Minerals and Waste Planning. ECC will continue to work with RDC in respect of the evidence base to contribute cooperatively with RDC in the preparation of the new Local Plan through to examination.

4. ECC RESPONSE TO DRAFT NEW LOCAL PLAN ISSUES AND OPTIONS CONSULTATION DOCUMENT (DECEMBER 2017)

ECC's response to the draft Plan Issues and Options consultation document is set out below and corresponds to the format and chapters within the consultation document, however this is preceded by a summary of the key issues.

4A Summary

 Duty to co-operate. In accordance with provisions of the Localism Act 2011, ECC will contribute cooperatively with RDC in preparation of the new Local Plan. This will primarily cover an assessment of the impact on the transport and highway network (as Local Highway Authority), the need to ensure additional school places (as Education Authority), consideration of surface water management (as Lead Local Flood Authority), and links to minerals and waste planning (as Minerals and Waste Planning Authority) as well as advice on Public Health as the Lead advisor.
ECC notes that the Issues and Options consultation is primarily thematic and does not present options covering spatial proposals or site allocations. In moving forward the focus will need to be on the further assessment of the spatial options and emerging spatial strategy, which will vary according to the location, nature and mix of new developments being considered. ECC wish to be proactively engaged with the assessment of the spatial options and site allocations, given the importance of infrastructure provision and funding to the Draft Plan, which will vary for each spatial option and site allocations, given their respective individual and cumulative infrastructure requirements, generating their own, individual and cumulative impacts and opportunities on the delivery of ECC service areas. This will be essential to enable ECC to continue to inform and identify the issues and opportunities for ECC services, to ensure the Local Plan is deliverable, in accordance with the tests of Soundness and that the right infrastructure is in place at the right time.
A particular focus will be the impacts of any proposed new large urban extensions or new settlements to assist RDC determine an appropriate strategy if those options progress as part of its preferred growth and development strategy.
In addition to the above ECC will continue to contribute co-operatively with RDC through the wider collective South Essex arrangements, to address cross boundary strategic planning and infrastructure matters, through the Association of South Essex Local Authorities (ASELA), and the emerging South Essex 2050 vision associated work streams, and preparation of a South Essex Joint Strategic/Spatial Plan (JSP);and through the South Essex Transport Board and the Opportunity South Essex Partnership (OSE). With the exception of the formation of ASELA and the preparation of a JSP, the majority of the issues and options identified have regard to this wider engagement.
 Housing provision. ECC acknowledges RDC is seeking to meet housing needs in full over the plan period. However, ECC acknowledges highway and transportation constraints, and in its role as Highway Authority will provide the necessary assessments to determine impacts (including cross boundary impacts) and mitigation measures, as RDC seeks to adopt a preferred growth and development strategy. The new Local Plan should also emphasise the need to provide infrastructure (secured through developer funding) as part of any new housing proposals. ECC welcomes the importance and consideration given to the provision of adult social care and extra care (encompassing aged and vulnerable people), within ECC's Independent Living programme.
 Infrastructure Provision and Funding. ECC agrees that Infrastructure is critical to support sustainable growth and it will be essential to ensure RDC has the right infrastructure, at the right time, to accommodate the new jobs and homes needed in the future. We welcome the acknowledgement of ECC's role in the provision of Local and Strategic infrastructure. Further comments are provided on the spatial strategy and on the implications for ECC services and infrastructure, ranging from large urban extensions to less growth at settlements lower in the settlement hierarchy

ECC will take a pro-active position to engage with RDC to ensure the delivery of new homes and employment is at the right location and of an appropriate scale to identify and deliver the necessary level of infrastructure investment, as part of a viable and deliverable plan. ECC seeks clarification on the size of residential sites / extensions being considered when compared to large residential urban extensions / new settlements.

ECC wish to explore and understand the potential implications of the nature and scale of developments on financial contributions, given the pooling of contributions under the CIL Regulations and hence potential viability and delivery issues which will be very different for each of the spatial options being considered. As outlined in 4.6 above, the new Local Plan should emphasise the need to provide infrastructure (secured through developer funding) as part of any new development proposals, to ensure the new plan is both viable and deliverable. Given the importance of infrastructure provision and funding for the new Local Plan, ECC wishes to work with RDC to ensure the necessary infrastructure funding (including all funding streams) and delivery evidence is fully considered as part of the assessment of all the spatial options. This is to ensure the preferred strategy is viable, deliverable and sound.
 Transport and highways. ECC, will work with RDC (in consultation with Southend on Sea and the South Essex authorities) to enable further transport and highway impact assessments to be undertaken to inform the preparation of the RDC Local Plan and in accordance with the ASELA workstreams and JSP.
There is overall support for proposals promoting the importance and need for improvements to the A127 Strategic Road Network, however greater emphasis should be placed on the role and importance of sustainable travel as part of a long term integrated transport solution, including walking, cycling, bus and rail. Adequate transport and highway provision will need to be evidenced including transparency of funding, viability and deliverability to unlock sustainable growth in new homes and employment, at a scale necessary to bring forward the level of investment needed to provide significant improvement to the highway and transport infrastructure.
In respect of the A127/A130 Fairglen Interchange, ECC would not support any new development and employment allocations (beyond the current adopted Local Plan employment allocations) until the proposed long term transport scheme for the junction is implemented. ECC supports the need for a range of highways and sustainable transport improvements to existing employment areas including, London Southend Airport and the airport business park and will continue to seek funding through bids to Central Government, SELEP and S106 contributions.
 Sustainable transport. ECC recommend greater emphasis is placed on sustainable transport including passenger transport as part of a wider sustainable growth strategy to underpin future development opportunities and to ensure an integrated transport package of solutions are developed for the District and in respect of its relationship and connectivity to Southend, South Essex, Essex and London.
 Minerals and Waste Planning. ECC will engage with RDC in the site assessment process to ensure new allocations appropriately address the minerals and waste safeguarding policy requirements within the adopted Essex Minerals Local Plan and the Essex and Southend-on-Sea Waste Local Plan. ECC wishes to draw attention to the dual requirements of these Local Plans concerning minerals and waste safeguarding, operations, sustainable use of minerals in construction, and the location of waste management uses within employment areas.
 Flood and Water Management. ECC wish to work with RDC to provide points of clarification and to ensure the most up to date evidence is used to underpin the preparation of the Local Plan including the strategy and site assessments. This will include reference to the Environment Agency's revised climate change allowances and the subsequent revisions to the South Essex Surface Water Management Plans, due to be published in 2018.
 Economic Growth. ECC welcomes proposals to ensure the protection and provision of suitable employment land and appropriate uses within the District, with the pre-eminent importance of London Southend Airport to the economy whilst seeking opportunities for rural diversification, tourism, retail, leisure, and town centres, to meet the life cycle needs of business including "Grow on Space" and development of skills and training opportunities.
ECC welcomes and supports the importance and economic role played by London Southend Airport as an international gateway, and the A127 corridor and London-Southend Victoria railway line for connectivity with South Essex, the rest of Essex and London. A key priority will be to enable investment in infrastructure and economic growth, including, for example, the A127 including passenger transport and ultrafast broadband, as well as developing options to support the alignment of skill provision to meet the local needs in accordance with the Economic Plan for Essex (2014) and the National Industrial Strategy The provision of jobs and infrastructure to support economic growth will be essential, including the need to provide social, physical and green infrastructure and are also being explored by ASELA through the Industrial Strategy workstream and the JSP.
 Superfast Broadband ECC recommend upgrading all broadband references to "ultrafast broadband" to promote the Governments next broadband programme; and refer to the BT Open Reach policy for providing FTTP connections on new development of houses of 30+units, free of charge to the developer https://www.ournetwork.openreach.co.uk/property-developers/site-registration.aspx
 Education ECC Support the use of ECC Planning School information and recommend a number of updates to reflect ECC's change in policy and standards (minimum size of new schools and use of ECC model infrastructure delivery policy). ECC wishes to engage with RDC as the new Local Plan progresses to preferred options stage to enable appropriate "scenario testing" of the preferred options for education requirements.
ECC will continue to work with RDC to ensure education needs are appropriate and adequately assessed as preparation of the new Local Plan continues. ECC will undertake a further assessment of the potential delivery and resource requirements for accommodating anticipated pupil change through "scenario testing" as and when RDC confirms its preferred spatial option for growth and development and the specific sites.
In respect of Special Education Needs, this should be acknowledged in the new Local Plan, and sites allocated specifically provision for children/young people with Special Educational Needs either within the existing school provision or the wider community. ECC wish to engage with RDC to identify requirements and opportunities.
 Early Years and Childcare. In addition to the above, support the use of the ECC evidence, however recommend a number of changes to explicitly refer to "Early Years and Childcare provision" and for consistency in approach. There will be a need to update the EYCC information to ECC
 Skills. ECC will engage with RDC and can provide advice and updates, including on the full range of post 16 education and training provision and on the revisions to the ECC Developers' Guide to Infrastructure Contributions, to include the need for large scale developments to adopt an Employment and Skills Plan; and reference to the new Essex Employment and Skills Board's 2017-18 as an evidence base and the seven priority sectors. ECC wish to work with RDC to identify and promote opportunities for skills and training development to align skills with jobs.
 Public Health. ECC welcome and are supportive of the links and inclusion of health and well-being throughout the Issues and Options Report; and offer support to assist the preparation of the Local Plan, for example the development of the health and well-being policy, greater involvement with employment opportunities for local residents; support for skills, training, education and employment opportunities; improvements to air quality.
ECC support and welcomes consideration on phasing and release of affordable housing; use and application of the revised Essex Design Guide, including key concepts for inclusive and adaptable housing (e.g.. dementia friendly principles and social cohesion); housing mix, provision for older people (including care homes) and active design principles including active and sustainable travel principles.
ECC recommend use and reference to the revised Essex Design Guide within the new Local Plan design policies and the supporting text.
ECC wish to work with RDC to provide support and advice in respect of the Health and Well-being policy; policies on "fast food" outlets; Education, Skills and Employment policies and the Good Design policies.
 Independent Living Support the general approach and inclusion of and reference to ECC's Independent Living Programme for Older People and Adults with Disabilities.
 Environment (natural, built and historic), ECC welcomes the broad approaches to protect and enhance the environment, and recommends a more holistic approach and links to the wider objectives of promoting growth and healthy communities, which can be provided through the natural environment, be it green infrastructure for climate change mitigation and adaption, building design and efficiency, creation and accessibility to open spaces, green spaces (including greenways and green corridors). ECC wishes to explore these opportunities and cross benefits further as incorporated within the revised Essex Design Guide (2018) and to ensure the biodiversity and geodiversity evidence base is up to date and consistent with the NPPF.
In respect of the Historic environment further consideration and assessment is required on conservation areas and listed buildings and the archaeological and historic records of designated and non- designated sites. ECC welcomes the opportunity to explore this further with RDC to ensure the evidence base is up to date and consistent with the NPPF.
 Sustainability Appraisal ECC considers the SA to be a good example of an initial Regulation 18 'Issues and Options' appraisal, exploring the sustainability considerations of a wide range of strategic options and assessing them to the same level of detail. However, ECC recommends that a number of the options within the SA/SEA are expanded to reflect the ranges in the Issues and Options consultation Report.

4B ECC Detailed Response to the Issues and Options Consultation

INTRODUCTION (SECTION 1)

Paragraph 1.5 ECC recommend that this paragraph is amended to clearly recognise that the Essex Minerals Local Plan 2014 (MLP) and Essex and Southend-on-Sea Waste Local Plan 2017 (WLP) form part of the statutory development plan for Rochford District. The Minerals and Waste Planning Authority (MWPA) is pleased to note that the mineral and waste plans are appropriately referenced further into the plan at relevant sections and shown to have relevance to Rochford, but it may be beneficial to qualify the extent of the Development Plan at the outset.

Paragraph 1.12 ECC welcomes and supports the preparation of a Draft Habitat Regulations Assessment to inform and accompany the preparation of the draft Local Plan

TELL US YOUR VIEWS (SECTION 2)

Next Steps

ECC service areas and functions would wish to work with RDC in the preparation of the Local Plan as it progresses to assess the suggested sites and the selection of preferred sites, with regards to the impact and opportunities on ECC services and infrastructure, to ensure sites selected are sustainable. Details on this are set out in Section 2A above and throughout the response below.
ECC as the MWPA is keen to enter into engagement with RDC with regard to proposed site allocations considered through the Local Plan process. This is to ensure that any future site allocations made by RDC appropriately address mineral and waste safeguarding matters in line with adopted policies. ECC recommend early engagement within the site assessment process, for effective collaboration and consistency across the wider Development Plan. Further details of the policy requirements are set out in the Essex Minerals Local Plan Adopted 2014 and the Essex and Southend-on-Sea Waste Local Plan Adopted 2017 For the avoidance of doubt, the considerations that may arise from the MWPA in relation to these sites would be as informatives only; there is no intention to influence the site assessment process and/or any scoring mechanism designed by RDC.

OUR CHARACTERISTICS (SECTION 3)

Figure 1 ECC recommends that the content of this map is reviewed to ensure it clearly presents the local and strategic context and characteristics of the district. For example greater use of graphics and annotations including:
 Annotations for the strategic road network (A127, A130 and A13), with specific emphasis on the A127 as the key strategic highway route for Rochford will demonstrate its importance within the local highway network 9
 The London - Victoria Railway line and stations should be clearly annotated, as well as inclusion of the wider network for context, for example the C2C line from Southend to London Fenchurch Street.
 Inclusion / indication of the existing bus networks and connectivity with surrounding areas, to demonstrate the passenger transport services within the area.
The above provides background and context for the Highway and Transportation network (including Sustainable travel) within the district and wider connectivity, including strengths and areas for improvement, and the need for the provision of sustainable access. This would also provide context for the national and local pictures presented in section 4 and the relationship with London (and the rest of Essex).

Our Economy

Paragraph 3.8 ECC recommend that reference is made to the wider rail network and specifically Cross Rail, which connects to the London - Victoria Line at Shenfield and will link to the wider London, and west of London, area.
Paragraphs ECC considers greater emphasis should be placed on the relationship
3.7 - 3.8 and connectivity between the District, Southend, South Essex, Essex and London, including the 2011 data presented in Figures 2 and 3. Whilst the data is of assistance, it is recommended that the mode of transport used to make journeys is also presented. This additional information would be required to inform the base assumptions for likely future modal choice that would arise as a consequence of further development. Equally this could help to demonstrate where the more significant concentration of improvements may be required to promote suitable sustainable cross boundary transport provision, which could affect the levels of car journeys undertaken by encouraging modal shift.
Paragraph 3.12 ECC consider that there is an opportunity to promote the potential benefits / outcomes for the local economy arising from improvements to the transport network, for example greater connectivity for residents and businesses, or an increase in flight destinations served by London Southend Airport.
Paragraph 3.14 ECC recommends the inclusion and reference to the Outer Thames Estuary SPA list of European sites.

Our Communities

Paragraph 3.23 ECC notes that this paragraph seeks to set out the Education provision across the district however there is no reference to either Early Years and Childcare (EYCC) or Special Education Needs (SEN) provision. ECC recommends that EYCC is incorporated and set out in Strategic Priority 4.4 and paragraphs 9.30 to 9.36 and SEN is referred to in Strategic Priority 4.3 and paragraphs 9.17 - 9.29.

Key Community Characteristics
ECC recommends greater recognition is given to the role and contribution of Passenger Transport, in respect of both existing and new provision of services to support the ageing population. ECC wish to explore this further with RDC in the preparation of the Local Plan, to promote an inclusive strategy for existing and new residents.
OUR SPATIAL CHALLENGES (SECTION 4)
ECC General Comment
ECC notes that this section sets out the National and South Essex picture and relationship to London, however it is recommended that this is expanded to provide a specific "county policy context." ECC welcomes the reference to ECC services throughout the document, however the inclusion of a wider "County Policy Context" would provide a clear and strategic policy framework, reflecting two tier context and delivery of ECC services and functions. ECC can provide appropriate supporting text links to relevant ECC policies and strategies. It is also recommended that within the wider context reference is also made to the adjoining Essex authorities outside the "South Essex" area including Maldon DC given the importance of the River Crouch.
ECC recommends that the following ECC policies and strategies are included and referred to within a new "county policy" context and delivery proposals:
 Essex Vision and Priorities 2017/21
 Essex Organisation Strategy, 2017 - 2021
 Economic Plan for Essex (2014)
 Children in Essex get the best start in life 2014-2018.
 People in Essex enjoy good health and wellbeing 2014-2018
 People in Essex have aspirations and achieve their ambitions through education, training and life-long learning 2014-2018
 People in Essex can live independently and exercise choice and control over their lives 2014-2018.
 Essex Transport Strategy, the Local Transport Plan for Essex (June 2011)
 ECC's Passenger Transport Strategy - Getting Around In Essex 2015.
 A127 Corridor for Growth - An Economic Plan 2014
 Essex children and Young People's Strategic Plan 2016 Onwards (2016)
 Essex Early Years and Childcare Strategy 2015-2018
 Commissioning school places in Essex 2017-2022
 Essex County Council Local and Neighbourhood Planners' Guide to School Organisation
 ECC Independent-Living-Programme-Position-Statement October 2016
 ECC Developers' Guide to Infrastructure Contributions (2016)
 Essex Minerals Local Plan Adopted 2014
 Essex and Southend-on-Sea Waste Local Plan Adopted 2017
 ECC Sustainable Urban Drainage Design Guide 2016
 Greater Essex Growth & Infrastructure Framework (2016)
 Superfast Essex Broadband

National Picture

Paragraph 4.3 ECC advises that the SELEP Strategic Economic Plan is now due to be completed during 2018.

Paragraph 4.5 ECC welcomes and is supportive of increasing employment opportunities for the District and would wish to engage with RDC to explore these opportunities further. This is consistent with ECC's Essex Outcomes Framework, through the development of the Essex Economic Growth Strategy and, the Economic Plan for Essex, including South Essex as one of four growth corridor. These corridors collectively form the locations for housing and employment, to secure future growth. These roles are based on location characteristics, local economic history and linkages to surrounding areas. Critically, these corridors will provide a mix of housing, which will allow new and existing residents to stay and develop in the District / County. ECC is a partner of the Association of South Essex Local Authorities (ASELA), which extends beyond the SELEP federated area of South Essex, to include Brentwood BC. ECC supports the emerging 'South Essex 2050 Ambition' for the area and the commencement of a Joint Spatial Plan (JSP) to provide a framework for the future growth ambitions of the area. ECC recommend that the role of ASELA and the emergent JSP is taken into account in the preparation of the Local Plan

ECC can provide additional information on the Essex Growth Commission Report (2017), ECC's Grow on Space study, as well as the specific economic strategies and engagement being developed by ECC and with partners, including OSE, promoting economic growth, regeneration, infrastructure delivery and sustainable new development, and having regard to the National Industrial Strategy.
ECC would welcome the opportunity to provide additional information in respect of the health profiles for the District, to assist with the identification of skills, training and employment opportunities, as well as the development of a health impact assessment process for developments.

ECC also considers there to be an opportunity to explore and promote opportunities in the area for employees and residents, with greater emphasis placed on accessibility and promotion of passenger transport as part of a wider package of transport solutions, and to optimise and improve the current passenger transport accessibility to the area.

Paragraph 4.6 ECC welcomes the reference that "infrastructure is critical to support sustainable economic growth" and the recognition of the need to work with partners, including ECC, under the duty to co-operate, to deliver Strategic and Local infrastructure.

ECC has provided further information throughout this response to inform the preparation of the new Local Plan, as it relates to ECC services and functions, to ensure are appropriately considered within the Local Plan. ECC recognises the need for essential infrastructure to be identified, to support the level of proposed growth within the Issues and Options consultation. ECC has and will continue to work with RDC to identify the appropriate infrastructure requirements and mitigation measures which need to be developed, including the preparation of the Infrastructure Delivery Plan, before the plan progresses to the Preferred Options stage,. This is explored further within the respective strategic priorities, themes and options below.

ECC recommends that RDC refer to the "ECC's Developers' Guide to Infrastructure Contributions" (2016), for details of the necessary contributions required from new development for the provision of essential infrastructure, to inform the ongoing evidence base and the delivery and viability assessments.

Paragraph 4.10 ECC welcomes the reference to minerals and waste as a strategic, cross boundary matter subject to the Duty and ECC is keen to enter into engagement with RDC with regard to proposed site allocations considered through the Local Plan process and that this is undertaken at the site assessment stage of the Local Plan, as referred to above under "Tell Us Your Views".

Paragraph 4.17 ECC recommends that the "Challenge" on how to deliver infrastructure to support new homes should also seek to incorporate new open space Suitable Accessible Natural Greenspace (SANG) as part of new residential developments to avoid recreational impacts on European sites in accordance with the Habitat Regulations. Further details on this aspect are incorporated within the revisions to the Essex Design Guide (revised EDG) to be published February 2018.
Please also refer to ECC comments in respect of paragraph 9.42 (options for Open space and outdoor recreation) and paragraph 10.29 (options for Greenways)

OUR VISION AND OBJECTIVES (SECTION 5)

Draft Vision

Paragraph 5.9 ECC is supportive of the emerging draft vision which is considered in accordance with the NPPF and the three dimensions for sustainable development; and ECC welcomes the inclusion and reference to health.

Strategic priorities

1. The homes and jobs needed in the area
2. Provision of retail, leisure and other commercial development
3. Provision of infrastructure, including transport, digital, flood risk, coastal management, minerals and energy
4. Provision of Health, security, community and cultural infrastructure and other local facilities, including EYCC, Education and Youth Facilities
5. Climate Change and Environmental protection and mitigation

It is noted that the Strategic Objectives in support of Strategic Priorities 1, 2, 4 and 5, do not refer to or recognise the role of sustainable transport to deliver these Strategic Priorities. ECC recommends further consideration is given to incorporate the principles of sustainable transport and travel within the new Local Plan in accordance with the Essex Local Transport Plan.

Strategic Objectives

SP1 The homes and jobs needed in the area

SO1 ECC support the objective to facilitate the delivery of sufficient, high quality and sustainable homes, combined with SO6 for all homes and commercial buildings to be built to the highest attainable quality, design and sustainability standards.
SO3 ECC welcomes the positive move towards supporting sustainable travel, however this only refers to improvements for new developments, whereas opportunities should be sought to overcoming existing shortfalls in sustainable connectivity.
SO5 ECC is supportive to the inclusion of skills, training, education and employment, and ECC Public Health would welcome the opportunity to work with RDC to explore the employment opportunities for residents. ECC considers that this could be included and assessed as part of the Health Impact Assessment process for developments, skills, training and employment opportunities.
ECC recommends this Strategic Objective amended to specifically refer to EYCC provision alongside the provision of good schools.
SO6 ECC support the objective for all homes and commercial buildings to be built to the highest attainable quality, design and sustainability standards in combination with SO1.
ECC recommends ECC recommends that these strategic objectives should also include consideration for new housing and commercial development to have reasonable access to green spaces. ECC can provide examples, where distance standards have been applied to protect and promote an accessible network of green space, including for example the Bristol Parks and Green Space Strategy 2008, with walking distance/ time to parks and green space. https://www.bristol.gov.uk/policies-plans-strategies/bristol-parks-and-green-space-strategy .
This would provide a cross over benefit between a number of the Strategic Priorities including SP1 (SO1 and 6); SP3 (SO 9 and 11), and SP4 (SO15 and 16).

SP 2 Provision of retail, leisure and other commercial development

SO 8 ECC suggest the objective should include accessibility to services and green spaces.

SP3 Provision of infrastructure, including transport, digital, flood risk, coastal management, minerals and energy

SO 9 ECC recommends that the reference to "broadband" is replaced by "Ultrafast Broadband". ECC acknowledges the current rollout programme is "Superfast Broadband", however it is recommended that the draft new Local Plan should refer to "Ultrafast Broadband" to reflect the Government's next roll out initiative, thereby providing longevity to Local Plan policy and distinguishing new provision from the "standard broadband" which is not considered fast enough. This should be applied throughout the document

SO 9 & 11 ECC recommends that these strategic objectives should also include consideration for new housing and commercial development to have reasonable access to green spaces. Please refer to ECC's comments to SO6 above and the Bristol Parks and Green Space Strategy example.

SO11 ECC support this Strategic Objective which also supports "air quality".

SO12 ECC welcomes the reference to 'encouraging adherence to the waste hierarchy' and making 'best use of mineral deposits' but considers that these statements could be afforded slightly more clarity. Supporting the waste hierarchy and ensuring a sustainable use of minerals requires that existing facilities and infrastructure are safeguarded to ensure that they are able to continue to make their planned contribution to the mineral and waste strategies operating in the County. Whilst already covered by MLP Policy S8 and WLP Policy 2, it is considered beneficial for this to be incorporated into the Rochford LP objectives. ECC suggests amendments to SO12 as follows:

"SO12: To plan for effective waste management by encouraging adherence to the waste hierarchy, working with Essex County Council to make best use of mineral deposits resources and mineral and waste facilities, including safeguarding resources and infrastructure, supporting renewable energy generation and energy efficiency as part of all new homes and commercial premises developed, as well as supporting efficient water use."

The requirement to safeguard mineral development is recognised in paragraph 10.21 and therefore the proposed modification is in accordance with that recognition. There is however no similar recognition for waste facilities, which the proposed modification to Strategic Objective 12 would then cover.

SO13 ECC can advise that any new plans for coastal change management should also involve the other partners of the Essex Coastal Forum, given that the Forum has the responsibility for policy changes to the Essex and South Suffolk Shoreline Management Plan

SP4 Provision of Health, security, community and cultural infrastructure and other local facilities, including EYCC, Education and Youth Facilities

SO15 ECC supports this strategy, which is supportive of the England Coast Path being created by Natural England, to be subsequently implemented by Essex Highways, for the economic and health benefits of the community and is consistent with the other Strategic Objectives.

SO 15 ECC support this strategy which would also support air quality, but should be amended to specifically include reference to "air quality".

SO 15 & 16 ECC recommends that these strategic objectives should also include consideration for new housing and commercial development to have reasonable access to green spaces. Please refer to ECC's comments to SO6 above and the Bristol Parks and Green Space Strategy example.

SP5 Climate Change and Environmental protection and mitigation

SO19 ECC supports the inclusion of this objective and strategic priorities for conservation and enhancements for the natural environment which is considered to be in accordance with NPPF (paragraph 156), however ECC recommends that the objectives should be further amended, to include policies which seek to minimise the impacts to biodiversity in accordance with paragraph 117 of the NPPF. Please refer to ECC in paragraph 10.1 below for further details on this matter.

SO22 ECC welcomes the objective, however recommend that "Green (and Blue) Infrastructure" is specifically referenced within the objective to read as follows:
"To mitigate and adapt to the forecasted impacts of climate change, including the water environment, air quality, biodiversity, flooding and green and blue infrastructure, support more efficient use of energy and natural resources and facilitate an increase in the use of renewable and low carbon energy facilities."
This is considered necessary to recognise the important role of this infrastructure for climate change mitigation and adaption, through micro-climate control, water management (SUDS), air quality, carbon sequestration and reduce biodiversity loss, which in turn strengthens communities through improved health and wellbeing and building resilience.

DELIVERING HOMES & JOBS (SECTION 6)

ECC General Comments

ECC recommend all references to the provision and requirements for future broadband are prefaced by "Ultrafast". ECC acknowledges the current rollout programme is "Superfast Broadband", however it is recommended that the draft new Local Plan should refer to "Ultrafast Broadband" to reflect the Government's next roll out initiative, thereby providing longevity to Local Plan policy and distinguishing new provision from the "standard broadband" which is not considered fast enough, this also applies to paragraph 6.127.

Paragraph 6.4 ECC notes that Green infrastructure is only mentioned in its wider District context. However, due to the rural nature of the district ECC would recommend that localised Green Infrastructure (GI) design principles are incorporated as part of a proposed housing development, specifically large developments such as Garden Communities and Urban Extensions. The would be in accordance with the NPPF and the Core Planning Principles on conserving and enhancing the natural environment, including the following statement in Paragraph 114 that Local Planning Authorities should "Set out a strategic approach in their Local Plans, planning positively for the creation, protection, enhancement and management of networks of biodiversity and green infrastructure."
ECC recommends that this principle is also incorporated within Strategic Priority SP5.2 to protect, manage and enhance important habitats, nature conservation areas, geo-diversity and greenways

SP1.1 Need for Market, Affordable and Specialist Homes

Paragraph 6.30 Options on how to meet Objectively Assessed Need for housing:
A. Seek to provide as much for the district as possible, subject to environmental constraints;
B. Work with neighbouring authorities to ensure housing need across the South Essex strategic housing market is effectively met; or
C. Consider a policy requirement to deliver a percentage of new market homes on schemes to be available to residents on a first come basis first-served basis for a limited period of time

ECC Comments

Options A-C: ECC does not consider these options as presented to be mutually exclusive and would expect RDC to explore all options (and combinations) when planning to meet housing need. ECC would anticipate that RDC would seek to comply with the "Mechanism for the Consideration of Unmet Housing Need", as endorsed by the Essex Planning Officers Associations in September 2017, which comprises all Local Planning authorities within Greater Essex (including RDC)

Affordable Homes

Paragraph 6.31 Options for the affordable housing threshold:
A. Reduce the threshold for provision a part of a scheme (potentially in line with emerging national policy);
B. Retain the current threshold for the provision of affordable homes as part of a development scheme;
C. Do not have a policy threshold for the provision of affordable homes (potentially rely on emerging national policy and guidance to set the minimum threshold)

ECC Comments

ECC does not consider Options A and B, as presented to be mutually exclusive and would expect a combination of options to support the delivery of affordable housing within the district. ECC considers that additional sensitivity analysis of the thresholds would be appropriate to ensure they are effective and viable.
ECC recommend that consideration is given to the phasing and release of affordable homes on new development sites. This would enable the affordable homes provision to be both inclusive and adaptable throughout the life-course and further details are incorporated within the revised EDG. This is a key concept within the EDG to incorporate wider design feature such as dementia friendly principles (as promoted by the RTPI) and ECC's Independent Living Programme both of which should be considered. Furthermore the location of properties within new developments should seek to ensure social cohesion within the communities, including the reduction of social isolation (in accordance with NPPF paragraph 50).

ECC recommend that further consideration is given to locational "accessibility" in the provision of affordable housing. For example, to ensure the affordable housing provision is located with good passenger transport and a range of sustainable travel modes, to ensure social inclusion. This is to minimise the risk of a broad spread of affordable housing in low numbers located in relatively inaccessible areas, with limited to no potential to secure improvements in passenger transport provision. Further details are available within ECC's "Passenger Transport Strategy - Getting Around In Essex" (2015).

In respect of identification of "key worker homes" and supporting the needs of healthcare providers ECC considers that this could also be addressed via within the provision of affordable homes. .ECC recommends RDC engage with healthcare employers on their current workforce strategies so as to support recruitment and retention of healthcare staff. ECC would welcome the opportunity to assist with this stakeholder engagement.

ECC does not support Option C for the reasons stated within the justification, it is considered contrary to the NPPF (paragraph 50, third bullet 3) where authorities are required to set policies, where there is an identified need for affordable housing and the emerging vision and strategic objectives of the draft Local Plan, for example SO2 "To plan for the mix of homes needed to support our current and future residences, in particular viably addressing affordability issues and supporting our again population "
Paragraph 6.32 Options for the proportion of affordable homes to be provided:
D. Retain the current affordable homes requirement of 35% where a scheme meets the threshold, subject to viability;
E. Increase the proportion of homes that we require developers to provide as affordable housing, subject to viability

ECC Comments

Options D-E: ECC does not consider these options as presented to be mutually exclusive and would expect a consistent approach to be developed in principle, to support the delivery of the appropriate proportion of affordable housing, based on robust evidence ECC consider additional sensitivity analysis of the thresholds would be appropriate to ensure they are effective and viable.

Please refer to ECC's comments to paragraphs 6.30-6.31 above, which equally apply to these options. For example ECC recommend that consideration is given to the phasing and release of affordable homes on new development sites. This would enable the affordable homes provision to be socially inclusive and adaptable, as set out in the revised EDG, which now includes wider design features such as dementia friendly principles, to ensure social cohesion within the communities, including the reduction of social isolation for specialist housing, and including independent living units for older people and adults with disabilities.

ECC consider the provision of specialist housing including ECC's Independent Living Programme for Older People and Adults with Disabilities, to be within the definition of "affordable housing" and it should be included within the appropriate housing mix (see paragraph 6.33 below).

Homes for Older People and Adults with Disabilities

Paragraph 6.33 Options for the Provision of Homes for Older People and Adults with Disabilities:
A. Continue the current approach to applications for specialist homes - on an ad hoc basis as applications are received based on available evidence
B. Include a policy on housing mix which requires the provision of specialist homes, such as wheelchair accessibility (part M Category 3), independent living units, sheltered and extra-care housing, over a certain threshold.

ECC Comments

ECC welcomes the acknowledgement of and reference to ECC's Independent Living (IL) Programmes for Older People and Adults with Disabilities to support the provision of specialist housing, based on evidence and in accordance with the NPPF and national policy.

ECC supports a revised version of Option B, to ensure the positive provision of specialist housing to meet the needs of residents, in accordance with ECC's strategies, guidance and evidence including:
 ECC's IL Programmes for Older People and Adults with Disabilities , for the respective demand and need for units across Essex by district, for example the IL Position Statement for Older People (2016) identified a shortfall of 129 units (19 rental and 110 ownership) required in the District for the period 2015 and 2020
 ECC Developers' Guide to Infrastructure Contributions (2016) (for securing the appropriate funds) and regard to the revised EDG for appropriate locational and design guidance

ECC can provide updates on the demand and need for IL units for both Older People and Adults with Disabilities, and would welcome the opportunity to engage with RDC, on an ongoing basis to ensure the most up to date information is available to inform and shape the preparation of the Local Plan.

SP1.2 Care Homes

Paragraph 6.35 ECC welcomes the reference to and ongoing engagement with ECC and would wish to maintain this engagement to inform the requirements and provision within the preparation of the Local Plan

Paragraph 6.36 Options for providing care homes in the district:
A. Continue the current approach to applications for specialist homes - on an ad hoc basis as applications are received based on available evidence.
B. Include a policy on housing mix which requires the provision of specialist homes, such as wheelchair accessibility (part M Category 3), independent living units, sheltered and extra-care housing, over a certain threshold

ECC Comments

Options A-B: ECC would anticipate combination of options (including the option in paragraphs 6.30-6.35) to support and ensure the appropriate mix of provision including care homes in accordance with the NPPF and based on evidence.
ECC recommend that consideration is given to the need to ensure provision is accessible, appropriate and inclusive to ensure integration within the community and has regard to the health and social care requirement a set out in the revised EDG and the details set out above in response to Paragraph 6.33, options for the provision of specialist housing.

ECC would welcome the opportunity to engage with RDC on these matters further to ensure the preparation of a legally compliance, effective and sound local plan.

SP1.3. Delivering our Need for Homes

ECC General Comment

The Issues and Options within this section provide a clear overview of the key planning issues facing the District and what the new Local Plan should address in respect of meeting the needs for homes. However, it is recommended that further consideration should be given to the following.
 Infrastructure provision and funding. The new Local Plan should ensure there are clear policies for the full provision, enhancement and funding of infrastructure arising from planned development. Mechanisms include planning obligations, the use of a Community Infrastructure Levy (CIL), and the ability to negotiate specific contractual obligations for major strategic sites, in accordance with the Garden City principles defined by the Town and Country Planning Association (or subsequent updated guidance) and wider definition of sustainable development outlined in the NPPF. This will ensure the delivery of sustainable development in accordance with the NPPF, including the three dimensions to achieve sustainable development (paragraphs 6 -10), the presumption in favour of sustainable development (paragraph 14) and the 12 core planning principles (paragraph 17).

At the heart of the NPPF is a presumption in favour of sustainable development. For plan-making this means local planning authorities should positively seek opportunities to meet the development needs of their area, and Local Plans should boost significantly the supply of housing to ensure the full objectively assessed needs for housing over the plan period. The NPPF includes the delivery of sufficient community and cultural facilities and services to meet local needs as a core planning principle.

There is a clear expectation that local authorities should make provision for funding for new school places from Section 106 contributions and CIL. ECC alone does not have the capital resources to fund the construction of early years' and child care places, primary schools or secondary schools. There appears to be a view developing that the provision of sufficient school places is the sole responsibility of ECC assisted by the DfE in the form of 'basic need' funding, as the District and Borough councils are not the local education authority. The expectation is that the DfE will fund any shortfall in school places that result from large new housing developments.

ECC wish to draw attention to paragraph 72 of the NPPF, which states 'The Government attaches great importance to ensuring that a sufficient choice of school places is available to meet the needs of existing and new communities.' ECC does not view financial contributions for education as optional. If this is the case then there will be no DfE and or ECC funding available, to provide all the school places required as a result of a growing school population and the need to create additional school places to meet the needs generated by new housing developments. ECC recommends that it is made clear in the new Local Plan that there is a requirement for financial contributions from developers to fund the full additional early years and childcare, primary and secondary school pupil places (including post 16) generated from new development to ensure that new housing developments are sustainable in terms of educational and childcare provision. ECC considers that this would accord with NPPF paragraph 72 and reiterates the requirements in the ECC Local and Neighborhood Planners' Guide to School Organisation and the ECC Developers' Guide to Infrastructure Contributions (2016). Further information on this issue is provided later in this response.
ECC welcomes the recognition that infrastructure is critical to support sustainable growth and to make sure RDC has the right infrastructure, at the right time, to accommodate the new jobs and homes needed in the future and the acknowledgement of ECC's role in the provision of Local and Strategic infrastructure. ECC wishes to be proactively engaged with the assessment of the spatial options and site allocations, given the importance of infrastructure provision and funding to the Draft Plan, which will vary for each spatial option and site allocations, given their respective individual and cumulative infrastructure requirements, generating their own, individual and cumulative impacts and opportunities on the delivery of ECC service areas.
 Flooding and its impact on development. This is broadly mentioned but will significantly influence future development locations. The main river and surface water flood risk areas should be clearly identified and the new Local Plan should provide appropriate policies in relation to flood risk. ECC is the Lead Local Flood Authority for surface water management and is revising the South Essex Surface Water Management Plan (SWMP) taking into account the recent changes in the EA's Climate Change Allowances. ECC recommends the provision of sustainable drainage systems (SuDS) and the revised SWMP as part of new development. Further information on this issue is provided later in this response.
 Broadband. While highlighted in the document, ECC recommend that "broadband" is distinguished from other telecommunications infrastructure, and specified in policy as a necessary infrastructure requirement for new development.. This will support relevant strategic and local objectives relating to economic growth particularly in rural Rochford. This will have a wider impact on growth and productivity, as increased broadband coverage will support businesses and attract investment to Essex. It also has the potential to increase opportunities for home-working and remote-working, reducing the demand on travel networks at peak periods. The importance is demonstrated by recent census returns which show that the biggest change in journey to work patterns in the last 20 years has actually been the increase in people working from home.

 Minerals and Waste provision and safeguarding requirements (please see section 2 "Tells Us Your views).

It is recommended that the above policy requirements are considered when preparing the new Local Plan and developing the overarching spatial strategy. Further information is provided below and in Sections 7 - 11.

Paragraph 6.46 ECC welcomes the positive recognition and importance placed on reducing inequalities and improving congestion levels, by ensuring the provision of new homes will include a variety of modal travel options. ECC recommends engagement and close working with ECC's Sustainable Travel Team and raising awareness of the local cycle action plans which also include some infrastructure elements

ECC recommends greater emphasis is placed on the creation of and access to more sustainable travel options within new developments, including connectivity to existing settlements for both housing and employment.

Paragraph 6.48 Options to provide a realistic strategy for delivering new homes:
A. Increase density within the existing residential area - which would require an amendment to our current density policy
B. Increase density on allocated residential sites
C. Several small extensions to the existing residential area
D. A number of fewer larger extensions to the existing residential area
E. A new settlement

ECC Comments

ECC does not consider these options as presented to be mutually exclusive. ECC would anticipate the Spatial Strategy to be developed with a range or combination of the options, based on evidence and in accordance with the NPPF and in particular the overarching principles of the NPPF.

ECC recommends that consideration is given to the wider "duty to co-operate" in emerging national policy (housing white paper) requiring local authorities (including RDC and ECC) to place greater emphasis on the development of Joint Strategic Priorities to address strategic cross boundary planning matters. The formation of ASELA to develop the South Essex 2050 vision with a set of strategic priorities and JSP will provide the context for RDC to consider the requirements of the South Essex Strategic Housing Market Area and to explore whether there are any unmet housing needs within the area.

ECC welcomes the recognition that infrastructure is critical to support sustainable growth and to make sure RDC has the right infrastructure, at the right time, to accommodate the new jobs and homes needed in the future, and the acknowledgement of ECC's role in the provision of Local and Strategic infrastructure. ECC wishes to be proactively engaged with the assessment of the spatial options and site allocations, given the importance of infrastructure provision and funding to the Draft Plan, which will vary for each spatial option and site allocations, given their respective individual and cumulative infrastructure requirements, generating their own, individual and cumulative impacts and opportunities on the delivery of ECC service areas.

ECC considers that any large scale housing developments will need to include appropriate infrastructure such as schools, community facilities and improvements to the roads. In contrast, a larger proportion of small scale or piecemeal developments are less likely to secure funding for the necessary infrastructure requirements. Furthermore infrastructure provision is likely to have a major impact on the phasing, delivery and viability of development(s) and this would need to be considered as part of the overall strategy.

ECC recommend consideration is given to the cumulative scale of development required to secure the necessary supporting infrastructure and the mechanisms available to secure developer contributions (be it S106 contributions, pooling of contributions or via the Community Infrastructure Levy). ECC consider this to be essential in the preparation of a new local plan, to ensure it complies with the legal duty to co-operate, meets the tests of soundness and is effective, viable and deliverable. ECC expect RDC to prepare a sound and deliverable Local Plan, having regard to the available levels and sources of investment available to deliver the supporting infrastructure.

ECC recommends consideration is also given to the respective infrastructure funding streams available to deliver and implement strategic infrastructure, be it the ECC Developers' Guide to Contributions, the Opportunity South Essex Partnership, the South Essex Local Enterprise Partnership, and Government Departments/agencies, such as the Department for Transport agencies, as well as changes in the national policy and legislation for the S106 and CIL.

ECC can advise in principle, that subject to the scale of the development being considered, Option E may have the potential to bring forward the level of investment needed to provide significant improvement to the highway and transportation infrastructure. However, in the absence of a location or scale for any new settlement ECC cannot recommend its preference for Option E over and above any other options put forward. Again, subject to the scale of development the other options including smaller size settlements may not bring the level of investment required. In essence this reflects the "critical mass" in the scale of development required to enable effective infrastructure and service planning, which it may not be possible to secure with a number of smaller developments given the effect of the CIL Regulations (Regulation 123) and the restrictions on pooling contributions.

SP1.4 Good Mix of Homes

Paragraph 6.58 Options identified in relation to the broad approach for considering the type and size of new homes:
A. Retain the current policy on types of homes, which takes a flexible, market-driven approach to types
B. Include specific reference to the size and types of homes referred to the South Essex SHMA
C. Continue to require new homes to meet the National Technical Housing Standards - nationally described space standards
D. Do not adopt specific policy on the mix of homes

ECC Comments

ECC would anticipate a strategy to be developed based on evidence and in accordance with the NPPF. Please refer to ECC's comments in response to the options in paragraphs 6.30 - 6.36 above paragraph 11.5 below which are considered relevant to this option.

ECC does not support Option D for the reasons stated in the justification, it is considered contrary to the NPPF (paragraph 50) and the emerging vision and objectives of the draft Local Plan, for example SO2 (as referred to in response to paragraph 6.31 above).

SP1.5 Gypsy, Travellers and Travelling Showpeople

Paragraph 6.78 Option identified to meet the needs of Gypsies and Travellers:
A. Retain the current criteria-based policy (Core Strategy policy H7)
B. Retain the current allocated site (Allocations Plan policy GT1)
C. Allocate a number of smaller Gypsy and Traveller pitches / sites to meet needs
D. Consider a mobile home policy for those no longer falling within the Gypsy and Traveller definition
E. Prepare a more detailed criteria-based policy
F. Do not have a policy on Gypsy and Traveller provision
ECC Comments
ECC does not consider these options to be mutually exclusive. ECC would expect RDC to develop a combination of options based on evidence and in accordance with the NPPF and the Planning Policy for Traveller sites 2015 (PPTS), requiring an inclusive approach for all gypsies and travellers, both members of the travelling and settled communities.

ECC would anticipate provision to be made for travellers who meet the planning definition, may be meet the definition or do not met the definition to be in accordance the Greater Essex Gypsy, Traveller and Travelling Showpeople Accommodation Assessment 2016-2033 (GTAA) published in January 2018.
Furthermore ECC would anticipate the emerging strategy and emerging policy to take into account the Transit Recommendations within the Essex GTAA prepared by EOPA and considered to be a strategic cross boundary issue for the Greater Essex authorities.

SP1.6 Houseboats and Liveaboards

Paragraph 6.82 ECC welcome and support the commitment to work with other neighbouring authorities and relevant bodies such as the Marine Management Organisation (MMO), Natural England (NE) and the Environment Agency (EA). ECC and partners would be able to assist in monitoring and the assessment of impacts arising from the proposed approach to Houseboats and Liveaboards. This could include identifying an appropriate scale / limit for the number of houseboats that could be permitted to moor in a particular area.

Paragraph 6.83 ECC considers the statement regarding the extent of land use planning control "to only extend as far as the mean high tide" to be incorrect and should be amended. ECC can advise that Land Use planning control extends to Low Water Mark, whilst the Marine Planning system extends to High Water Spring Tide, therefore there is an overlap of the 2 planning systems in the intertidal area. This correction also provides an opportunity to work with the MMO in developing evidence and an emerging policy.

Paragraph 6.84 ECC considers further exploration of the infrastructure requirements is necessary, in addition to the reference to the need for provision of toilets for houseboats with a permanent mooring, and to also include the infrastructure provision required for boats which are moored temporarily. It is important that the boats do not discharge waste into the marine environment and hence they would need to be equipped with holding tanks and to use pump out facilities to discharge this type of waste appropriately.
Paragraph 6.86 Options to address the mooring of houseboats in the district:
A. Retain the existing policy
B. Amend the existing policy to strengthen criteria
C. Allocate specific areas of coastline where such uses may be acceptable
D. Amend the definition in the Development Management Plan

ECC Comments

ECC would anticipate a strategy to be developed based on evidence and in accordance with the NPPF and other national policy. ECC considers additional evidence and engagement is required, and recommend that this is explored further with EPOA and / or Essex Coastal Forum.

ECC welcome the consideration of the need for a policy on houseboats/ liveboards as part of the review of the current polices to ensure they are based on the most up to date evidence. This would be appropriate given the growth in occupation and experiences elsewhere in the country (especially in London) where living on a boat is proving to be an attractive proposal, and in certain areas demand has outstripped available mooring. Whilst it may be a lifestyle choice for many, the result is an increasing number of houseboats across the Essex coast, especially in areas commutable to London.

SP1.7 Meeting Business Needs;

Paragraph 6.87 ECC recommends consideration is given to the contribution made by the environmental / Green Infrastructure (GI) to provide a network of multi-functional high quality green spaces and other environmental features, which together deliver multiple environmental, social and economic benefits. ECC can provide advice and evidence from the findings of a Forestry Commission report on the economic value of Green Infrastructure, to overcome barriers to businesses, whilst improving people's quality of life, health and wellbeing, which is available here:
https://www.forestry.gov.uk/pdf/nweeconomicbenefitsofgiinvestigating.pdf/$file/nweeconomicbenefitsofgiinvestigating.pdf

Paragraph 6.92 ECC notes the emerging Local Plan seeks to facilitate a diverse, modernised economy providing high value employment, and supports this aspiration. Paragraph 6.105 states that the Economic Development Needs Topic Paper 2017 advocates employment land increases to primarily facilitate B1 and B2 uses. Whilst ECC does not object to this, it is considered important to ensure that any strategy seeking to grow the economy does not preclude opportunities for waste management, with such facilities often being sited on industrial / employment land. Whilst, waste related developments are employers in their own right, economic activity generates waste, and a cost effective, local waste solution supports economic development across the spectrum. It is recognised that there is nothing in the Issues and Options consultation that indicates such opportunities would be precluded, and indeed ECC notes the role that Rawreth and Star Lane industrial estates play in this regard, but ECC as the MWPA welcomes the opportunity to make this point. It is requested that reference is made to supporting appropriate 'sui generis' uses when defining appropriate use classes on employment land.

Paragraph 6.94 Please amend the reference to "Ultrafast broadband" for the reasons set out in response to Section 6 and paragraphs 6.96 and 6.127.

Paragraph 6.96 ECC supports this statement and the need for improvements to the highway networks / sustainable travel choices to support businesses and economic growth; and to enable people to work in the local area.

Paragraph 6.96 Options to support employment and economic growth in the district
A. Continue to support employment growth within the current employment growth policy
B. Update the current employment growth policy to include reference to broadband
C. Update the current employment growth policy to further support new businesses at each stage of their lifecycle - in particular to reflect the need for grow-on space
D. Include specific reference in the current employment growth policy to tourism; and
E. Include specific reference to supporting sustainable travel options and promoting highways improvements

ECC Comments

ECC would expect all of the options to contribute to RDC meeting its need for employment and economic growth; and would expect RDC to prepare a sound and legally compliant Local Plan, based on evidence and in accordance with the NPPF.
ECC welcomes proposals to ensure the protection and provision of suitable employment land and appropriate uses within the District, with the pre-eminence of the importance of London Southend Airport to the economy whilst seeking opportunities for rural diversification, tourism, retail, leisure, town centres, to meeting the life cycle of business needs including "Grow on Space" and development of skills and training opportunities.

ECC welcomes and supports the importance and economic role played by London Southend Airport as international gateway and the A127 corridor and London-Southend Victoria railway line for connectivity with South Essex, the rest of Essex and London. A key priority will be to enable investment in infrastructure and economic growth (for example the A127 including passenger transport; ultrafast broadband) as well as developing options to support the alignment of skill provision to meet the local needs in accordance with the Economic Plan for Essex (2014) and the Government's Industrial Strategy as are being explored by the ASELA through the Industrial Strategy workstream and the preparation of the JSP. The provision of jobs and infrastructure to support economic growth will be essential, including the need to provide social, physical and green infrastructure.

ECC recommends consideration is given to the role and contribution of waste related developments as employers in their own right, economic activity generates waste, and a cost effective, local waste solution supports economic development across the spectrum. ECC recommends the inclusion and reference to 'sui generis' uses when defining appropriate use classes on employment land (see paragraph 6.92 above and 6.105 below).

In respect of Option B and the reference to Broadband, ECC acknowledge the importance of this infrastructure to support economic growth. Please refer to ECC's comments in response to paragraph 8.44 and the options for communication and broadband provision, as well as the references above to "Ultrafast" broadband.

In respect of Option C, ECC welcomes and supports the reference to the ECC "Grow on space" report 2017 and its findings seeking to address the lifecycle needs of businesses. This is also consistent with the Essex Economic Commission.

In respect of option D and the references to rural diversification and tourism ECC considers the development and promotion of the Essex Coast Path could provide opportunities for the local economy. ECC considers there is a need to have regard to the role and contribution of the environment and in particular investment in Green Infrastructure to attract new businesses and opportunities which will help to create employment, including for example regeneration projects which together can deliver multiple environmental, social and economic benefits. Further details and examples are set out in response to paragraph 4.6 above.

In respect of Option E, ECC supports the need for a range of highways and sustainable transport improvements to existing employment areas, including London Southend Airport and the airport business park and will continue to seek funding through bids to central Government, SELEP and S106 contributions, as set out in response to SP1.3 (ECC general comment) above and Paragraph 6.48.
As explained, ECC would anticipate the inclusion and promotion of sustainable modes of travel to support the community (both residents and businesses) to be embedded in the emerging strategy in conjunction with other options, to support employment and to deliver the wider principles in the emerging vision and spatial strategy, in accordance with the Essex LTP, Economic Plan for Essex and the A127 Corridor for Growth An Economic Plan. Please also refer to ECC comments regarding Highway Infrastructure in section 8.

SP1.8 Need for Jobs;

Paragraph ECC notes that the emerging Local Plan seeks to facilitate a diverse,
6.105 modernised economy providing high value employment. This aspiration is supported. Paragraph 6.105 states that the Economic Development Needs Topic Paper 2017 advocates employment land increases to primarily facilitate B1 and B2 uses. Again, this is not objected to but it is important that any strategy seeking to grow the economy does not preclude opportunities for waste management, with such facilities often being sited on industrial / employment land. As explained in response to paragraph 6.92 & 6.96 above regarding waste management developments as employers in their own right ECC recommends that reference is made to supporting appropriate 'sui generis' uses when defining appropriate use classes on employment land.

Paragraph 6.111 Options to support economic growth in the district over the next 20 years:

A. Develop specific policies for each employment site to protect certain uses
B. Reconsider the allocation of Rawreth and Star Lane industrial estates back to employment
C. Review new employment land allocations that do not have planning permission
D. Retain current strategy and allocate additional employment land
E. Promote improvements to quality of building stock and intensification of existing sites
F. Strengthen policy stance on access improvements
G. Do not have a policy on employment land

ECC Comments

ECC does not consider these options to be mutually exclusive and would expect RDC to develop a policy based on evidence and in accordance with the NPPF and the National Planning Policy for Waste 2014 (NPPW).

ECC would expect all of the options A-F to contribute to RDC meeting its need for economic growth, taking into account ECC's comments in respect of Paragraph 6.96 above to support employment and economic growth in the district. ). ECC would expect a Rochford Employment Land Review to be prepared and for the following evidence to be taken into account -, the South Essex Economic Development Needs Assessment; the Governments Industrial Strategy, SELEPs Economic Plan, OSE economic objectives, Thames Estuary Commission, the Economic Plan for Essex and ASELA's emerging South Essex 2050 vision and emerging industrial strategy workstream and JSP.

provide an effective multi modal interchange for the Airport, with improved connectivity and realistic sustainable travel option for all users.

Paragraph 6.114 ECC supports the development of the Airport business park and the associated highway and cycling network improvements

Paragraph 6.115 ECC acknowledges the need for investment in the highway / transport network around London Southend Airport and will continue to seek funding through bids to Central Government, SELEP and S106 contributions.
ECC considers there to be a need to promote and encourage a package of sustainable travel options, for residents and businesses to travel sustainably, with the highway improvements referred to also including improvements to bus journey times and bus priority measures, to promote sustainable travel (including buses) as a realistic sustainable travel option. Further contributions through a combination of s106 and S278 and CIL funding should be secured through appropriate new developments to address the sustainable travel agenda when opportunities arise.
Paragraph 6.116 ECC acknowledges and supports the need for transportation improvements to the A127 to facilitate growth within the District and South Essex; and recommend that reference is made to the joint ECC and Southend on Sea BC A127 Route management Strategy entitled A127 Corridor for Growth - An Economic Plan 2014

Paragraph 6.117 Options in relation to London Southend Airport:
A. Retain and update the Core Strategy policy supporting London Southend Airport's growth
B. Retain the existing policy in the Allocations Plan
C. Retain the existing policies in the JAAP
D. Continue to support surface access improvements in and around London Southend Airport

ECC Comments

ECC does not consider these options to be mutually exclusive. ECC would expect RDC to develop a combination of options based on evidence and in accordance with the NPPF.

ECC recommends that RDC should consider and clarify the "in principle" inter-relationship and compatibility between the JAAP and the new emerging Local Plan. For example, is the intention to incorporate the provisions of the JAAP within the new Local Plan, or will the JAAP continue to be a separate standalone document, subject to its own review?

In respect of Option D, ECC considers that the JAAP clearly sets out the associated access improvements for London Southend Airport, and that this would be appropriate option to address the passenger transport and sustainable travel options, as part of an integrated travel solution. ECC considers there to be a need to actively promote and improve passenger transport provision and connectivity, rather than solely relying on highway improvements to provide benefits for passenger transport, as any additional highway capacity may be absorbed by continual increases in demand by motorists, in the absence of realistic alternative travel options.

SP1.10 Supporting Tourism and Rural Diversification

Paragraph 6.121 ECC notes the comments regarding the lack of rural passenger transport services. However, it is of concern that the emphasis for the solution is solely placed on improvements to roads and the cycling network. In order for RDC to improve accessibility to the rural parts of the District, whether for tourism, employment or other reasons, it is considered that the most effective and viable approach would be the development of a District transportation strategy. This would have the benefit of setting out aspirational networks for all sustainable travel options including walking, cycling and passenger transport. There are a range of options that could be considered from traditional timetabled services to demand responsive operation or a combination of services to optimise technology. ECC would wish to engage with RDC to explore the options, which could be of particular value and support for tourism and rural diversification.

ECC considers investment to improve and create new Green Infrastructure such as woodlands, nature reserves and greening town centres would be appropriate and would benefit tourism, through attracting new visitors, and support retail and tourism sectors.

ECC considers transport and accessibility to be vitally important for tourism and investing in the Green infrastructure would provide opportunities to encourage alternative modes such as walking and cycling. This would improve accessibility to green spaces, whether by the distance from home and businesses; or by the creation of green links/greenways including enhancements to the existing Public Rights of Way network (including cycleways). Thus providing alternative traffic free cycling and walking routes, as well as wildlife corridors.

ECC considers that this would need to be developed in partnership with stakeholders including ECC and public transport providers to improve the accessibility of green spaces, to be as easy as possible. ECC would welcome the opportunity to explore this further, as outlined in ECC's response to SO6 above, regarding the proximity of new developments to green space.

Paragraph 6.127 Please amend the reference to "Ultrafast broadband" for the reasons set out in response to Section 6 and paragraphs 6.94, 6.96 and 6.127.

Paragraph 6.128 Options for tourism and rural diversification:

A. Continue to support current defined forms of green tourism and rural diversification as set out in our current policies
B. Expand the current approach to include other forms of rural diversification
C. Do not support rural diversification

ECC Comments

ECC does not consider options A and B to be mutually exclusive. ECC would expect RDC to develop a combination of the options based on evidence and in accordance with the NPPF, and to evolve as part of the overarching economic growth strategy (see paragraphs 6.96 and 6.116 above).

In respect of Option B (rural diversification) ECC supports this option in principle (subject to evidence) to provide an opportunity to retain employment in the first instance which may then lead to creation of new jobs. ECC recommends that the following factors are further explored:

 Accessibility Issues - there is potential to expand the current policy approach to address accessibility issues raised by ECC (paragraph 6.121). ECC recommends further investigation is required in respect of the wider passenger transport improvements to support access to tourism and rural areas, tourism. It is considered that this could include a range from timetables to the "on demand" bus services, as realistic alternatives; which goes beyond improvements to roads and cycle networks.
 Tourism and consideration of the potential benefits of the England Coast Path, and opportunities for tourism and rural diversification including for temporary camp sites if for example there is an increase in events specifically using the coast such as Maldon District's Council annual Saltmarsh 75 event.
 Potential provision for waste management facilities suited to the rural environment (such as anaerobic digestion or composting), as part of rural diversification in accordance with NPPW

ECC recognise that Policy GB2 in the Core Strategy and Policies DM12 and DM13 in the Development Management Plan do not act to constrain the rural diversification opportunities highlighted above and a continuation of this stance may be appropriate, based on evidence.

ECC does not support Option C for the reasons stated within the justification, it is considered contrary to the NPPF (and the emerging vision and objectives for the draft Local Plan.
SUPPORTING COMMERCIAL DEVELOPMENT (SECTION 7)

SP2.1 Retail, Leisure and Town Centres

Paragraphs 7.12 In respect of the Retail and Leisure Study update 2014, ECC
and 7.17 notes the reference to "catering needs" and recommend that this should also include "A5" fast foot outlets, to avoid clustering and high concentrations of A5 premises within the district. ECC strongly recommends that RDC review the existence and pattern of A5 premises, which can be undertaken using the FEAT tool (http://www.feat-tool.org.uk/), which is a fast food tool which provides details on fast food outlets for districts including A5, fast food retailers. ECC Public Health is aware of the emerging evidence base on high energy foods and obesity, including recent publications from Public Health England for spatial planners on fast food restrictions. ECC Public Health would welcome the opportunity to provide advice and to work with RDC on this matter.

Paragraph 7.20 Options for the district's town centres:
A. Retain current Core Strategy policies
B. Retain current policies in the Rayleigh Centre Area Action Plan
C. Retain current policies in the Rochford Town Centre Area Action Plan
D. Retain current policies in the Hockley Area Action Plan
E. Review the town centre Area Action Plans
F. Do not have policies on town centres

ECC does not consider these options to be mutually exclusive. ECC would expect RDC to develop a combination of options based on evidence and in accordance with the NPPF.

As set out in response to paragraph 6.117 in respect of the JAAP, ECC recommends that RDC should consider and clarify the "in principle" inter-relationship and compatibility between these Area Action Plans and new emerging Local Plan. For example, is the intention to incorporate these Area Action Plans into the new Local Plan, or will they be separate standalone Area Action Plans subject to their own reviews?
DELIVERING INFRASTRUCTURE (SECTION 8)

SP3.1Highways Infrastructure

Paragraph 8.17 ECC welcomes and supports the references and importance given to the Essex and Southend "A127 A Corridor for Growth - An Economic Plan (2014)" and the need for investment in the highway and transportation network, in accordance with the Essex LTP. ECC will continue to seek funding through bids from central Government, SELEP and S106 contributions as appropriate (CIL?) (as stated in 6.111 above).

ECC can advise that work is progressing on the next phase of the A127 Route Management Strategy, with the Options Appraisal and Strategy Report, in conjunction with the South Essex authorities, the London Borough of Havering, Transport for London and Highways England, to promote the importance of the A127 to facilitate growth across the area. In respect of improvements to the strategic transport network, ECC can confirm that the 'short term' funded transport scheme for the A127/A130 Fairglen Interchange is planned for implementation by 2022/23. ECC is also preparing a Joint A13 Route Management Strategy with Southend on Sea BC and Thurrock BC Highway Authorities.

In moving forward it is considered that RDC's approach to the Highways and Transportation will need to take into account the ASELA South Essex 2050 vision and emerging Infrastructure workstreams and the JSP.

Paragraph 8.18 ECC welcomes the reference to work with ECC as the Highways Authority and neighbouring authorities to promote strategic and more localised improvements to the highways network. ECC will continue to work with RDC on an ongoing basis to ensure these strategic matters are addressed collectively within the respective emerging Local Plans and a wider South Essex Joint Strategic Plan.

Paragraph 8.20 Options for the Local Highway Network:

A. Retain current policies on the local highway network
B. Prioritise local highways and junctions between Rayleigh, Hockley and Rochford (B1013), to support and direct funds to improve the local highway network
C. Prioritise local highways and junctions by upgrading the east to west connection north of Rayleigh, Hockley and Rochford, to support and direct funds to improve the local highway network
D. Do not have a specific policy on the local highway network

ECC Comments

ECC does not consider these options to be mutually exclusive. ECC would expect RDC to develop a combination of options in consultation with ECC as highway and transport authority, based on evidence (including transport modelling) and in accordance with the NPPF.

ECC would anticipate the strategy for the local highways network to be a combined approach as part of an integrated package of transport solutions (including sustainable travel options) and for this to be embedded within the Local Plans' spatial strategy.

As stated in response to SP1.3 and paragraphs 6.46 and 6.113 above, ECC considers greater emphasis should be placed on an integrated transport solution, in accordance with the Essex LTP to move away from the traditional reliance on road improvements, which is only part of the solution. For example, the inclusion and promotion of sustainable modes of travel (in addition to the outcomes of the transport modelling work) would support the community (both residents and businesses) in respect of transport and travel through the main towns and improve rural transport options. There is a need to ensure the appropriate approaches for the local highway network also take into account the requirements and inter-relationship with the wider local and Strategic networks as well as cross boundary issues / impacts.

Strategic Highways Network Transport

Paragraph 8.21 ECC welcome the reference for RDC to work with ECC and Southend BC (as the Highways Authorities) in the development of a transport model for the length of the A127, however please refer to ECC's update on the A127 Route Management Strategy in paragraph 8.17 above.

ECC can advise that the A127 comprises three highway authorities (Southend on Sea, ECC and the London Borough of Havering (LBH)), as such the A127 Route Management Strategy is being extended to incorporate the LBH. Furthermore LBH and the seven south Essex authorities (including ECC) have signed a Statement of Common Ground in respect of the importance of the A127 to facilitate growth.
ECC is engaging with the South Essex authorities in respect of a potential South Essex transport model which would be consistent with ECC's aspirations for an Essex wide model, drawing on the modelling work to date. This will however need to take into account the Highways England modelling information, including for example the Lower Thames Crossing.

ECC can also advise that Highways England would wish to be engaged in emerging Local Plans, to ensure any potential "ripple effect" of development is considered in respect of their transport network, for example the M25, A12 and sections of the A13 within South Essex.

Paragraph 8.21 Options identified for the strategic highway network:
A. Support improvements to the strategic highway network
B. Do not have a specific policy on the strategic highway network

ECC Comments
ECC would expect RDC to prepare a policy approach to the strategic highway network in consultation with ECC as highway and transport authority, based on evidence (including transport modelling) and in accordance with the NPPF.
In respect of Option A, ECC would anticipate the policy for the strategic highways network to be a combined approach as part of an integrated package of transport solutions (including sustainable travel options) and moving away from the traditional reliance on road improvements, which is only part of the solution. This would be in accordance with the Essex Local Transport Plan, and the A127 and emerging A13 Route Management Strategies as set out in response to paragraphs 8.17-21 above, and in response to SP1.3, paragraphs 6.46 and 6.111.
ECC does not support Option B for the reasons stated within the justification; it is considered contrary to the NPPF, the Essex LTP and A127 Route Management Strategy and the emerging vision and strategic objectives in the draft Local Plan.

SP3.2 Sustainable Travel

Paragraph 8.22 ECC welcome the desire for a modal shift towards more sustainable ways to travel, given that car use is the dominant mode of transport. ECC recommends there to be a need to change the modal shift in the short term, with greater emphasis placed on promoting alternative travel options (walking, cycling, passenger and public transport) and given greater weight in the Local Plan, to ensure these facilities are planned in now, to enable the options and benefits to be realised during the plan period. Greater emphasis is required on an integrated transport solution, and moving away from the traditional reliance on road improvements, which is only part of the solution.

Paragraph 8.22 ECC notes the reference to the Rayleigh Town Centre AQMA, however recommend this should be expanded to include reference to the National Air Quality Plan published by DEFRA in July 2017 which designates a site on the A127 to the east of Rayleigh Weir.

Paragraph 8.24 ECC welcomes the reference to Public Transport and recognition of the importance and connectivity to the rural areas and cross boundary connections, however there is a need to recognise that Public Transport is of value to everyone (all residents and employers) and not solely to residents who do not have access to private vehicles. There is a need for a change in emphasis, with the principles of alternative sustainable travel and accessibility (including passenger transport) to be embedded within the Local Plans' emerging spatial strategy to deliver the "vision" for the district and modal shift in transport. ECC recommends that RDC actively engages and works with the local transport operators in the District as well as ECC to develop services.

For example, there is the opportunity to explore innovative ways to deliver a more demand led public transport service to broaden accessibility away from the scheduled bus service. It could bring improved frequencies and less complex journeys by being able to be more responsive to demand for specific journeys, and provide quicker interchanges between modes. How this is supported could be explored within the context of paragraph 8.30, and may have potential to form part of the solution to air quality issues identified in paragraph 8.31.

Paragraph 8.27 ECC recommend that reference is made to the Rochford Cycling Action Plan 2018; prepared by Essex Highways and further information on the Essex Cycling Strategies is available here:
http://www.essexhighways.org/getting-around/cycling/cycle-programme.aspx.
Please note for consistency of terminology the references to "Cycle "Storage" within this paragraph should be change to "Cycle "Parking".

Paragraph 8.28 For clarity, ECC recommends that greater references should be made to "cycling" and "cycling networks", to help distinguish the nature of the routes being referred to, for example by inserting "cycle" before "routes to link homes" within this paragraph.

Paragraphs ECC welcomes the reference to the positive role of "Green Infrastructure"
8.27, 8.28 within this section which highlights the high dependency on cars, and that
and 8.32 other sustainable modes of travel should be encouraged.

In respect of the approach to car use, consideration should be given to the provision for charging points for electric cars (see also comments under Renewable Energy Generation). Further consideration is required on the practicality of long term public transport provision with the likely changes in car ownership patterns in 20 years' time, arising from the Government's commitment to ban the sale of new diesel and petrol vehicles from 2040 and responses from the car industry and possible growth in the use of electric vehicles, be it hybrid or pure electric vehicles, with sales projected to increase to around 10% of new vehicles by 2025. The industry anticipate the share of Electric Vehicles will continue to rise and that by 2025 Electric Vehicles will be more affordable than internal combustion vehicles, even without Government subsidies.

The need for and provision of Electric Vehicle charging points should be explored further and ECC's Environment team wish to engage with RDC on this matter, including sharing examples of good practice in emerging and new Local Plans.
Paragraph 8.30 ECC would welcome the opportunity to work closely with RDC on the development and implementation of Travel Plans for all new developments, or extensions to existing businesses, or where the development will have a significant impact on the highway. The ECC Sustainable Travel team would welcome the opportunity to explore this further with RDC and recommend reference is made to ECC's Passenger Transport Strategy - Getting Around In Essex 2015.

Paragraph 8.33 ECC would welcome the opportunity to work with RDC to explore the issues raised (bullet points 1-6) in relation to sustainable travel choices for communities across the district, which could be addressed through the Local Plan. Further consideration is required regarding the role and importance of realistic sustainable travel options to support the growth in the District.

Key issues ECC would like to explore further with RDC include:

Fifth bullet point - ECC considers the proposal to re-route the bus services away from Marked Square in Rochford Town Centre to be unsound. The removal of buses from this key location would be contrary to the principles of sustainable and accessible communities, and the strategic objectives in the Local Plan including the need for a modal shift in transport towards realistic and sustainable travel options for all. For example; if buses could not serve this area then residents would be encouraged to travel by car, adding further traffic to the already congested road network.

Sixth & Seventh bullet point - Further clarification is required on the nature of the issues.

Paragraph 8.34 ECC supports the proposal for setting a more challenging mode share; and would wish to work with RDC to explore and develop these issues and opportunities further within the context of the emerging new Local Plan.

Paragraph 8.35 ECC welcomes the opportunity to work with RDC and partners to explore and help shape new and improved passenger transport options across the District, as part of ongoing "duty to co-operate" engagement in the preparation of the Local Plan.

Paragraph 8.36 ECC consider the reference to SERT, which concerns bus services to be unclear within this paragraph on cycling.

Paragraph 8.37 Options identified to support Sustainable Travel
A. Retain the current policy on public transport
B. Support the development of a rapid public transit system for South Essex
C. Retain the current policy on travel plans
D Lower the threshold to require travel plans to be prepared for schemes under 50 homes
E. Retain the current policy on walking and cycling
F. Do not have policies on sustainable travel

ECC Comments

ECC would expect RDC to develop a combination of options A-E, in consultation with ECC as highway and transport authority, based on evidence and in accordance with the NPPF.

ECC would anticipate the approach to support sustainable travel to be a combination of options, as part of an all-encompassing, integrated package of transport solutions (including highway network improvements) and for this to be embedded within the Local Plans.

ECC recommend RDC has regard to NPPF (section 4 Promoting Sustainable Transport and section 8 Promoting Healthy Communities), the Essex Local Transport Plan, the A127 and emerging A13 Route Management Strategies, ECC's Sustainable Travel Strategy, and evidence (including transport modelling the Cycle Action Plan and South Essex Active Travel programme), and ECC's Passenger Transport Strategy - Getting Around in Essex (2015).

In respect of Option A, ECC considers this to have the potential for greatest advantages to prepare the District for its future transportation needs, including the potential for a more demand- led model, to work alongside scheduled bus and rail services. ECC would anticipate the need to consider this as part of a wider cross boundary engagement, with neighbouring authorities, ECC and transport providers. ECC would welcome the opportunity to engage with RDC on this matter.
In respect of Option D, ECC recommend that the threshold for travel plans is considered further to take into account the thresholds within EPOA Guidance for Health Impact Assessments 2008; where active and sustainable travel is already considered. ECC is currently reviewing the EPOA Guidance for Health Impact Assessments, to ensure it is up to date and relevant. ECC would welcome the opportunity to work with RDC on the development of this aspect within the Local Plan.

In respect of Option E, ECC considers the current approach in policy T6 positively encourages people to travel sustainably.

ECC does not support Option F for the reasons stated in the Justification, it is considered contrary to national policy, the Essex Local Transport Plan, and ECC Passenger Transport Strategy and the emerging vision and strategic objectives of the draft Local Plan.

SP3.3 Communications Infrastructure,

Paragraph 8.43 ECC recommends that reference is made to the BT Openreach policy of providing FTTP connections to any new development of houses over 30 properties, free of charge to the developer. Further information is available on the BT Open reach web link: https://www.ournetwork.openreach.co.uk/property-developers/site-registration.aspx

This provides the framework for implementation of superfast broadband within new residential developments

Paragraph 8.44 Options identified for communications infrastructure:
A. Retain the existing policy on telecommunications infrastructure
B. Amend the existing policy to include specific reference to improving broadband and mobile coverage
C. Ensure that all commercial and residential developments over a certain threshold are conditioned to deliver appropriate broadband infrastructure
D. Do not have a policy on telecommunications infrastructure

ECC Comments
ECC would expect RDC to develop a combination of options A-C based on evidence and in accordance with the NPPF. ECC would anticipate the strategy for the communication infrastructure to be a combined approach embedded within the Local Plan.

As set out in response to Section 6, paragraphs 6.94, 6.96 and 6.127, ECC recommend all references to the provision of and requirements for future broadband are pre-fixed by "Ultrafast". ECC acknowledge the current rollout programme is "Superfast Broadband", however it is recommended that the draft new Local Plan should refer to "Ultrafast Broadband" to reflect the Government's next roll out initiative, thereby provide longevity in the draft Local Plan and to distinguish the standards for new provision from the "standard broadband" which is not fast enough.

ECC also recommends that reference is made to the BT Openreach policy of providing FTTP connections to any new development of houses over 30 units, free of charge to the developer. Further information is available on the BT Open reach web link: https://www.ournetwork.openreach.co.uk/property-developers/site-registration.aspx
This provides the framework for implementation of superfast broadband within new residential developments.

In respect of Option B, ECC considers this to be a positive approach to develop infrastructure resilience to support the growth ambitions within RDC. ECC recommends that the needs of both residents and businesses are incorporated within the policy requirements for good communication infrastructure provision.

ECC would welcome the opportunity to work with RDC to ensure the latest policies; guidance and evidence are taken into account to inform the principles, strategies and policies and site allocations within the emerging Local Plan.

ECC does not support Option D for the reasons stated in the justification, and considers it to be contrary to the NPPF (paragraphs 42-43) and the emerging vision and strategic objectives of the Local Plan, for example SO9.

SP3.4 Water and Flood Management,

Paragraph 8.45 ECC wish to draw RDC's attention to the requirements of NPPF paragraph 100, which requires development in areas at risk from all forms of flooding should be avoided and not just fluvial and coastal flooding. This is in line with national guidance which states:

In plan-making, local planning authorities apply a sequential approach to site selection so that development is, as far as reasonably possible, located where the risk of flooding (from all sources) is lowest, taking account of climate change and the vulnerability of future uses to flood risk. (Paragraph: 001 Reference ID: 7-001-20140306 https://www.gov.uk/guidance/flood-risk-and-coastal-change)
ECC notes that the South Essex Strategic Flood Risk Assessment 2011 is in the process of being updated given the changes to the Environment Agency (EA) climate change allowance.

ECC also recommends that the following guidance and evidence
published since 2011, should be taken into account in the preparation of
the Local Plan:
 EA - Risk of Flooding from Surface Water (RoFSW) maps;
 ECC Sustainable Urban Drainage Design Guide 2016
 ECC Essex SUDS Design Guide 2016;
 South Essex Surface Water Management Plan (2012 and emerging
revision due 2018);
 ECC Developers' Guide to Infrastructure Contributions (2016)

ECC also advises that the following Assessments and Strategies are
currently being updated and once complete should also be taken into
account as part of the Local Plan and Sustainability Appraisals evidence
base:
 The Preliminary Flood Risk Assessment for Essex; and
 The Essex Flood Risk Management Strategy
ECC would welcome the opportunity to work with RDC to ensure the latest
policies; guidance and evidence are taken into account to inform the
principles, strategies and policies and site allocations within the emerging
Local Plan.

Paragraph 8.46 & 8.48 Whilst the preferred intent of management in the Shoreline
Management Plan might be to maintain or upgrade defences along the
coast, there is no guarantee that funding will be available to deliver these
preferred policies. It is therefore appropriate that RDC seeks to secure
funding from development or other sources to potentially allow a funding
contribution towards any coast flood or erosion schemes especially given
the new approach of 'partnership funding' which now applies.

Paragraph 8.47 ECC welcome the positive consideration and approach to locate
& 8.48 development, within the lower flood risk areas, whilst taking into account
climate change, the vulnerability of future uses to flood risk and the impact
on water supply from a changing climate.

Paragraph 8.49 ECC can advise that the South Essex Surface Water Management Plan (2012) is being updated and this includes revisions to the Critical
Drainage Areas. The review is scheduled to be completed in 2018 and
ECC would welcome the opportunity to work with RDC and to provide this
additional information to inform preparation of the Local Plan, in particular
the emerging spatial strategy and the assessment of site allocations.

Paragraph 8.50 In respect of the reference to below and above ground SUDS features,
ECC's requires priority to be given to the provision of above ground
SUDS features (with the exception of soakaways) and that below ground
SUDS features should only be considered acceptable, if it is
demonstrated that above ground SUDS features are not viable. In all
cases ECC would require any features to provide acceptable levels of
water quality treatment/ storage requirements

Paragraph 8.50 & 8.51 ECC welcomes and supports the use of SUDS to alleviate flooding and that it should be incorporated in to new developments, domestic and
commercial. SUDS can provide great opportunity to improve our
environment and, linked with Green Infrastructure, could create a more
balanced and natural ecology in our communities. SUDS can help meet
the growing demands to deliver GI by creating green open spaces which
encourage biodiversity, habitats, wildlife corridors and health and
wellbeing.

Paragraph 8.51 ECC recommend that the emphasis of the statements within this
paragraph are changed, to encourage SUDS on all new developments,
including minor developments, and should not be limited to the major
developments which are subject to statutory consultation with ECC as the
LLFA.

ECC recommend that the last sentence in this paragraph should be
changed to reflect the overall requirements and application of SUDS
design principles, to read as follows:

"In some instances, financial contributions could be sought to improve
surface water drainage infrastructure through a standard CIL charge for
example (considered in detail below)."

Further information is available within the ECC Sustainable Drainage
Systems Design Guide (2016) and ECC will work with RDC on this matter
in the preparation of the Local Plan.

Paragraph 8.53 ECC welcome the positive consideration and approach to locate
development, within the lower flood risk areas, whilst taking into account
climate change, the vulnerability of future uses to flood risk and the impact
on water supply from a changing climate.
ECC recommend that reference is made to the Environment Agency's
revised climate change allowances, further details are available here:
https://www.gov.uk/guidance/flood-risk-assessments-climate-changeallowances

Paragraph 8.56 ECC recommends that new developments should be supported by
infiltration and groundwater testing. Further details are set out within the
ECC Sustainable Drainage Systems Design Guide (2016).

Paragraph 8.58 Options identified to minimise flood risk:
A. Retain the existing flood risk policy for coastal flooding
B. Revise Core Strategy policy ENV3
C. Continue to apply SUDS policies
D. Do not have a policy on flood risk

ECC Comments

ECC would expect RDC to develop a combination of options A-C based on evidence and in accordance with national policy including the NPPF.

ECC will engage with RDC on an ongoing basis in the preparation of the Local Plan to ensure it is based on the most up to date Guidance and evidence including the ECC SUDS guide, the revised South Essex Surface Water Management Plan, as well as the latest EA climate change allowances.
ECC does not support Option D for the reasons stated in the justification, it is considered contrary to national policy (including paragraphs 99-108).

SP3.5 Renewable Energy Generation

Paragraph 8.62 ECC note and support the reference to the Rayleigh Town Centre Air Quality Action Plan (AQAP) in respect of the need to explore different measures including for example provision for electric vehicles (Electric Charging Points).

Paragraph 8.64 & 8.65 ECC welcome the recognition of the need for charging points in urban centre car parks. ECC is currently preparing a strategy for Electric Vehicles and would welcome the opportunity to work with RDC, including on the need for new policies to promote the provision of Electric Charging Points for new domestic and commercial developments (see paragraphs 8.22-8.37 above). This is required to support the need for this new infrastructure with a variety of Electric Charging Points required to meet the anticipated grown in Electric Vehicles, which could not be solely met by urban car parks.

Paragraph 8.66 Options identified to support renewable energy provision within the district:
A. Retain the current policies on renewable energy
B. Include a specific policy on electric vehicle charging points
C. Do not have a policy on renewable energy

ECC Comments

ECC does not consider these options to be mutually exclusive and would expect
RDC develop a combination options A & B based on evidence and in accordance with the NPPF and other national policy.

In respect of Options A and B, ECC would support a review of the current policies and amendments to ensure they are in accordance with the most up to date evidence (including developments in technology) and national policy and guidance.

ECC consider the policy should be amended to include the provision for Electric Vehicles Charging Points. ECC would welcome the opportunity to explore these requirements further with RDC in the preparation of the local plan, including the policies and infrastructure requirements for the provision of Electric Charging Points, and consideration given to engaging the key stakeholders.

ECC does not support Option C for the reasons stated in the justification, it is considered contrary to national policy and the Essex Local Transport Plan, supporting evidence and the emerging vision for the Local Plan.

SP3.6 Planning Obligations and Standard Charges;

Paragraph 8.73 ECC welcome the reference to and identification of the issues raised in respect of the delivery of infrastructure provision associated with a large number of small sites, as set out in ECC's earlier comments in response to paragraph 6.48 (options to provide a realistic strategy for delivering homes).

ECC a statutory authority responsible for the provision of specific infrastructure in support of communities and the preparation of Local Plans, would wish to engage with RDC on an ongoing basis in the preparation of the Local Plan and Spatial Strategy, especially as the Local Plan progresses to consider specific sites and spatial strategy. ECC can also provide details of our policies, strategies, guidance and standards in respect of the delivery of specific infrastructure and the respective levels of growth required, for example:
 the ECC Developers' Guide to Infrastructure Contributions (2016); and
 the Essex County Council Local and Neighbourhood Planners' Guide to School Organisation (2018).

Please be advised that the latter Guide includes changes and updates to ECC's policy for the minimum size and land requirements for new primary and secondary school provision, please also refer to Section 8 below.

ECC can confirm that the issues do arise and that, subject to the scale of development, small schemes may not bring the level of investment required. In essence this reflects the "critical mass" in the scale of development required to enable effective infrastructure and service planning, which it may not be possible to secure with a number of smaller developments given the effect of the CIL Regs (Regulation 123) and restrictions on the pooling of contributions.

Paragraph 8.75 Options for planning obligations and standard charges:
A. Retain the existing policy and provisions in current local plan policy
B. Do not have a policy on planning obligations and standard charges

ECC Comments

ECC would expect RDC to prepare a policy for planning and obligations and standard charge, based on evidence and in accordance with the NPPF.

ECC considers there to be a requirement to retain an appropriate and up to date policy for securing the necessary Planning Obligations and Standard Charges in accordance with the NPPF, the Planning Practice Guidance, the forthcoming changes in national policy on this matter, and the ECC Developers' Guide to Infrastructure Contributions and the recommended 'Infrastructure delivery and impact mitigation' policy set out in Appendix B to the Essex County Council Local and Neighbourhood Planners' Guide to School Organisation (2018). With reference to ECC comments in response to paragraph 6.48 and 8.74 above, the principle of "pooling" restrictions and applying standard charges to smaller sites is not sufficient to meet the substantial levels of investment required to enable the provision of the appropriate infrastructure.

ECC therefore recommends that RDC's existing planning t policy is amended to take into account the latest material considerations and that RDC uses the best practice policy for "Infrastructure delivery and impact mitigation policy' (referred to above) to deal with pooled contributions, and to list any on-site facilities (new schools or extra land to expand existing schools) within the individual housing allocation policies. It is necessary to separately designate land to be allocated for Education use as D1 use class. This is considered necessary to avoid residential hope value being attributed to school land as part of any development viability assessment.

ECC recommends that the use of the best practice policy approach, referred to above is applied to the provision of other specific infrastructure, as outlined in ECC Developers' Guide to Infrastructure Contributions (2016).

ECC would welcome the opportunity to work with RDC on an ongoing basis to develop an effective approach through the preparation of the Local Plan.

SUPPORTING HEALTH, COMMUNITY AND CULTURE (SECTION 9)

SP4.1 Health and Well-being;

ECC welcomes and strongly supports the approach taken by RDC regarding health within this section. ECC considers the approach to be very positive towards Public Health and the wider issues of health have been considered and the promotion of Public Health with reference to the NPPF. ECC would welcome the opportunity to work with RDC in the development of this policy in conjunction with their planning and Health and Wellbeing team; and can provide advice on a range of supporting evidence and good practice available to inform the preparation of the local plan. This includes:
 FEAT tool (http://www.feat-tool.org.uk/), which allows authorities identify the various types of food retailers within their districts, including A5, fast food retailers.
 RTPI dementia friendly practice guidance- http://www.rtpi.org.uk/knowledge/practice/dementia-and-town-planning/
 Sports England Active Design- https://www.sportengland.org/media/3426/spe003-active-design-published-october-2015-email-2.pdf
 Public Health England - Health profiles- https://fingertips.phe.org.uk/profile/health-profiles
Paragraph 9.11 Options to promote health and wellbeing:
A. Retain the existing policy in current local plan policy
B. Ensure that land is specifically for healthcare
C. No policy on healthcare needs
D. Build on the existing healthcare policy to address wider health and well-being issues

ECC Comments

ECC would expect RDC to develop a combination of options based on evidence and in accordance with the NPPF.

ECC as a lead advisor for Public Health will engage with RDC on an ongoing basis in the preparation of the Local Plan and Spatial Strategy, especially as the Local Plan progresses to consider specific sites and spatial strategy. ECC can also provide details of its policies, strategies, guidance and standards in respect of the delivery of specific infrastructure and the respective levels of growth required.

In respect of Option D, ECC is supportive of this approach to refresh and build upon the existing health and wellbeing policy and ECC Public Health would welcome the opportunity to work with RDC in the development of this policy in conjunction with their planning and Health and Wellbeing teams.

ECC considers this approach should include greater recognition of the role of the natural environment and Green Infrastructure within the communities' health and wellbeing, including opportunities in preventing and treating ill health, as well as promoting wellness, including greater access and use of green space

ECC does not support Option C, for the reasons stated within the justification, it is considered contrary to national policy, the emerging vision for the Local Plan, ECC's vision for Essex and the revised EDG.

SP4.2 Community Facilities;

Paragraph 9.15 Options for Community Facilities:
A. Retain the existing policy in current local plan policy
B. Strengthen provisions in the existing policy
C. No policy on community facilities

ECC would expect RDC to prepare a policy option based on evidence and in accordance with the NPPF.

ECC would anticipate the provision of a range of community infrastructure in support of Local Plans, would wish to engage with RDC on an ongoing basis in the preparation of the Local Plan and Spatial Strategy, especially as the Local Plan progresses to consider specific sites and spatial strategy. Further details are set out in Section 2B above and in response to Section 4 of the Issues and Options Report.
In terms of future provision, opportunities for the co-location of services and maximising the use of existing buildings will be encouraged, to respond to the increasingly integrated models of service provision and provision for multi-purpose facilities. There is increasing emphasis on the integration of other form of community infrastructure, such as libraries and community spaces.

New provision is therefore likely to be in the form of a co-located community hub/library. This will be dependent on the level of population growth and the demographic of that population, along with the service requirements of future library provision. It is therefore likely that new provision could be made at some of the larger growth locations, particularly if there is a need for other community facilities, e.g. health centres, community halls etc. However, at this stage it is not possible to identify specific needs or costs of provision. It is not possible to identify specific needs or costs at this stage. Co-location may be something that should be encouraged but this would be more of a policy focus, possibly through a masterplanning approach, for the new development.

Funding will need to come from developer contributions and will be delivered through the masterplanning of new development sites.

ECC does not support Option C for the reasons stated in the justification, it is considered contrary to national policy, the emerging vision and objectives of the draft local plan and would not enable the necessary infrastructure to be appropriately planned for and delivered to meet the needs of the local community (residents and businesses).

SP4.3 Education and Skills;

ECC note the scope of Strategic Priority 4.3 (this section) mainly concerns Educational facilities; however there is no acknowledgement of or reference to the provision and requirements for Special Education Needs, either within schools or the wider community. ECC recommends that this is addressed, to consider and demonstrate the needs of the residents and the contribution that it can make. ECC welcome the opportunity to work with RDC to explore this further and can provide additional information on ECC's policies, strategies and evidence in respect of the requirements for this service, to be taken into account in the preparation of the Local Plan.

Paragraph 9.17 ECC welcomes the references within this paragraph, however the reference to "Nursery Education" should be changed to "EYCC provision" and this change should be incorporated throughout the document. Equally the reference to the need to ensure that there is sufficient capacity within "schools" should be amended to specifically refer to "EYCC provision" in addition to schools

Paragraph 9.22 & 9.27 ECC advises that the Essex Employment and Skills Board (ESB), through its 2017-18 Evidence Base, has identified seven priority sectors for Greater Essex including: construction, logistics, advanced manufacturing and engineering, IT/digital, healthcare and finance and insurance. To address shortages in these areas the ESB works in partnership with skills training providers, employers and other partners to offer an Education and Industry, Science, Technology, Engineering and Maths programme, to all secondary schools. These taster day opportunities, open to the District's schools would complement the District's Career Taster Days and continue to promote apprenticeships and access to skills and training. ECC welcomes the opportunity to explore this further with RDC in the preparation of the Local Plan.

Paragraph 9.23 ECC would like to advise RDC that it is in the process of updating the referenced ECC Developers' Guide to Infrastructure Contributions (2016), to include planning obligations and standard charges for contributions to support the full range of post-16 provision, where need is sufficiently evidenced. This is as a result of students 16-18 being required to stay in some form of education or training. This would support workforces, support apprenticeships and work with local colleges to address identified skills gaps. This also reflects ECC's overarching Lifelong Learning Strategy 2014 - 2018 and supporting strategies

Paragraph 9.26 ECC requests that the references to the scale of residential development that would generate the need for a viable new school are updated, to reflect section 2.2 of the recently published Essex County Council Local and Neighbourhood Planners' Guide to School Organisation (the Planners Guide) i.e. circa 1,400 houses for a 2 form entry primary school and 4,500 houses for a 6 form entry secondary school.

ECC's School Organisation Team welcomes the opportunity to assist in the preparation of the Local Plan and the next stage will be for ECC to 'scenario test' the preferred option to identify the education infrastructure required to mitigate the cumulative impact of allocations and permitted development.

Paragraph 9.27 Please refer to ECC's comments in paragraph 9.22 above, ECC would welcome the opportunity to explore this further with RDC in the preparation of the Local Plan.

Paragraph 9.29 Options identified to plan for education and skills development in the future:

A. Retain the current policies on schools provision
B. Ensure that land is specifically allocated for schools
C. Do not have a policy on meeting education needs
D. Update the current employment growth policy on skills and continue to support skills development through a skills training academy
E. Promote apprenticeships through planning

ECC Comments

ECC does not consider these options to be mutually exclusive. ECC would expect RDC to develop a combination of the options based on evidence and in accordance with the NPPF.

In respect of this section and the range of Options, ECC recommends that they are expanded to explicitly incorporate the requirements and provision of Special Education Needs within schools and the wider community. ECC welcomes the opportunity to work with RDC on an ongoing basis to ensure this is addressed in the development of the Local Plan, in accordance with ECC's overarching Lifelong Learning Strategy 2014 - 2018 and supporting strategies, which include the provision of services from pre-birth to 24 for children with Special Educational Needs or Disabilities.
Further details are also available within
 Essex Early Years and Childcare Strategy 2015-2018;
 ECC Local and Neighborhood Planners' Guide to School Organisation; and the
 ECC Developers' Guide to Infrastructure Contributions (2016).
In respect of Options A and B, ECC does not consider there to be a need for separate education infrastructure policies as before. ECC recommends that RDC uses the best practice policy set out in Appendix B to the ECC Local and Neighborhood Planners' Guide to School Organisation, as set out in response to SP3.6 and paragraphs 8.73 and 8.75 above)regarding an appropriate and effective approach to pooled contributions, and to list any on-site facilities (new schools or extra land to expand existing schools) within the individual housing allocation policies.

It is necessary to separately designate land to be allocated for Education use as D1 use class. This is considered necessary to avoid residential hope value being attributed to school land as part of any development viability assessment.

In respect of Option C, ECC does not support this approach for the reasons stated in justification, it is considered contrary to the emerging vision and strategic objectives of the draft local plan, to national policy and would fail to comply with "Duty to Co-operate" in the preparation of a sound, legally compliant and deliverable local plan, as it would not enable the necessary educational infrastructure to be appropriately planned for and delivered to meet the needs of the local community (residents and businesses).

In respect of Option D, ECC recommends the current employment growth policy on skills and supporting skills development are amended and based upon the most up to date evidence and strategies, to determine the requirements for the future. For example ECC would wish to reserve the position on the proposal for construction of a specific academy; ECC recommends further investigation of the skills system is required to ensure it more closely reflects the needs (both now and emerging) of current and new employers. ECC would wish to engage and work with RDC on these matters including the need to address the social determinants of health.

In respect of Option E, ECC welcomes and is supportive of the approach to using development as a way of supporting local apprenticeships. ECC is in the process of updating the referenced ECC Developers' Guide to Infrastructure Contributions (2016), to include planning obligations and standard charges for contributions to support the full range of post-16 provision, where need is sufficiently evidenced.
This is as a result of students 16-18 being required to stay in some form of education or training. This would support workforces, support apprenticeships and work with local colleges to address identified skills gaps. ECC would wish to engaged and work with RDC in the development of these matters in the preparation of the Local Plan, to ensure it reflects the latest evidence and strategies, including for example (but not limited to) ECC's overarching Lifelong Learning Strategy 2014 - 2018.

SP4.4 Early Years and Childcare Provision;

Paragraph 9.30 Overall ECC is generally supportive of the approach to EYCC, as presented, however please be advised that the ECC Strategy "Essex Early Years and Childcare Strategy 2015-2016 will be reviewed late 2018. ECC would welcome the opportunity to work with RDC on an ongoing basis to ensure the draft Local Plan is prepared based upon the most up to date ECC strategies and objectives as well as the latest EYCC sufficiency data, which is reviewed annually. ECC wishes to be engaged with the next stages of the Local Plan and the consideration of site allocations and their assessments to ensure full consideration is given to the opportunities and impacts on EYCC infrastructure requirements and delivery matters arising from both individual and cumulative site allocations.

Paragraph 9.31 ECC recommend that the emphasis and role of the EYCC service as referred to is changed to correctly reflect the role and provision of EYCC services, which is for every child to achieve a good level of development and best start in life, and not for parents employment. The provision of EYCC facilities is a key service which supports parents wishing to re-enter employment, continue with their current employment or to pursue further or higher education. Please refer to the Essex Early Years and Childcare Strategy 2015-2018 for further clarification, which includes ECC's vision that "Children in Essex get the best start in life to enable them to reach their full potential". The access to high quality education is one of the fundamental influences on the long term life chances of children living in Essex. Furthermore this strategy forms part of ECC's broader Lifelong Learning Strategy 2014 - 2018, for children from pre-birth to 19 and pre-birth to 24 for children with Special Education Needs or Disabilities.

Paragraph 9.32 ECC welcomes and supports the reference to the EYCC sufficiency data (at August 2016) presented within table 11, however please be advised that this data is monitored and updated on an annual basis, and more recent information is now available. ECC would welcome the opportunity to work with RDC on an ongoing basis as the draft Local Plan is prepared, to ensure it based upon the most up to date and relevant ECC strategies and objectives including this EYCC sufficiency data (as referred to in paragraph 9.30 above).

Paragraph 9.33 ECC recommends that all references to nursery education is changed to "Early Years and Childcare Provision". ECC notes the reference to "Childrens Centres" within the paragraph and can advise that the provision of these service had been changed is and is now call "Essex Child and Family Well-being Service" as set out in paragraph 9.35. ECC recommends that all references to "Childrens Centres" throughout the draft Plan are now changed to "Essex Child and Family Well-being Service". Further information and evidence is available on ECC's website as follows: http://www.essex.gov.uk/Education-Schools/Early-Years-Childcare/Pages/Children%E2%80%99s-centres.aspx

Paragraph 9.34 & 9.35 ECC recommends that the references to "PB" are changed to "pre-Birth" to provide the clarification on the nature of the services being provided.

Paragraph 9.36 Options Identified for the provision of early years and childcare facilities:

A. Retain the current policies on schools, early years and childcare
B. Ensure that land is specifically allocated for schools, early years and childcare
C. Do not have a policy on early years and childcare facilities
ECC Comments
ECC would anticipate the strategy for early years and childcare facilities to be developed with a combination of the options, based on evidence and in accordance with the NPPF

In respect of this section and the range of Options, ECC recommends that they are expanded to explicitly incorporate the requirements and provision of Special Education Needs within EYCC and the wider community. ECC welcomes the opportunity to work with RDC on an ongoing basis to ensure this is addressed in the development of the Local Plan, in accordance with ECC's overarching Lifelong Learning Strategy 2014 - 2018 and supporting strategies, which include the provision of services from pre-birth to 24 for children with Special Educational Needs or Disabilities.

Further details are also available within:
 Essex Early Years and Childcare Strategy 2015-2018;
 ECC Local and Neighborhood Planners' Guide to School Organisation and the
 ECC Developers' Guide to Infrastructure Contributions (2016)
In respect of Option A, ECC is supportive of a broad approach in respect of Education and EYCC to ensuring there is sufficient provision. There is however a need to ensure that the policies are updated to reflect current and future need for the community. ECC recommends that the following are taken into account:
 ECC's Essex Early Years and Childcare Strategy 2015-2018;
 the implementation of the Government's Extended Funding Entitlement offer (30 hours) introduced in September 2017;
 ECC's emerging strategy for the "Essex Child and Family Service",
 the most up to date EYCC Sufficiency Data; and
 the Infrastructure delivery requirements set out in ECC Developers' Guide to Infrastructure Contributions (2016).

ECC would welcome the opportunity to continue to work with RDC, to ensure the most-up to date and relevant Strategies, guidance and evidence is used to inform the broad policy approach as well as the wider preparation of the draft Local Plan.

In respect of Option B, ECC is supportive of this approach to ensure specific land is allocated for the provision of schools and EYCC facilities. ECC would welcome the opportunity to continue to engage with RDC on this matter, and draw your attention to the requirements of the ECC Developers' Guide to Infrastructure Contributions (2016), the ECC Local and Neighborhood Planners' Guide to School Organisation, as well as ECC's comments above to paragraph 9.36 and the Options identified to plan for education and skills development in the future.

ECC does not support Option C, for the reasons stated in the justification, it is considered contrary, national planning policy and would fail to comply with the "Duty to Co-operate" in the preparation of a sound, legally compliant and deliverable Local Plan, the emerging vision and objectives, and it would not enable EYCC and educational infrastructure to be appropriately planned for and delivered to meet the needs of the local community (residents and businesses).

SP4.5 Open Space and Outdoor Sports and Recreation

Paragraph 9.37 ECC welcomes and supports the provision of Open Space, Outdoor Sports and Recreation (both formal and informal) and supports the preparation of up to date evidence with the joint South Essex Playing Pitch Strategy, in co-operation with Active Essex, as well as the need to commission a new Open Space Study incorporating Green space and infrastructure.

ECC recommends further consideration is given to the wider role of and value of green space to support healthy communities including general landscape value, green infrastructure, biodiversity, green corridors and country parks for the provision of managed informal passive and active recreational space for all residents.

Paragraph 9.42 Options identified for open space, outdoor sports and recreation:
A. Retain, and where necessary update, the existing overarching policy on open spaces
B. Retain, and where necessary update, our current policy on existing open space
C. Retain, and where necessary update, our current policy on new open space
D. Retain, and where necessary update, our current policies
ECC would expect RDC to develop a combination of the options, based on evidence and in accordance with the NPPF.

ECC would expect this to include the South Essex Playing Pitch Strategy and the Open Space and Green Infrastructure Study to be commissioned) and in accordance with the NPPF and guidance, including the emerging EDG (to be published February 2018) and Sport England's Active Design Principles, to create and promote healthy communities.

ECC recommend that further consideration is given to connectivity investment and improvements between green spaces through the provision of green corridors and enhancement of existing and new Green Infrastructure, which would provide a number of key benefits. This includes
 Climate change adaptation and mitigation
 Health, wellbeing and social cohesion
 Economic growth and investment
 Wildlife and habitats

This would support the creation of stronger communities and these benefits could be achieved through good planning and management to ensure green space is supplied and maintained. ECC would wish to engage with RDC on an ongoing basis in the preparation of the Local Plan, especially as the plan progresses to consider specific sites and spatial strategy.

In respect of Option C, ECC recommends that the "Challenge" on how to deliver infrastructure to support new homes should also seek to incorporate new open space Suitable Accessible Natural Greenspace (SANG) as part of new residential developments to avoid recreational impacts on European sites. Further details on this aspect are incorporated within the revisions to the emerging EDG. ECC also consider that this approach and option is cross referenced to the challenges set out in paragraph 4.17 and the approach to Greenways in paragraph 10.29 (Option H).

SP4.6 Indoor Sports and Leisure Centres

Paragraph 9.50 Options to address the provision of the indoor sports and leisure centres:
A. Retain the existing policy
B. Do not have a policy on indoor sports and leisure centres

ECC Comments

ECC would expect RDC to develop a policy approach based on evidence and in accordance with the NPPF.

ECC support Option A, subject to the need for any amendment arising from the new / emerging evidence base.

ECC does not support Option B, for the reasons stated within justification, it is considered contrary to the NPPF and the emerging vision and strategic objectives of the draft local plan.

SP4.7 Facilities for Young People;

Please refer to ECC's comments in response to SP4.3 - 4.5 above regarding community facilities; Education and Skills; Open Space and Outdoor Sports and Recreation; and Indoor Sports and Leisure Centres.

ECC would welcome the opportunity to work with RDC to ensure the latest ECC policies; guidance and evidence are taken into account to inform the principles, strategies and specific policies within the emerging Local Plan, please also refer to the Revised EDG.

SP4.8 Play Space Facilities;

Please refer to ECC's comments in response to SP4.3 - 4.5 above regarding community facilities; Education and Skills; Open Space and Outdoor Sports and Recreation; and indoor sports and leisure centres.

ECC would welcome the opportunity to work with RDC to ensure the latest ECC policies; guidance and evidence are taken into account to inform the principles, strategies and specific policies within the emerging Local Plan, please also refer to the Revised EDG.

PROTECTING AND ENHANCING OUR ENVIRONMENT (SECTION 10)

Paragraph 10.1 Overall ECC welcomes the Strategic Priority SP5

ECC supports the inclusion and strategic priority 5 (and SO19) regarding conservation and enhancement of the natural environment, broadly in accordance with NPPF (paragraph 156). ECC recommends that the objectives should be further amended, to include policies which seek to minimise the impacts to biodiversity in accordance with NPPF paragraph 117, which sets out the need for planning policies to:
 plan for biodiversity at a landscape-scale across local authority boundaries;
 identify and map components of the local ecological networks, including the hierarchy of international, national and locally designated sites of importance for biodiversity, wildlife corridors and stepping stones that connect them and areas identified by local partnerships for habitat restoration or creation;
 promote the preservation, restoration and re-creation of priority habitats, ecological networks and the protection and recovery of priority species populations, linked to national and local targets, and identify suitable indicators for monitoring biodiversity in the plan;
 aim to prevent harm to geological conservation interests;

ECC recommends that this is developed under the Duty to Co-operate with neighbouring authorities to both identify the wildlife corridors and to implement them through planning policies.

ECC consider the following Acts, Strategies and Guidance to be relevant and recommends that these are taken into account and used as appropriate:
 NERC Act 2006 concerning biodiversity duties for public bodies;
 England Biodiversity Strategy 2020; Net Gain initiative;  DEFRA's biodiversity metric calculator; and
 Essex Biodiversity Validation Checklist.

SP5.1 Green Belt

Paragraphs 10.5 ECC notes and supports RDC's desire to protect the Green Belt,
10.15 whilst also seeking to meet the emerging vision and strategic objectives for the District, including the preparation of evidence incorporating a review of the Green Belt boundary for plan making purposes in accordance with the NPPF.
ECC supports this approach and welcomes the opportunity to work closely with RDC on this matter, in accordance with ECC's Full Council motion in December 2014 and 2017, to support the Essex District, Borough and City Councils which when developing their Local Plans, seek to protect Green belt sites from inappropriate development and to ensure that housing development cannot occur where there is insufficient infrastructural provision. ECC will not support Local (Development) Plans unless adequate resources are identified from developers, local councils and/or Government grants to ensure that sufficient infrastructure, including roads, schools, medical facilities, parking, sewerage and drainage, is provided in a timely manner and in a way that balances the needs to promote economic growth and provide housing for residents whilst protecting their quality of life.

In 2017 ECC called on the Secretary of State for Communities and Local Government to issue urgent statutory guidance, which removes the opportunity for this exploitation and protects valued greenfield sites from predatory development.'

Paragraph 10.16 Options in relation to the Green Belt:

A. Retain the existing policy on broad Green Belt principles in the Core Strategy
B. Amend the current Green Belt policy in the Core Strategy
C. Do not have a policy on the Green Belt

ECC Comments

ECC would expect RDC to develop a policy option based on evidence and in accordance with the NPPF. In respect of both Options A and B, ECC recommend a Review of the Green Belt boundary as part of the evidence base to inform the preparation of the Local Plan and its emerging spatial strategy, in accordance with NPPF (paragraphs 83-85), to set the framework for Green Belt and settlement policy.

ECC would welcome the opportunity to work with RDC to ensure the latest ECC policies; guidance and evidence are taken into account to inform the principles, strategies and specific policies within the emerging Local Plan.

ECC does not support Option C, for the reasons stated within the justification and would expect RDC to take any decision based on robust evidence and in accordance with the NPPF.

SP5.2 Biodiversity, Geology and Green Infrastructure

Paragraph 10.17 ECC welcomes the overall approach to protect and enhance the natural environment by RDC, including a review of the evidence base to ensure decisions are based upon the most up to date biodiversity and geodiversity information.

ECC recommends the inclusion and reference to the Outer Thames Estuary SPA within the list of European sites.

Paragraph 10.19 ECC note that Green Infrastructure (GI) is only referred to in its wider District context (see ECC comments to paragraph 6.4). However, due to the rural nature of the District, ECC considers localised GI design principles should be incorporated as part of a proposed housing development, specifically large developments such as Garden Communities and Urban Extensions. This would be in accordance with the NPPF and the Core Planning Principles and in particular paragraph 114 for conserving and enhancing the natural environment, by setting out the strategic approach within the Local Plans.

ECC recommends the principles in NPPF paragraph 114 are incorporated within Strategic Priority SP5.2 to protect, manage and enhance important habitats, nature conservation areas, geo-diversity and greenways.

Paragraph 10.20 ECC recommends Local Geodiversity/Geological Sites (LoGS) are added to the list of local sites. These are in addition to Local Wildlife sites (LoWS) and would be in accordance with NPPF paragraph 117.

Paragraph 10.21 As outlined above in response to Strategic Objective 12, ECC welcomes the reference to 'encouraging adherence to the waste hierarchy' and making 'best use of mineral deposits' but considers that these statements could be afforded slightly more clarity. Supporting the waste hierarchy and ensuring a sustainable use of minerals requires that existing facilities and infrastructure are safeguarded to ensure that they are able to continue to make their planned contribution to the mineral and waste strategies operating in the County. Whilst already covered by MLP Policy S8 and WLP Policy 2, it is considered beneficial for this to be incorporated into the Rochford LP objectives (see suggested change to Strategic Objective 12 above).

ECC welcomes and supports the reference to the requirement to safeguard mineral development recognised in paragraph 10.21 and consider the proposed modification to Strategic Objective12 to be in accordance with this recognition. However, it is noted that there is no similar recognition for waste facilities, which the proposed modification to Strategic Objective 12 would then cover.

Paragraph 10.22 ECC supports the approach outlined in this paragraph and polices DM25-DM27 which are considered to be in accordance with NPPF paragraph 118 to deliver biodiversity and the requirements of the NERC Act

Paragraph 10.26 ECC welcome and support the development of an Essex-wide strategy in respect of Recreational Disturbance Avoidance Mitigation Strategy, however note that this would mitigate for recreational disturbance impacts, in-combination with other plans and projects.

Paragraph 10.27 Options in relation to Biodiversity and Geodiversity in the district:
A. Retain or amend our current broad policy on sites of nature conservation importance
B. Do not have a policy on sites of nature conservation importance

Paragraph 10.28 Options identified to support and protect local habitats which have important ecological value:
C. Retain our current policy on trees and woodlands
D. Retain our current policy on other important landscape features
E. Retain our current policy on species and habitat protection
F. Update our current policy on Local Wildlife Sites
G. Condense and merge our current policies on nature conservation
Paragraph10.29 Options identified in relation to greenways in the district:
H. Retain our current policy on greenways
I. Do not have a policy on greenways

ECC Comments

Options A- I: ECC does not consider the options to be mutually exclusive. ECC would expect RDC to develop a combination of the options based on evidence and in accordance with the NPPF and guidance, whilst also having regard to the evidence presented in sections SP4.5 and 4.6 and ECC comments (see above).

ECC would wish to engage with RDC on an ongoing basis in the preparation of the Local Plan, especially as the plan progresses to consider specific sites and spatial strategy.

In respect of Option A, ECC welcomes and supports the proposal to commission a joint South Essex Open Space and Green Strategy, which shall subsequently inform this Local Plan. ECC also welcomes the importance assigned to nature conservation sites, the identification and enhancement of local wildlife/green corridors and networks to build biodiversity resilience to climate change allowing species dispersal within the urban landscape. These corridors will also provide a provision of greenways for walking and cycling; improve accessibility to green spaces and should have regard to the cycle network in the Rochford Cycling Action Plan.

ECC consider there to be the additional benefits including the health and wellbeing agenda, as well as improving the attractiveness of a place and potential to attract visitors and investment to the area.

In respect of Options C-G (local habitats) - Whilst ECC does not disagree with these options, consideration should be given to the preparation of one policy, incorporating all the policies referred to (within options C-G and ENV1). This would enable a holistic approach to be taken to our natural environment, with the elements considered as a "whole", within Option G.

In respect of Option G, if developed, ECC recommends that the policy is expanded to include "greenways" (please refer to ECC's comments in sections SP4.5 and 4.6 above in relation to open space and outdoor recreation and green infrastructure).
ECC supports Option H (Greenways), in principle, if it is not incorporated within Option G, as suggested above. ECC consider there to be a need to ensure "greenways" are captured, in accordance to NPPF, and having regard to the wider benefits as outlined above in respect of biodiversity; resilience to climate change, protecting the health of the green space, green infrastructure, open space, outdoor recreation, sustainable travel options and to promoting healthy communities.

ECC does not support Options B and I, for the reasons stated within their justifications, they are considered contrary to national policy and the emerging Local Plans strategy and vision.

SP5.3 Wallasea Island and the RSPB Wild Coast Project

Paragraph 10.34 Options identified for Wallasea Island and the RSPB's Wild Coast Project:
A. Retain the current policy which supports the Wallasea Island Wild Coast Project
B. Continue to support further development at Essex Marina as per current policy
C. Do not support further development at Essex Marina

ECC Comments

ECC would expect RDC to develop a policy approach for based on evidence and in accordance with the NPPF.

In respect of Option A, ECC would anticipate the strategy for Wallasea Island and the RSPB's Wild Coast project, to be developed with a combination of the options, based on evidence and in accordance with the NPPF including consideration for a project level HRA and appropriate mitigation for recreational disturbance.
ECC would recommend the need for a holistic approach within the context of the wider emerging spatial strategy, as well as the other emerging strategies in respect of open space, green space, nature conservation, rural diversification, tourism green infrastructure and sustainable travel. A balanced approach is considered necessary to both support the Wallasea project and improvements to accessibility, whilst ensure this would be sustainable with minimal ecological impact to ensure its survival and viability as a visitor destination.

In respect of Options B & C in relation to the Essex Marina, ECC would expect a policy approach to be developed based on evidence and in accordance with the NPPF.

SP5.4 Landscape Character;

Paragraph 10.35 ECC notes and welcomes inclusion of this section and the importance and use of Landscape Character Assessments as part of the baseline criteria for any development proposal. The principle of this approach is supported and should ensure the existing landscape elements are retained and that any new elements should enhance the overall landscape character.

Paragraph 10.44 Options identified for Landscape Character:
A. Retain the current policies on the Upper Roach Valley
B. Retain the current policies on the Coastal Protection Belt
C. Develop a broad policy on landscape character
D. Ensure consistency throughout Development Management Plan policies in relation to supporting development in appropriate landscape character areas and special landscapes.
E. Do not have a policy on landscape character

ECC Comments

ECC would anticipate a combination of the options A-D to be developed based upon evidence and in accordance with NPPF.

ECC does not support Option E for the reasons stated within the "justification", it is considered contrary to NPPF (paragraph156).

SP5.5 Protecting and Enhancing Heritage and Culture

Paragraph 10.45 ECC notes and welcomes the reference to the EDG, within this section and throughout the Issues and Options Report; however as this EDG is being revised and now includes sections such as Green infrastructure, Garden Communities and SUDS, which could form other key adoptable guidelines for future development.

ECC recommend that the new revised EDG is taken into account in the ongoing preparation of the draft Local Plan and ECC would welcome the opportunity to work with RDC on this matter.

SP5.6 Good Design and Building Efficiency

Paragraph 10.54 ECC recommend that this section is updated to reflect the updates and changes within the revised EDG 2018, which now specifically addresses health and wellbeing requirements. ECC can confirm that Sports England has been engaged with the revisions to the EDG, to include the Sport England - Active Design Principles 2015; which is supported by Public Health England and is consistent with the overall approach to health and wellbeing.

Paragraph 10.57 ECC recommend that a reference should be included to require the sustainable use of minerals in the construction of approved developments. This would be consistent with Strategic Objective 12 which aims to make best use of mineral resources, in accordance with the NPPF.

Paragraph 10.62 Options identified in relation to ensuring design principles are appropriate:
A. Retain the existing policies on design.
Ensure design policies make specific reference to Secured by Design, and the need to strike an appropriate balance between urban design and security.
C. Retain current guidance within our Supplementary Planning Documents.
D. Develop specific design principles for individual towns and villages building on the current guidance within our Supplementary Planning Documents.

ECC Comments

ECC would anticipate a combination of the options A-D to be developed based upon evidence and in accordance with NPPF.

ECC recommends the following Guidance and Evidence is also taken into account to inform the emerging Local Plan:
 The Revised EDG (to be published in February 2018)
 Sport England - Active Design Principles 2015 (which provide updates which specifically include health and well-being requirements and the creation of inclusive and active places. ECC can confirm that Sports England has been engaged with the revisions to the EDG, to include the; which is supported by Public Health England and is consistent with the overall approach to health and wellbeing.

In respect of Option A, ECC considered this option would need to be amended to take into account changes in national policy and guidance, including the removal of the Code for Sustainable Homes.

In respect of Option B, ECC consider the guidance within the Revised EDG to be applicable and relevant.

Paragraph 10.63 Options for building efficiency standards for new homes, and new commercial and industrial buildings.
E. Remove reference to the Code for Sustainable Homes and replace with a simpler policy on water efficiency.
F. Continue to drive up energy efficiency standards for new homes through replacing the Code for Sustainable Homes with one that focuses on energy, thermal and water efficiency in particular.
G. Do not have a policy on energy efficiency standards for new homes.
H. Retain existing policy on BREEAM.
I. Amend the existing policy on BREEAM to apply to only certain types of buildings.
J. Include a specific policy on the efficiency of conversions, extensions and alterations to existing homes.
K. Do not have a policy on energy efficiency standards for conversions, extensions and alterations to existing homes.

ECC Comments

ECC would anticipate a combination of the options E-F and H-J to be developed based upon evidence and in accordance with NPPF (paragraph 156).

In respect of Option E, whilst the removal of reference to the "Code for Sustainable Homes" would be appropriate, there would be a need to ensure an appropriate approach to water efficiency is developed, in accordance with the NPPF to address the broad principles being developed within the emerging vision, strategic objectives and spatial strategy (as outlined in Option C) and to incorporate the standard for energy efficiency within Option F to promote sustainable development, and resilience to climate change, in accordance with the NPPF.

In respect of Option J, this is supported by ECC and is considered to be consistent with best practice, for example the approach contained in Uttlesford District Council's Supplementary Planning Document on home extensions to reduce carbon dioxide emissions from existing building.

ECC does not support Options G & K, for the reasons stated within the respective justifications, they are it is considered contrary to the NPPF (paragraph 156) and the emerging vision and strategic objectives of the draft Local Plan.

SP5.7 Air Quality

Paragraph 10.64 ECC recommends that the scope and content of this section is expanded to include the latest national policy advice including the "National Air Quality Plan (2017)" published by DEFRA in July 2017, and the designation of the A127 to the east of Rayleigh Weir as an area having possible air quality issues.
Paragraph 10.69 ECC recommends inclusion and reference to the adoption of the AQMP for Rayleigh should be updated to say it was adopted in 2017 as this document has been issued after the date of adoption

Paragraph 10.72. Options in relation to Air Quality:

A. Retain the existing policies on air quality
B. Continue to promote clean air initiatives, such as sustainable ways to travel and renewable energy projects
C. Support, where appropriate, the actions put forward in the Rayleigh Town Centre Air Quality Action Plan
D. Do not have a policy on air quality
ECC Comments
ECC would anticipate a RDC to develop a combination of options, based on evidence and in accordance with the NPPF and DEFRA's National Air Quality Plan (2017), which specifically designates the A127 to the east of Rayleigh Weir as having possible air quality issues.

ECC recommends that consideration is also given to the use and role of wider sustainable development principles including green infrastructure, green spaces and green design principles to provide an opportunity to enhance the environment and support wider health.

ECC does not support Option D, for the reasons stated in the justification, it is considered contrary to NPPF (Paragraph 156), the National Air Quality Plan (Defra 2017) legislation, and the emerging vision and strategic objectives of the draft local plan.

DETAILED POLICY CONSIDERATIONS (SECTION 11)

ECC notes the majority of the issues identified within this section concern detailed matters, below the overarching strategic polices and principles addressed in the preceding sections of the ECC response to the Issues and Options consultation.
The principle of the approach is noted, however, ECC would anticipate all the themes and options to be developed, based on evidence and in accordance with the NPPF, taking into account the outcomes of the wider emerging spatial strategies and principles being developed within this Issues and Options consultation, as part of the preparation of the Local Plan.

In addition to the above, ECC can provide the following detailed comments on specific themes:

D.P1.1 Mix of Affordable Housing

Paragraph 11.5 Options to address the split between affordable housing products:
F. Retain the current affordable homes split (80% social and 20% intermediate) where a scheme meets the prescribed threshold
G. Amend the split taking into account any changes in national planning policy and guidance (if the definition of affordable homes is widened to include other products)
H. Do not have a prescribed split in a policy

ECC Comments

ECC would anticipate a RDC to develop a combination of options, based on evidence and in accordance with the NPPF

Please refer to ECC's comments in response to SP1.1 (see Paragraphs 6.30, 6.31 and 6.32) above which equally apply to this option; and in particular ECC's recommendations for consideration to be given to the provision of key worker homes through the affordable housing schemes, to support the needs of healthcare providers (see paragraph 6.31)

DP1.8 Options for development of Brownfield (Previously Developed) Land in the Green Belt in the future
A. Retain the current policy on previously developed land
B. Do not have a policy on previously developed land

ECC Comments

ECC would anticipate the approach to the development of Brownfield Land in the Green Belt, to be developed based on evidence and in accordance with the NPPF, as stated in ECC's response to SP5.1 and paragraph 10.16 regarding the policy approach to Green Belt, the need for a Review of the Green Belt Boundary.

ECC does not support Option B for the reasons stated within the justification, and it is considered contrary to the NPPF (paragraphs 79-92).

DP1.10 Parking standards and Traffic Management

Paragraph 11.57 Options identified for Parking and Traffic Management:
A. Retain our broad policy on parking standards and remove our Development Management Plan
B. Retain our current approach to traffic management
C. Do not have policies on parking and traffic management.

ECC Comments

ECC would expect RDC to develop a combination of options A and B, based on evidence and in accordance with the NPPF.

Please also refer to ECC's response to highway infrastructure (Section 8) regarding the Local and Strategic Highway Network and Sustainable Travel. There is a need for greater emphasis to be placed on an integrated package of transport solutions, which is applicable to Parking Standards and Traffic Management. Please also refer to ECC's earlier comments in Sections 6-8, regarding the development of sustainable communities, and in particular active design principles, promotion of healthy communities and the revised EDG to be applicable. This is necessary to ensure a holistic approach and consistency across the emerging vision and strategic objectives within the draft Local Plan.

In respect of Option B, this is partially supported by ECC, given the need to ensure that the policy is strengthened to provide an appropriate level of off street parking and to fully mitigate the impact of development (as set out in the traffic management plan), however there may be the potential to combine these options into one policy.

ECC would welcome the opportunity to explore this further with RDC as part of the preparation of the Local Plan.

ECC does not support Option C, for the reasons stated in the justification; it is considered contrary to NPPF (paragraph 156 & 157), the Essex LTP, EPOA's Parking Standards Design and Good Practice Guide; and the revised EDG.

D.P1.11 Home Businesses

Paragraph 11.61 Options to deal with home businesses:
A. Retain the current policy
B. Take a more restrictive approach to home businesses
C. Take a more flexible approach to home Businesses
D. Do not have a policy on home businesses

ECC Comments

ECC would expect RDC to develop a combination of the options A-C, based on evidence and in accordance with the NPPF.

In respect of Option C, ECC would support a more flexible approach to home businesses, taking into account the balances within this section and the inter-relationship and links to ECC's earlier comments regarding the ambition for communication infrastructure (improvements to broadband coverage and speed) as well as the need for "grow on space", to accommodate businesses as they become more successful and need more space from which to operate.

Further details on this are set out in ECC's response to meeting business needs (SP1.7 and paragraph 6.87); the options to support employment and economic growth (paragraphs 6.94 & 6.96); and Communication Infrastructure and the options to improve broadband coverage and speed including ultrafast broadband (SP3.3 and paragraphs 8.43 & 8.44).

ECC's considers there to be a need for a holistic approach and consistency across the emerging vision and strategic objectives within the draft Local Plan.

ECC does not support Option C for the reasons stated within the justification, it is considered contrary to the emerging vision and strategic objectives within the draft Local Plan.

DRAFT SUSTAINABILITY APPRAISAL

ECC consider the SA to be a good example of an initial Regulation 18 'Issues and Options' appraisal, exploring the sustainability considerations of a wide range of strategic options and assessing them to the same level of detail.
Whilst not a criticism of the SA, it is considered that the options explored surrounding OAN possibilities within the Plan could be expanded upon within the SA. The Plan, at Table 2 (South Essex Housing Market Area - OAN for new homes (Source: South Essex SHMA Addendum 2017)) indicates a range of between 331 and 361 homes per year. Although the upper and lower figures displayed are perhaps not distinctively different to warrant separate assessment within the SA under the Regulations, RDC may want the SA to consider assessing indicative higher and lower figures in future iterations. If felt necessary, this could also be expanded to assess reasonable spatial strategy options / permutations under different scenarios regarding levels of growth (i.e. at which level of growth would certain spatial strategy options be considered reasonable). Further, it may also be considered necessary to assess the figure included for the District in the recent DCLG consultation which set a standardised methodology for calculating housing needs. This is in consideration of the Plan being at an early stage of preparation and uncertainty as to what might be the District's OAN later on in the plan-making process.

ECC notes the reference throughout the SA and the Issues and Options Report, to 'a combination of options' and considers that whilst this may be a logical option in most cases, care needs to be taken as to what form a 'combined' policy would contain and aspire to.

ECC recommends that the "Climate Change" section should include a reference on whether the proposal will support the findings/priorities of the South Essex Surface Water Management Plan (2012 and emerging 2018 revision).

Comment

Issues and Options Document

Representation ID: 37038

Received: 06/03/2018

Respondent: Essex County Council

Representation Summary:

Environment (natural, built and historic), ECC welcomes the broad approaches to protect and enhance the environment, and recommends a more holistic approach and links to the wider objectives of promoting growth and healthy communities, which can be provided through the natural environment, be it green infrastructure for climate change mitigation and adaption, building design and efficiency, creation and accessibility to open spaces, green spaces (including greenways and green corridors). ECC wishes to explore these opportunities and cross benefits further as incorporated within the revised Essex Design Guide (2018) and to ensure the biodiversity and geodiversity evidence base is up to date and consistent with the NPPF.
In respect of the Historic environment further consideration and assessment is required on conservation areas and listed buildings and the archaeological and historic records of designated and non- designated sites. ECC welcomes the opportunity to explore this further with RDC to ensure the evidence base is up to date and consistent with the NPPF.

Sustainability Appraisal ECC considers the SA to be a good example of an initial Regulation 18 'Issues and Options' appraisal, exploring the sustainability considerations of a wide range of strategic options and assessing them to the same level of detail. However, ECC recommends that a number of the options within the SA/SEA are expanded to reflect the ranges in the Issues and Options consultation Report.

Full text:

1. INTRODUCTION

Rochford District Council (RDC) is currently consulting on the Draft New Local Plan Issues and Options (the Draft Local Plan) Regulation 18 document. This consultation represents the first stage in preparing a new Local Plan for the District of Rochford. Once prepared, the Local Plan will include the required strategies, policies and proposals to guide future planning across the District; and will replace the current suite of Adopted Development Plans (up to 2025).

Essex County Council (ECC) supports the preparation of a new Local Plan for RDC and welcomes the opportunity to comment on the Issues and Options consultation. A Local Plan by setting out a specific vision and policies for the long-term planning and development of the District can provide a platform from which to secure a sustainable economic, social and environmental future to the benefit of residents, businesses and visitors.

A robust long-term strategy will provide a reliable basis on which RDC, ECC and its partners may plan and provide future service provision and required community infrastructure for which they are responsible. ECC will also use its best endeavours to assist on strategic and cross-boundary matters under the duty to cooperate, including engagement and co-operation with other organisations for which those issues may have relevance.

2. ECC Interest in the Issues and Options Consultation

ECC aims to ensure that local policies and related strategies provide the greatest benefit to deliver a buoyant economy for the existing and future population that live, work, visit and invest in Essex. As a result ECC is keen to understand, inform, support and help refine the formulation of any development strategy and policies delivered by Local Planning Authorities. Involvement is necessary and beneficial because of ECC's roles as:
a. a key partner within Greater Essex, the Association of South Essex Local Authorities (ASELA) and, Opportunity South Essex Partnership (OSE); promoting economic growth, regeneration, infrastructure delivery and sustainable new development;
b. major provider and commissioner of a wide range of local government services throughout the county;
c. the strategic highway and transport authority, including responsibility for the delivery of the Essex Local Transport Plan; Local Education Authority including early years and childcare; Minerals and Waste Planning Authority; Lead Local Flood Authority; lead advisors on public health; and adult social care in relation to the securing the right housing mix which takes account of the housing needs of older people; and d. as an infrastructure funding partner, that seeks to ensure that the proposals are realistic and do not place an unnecessary (or unacceptable) cost burden on ECC's Capital Programme.

3. DUTY TO CO-OPERATE

The duty to cooperate (the Duty) was introduced by the Localism Act in November 2011. The Act inserted a new Section 33A into the Planning and Compulsory Purchase Act 2004. This placed a legal duty on all local authorities and public bodies (defined in regulations) to 'engage constructively, actively and on an ongoing basis' to maximise the effectiveness of local and marine plan preparation relating to strategic cross boundary matters, and in particular with County Councils on strategic matters.

The National Planning Policy Framework (NPPF) provides detail on how strategic planning matters should be addressed in local plans (paragraphs 178-181). Local planning authorities are expected to work 'collaboratively with other bodies to ensure that strategic priorities across local authority boundaries are properly coordinated and clearly reflected in individual local plans' (paragraph 179). 'Strategic priorities' to which local planning authorities should have particular regard are set out in paragraph 156 of the NPPF.

Specific guidance on how the Duty should be applied is included in the Planning Practice Guidance (the PPG). This makes it clear that the Duty requires a proactive, ongoing and focussed approach to strategic matters. Constructive cooperation must be an integral part of plan preparation and result in clear policy outcomes which can be demonstrated through the examination process.

The PPG makes it clear that the Duty requires cooperation in two tier local planning authority areas and states 'Close cooperation between district local planning authorities and county councils in two tier local planning authority areas will be critical to ensure that both tiers are effective when planning for strategic matters such as minerals, waste, transport and education.
ECC will use its best endeavours to assist RDC on strategic and cross-boundary matters under the duty, including engagement and co-operation with other organisations for which those issues may have relevance e.g. Highways England. In accordance with the Duty, ECC will contribute cooperatively to the preparation of a new Rochford Local Plan, particularly within the following broad subject areas,
 ECC assets and services. Where relevant, advice on the current status of assets and services and the likely impact and implications of proposals in emerging Local Plans for the future operation and delivery of ECC services.
 Evidence base. Guidance with assembly and interpretation of the evidence base both for strategic/cross-boundary projects, for example, education provision and transport studies and modelling.
 Sub-regional and broader context. Assistance with identification of relevant information and its fit with broader strategic initiatives, and assessments of how emerging proposals for the District may impact on areas beyond and vice-versa.
 Policy development. Contributions on the relationship of the evidence base with the structure and content of emerging policies and proposals.
 Inter-relationship between Local Plans. Including the Essex Minerals Local Plan Adopted 2014 and the Essex and Southend-on-Sea Waste Local Plan Adopted 2017.

ECC acknowledges and supports the production of a new Local Plan by RDC ensuring an up-to-date Local Plan. This can facilitate new job opportunities, attract investment in new and improved infrastructure, protect the environment and ensure new homes meet the needs of a growing population, which are sustainably located, and achieve the right standards of quality and design.

RDC has already undertaken work with ECC under the Duty to Co-operate during the past year, in addition to the joint and regular meetings established with the South Essex authorities, including RDC and ECC, through specific South Essex Strategic Planning DTC Groups for Members and Officers respectively to explore cross boundary matters.

The on-going duty to co-operate work that RDC has undertaken with ECC to date is acknowledged and this consultation provides the first opportunity for ECC to review the emerging issues and options in their entirety. ECC shall continue to work with RDC and provide as appropriate the latest ECC strategies and evidence to inform and shape the draft Local Plan, which will require further changes as the spatial strategy emerges and the site allocations are considered and assessed both individually and cumulatively, to test and establish the infrastructure requirements. This includes but is not limited to ECC service areas such as Highways; Infrastructure Planning; Education and Early Years and Child Care provision; Independent Living; Flood and Water Management; Public Health; and Minerals and Waste Planning. ECC will continue to work with RDC in respect of the evidence base to contribute cooperatively with RDC in the preparation of the new Local Plan through to examination.

4. ECC RESPONSE TO DRAFT NEW LOCAL PLAN ISSUES AND OPTIONS CONSULTATION DOCUMENT (DECEMBER 2017)

ECC's response to the draft Plan Issues and Options consultation document is set out below and corresponds to the format and chapters within the consultation document, however this is preceded by a summary of the key issues.

4A Summary

 Duty to co-operate. In accordance with provisions of the Localism Act 2011, ECC will contribute cooperatively with RDC in preparation of the new Local Plan. This will primarily cover an assessment of the impact on the transport and highway network (as Local Highway Authority), the need to ensure additional school places (as Education Authority), consideration of surface water management (as Lead Local Flood Authority), and links to minerals and waste planning (as Minerals and Waste Planning Authority) as well as advice on Public Health as the Lead advisor.
ECC notes that the Issues and Options consultation is primarily thematic and does not present options covering spatial proposals or site allocations. In moving forward the focus will need to be on the further assessment of the spatial options and emerging spatial strategy, which will vary according to the location, nature and mix of new developments being considered. ECC wish to be proactively engaged with the assessment of the spatial options and site allocations, given the importance of infrastructure provision and funding to the Draft Plan, which will vary for each spatial option and site allocations, given their respective individual and cumulative infrastructure requirements, generating their own, individual and cumulative impacts and opportunities on the delivery of ECC service areas. This will be essential to enable ECC to continue to inform and identify the issues and opportunities for ECC services, to ensure the Local Plan is deliverable, in accordance with the tests of Soundness and that the right infrastructure is in place at the right time.
A particular focus will be the impacts of any proposed new large urban extensions or new settlements to assist RDC determine an appropriate strategy if those options progress as part of its preferred growth and development strategy.
In addition to the above ECC will continue to contribute co-operatively with RDC through the wider collective South Essex arrangements, to address cross boundary strategic planning and infrastructure matters, through the Association of South Essex Local Authorities (ASELA), and the emerging South Essex 2050 vision associated work streams, and preparation of a South Essex Joint Strategic/Spatial Plan (JSP);and through the South Essex Transport Board and the Opportunity South Essex Partnership (OSE). With the exception of the formation of ASELA and the preparation of a JSP, the majority of the issues and options identified have regard to this wider engagement.
 Housing provision. ECC acknowledges RDC is seeking to meet housing needs in full over the plan period. However, ECC acknowledges highway and transportation constraints, and in its role as Highway Authority will provide the necessary assessments to determine impacts (including cross boundary impacts) and mitigation measures, as RDC seeks to adopt a preferred growth and development strategy. The new Local Plan should also emphasise the need to provide infrastructure (secured through developer funding) as part of any new housing proposals. ECC welcomes the importance and consideration given to the provision of adult social care and extra care (encompassing aged and vulnerable people), within ECC's Independent Living programme.
 Infrastructure Provision and Funding. ECC agrees that Infrastructure is critical to support sustainable growth and it will be essential to ensure RDC has the right infrastructure, at the right time, to accommodate the new jobs and homes needed in the future. We welcome the acknowledgement of ECC's role in the provision of Local and Strategic infrastructure. Further comments are provided on the spatial strategy and on the implications for ECC services and infrastructure, ranging from large urban extensions to less growth at settlements lower in the settlement hierarchy

ECC will take a pro-active position to engage with RDC to ensure the delivery of new homes and employment is at the right location and of an appropriate scale to identify and deliver the necessary level of infrastructure investment, as part of a viable and deliverable plan. ECC seeks clarification on the size of residential sites / extensions being considered when compared to large residential urban extensions / new settlements.

ECC wish to explore and understand the potential implications of the nature and scale of developments on financial contributions, given the pooling of contributions under the CIL Regulations and hence potential viability and delivery issues which will be very different for each of the spatial options being considered. As outlined in 4.6 above, the new Local Plan should emphasise the need to provide infrastructure (secured through developer funding) as part of any new development proposals, to ensure the new plan is both viable and deliverable. Given the importance of infrastructure provision and funding for the new Local Plan, ECC wishes to work with RDC to ensure the necessary infrastructure funding (including all funding streams) and delivery evidence is fully considered as part of the assessment of all the spatial options. This is to ensure the preferred strategy is viable, deliverable and sound.
 Transport and highways. ECC, will work with RDC (in consultation with Southend on Sea and the South Essex authorities) to enable further transport and highway impact assessments to be undertaken to inform the preparation of the RDC Local Plan and in accordance with the ASELA workstreams and JSP.
There is overall support for proposals promoting the importance and need for improvements to the A127 Strategic Road Network, however greater emphasis should be placed on the role and importance of sustainable travel as part of a long term integrated transport solution, including walking, cycling, bus and rail. Adequate transport and highway provision will need to be evidenced including transparency of funding, viability and deliverability to unlock sustainable growth in new homes and employment, at a scale necessary to bring forward the level of investment needed to provide significant improvement to the highway and transport infrastructure.
In respect of the A127/A130 Fairglen Interchange, ECC would not support any new development and employment allocations (beyond the current adopted Local Plan employment allocations) until the proposed long term transport scheme for the junction is implemented. ECC supports the need for a range of highways and sustainable transport improvements to existing employment areas including, London Southend Airport and the airport business park and will continue to seek funding through bids to Central Government, SELEP and S106 contributions.
 Sustainable transport. ECC recommend greater emphasis is placed on sustainable transport including passenger transport as part of a wider sustainable growth strategy to underpin future development opportunities and to ensure an integrated transport package of solutions are developed for the District and in respect of its relationship and connectivity to Southend, South Essex, Essex and London.
 Minerals and Waste Planning. ECC will engage with RDC in the site assessment process to ensure new allocations appropriately address the minerals and waste safeguarding policy requirements within the adopted Essex Minerals Local Plan and the Essex and Southend-on-Sea Waste Local Plan. ECC wishes to draw attention to the dual requirements of these Local Plans concerning minerals and waste safeguarding, operations, sustainable use of minerals in construction, and the location of waste management uses within employment areas.
 Flood and Water Management. ECC wish to work with RDC to provide points of clarification and to ensure the most up to date evidence is used to underpin the preparation of the Local Plan including the strategy and site assessments. This will include reference to the Environment Agency's revised climate change allowances and the subsequent revisions to the South Essex Surface Water Management Plans, due to be published in 2018.
 Economic Growth. ECC welcomes proposals to ensure the protection and provision of suitable employment land and appropriate uses within the District, with the pre-eminent importance of London Southend Airport to the economy whilst seeking opportunities for rural diversification, tourism, retail, leisure, and town centres, to meet the life cycle needs of business including "Grow on Space" and development of skills and training opportunities.
ECC welcomes and supports the importance and economic role played by London Southend Airport as an international gateway, and the A127 corridor and London-Southend Victoria railway line for connectivity with South Essex, the rest of Essex and London. A key priority will be to enable investment in infrastructure and economic growth, including, for example, the A127 including passenger transport and ultrafast broadband, as well as developing options to support the alignment of skill provision to meet the local needs in accordance with the Economic Plan for Essex (2014) and the National Industrial Strategy The provision of jobs and infrastructure to support economic growth will be essential, including the need to provide social, physical and green infrastructure and are also being explored by ASELA through the Industrial Strategy workstream and the JSP.
 Superfast Broadband ECC recommend upgrading all broadband references to "ultrafast broadband" to promote the Governments next broadband programme; and refer to the BT Open Reach policy for providing FTTP connections on new development of houses of 30+units, free of charge to the developer https://www.ournetwork.openreach.co.uk/property-developers/site-registration.aspx
 Education ECC Support the use of ECC Planning School information and recommend a number of updates to reflect ECC's change in policy and standards (minimum size of new schools and use of ECC model infrastructure delivery policy). ECC wishes to engage with RDC as the new Local Plan progresses to preferred options stage to enable appropriate "scenario testing" of the preferred options for education requirements.
ECC will continue to work with RDC to ensure education needs are appropriate and adequately assessed as preparation of the new Local Plan continues. ECC will undertake a further assessment of the potential delivery and resource requirements for accommodating anticipated pupil change through "scenario testing" as and when RDC confirms its preferred spatial option for growth and development and the specific sites.
In respect of Special Education Needs, this should be acknowledged in the new Local Plan, and sites allocated specifically provision for children/young people with Special Educational Needs either within the existing school provision or the wider community. ECC wish to engage with RDC to identify requirements and opportunities.
 Early Years and Childcare. In addition to the above, support the use of the ECC evidence, however recommend a number of changes to explicitly refer to "Early Years and Childcare provision" and for consistency in approach. There will be a need to update the EYCC information to ECC
 Skills. ECC will engage with RDC and can provide advice and updates, including on the full range of post 16 education and training provision and on the revisions to the ECC Developers' Guide to Infrastructure Contributions, to include the need for large scale developments to adopt an Employment and Skills Plan; and reference to the new Essex Employment and Skills Board's 2017-18 as an evidence base and the seven priority sectors. ECC wish to work with RDC to identify and promote opportunities for skills and training development to align skills with jobs.
 Public Health. ECC welcome and are supportive of the links and inclusion of health and well-being throughout the Issues and Options Report; and offer support to assist the preparation of the Local Plan, for example the development of the health and well-being policy, greater involvement with employment opportunities for local residents; support for skills, training, education and employment opportunities; improvements to air quality.
ECC support and welcomes consideration on phasing and release of affordable housing; use and application of the revised Essex Design Guide, including key concepts for inclusive and adaptable housing (e.g.. dementia friendly principles and social cohesion); housing mix, provision for older people (including care homes) and active design principles including active and sustainable travel principles.
ECC recommend use and reference to the revised Essex Design Guide within the new Local Plan design policies and the supporting text.
ECC wish to work with RDC to provide support and advice in respect of the Health and Well-being policy; policies on "fast food" outlets; Education, Skills and Employment policies and the Good Design policies.
 Independent Living Support the general approach and inclusion of and reference to ECC's Independent Living Programme for Older People and Adults with Disabilities.
 Environment (natural, built and historic), ECC welcomes the broad approaches to protect and enhance the environment, and recommends a more holistic approach and links to the wider objectives of promoting growth and healthy communities, which can be provided through the natural environment, be it green infrastructure for climate change mitigation and adaption, building design and efficiency, creation and accessibility to open spaces, green spaces (including greenways and green corridors). ECC wishes to explore these opportunities and cross benefits further as incorporated within the revised Essex Design Guide (2018) and to ensure the biodiversity and geodiversity evidence base is up to date and consistent with the NPPF.
In respect of the Historic environment further consideration and assessment is required on conservation areas and listed buildings and the archaeological and historic records of designated and non- designated sites. ECC welcomes the opportunity to explore this further with RDC to ensure the evidence base is up to date and consistent with the NPPF.
 Sustainability Appraisal ECC considers the SA to be a good example of an initial Regulation 18 'Issues and Options' appraisal, exploring the sustainability considerations of a wide range of strategic options and assessing them to the same level of detail. However, ECC recommends that a number of the options within the SA/SEA are expanded to reflect the ranges in the Issues and Options consultation Report.

4B ECC Detailed Response to the Issues and Options Consultation

INTRODUCTION (SECTION 1)

Paragraph 1.5 ECC recommend that this paragraph is amended to clearly recognise that the Essex Minerals Local Plan 2014 (MLP) and Essex and Southend-on-Sea Waste Local Plan 2017 (WLP) form part of the statutory development plan for Rochford District. The Minerals and Waste Planning Authority (MWPA) is pleased to note that the mineral and waste plans are appropriately referenced further into the plan at relevant sections and shown to have relevance to Rochford, but it may be beneficial to qualify the extent of the Development Plan at the outset.

Paragraph 1.12 ECC welcomes and supports the preparation of a Draft Habitat Regulations Assessment to inform and accompany the preparation of the draft Local Plan

TELL US YOUR VIEWS (SECTION 2)

Next Steps

ECC service areas and functions would wish to work with RDC in the preparation of the Local Plan as it progresses to assess the suggested sites and the selection of preferred sites, with regards to the impact and opportunities on ECC services and infrastructure, to ensure sites selected are sustainable. Details on this are set out in Section 2A above and throughout the response below.
ECC as the MWPA is keen to enter into engagement with RDC with regard to proposed site allocations considered through the Local Plan process. This is to ensure that any future site allocations made by RDC appropriately address mineral and waste safeguarding matters in line with adopted policies. ECC recommend early engagement within the site assessment process, for effective collaboration and consistency across the wider Development Plan. Further details of the policy requirements are set out in the Essex Minerals Local Plan Adopted 2014 and the Essex and Southend-on-Sea Waste Local Plan Adopted 2017 For the avoidance of doubt, the considerations that may arise from the MWPA in relation to these sites would be as informatives only; there is no intention to influence the site assessment process and/or any scoring mechanism designed by RDC.

OUR CHARACTERISTICS (SECTION 3)

Figure 1 ECC recommends that the content of this map is reviewed to ensure it clearly presents the local and strategic context and characteristics of the district. For example greater use of graphics and annotations including:
 Annotations for the strategic road network (A127, A130 and A13), with specific emphasis on the A127 as the key strategic highway route for Rochford will demonstrate its importance within the local highway network 9
 The London - Victoria Railway line and stations should be clearly annotated, as well as inclusion of the wider network for context, for example the C2C line from Southend to London Fenchurch Street.
 Inclusion / indication of the existing bus networks and connectivity with surrounding areas, to demonstrate the passenger transport services within the area.
The above provides background and context for the Highway and Transportation network (including Sustainable travel) within the district and wider connectivity, including strengths and areas for improvement, and the need for the provision of sustainable access. This would also provide context for the national and local pictures presented in section 4 and the relationship with London (and the rest of Essex).

Our Economy

Paragraph 3.8 ECC recommend that reference is made to the wider rail network and specifically Cross Rail, which connects to the London - Victoria Line at Shenfield and will link to the wider London, and west of London, area.
Paragraphs ECC considers greater emphasis should be placed on the relationship
3.7 - 3.8 and connectivity between the District, Southend, South Essex, Essex and London, including the 2011 data presented in Figures 2 and 3. Whilst the data is of assistance, it is recommended that the mode of transport used to make journeys is also presented. This additional information would be required to inform the base assumptions for likely future modal choice that would arise as a consequence of further development. Equally this could help to demonstrate where the more significant concentration of improvements may be required to promote suitable sustainable cross boundary transport provision, which could affect the levels of car journeys undertaken by encouraging modal shift.
Paragraph 3.12 ECC consider that there is an opportunity to promote the potential benefits / outcomes for the local economy arising from improvements to the transport network, for example greater connectivity for residents and businesses, or an increase in flight destinations served by London Southend Airport.
Paragraph 3.14 ECC recommends the inclusion and reference to the Outer Thames Estuary SPA list of European sites.

Our Communities

Paragraph 3.23 ECC notes that this paragraph seeks to set out the Education provision across the district however there is no reference to either Early Years and Childcare (EYCC) or Special Education Needs (SEN) provision. ECC recommends that EYCC is incorporated and set out in Strategic Priority 4.4 and paragraphs 9.30 to 9.36 and SEN is referred to in Strategic Priority 4.3 and paragraphs 9.17 - 9.29.

Key Community Characteristics
ECC recommends greater recognition is given to the role and contribution of Passenger Transport, in respect of both existing and new provision of services to support the ageing population. ECC wish to explore this further with RDC in the preparation of the Local Plan, to promote an inclusive strategy for existing and new residents.
OUR SPATIAL CHALLENGES (SECTION 4)
ECC General Comment
ECC notes that this section sets out the National and South Essex picture and relationship to London, however it is recommended that this is expanded to provide a specific "county policy context." ECC welcomes the reference to ECC services throughout the document, however the inclusion of a wider "County Policy Context" would provide a clear and strategic policy framework, reflecting two tier context and delivery of ECC services and functions. ECC can provide appropriate supporting text links to relevant ECC policies and strategies. It is also recommended that within the wider context reference is also made to the adjoining Essex authorities outside the "South Essex" area including Maldon DC given the importance of the River Crouch.
ECC recommends that the following ECC policies and strategies are included and referred to within a new "county policy" context and delivery proposals:
 Essex Vision and Priorities 2017/21
 Essex Organisation Strategy, 2017 - 2021
 Economic Plan for Essex (2014)
 Children in Essex get the best start in life 2014-2018.
 People in Essex enjoy good health and wellbeing 2014-2018
 People in Essex have aspirations and achieve their ambitions through education, training and life-long learning 2014-2018
 People in Essex can live independently and exercise choice and control over their lives 2014-2018.
 Essex Transport Strategy, the Local Transport Plan for Essex (June 2011)
 ECC's Passenger Transport Strategy - Getting Around In Essex 2015.
 A127 Corridor for Growth - An Economic Plan 2014
 Essex children and Young People's Strategic Plan 2016 Onwards (2016)
 Essex Early Years and Childcare Strategy 2015-2018
 Commissioning school places in Essex 2017-2022
 Essex County Council Local and Neighbourhood Planners' Guide to School Organisation
 ECC Independent-Living-Programme-Position-Statement October 2016
 ECC Developers' Guide to Infrastructure Contributions (2016)
 Essex Minerals Local Plan Adopted 2014
 Essex and Southend-on-Sea Waste Local Plan Adopted 2017
 ECC Sustainable Urban Drainage Design Guide 2016
 Greater Essex Growth & Infrastructure Framework (2016)
 Superfast Essex Broadband

National Picture

Paragraph 4.3 ECC advises that the SELEP Strategic Economic Plan is now due to be completed during 2018.

Paragraph 4.5 ECC welcomes and is supportive of increasing employment opportunities for the District and would wish to engage with RDC to explore these opportunities further. This is consistent with ECC's Essex Outcomes Framework, through the development of the Essex Economic Growth Strategy and, the Economic Plan for Essex, including South Essex as one of four growth corridor. These corridors collectively form the locations for housing and employment, to secure future growth. These roles are based on location characteristics, local economic history and linkages to surrounding areas. Critically, these corridors will provide a mix of housing, which will allow new and existing residents to stay and develop in the District / County. ECC is a partner of the Association of South Essex Local Authorities (ASELA), which extends beyond the SELEP federated area of South Essex, to include Brentwood BC. ECC supports the emerging 'South Essex 2050 Ambition' for the area and the commencement of a Joint Spatial Plan (JSP) to provide a framework for the future growth ambitions of the area. ECC recommend that the role of ASELA and the emergent JSP is taken into account in the preparation of the Local Plan

ECC can provide additional information on the Essex Growth Commission Report (2017), ECC's Grow on Space study, as well as the specific economic strategies and engagement being developed by ECC and with partners, including OSE, promoting economic growth, regeneration, infrastructure delivery and sustainable new development, and having regard to the National Industrial Strategy.
ECC would welcome the opportunity to provide additional information in respect of the health profiles for the District, to assist with the identification of skills, training and employment opportunities, as well as the development of a health impact assessment process for developments.

ECC also considers there to be an opportunity to explore and promote opportunities in the area for employees and residents, with greater emphasis placed on accessibility and promotion of passenger transport as part of a wider package of transport solutions, and to optimise and improve the current passenger transport accessibility to the area.

Paragraph 4.6 ECC welcomes the reference that "infrastructure is critical to support sustainable economic growth" and the recognition of the need to work with partners, including ECC, under the duty to co-operate, to deliver Strategic and Local infrastructure.

ECC has provided further information throughout this response to inform the preparation of the new Local Plan, as it relates to ECC services and functions, to ensure are appropriately considered within the Local Plan. ECC recognises the need for essential infrastructure to be identified, to support the level of proposed growth within the Issues and Options consultation. ECC has and will continue to work with RDC to identify the appropriate infrastructure requirements and mitigation measures which need to be developed, including the preparation of the Infrastructure Delivery Plan, before the plan progresses to the Preferred Options stage,. This is explored further within the respective strategic priorities, themes and options below.

ECC recommends that RDC refer to the "ECC's Developers' Guide to Infrastructure Contributions" (2016), for details of the necessary contributions required from new development for the provision of essential infrastructure, to inform the ongoing evidence base and the delivery and viability assessments.

Paragraph 4.10 ECC welcomes the reference to minerals and waste as a strategic, cross boundary matter subject to the Duty and ECC is keen to enter into engagement with RDC with regard to proposed site allocations considered through the Local Plan process and that this is undertaken at the site assessment stage of the Local Plan, as referred to above under "Tell Us Your Views".

Paragraph 4.17 ECC recommends that the "Challenge" on how to deliver infrastructure to support new homes should also seek to incorporate new open space Suitable Accessible Natural Greenspace (SANG) as part of new residential developments to avoid recreational impacts on European sites in accordance with the Habitat Regulations. Further details on this aspect are incorporated within the revisions to the Essex Design Guide (revised EDG) to be published February 2018.
Please also refer to ECC comments in respect of paragraph 9.42 (options for Open space and outdoor recreation) and paragraph 10.29 (options for Greenways)

OUR VISION AND OBJECTIVES (SECTION 5)

Draft Vision

Paragraph 5.9 ECC is supportive of the emerging draft vision which is considered in accordance with the NPPF and the three dimensions for sustainable development; and ECC welcomes the inclusion and reference to health.

Strategic priorities

1. The homes and jobs needed in the area
2. Provision of retail, leisure and other commercial development
3. Provision of infrastructure, including transport, digital, flood risk, coastal management, minerals and energy
4. Provision of Health, security, community and cultural infrastructure and other local facilities, including EYCC, Education and Youth Facilities
5. Climate Change and Environmental protection and mitigation

It is noted that the Strategic Objectives in support of Strategic Priorities 1, 2, 4 and 5, do not refer to or recognise the role of sustainable transport to deliver these Strategic Priorities. ECC recommends further consideration is given to incorporate the principles of sustainable transport and travel within the new Local Plan in accordance with the Essex Local Transport Plan.

Strategic Objectives

SP1 The homes and jobs needed in the area

SO1 ECC support the objective to facilitate the delivery of sufficient, high quality and sustainable homes, combined with SO6 for all homes and commercial buildings to be built to the highest attainable quality, design and sustainability standards.
SO3 ECC welcomes the positive move towards supporting sustainable travel, however this only refers to improvements for new developments, whereas opportunities should be sought to overcoming existing shortfalls in sustainable connectivity.
SO5 ECC is supportive to the inclusion of skills, training, education and employment, and ECC Public Health would welcome the opportunity to work with RDC to explore the employment opportunities for residents. ECC considers that this could be included and assessed as part of the Health Impact Assessment process for developments, skills, training and employment opportunities.
ECC recommends this Strategic Objective amended to specifically refer to EYCC provision alongside the provision of good schools.
SO6 ECC support the objective for all homes and commercial buildings to be built to the highest attainable quality, design and sustainability standards in combination with SO1.
ECC recommends ECC recommends that these strategic objectives should also include consideration for new housing and commercial development to have reasonable access to green spaces. ECC can provide examples, where distance standards have been applied to protect and promote an accessible network of green space, including for example the Bristol Parks and Green Space Strategy 2008, with walking distance/ time to parks and green space. https://www.bristol.gov.uk/policies-plans-strategies/bristol-parks-and-green-space-strategy .
This would provide a cross over benefit between a number of the Strategic Priorities including SP1 (SO1 and 6); SP3 (SO 9 and 11), and SP4 (SO15 and 16).

SP 2 Provision of retail, leisure and other commercial development

SO 8 ECC suggest the objective should include accessibility to services and green spaces.

SP3 Provision of infrastructure, including transport, digital, flood risk, coastal management, minerals and energy

SO 9 ECC recommends that the reference to "broadband" is replaced by "Ultrafast Broadband". ECC acknowledges the current rollout programme is "Superfast Broadband", however it is recommended that the draft new Local Plan should refer to "Ultrafast Broadband" to reflect the Government's next roll out initiative, thereby providing longevity to Local Plan policy and distinguishing new provision from the "standard broadband" which is not considered fast enough. This should be applied throughout the document

SO 9 & 11 ECC recommends that these strategic objectives should also include consideration for new housing and commercial development to have reasonable access to green spaces. Please refer to ECC's comments to SO6 above and the Bristol Parks and Green Space Strategy example.

SO11 ECC support this Strategic Objective which also supports "air quality".

SO12 ECC welcomes the reference to 'encouraging adherence to the waste hierarchy' and making 'best use of mineral deposits' but considers that these statements could be afforded slightly more clarity. Supporting the waste hierarchy and ensuring a sustainable use of minerals requires that existing facilities and infrastructure are safeguarded to ensure that they are able to continue to make their planned contribution to the mineral and waste strategies operating in the County. Whilst already covered by MLP Policy S8 and WLP Policy 2, it is considered beneficial for this to be incorporated into the Rochford LP objectives. ECC suggests amendments to SO12 as follows:

"SO12: To plan for effective waste management by encouraging adherence to the waste hierarchy, working with Essex County Council to make best use of mineral deposits resources and mineral and waste facilities, including safeguarding resources and infrastructure, supporting renewable energy generation and energy efficiency as part of all new homes and commercial premises developed, as well as supporting efficient water use."

The requirement to safeguard mineral development is recognised in paragraph 10.21 and therefore the proposed modification is in accordance with that recognition. There is however no similar recognition for waste facilities, which the proposed modification to Strategic Objective 12 would then cover.

SO13 ECC can advise that any new plans for coastal change management should also involve the other partners of the Essex Coastal Forum, given that the Forum has the responsibility for policy changes to the Essex and South Suffolk Shoreline Management Plan

SP4 Provision of Health, security, community and cultural infrastructure and other local facilities, including EYCC, Education and Youth Facilities

SO15 ECC supports this strategy, which is supportive of the England Coast Path being created by Natural England, to be subsequently implemented by Essex Highways, for the economic and health benefits of the community and is consistent with the other Strategic Objectives.

SO 15 ECC support this strategy which would also support air quality, but should be amended to specifically include reference to "air quality".

SO 15 & 16 ECC recommends that these strategic objectives should also include consideration for new housing and commercial development to have reasonable access to green spaces. Please refer to ECC's comments to SO6 above and the Bristol Parks and Green Space Strategy example.

SP5 Climate Change and Environmental protection and mitigation

SO19 ECC supports the inclusion of this objective and strategic priorities for conservation and enhancements for the natural environment which is considered to be in accordance with NPPF (paragraph 156), however ECC recommends that the objectives should be further amended, to include policies which seek to minimise the impacts to biodiversity in accordance with paragraph 117 of the NPPF. Please refer to ECC in paragraph 10.1 below for further details on this matter.

SO22 ECC welcomes the objective, however recommend that "Green (and Blue) Infrastructure" is specifically referenced within the objective to read as follows:
"To mitigate and adapt to the forecasted impacts of climate change, including the water environment, air quality, biodiversity, flooding and green and blue infrastructure, support more efficient use of energy and natural resources and facilitate an increase in the use of renewable and low carbon energy facilities."
This is considered necessary to recognise the important role of this infrastructure for climate change mitigation and adaption, through micro-climate control, water management (SUDS), air quality, carbon sequestration and reduce biodiversity loss, which in turn strengthens communities through improved health and wellbeing and building resilience.

DELIVERING HOMES & JOBS (SECTION 6)

ECC General Comments

ECC recommend all references to the provision and requirements for future broadband are prefaced by "Ultrafast". ECC acknowledges the current rollout programme is "Superfast Broadband", however it is recommended that the draft new Local Plan should refer to "Ultrafast Broadband" to reflect the Government's next roll out initiative, thereby providing longevity to Local Plan policy and distinguishing new provision from the "standard broadband" which is not considered fast enough, this also applies to paragraph 6.127.

Paragraph 6.4 ECC notes that Green infrastructure is only mentioned in its wider District context. However, due to the rural nature of the district ECC would recommend that localised Green Infrastructure (GI) design principles are incorporated as part of a proposed housing development, specifically large developments such as Garden Communities and Urban Extensions. The would be in accordance with the NPPF and the Core Planning Principles on conserving and enhancing the natural environment, including the following statement in Paragraph 114 that Local Planning Authorities should "Set out a strategic approach in their Local Plans, planning positively for the creation, protection, enhancement and management of networks of biodiversity and green infrastructure."
ECC recommends that this principle is also incorporated within Strategic Priority SP5.2 to protect, manage and enhance important habitats, nature conservation areas, geo-diversity and greenways

SP1.1 Need for Market, Affordable and Specialist Homes

Paragraph 6.30 Options on how to meet Objectively Assessed Need for housing:
A. Seek to provide as much for the district as possible, subject to environmental constraints;
B. Work with neighbouring authorities to ensure housing need across the South Essex strategic housing market is effectively met; or
C. Consider a policy requirement to deliver a percentage of new market homes on schemes to be available to residents on a first come basis first-served basis for a limited period of time

ECC Comments

Options A-C: ECC does not consider these options as presented to be mutually exclusive and would expect RDC to explore all options (and combinations) when planning to meet housing need. ECC would anticipate that RDC would seek to comply with the "Mechanism for the Consideration of Unmet Housing Need", as endorsed by the Essex Planning Officers Associations in September 2017, which comprises all Local Planning authorities within Greater Essex (including RDC)

Affordable Homes

Paragraph 6.31 Options for the affordable housing threshold:
A. Reduce the threshold for provision a part of a scheme (potentially in line with emerging national policy);
B. Retain the current threshold for the provision of affordable homes as part of a development scheme;
C. Do not have a policy threshold for the provision of affordable homes (potentially rely on emerging national policy and guidance to set the minimum threshold)

ECC Comments

ECC does not consider Options A and B, as presented to be mutually exclusive and would expect a combination of options to support the delivery of affordable housing within the district. ECC considers that additional sensitivity analysis of the thresholds would be appropriate to ensure they are effective and viable.
ECC recommend that consideration is given to the phasing and release of affordable homes on new development sites. This would enable the affordable homes provision to be both inclusive and adaptable throughout the life-course and further details are incorporated within the revised EDG. This is a key concept within the EDG to incorporate wider design feature such as dementia friendly principles (as promoted by the RTPI) and ECC's Independent Living Programme both of which should be considered. Furthermore the location of properties within new developments should seek to ensure social cohesion within the communities, including the reduction of social isolation (in accordance with NPPF paragraph 50).

ECC recommend that further consideration is given to locational "accessibility" in the provision of affordable housing. For example, to ensure the affordable housing provision is located with good passenger transport and a range of sustainable travel modes, to ensure social inclusion. This is to minimise the risk of a broad spread of affordable housing in low numbers located in relatively inaccessible areas, with limited to no potential to secure improvements in passenger transport provision. Further details are available within ECC's "Passenger Transport Strategy - Getting Around In Essex" (2015).

In respect of identification of "key worker homes" and supporting the needs of healthcare providers ECC considers that this could also be addressed via within the provision of affordable homes. .ECC recommends RDC engage with healthcare employers on their current workforce strategies so as to support recruitment and retention of healthcare staff. ECC would welcome the opportunity to assist with this stakeholder engagement.

ECC does not support Option C for the reasons stated within the justification, it is considered contrary to the NPPF (paragraph 50, third bullet 3) where authorities are required to set policies, where there is an identified need for affordable housing and the emerging vision and strategic objectives of the draft Local Plan, for example SO2 "To plan for the mix of homes needed to support our current and future residences, in particular viably addressing affordability issues and supporting our again population "
Paragraph 6.32 Options for the proportion of affordable homes to be provided:
D. Retain the current affordable homes requirement of 35% where a scheme meets the threshold, subject to viability;
E. Increase the proportion of homes that we require developers to provide as affordable housing, subject to viability

ECC Comments

Options D-E: ECC does not consider these options as presented to be mutually exclusive and would expect a consistent approach to be developed in principle, to support the delivery of the appropriate proportion of affordable housing, based on robust evidence ECC consider additional sensitivity analysis of the thresholds would be appropriate to ensure they are effective and viable.

Please refer to ECC's comments to paragraphs 6.30-6.31 above, which equally apply to these options. For example ECC recommend that consideration is given to the phasing and release of affordable homes on new development sites. This would enable the affordable homes provision to be socially inclusive and adaptable, as set out in the revised EDG, which now includes wider design features such as dementia friendly principles, to ensure social cohesion within the communities, including the reduction of social isolation for specialist housing, and including independent living units for older people and adults with disabilities.

ECC consider the provision of specialist housing including ECC's Independent Living Programme for Older People and Adults with Disabilities, to be within the definition of "affordable housing" and it should be included within the appropriate housing mix (see paragraph 6.33 below).

Homes for Older People and Adults with Disabilities

Paragraph 6.33 Options for the Provision of Homes for Older People and Adults with Disabilities:
A. Continue the current approach to applications for specialist homes - on an ad hoc basis as applications are received based on available evidence
B. Include a policy on housing mix which requires the provision of specialist homes, such as wheelchair accessibility (part M Category 3), independent living units, sheltered and extra-care housing, over a certain threshold.

ECC Comments

ECC welcomes the acknowledgement of and reference to ECC's Independent Living (IL) Programmes for Older People and Adults with Disabilities to support the provision of specialist housing, based on evidence and in accordance with the NPPF and national policy.

ECC supports a revised version of Option B, to ensure the positive provision of specialist housing to meet the needs of residents, in accordance with ECC's strategies, guidance and evidence including:
 ECC's IL Programmes for Older People and Adults with Disabilities , for the respective demand and need for units across Essex by district, for example the IL Position Statement for Older People (2016) identified a shortfall of 129 units (19 rental and 110 ownership) required in the District for the period 2015 and 2020
 ECC Developers' Guide to Infrastructure Contributions (2016) (for securing the appropriate funds) and regard to the revised EDG for appropriate locational and design guidance

ECC can provide updates on the demand and need for IL units for both Older People and Adults with Disabilities, and would welcome the opportunity to engage with RDC, on an ongoing basis to ensure the most up to date information is available to inform and shape the preparation of the Local Plan.

SP1.2 Care Homes

Paragraph 6.35 ECC welcomes the reference to and ongoing engagement with ECC and would wish to maintain this engagement to inform the requirements and provision within the preparation of the Local Plan

Paragraph 6.36 Options for providing care homes in the district:
A. Continue the current approach to applications for specialist homes - on an ad hoc basis as applications are received based on available evidence.
B. Include a policy on housing mix which requires the provision of specialist homes, such as wheelchair accessibility (part M Category 3), independent living units, sheltered and extra-care housing, over a certain threshold

ECC Comments

Options A-B: ECC would anticipate combination of options (including the option in paragraphs 6.30-6.35) to support and ensure the appropriate mix of provision including care homes in accordance with the NPPF and based on evidence.
ECC recommend that consideration is given to the need to ensure provision is accessible, appropriate and inclusive to ensure integration within the community and has regard to the health and social care requirement a set out in the revised EDG and the details set out above in response to Paragraph 6.33, options for the provision of specialist housing.

ECC would welcome the opportunity to engage with RDC on these matters further to ensure the preparation of a legally compliance, effective and sound local plan.

SP1.3. Delivering our Need for Homes

ECC General Comment

The Issues and Options within this section provide a clear overview of the key planning issues facing the District and what the new Local Plan should address in respect of meeting the needs for homes. However, it is recommended that further consideration should be given to the following.
 Infrastructure provision and funding. The new Local Plan should ensure there are clear policies for the full provision, enhancement and funding of infrastructure arising from planned development. Mechanisms include planning obligations, the use of a Community Infrastructure Levy (CIL), and the ability to negotiate specific contractual obligations for major strategic sites, in accordance with the Garden City principles defined by the Town and Country Planning Association (or subsequent updated guidance) and wider definition of sustainable development outlined in the NPPF. This will ensure the delivery of sustainable development in accordance with the NPPF, including the three dimensions to achieve sustainable development (paragraphs 6 -10), the presumption in favour of sustainable development (paragraph 14) and the 12 core planning principles (paragraph 17).

At the heart of the NPPF is a presumption in favour of sustainable development. For plan-making this means local planning authorities should positively seek opportunities to meet the development needs of their area, and Local Plans should boost significantly the supply of housing to ensure the full objectively assessed needs for housing over the plan period. The NPPF includes the delivery of sufficient community and cultural facilities and services to meet local needs as a core planning principle.

There is a clear expectation that local authorities should make provision for funding for new school places from Section 106 contributions and CIL. ECC alone does not have the capital resources to fund the construction of early years' and child care places, primary schools or secondary schools. There appears to be a view developing that the provision of sufficient school places is the sole responsibility of ECC assisted by the DfE in the form of 'basic need' funding, as the District and Borough councils are not the local education authority. The expectation is that the DfE will fund any shortfall in school places that result from large new housing developments.

ECC wish to draw attention to paragraph 72 of the NPPF, which states 'The Government attaches great importance to ensuring that a sufficient choice of school places is available to meet the needs of existing and new communities.' ECC does not view financial contributions for education as optional. If this is the case then there will be no DfE and or ECC funding available, to provide all the school places required as a result of a growing school population and the need to create additional school places to meet the needs generated by new housing developments. ECC recommends that it is made clear in the new Local Plan that there is a requirement for financial contributions from developers to fund the full additional early years and childcare, primary and secondary school pupil places (including post 16) generated from new development to ensure that new housing developments are sustainable in terms of educational and childcare provision. ECC considers that this would accord with NPPF paragraph 72 and reiterates the requirements in the ECC Local and Neighborhood Planners' Guide to School Organisation and the ECC Developers' Guide to Infrastructure Contributions (2016). Further information on this issue is provided later in this response.
ECC welcomes the recognition that infrastructure is critical to support sustainable growth and to make sure RDC has the right infrastructure, at the right time, to accommodate the new jobs and homes needed in the future and the acknowledgement of ECC's role in the provision of Local and Strategic infrastructure. ECC wishes to be proactively engaged with the assessment of the spatial options and site allocations, given the importance of infrastructure provision and funding to the Draft Plan, which will vary for each spatial option and site allocations, given their respective individual and cumulative infrastructure requirements, generating their own, individual and cumulative impacts and opportunities on the delivery of ECC service areas.
 Flooding and its impact on development. This is broadly mentioned but will significantly influence future development locations. The main river and surface water flood risk areas should be clearly identified and the new Local Plan should provide appropriate policies in relation to flood risk. ECC is the Lead Local Flood Authority for surface water management and is revising the South Essex Surface Water Management Plan (SWMP) taking into account the recent changes in the EA's Climate Change Allowances. ECC recommends the provision of sustainable drainage systems (SuDS) and the revised SWMP as part of new development. Further information on this issue is provided later in this response.
 Broadband. While highlighted in the document, ECC recommend that "broadband" is distinguished from other telecommunications infrastructure, and specified in policy as a necessary infrastructure requirement for new development.. This will support relevant strategic and local objectives relating to economic growth particularly in rural Rochford. This will have a wider impact on growth and productivity, as increased broadband coverage will support businesses and attract investment to Essex. It also has the potential to increase opportunities for home-working and remote-working, reducing the demand on travel networks at peak periods. The importance is demonstrated by recent census returns which show that the biggest change in journey to work patterns in the last 20 years has actually been the increase in people working from home.

 Minerals and Waste provision and safeguarding requirements (please see section 2 "Tells Us Your views).

It is recommended that the above policy requirements are considered when preparing the new Local Plan and developing the overarching spatial strategy. Further information is provided below and in Sections 7 - 11.

Paragraph 6.46 ECC welcomes the positive recognition and importance placed on reducing inequalities and improving congestion levels, by ensuring the provision of new homes will include a variety of modal travel options. ECC recommends engagement and close working with ECC's Sustainable Travel Team and raising awareness of the local cycle action plans which also include some infrastructure elements

ECC recommends greater emphasis is placed on the creation of and access to more sustainable travel options within new developments, including connectivity to existing settlements for both housing and employment.

Paragraph 6.48 Options to provide a realistic strategy for delivering new homes:
A. Increase density within the existing residential area - which would require an amendment to our current density policy
B. Increase density on allocated residential sites
C. Several small extensions to the existing residential area
D. A number of fewer larger extensions to the existing residential area
E. A new settlement

ECC Comments

ECC does not consider these options as presented to be mutually exclusive. ECC would anticipate the Spatial Strategy to be developed with a range or combination of the options, based on evidence and in accordance with the NPPF and in particular the overarching principles of the NPPF.

ECC recommends that consideration is given to the wider "duty to co-operate" in emerging national policy (housing white paper) requiring local authorities (including RDC and ECC) to place greater emphasis on the development of Joint Strategic Priorities to address strategic cross boundary planning matters. The formation of ASELA to develop the South Essex 2050 vision with a set of strategic priorities and JSP will provide the context for RDC to consider the requirements of the South Essex Strategic Housing Market Area and to explore whether there are any unmet housing needs within the area.

ECC welcomes the recognition that infrastructure is critical to support sustainable growth and to make sure RDC has the right infrastructure, at the right time, to accommodate the new jobs and homes needed in the future, and the acknowledgement of ECC's role in the provision of Local and Strategic infrastructure. ECC wishes to be proactively engaged with the assessment of the spatial options and site allocations, given the importance of infrastructure provision and funding to the Draft Plan, which will vary for each spatial option and site allocations, given their respective individual and cumulative infrastructure requirements, generating their own, individual and cumulative impacts and opportunities on the delivery of ECC service areas.

ECC considers that any large scale housing developments will need to include appropriate infrastructure such as schools, community facilities and improvements to the roads. In contrast, a larger proportion of small scale or piecemeal developments are less likely to secure funding for the necessary infrastructure requirements. Furthermore infrastructure provision is likely to have a major impact on the phasing, delivery and viability of development(s) and this would need to be considered as part of the overall strategy.

ECC recommend consideration is given to the cumulative scale of development required to secure the necessary supporting infrastructure and the mechanisms available to secure developer contributions (be it S106 contributions, pooling of contributions or via the Community Infrastructure Levy). ECC consider this to be essential in the preparation of a new local plan, to ensure it complies with the legal duty to co-operate, meets the tests of soundness and is effective, viable and deliverable. ECC expect RDC to prepare a sound and deliverable Local Plan, having regard to the available levels and sources of investment available to deliver the supporting infrastructure.

ECC recommends consideration is also given to the respective infrastructure funding streams available to deliver and implement strategic infrastructure, be it the ECC Developers' Guide to Contributions, the Opportunity South Essex Partnership, the South Essex Local Enterprise Partnership, and Government Departments/agencies, such as the Department for Transport agencies, as well as changes in the national policy and legislation for the S106 and CIL.

ECC can advise in principle, that subject to the scale of the development being considered, Option E may have the potential to bring forward the level of investment needed to provide significant improvement to the highway and transportation infrastructure. However, in the absence of a location or scale for any new settlement ECC cannot recommend its preference for Option E over and above any other options put forward. Again, subject to the scale of development the other options including smaller size settlements may not bring the level of investment required. In essence this reflects the "critical mass" in the scale of development required to enable effective infrastructure and service planning, which it may not be possible to secure with a number of smaller developments given the effect of the CIL Regulations (Regulation 123) and the restrictions on pooling contributions.

SP1.4 Good Mix of Homes

Paragraph 6.58 Options identified in relation to the broad approach for considering the type and size of new homes:
A. Retain the current policy on types of homes, which takes a flexible, market-driven approach to types
B. Include specific reference to the size and types of homes referred to the South Essex SHMA
C. Continue to require new homes to meet the National Technical Housing Standards - nationally described space standards
D. Do not adopt specific policy on the mix of homes

ECC Comments

ECC would anticipate a strategy to be developed based on evidence and in accordance with the NPPF. Please refer to ECC's comments in response to the options in paragraphs 6.30 - 6.36 above paragraph 11.5 below which are considered relevant to this option.

ECC does not support Option D for the reasons stated in the justification, it is considered contrary to the NPPF (paragraph 50) and the emerging vision and objectives of the draft Local Plan, for example SO2 (as referred to in response to paragraph 6.31 above).

SP1.5 Gypsy, Travellers and Travelling Showpeople

Paragraph 6.78 Option identified to meet the needs of Gypsies and Travellers:
A. Retain the current criteria-based policy (Core Strategy policy H7)
B. Retain the current allocated site (Allocations Plan policy GT1)
C. Allocate a number of smaller Gypsy and Traveller pitches / sites to meet needs
D. Consider a mobile home policy for those no longer falling within the Gypsy and Traveller definition
E. Prepare a more detailed criteria-based policy
F. Do not have a policy on Gypsy and Traveller provision
ECC Comments
ECC does not consider these options to be mutually exclusive. ECC would expect RDC to develop a combination of options based on evidence and in accordance with the NPPF and the Planning Policy for Traveller sites 2015 (PPTS), requiring an inclusive approach for all gypsies and travellers, both members of the travelling and settled communities.

ECC would anticipate provision to be made for travellers who meet the planning definition, may be meet the definition or do not met the definition to be in accordance the Greater Essex Gypsy, Traveller and Travelling Showpeople Accommodation Assessment 2016-2033 (GTAA) published in January 2018.
Furthermore ECC would anticipate the emerging strategy and emerging policy to take into account the Transit Recommendations within the Essex GTAA prepared by EOPA and considered to be a strategic cross boundary issue for the Greater Essex authorities.

SP1.6 Houseboats and Liveaboards

Paragraph 6.82 ECC welcome and support the commitment to work with other neighbouring authorities and relevant bodies such as the Marine Management Organisation (MMO), Natural England (NE) and the Environment Agency (EA). ECC and partners would be able to assist in monitoring and the assessment of impacts arising from the proposed approach to Houseboats and Liveaboards. This could include identifying an appropriate scale / limit for the number of houseboats that could be permitted to moor in a particular area.

Paragraph 6.83 ECC considers the statement regarding the extent of land use planning control "to only extend as far as the mean high tide" to be incorrect and should be amended. ECC can advise that Land Use planning control extends to Low Water Mark, whilst the Marine Planning system extends to High Water Spring Tide, therefore there is an overlap of the 2 planning systems in the intertidal area. This correction also provides an opportunity to work with the MMO in developing evidence and an emerging policy.

Paragraph 6.84 ECC considers further exploration of the infrastructure requirements is necessary, in addition to the reference to the need for provision of toilets for houseboats with a permanent mooring, and to also include the infrastructure provision required for boats which are moored temporarily. It is important that the boats do not discharge waste into the marine environment and hence they would need to be equipped with holding tanks and to use pump out facilities to discharge this type of waste appropriately.
Paragraph 6.86 Options to address the mooring of houseboats in the district:
A. Retain the existing policy
B. Amend the existing policy to strengthen criteria
C. Allocate specific areas of coastline where such uses may be acceptable
D. Amend the definition in the Development Management Plan

ECC Comments

ECC would anticipate a strategy to be developed based on evidence and in accordance with the NPPF and other national policy. ECC considers additional evidence and engagement is required, and recommend that this is explored further with EPOA and / or Essex Coastal Forum.

ECC welcome the consideration of the need for a policy on houseboats/ liveboards as part of the review of the current polices to ensure they are based on the most up to date evidence. This would be appropriate given the growth in occupation and experiences elsewhere in the country (especially in London) where living on a boat is proving to be an attractive proposal, and in certain areas demand has outstripped available mooring. Whilst it may be a lifestyle choice for many, the result is an increasing number of houseboats across the Essex coast, especially in areas commutable to London.

SP1.7 Meeting Business Needs;

Paragraph 6.87 ECC recommends consideration is given to the contribution made by the environmental / Green Infrastructure (GI) to provide a network of multi-functional high quality green spaces and other environmental features, which together deliver multiple environmental, social and economic benefits. ECC can provide advice and evidence from the findings of a Forestry Commission report on the economic value of Green Infrastructure, to overcome barriers to businesses, whilst improving people's quality of life, health and wellbeing, which is available here:
https://www.forestry.gov.uk/pdf/nweeconomicbenefitsofgiinvestigating.pdf/$file/nweeconomicbenefitsofgiinvestigating.pdf

Paragraph 6.92 ECC notes the emerging Local Plan seeks to facilitate a diverse, modernised economy providing high value employment, and supports this aspiration. Paragraph 6.105 states that the Economic Development Needs Topic Paper 2017 advocates employment land increases to primarily facilitate B1 and B2 uses. Whilst ECC does not object to this, it is considered important to ensure that any strategy seeking to grow the economy does not preclude opportunities for waste management, with such facilities often being sited on industrial / employment land. Whilst, waste related developments are employers in their own right, economic activity generates waste, and a cost effective, local waste solution supports economic development across the spectrum. It is recognised that there is nothing in the Issues and Options consultation that indicates such opportunities would be precluded, and indeed ECC notes the role that Rawreth and Star Lane industrial estates play in this regard, but ECC as the MWPA welcomes the opportunity to make this point. It is requested that reference is made to supporting appropriate 'sui generis' uses when defining appropriate use classes on employment land.

Paragraph 6.94 Please amend the reference to "Ultrafast broadband" for the reasons set out in response to Section 6 and paragraphs 6.96 and 6.127.

Paragraph 6.96 ECC supports this statement and the need for improvements to the highway networks / sustainable travel choices to support businesses and economic growth; and to enable people to work in the local area.

Paragraph 6.96 Options to support employment and economic growth in the district
A. Continue to support employment growth within the current employment growth policy
B. Update the current employment growth policy to include reference to broadband
C. Update the current employment growth policy to further support new businesses at each stage of their lifecycle - in particular to reflect the need for grow-on space
D. Include specific reference in the current employment growth policy to tourism; and
E. Include specific reference to supporting sustainable travel options and promoting highways improvements

ECC Comments

ECC would expect all of the options to contribute to RDC meeting its need for employment and economic growth; and would expect RDC to prepare a sound and legally compliant Local Plan, based on evidence and in accordance with the NPPF.
ECC welcomes proposals to ensure the protection and provision of suitable employment land and appropriate uses within the District, with the pre-eminence of the importance of London Southend Airport to the economy whilst seeking opportunities for rural diversification, tourism, retail, leisure, town centres, to meeting the life cycle of business needs including "Grow on Space" and development of skills and training opportunities.

ECC welcomes and supports the importance and economic role played by London Southend Airport as international gateway and the A127 corridor and London-Southend Victoria railway line for connectivity with South Essex, the rest of Essex and London. A key priority will be to enable investment in infrastructure and economic growth (for example the A127 including passenger transport; ultrafast broadband) as well as developing options to support the alignment of skill provision to meet the local needs in accordance with the Economic Plan for Essex (2014) and the Government's Industrial Strategy as are being explored by the ASELA through the Industrial Strategy workstream and the preparation of the JSP. The provision of jobs and infrastructure to support economic growth will be essential, including the need to provide social, physical and green infrastructure.

ECC recommends consideration is given to the role and contribution of waste related developments as employers in their own right, economic activity generates waste, and a cost effective, local waste solution supports economic development across the spectrum. ECC recommends the inclusion and reference to 'sui generis' uses when defining appropriate use classes on employment land (see paragraph 6.92 above and 6.105 below).

In respect of Option B and the reference to Broadband, ECC acknowledge the importance of this infrastructure to support economic growth. Please refer to ECC's comments in response to paragraph 8.44 and the options for communication and broadband provision, as well as the references above to "Ultrafast" broadband.

In respect of Option C, ECC welcomes and supports the reference to the ECC "Grow on space" report 2017 and its findings seeking to address the lifecycle needs of businesses. This is also consistent with the Essex Economic Commission.

In respect of option D and the references to rural diversification and tourism ECC considers the development and promotion of the Essex Coast Path could provide opportunities for the local economy. ECC considers there is a need to have regard to the role and contribution of the environment and in particular investment in Green Infrastructure to attract new businesses and opportunities which will help to create employment, including for example regeneration projects which together can deliver multiple environmental, social and economic benefits. Further details and examples are set out in response to paragraph 4.6 above.

In respect of Option E, ECC supports the need for a range of highways and sustainable transport improvements to existing employment areas, including London Southend Airport and the airport business park and will continue to seek funding through bids to central Government, SELEP and S106 contributions, as set out in response to SP1.3 (ECC general comment) above and Paragraph 6.48.
As explained, ECC would anticipate the inclusion and promotion of sustainable modes of travel to support the community (both residents and businesses) to be embedded in the emerging strategy in conjunction with other options, to support employment and to deliver the wider principles in the emerging vision and spatial strategy, in accordance with the Essex LTP, Economic Plan for Essex and the A127 Corridor for Growth An Economic Plan. Please also refer to ECC comments regarding Highway Infrastructure in section 8.

SP1.8 Need for Jobs;

Paragraph ECC notes that the emerging Local Plan seeks to facilitate a diverse,
6.105 modernised economy providing high value employment. This aspiration is supported. Paragraph 6.105 states that the Economic Development Needs Topic Paper 2017 advocates employment land increases to primarily facilitate B1 and B2 uses. Again, this is not objected to but it is important that any strategy seeking to grow the economy does not preclude opportunities for waste management, with such facilities often being sited on industrial / employment land. As explained in response to paragraph 6.92 & 6.96 above regarding waste management developments as employers in their own right ECC recommends that reference is made to supporting appropriate 'sui generis' uses when defining appropriate use classes on employment land.

Paragraph 6.111 Options to support economic growth in the district over the next 20 years:

A. Develop specific policies for each employment site to protect certain uses
B. Reconsider the allocation of Rawreth and Star Lane industrial estates back to employment
C. Review new employment land allocations that do not have planning permission
D. Retain current strategy and allocate additional employment land
E. Promote improvements to quality of building stock and intensification of existing sites
F. Strengthen policy stance on access improvements
G. Do not have a policy on employment land

ECC Comments

ECC does not consider these options to be mutually exclusive and would expect RDC to develop a policy based on evidence and in accordance with the NPPF and the National Planning Policy for Waste 2014 (NPPW).

ECC would expect all of the options A-F to contribute to RDC meeting its need for economic growth, taking into account ECC's comments in respect of Paragraph 6.96 above to support employment and economic growth in the district. ). ECC would expect a Rochford Employment Land Review to be prepared and for the following evidence to be taken into account -, the South Essex Economic Development Needs Assessment; the Governments Industrial Strategy, SELEPs Economic Plan, OSE economic objectives, Thames Estuary Commission, the Economic Plan for Essex and ASELA's emerging South Essex 2050 vision and emerging industrial strategy workstream and JSP.

provide an effective multi modal interchange for the Airport, with improved connectivity and realistic sustainable travel option for all users.

Paragraph 6.114 ECC supports the development of the Airport business park and the associated highway and cycling network improvements

Paragraph 6.115 ECC acknowledges the need for investment in the highway / transport network around London Southend Airport and will continue to seek funding through bids to Central Government, SELEP and S106 contributions.
ECC considers there to be a need to promote and encourage a package of sustainable travel options, for residents and businesses to travel sustainably, with the highway improvements referred to also including improvements to bus journey times and bus priority measures, to promote sustainable travel (including buses) as a realistic sustainable travel option. Further contributions through a combination of s106 and S278 and CIL funding should be secured through appropriate new developments to address the sustainable travel agenda when opportunities arise.
Paragraph 6.116 ECC acknowledges and supports the need for transportation improvements to the A127 to facilitate growth within the District and South Essex; and recommend that reference is made to the joint ECC and Southend on Sea BC A127 Route management Strategy entitled A127 Corridor for Growth - An Economic Plan 2014

Paragraph 6.117 Options in relation to London Southend Airport:
A. Retain and update the Core Strategy policy supporting London Southend Airport's growth
B. Retain the existing policy in the Allocations Plan
C. Retain the existing policies in the JAAP
D. Continue to support surface access improvements in and around London Southend Airport

ECC Comments

ECC does not consider these options to be mutually exclusive. ECC would expect RDC to develop a combination of options based on evidence and in accordance with the NPPF.

ECC recommends that RDC should consider and clarify the "in principle" inter-relationship and compatibility between the JAAP and the new emerging Local Plan. For example, is the intention to incorporate the provisions of the JAAP within the new Local Plan, or will the JAAP continue to be a separate standalone document, subject to its own review?

In respect of Option D, ECC considers that the JAAP clearly sets out the associated access improvements for London Southend Airport, and that this would be appropriate option to address the passenger transport and sustainable travel options, as part of an integrated travel solution. ECC considers there to be a need to actively promote and improve passenger transport provision and connectivity, rather than solely relying on highway improvements to provide benefits for passenger transport, as any additional highway capacity may be absorbed by continual increases in demand by motorists, in the absence of realistic alternative travel options.

SP1.10 Supporting Tourism and Rural Diversification

Paragraph 6.121 ECC notes the comments regarding the lack of rural passenger transport services. However, it is of concern that the emphasis for the solution is solely placed on improvements to roads and the cycling network. In order for RDC to improve accessibility to the rural parts of the District, whether for tourism, employment or other reasons, it is considered that the most effective and viable approach would be the development of a District transportation strategy. This would have the benefit of setting out aspirational networks for all sustainable travel options including walking, cycling and passenger transport. There are a range of options that could be considered from traditional timetabled services to demand responsive operation or a combination of services to optimise technology. ECC would wish to engage with RDC to explore the options, which could be of particular value and support for tourism and rural diversification.

ECC considers investment to improve and create new Green Infrastructure such as woodlands, nature reserves and greening town centres would be appropriate and would benefit tourism, through attracting new visitors, and support retail and tourism sectors.

ECC considers transport and accessibility to be vitally important for tourism and investing in the Green infrastructure would provide opportunities to encourage alternative modes such as walking and cycling. This would improve accessibility to green spaces, whether by the distance from home and businesses; or by the creation of green links/greenways including enhancements to the existing Public Rights of Way network (including cycleways). Thus providing alternative traffic free cycling and walking routes, as well as wildlife corridors.

ECC considers that this would need to be developed in partnership with stakeholders including ECC and public transport providers to improve the accessibility of green spaces, to be as easy as possible. ECC would welcome the opportunity to explore this further, as outlined in ECC's response to SO6 above, regarding the proximity of new developments to green space.

Paragraph 6.127 Please amend the reference to "Ultrafast broadband" for the reasons set out in response to Section 6 and paragraphs 6.94, 6.96 and 6.127.

Paragraph 6.128 Options for tourism and rural diversification:

A. Continue to support current defined forms of green tourism and rural diversification as set out in our current policies
B. Expand the current approach to include other forms of rural diversification
C. Do not support rural diversification

ECC Comments

ECC does not consider options A and B to be mutually exclusive. ECC would expect RDC to develop a combination of the options based on evidence and in accordance with the NPPF, and to evolve as part of the overarching economic growth strategy (see paragraphs 6.96 and 6.116 above).

In respect of Option B (rural diversification) ECC supports this option in principle (subject to evidence) to provide an opportunity to retain employment in the first instance which may then lead to creation of new jobs. ECC recommends that the following factors are further explored:

 Accessibility Issues - there is potential to expand the current policy approach to address accessibility issues raised by ECC (paragraph 6.121). ECC recommends further investigation is required in respect of the wider passenger transport improvements to support access to tourism and rural areas, tourism. It is considered that this could include a range from timetables to the "on demand" bus services, as realistic alternatives; which goes beyond improvements to roads and cycle networks.
 Tourism and consideration of the potential benefits of the England Coast Path, and opportunities for tourism and rural diversification including for temporary camp sites if for example there is an increase in events specifically using the coast such as Maldon District's Council annual Saltmarsh 75 event.
 Potential provision for waste management facilities suited to the rural environment (such as anaerobic digestion or composting), as part of rural diversification in accordance with NPPW

ECC recognise that Policy GB2 in the Core Strategy and Policies DM12 and DM13 in the Development Management Plan do not act to constrain the rural diversification opportunities highlighted above and a continuation of this stance may be appropriate, based on evidence.

ECC does not support Option C for the reasons stated within the justification, it is considered contrary to the NPPF (and the emerging vision and objectives for the draft Local Plan.
SUPPORTING COMMERCIAL DEVELOPMENT (SECTION 7)

SP2.1 Retail, Leisure and Town Centres

Paragraphs 7.12 In respect of the Retail and Leisure Study update 2014, ECC
and 7.17 notes the reference to "catering needs" and recommend that this should also include "A5" fast foot outlets, to avoid clustering and high concentrations of A5 premises within the district. ECC strongly recommends that RDC review the existence and pattern of A5 premises, which can be undertaken using the FEAT tool (http://www.feat-tool.org.uk/), which is a fast food tool which provides details on fast food outlets for districts including A5, fast food retailers. ECC Public Health is aware of the emerging evidence base on high energy foods and obesity, including recent publications from Public Health England for spatial planners on fast food restrictions. ECC Public Health would welcome the opportunity to provide advice and to work with RDC on this matter.

Paragraph 7.20 Options for the district's town centres:
A. Retain current Core Strategy policies
B. Retain current policies in the Rayleigh Centre Area Action Plan
C. Retain current policies in the Rochford Town Centre Area Action Plan
D. Retain current policies in the Hockley Area Action Plan
E. Review the town centre Area Action Plans
F. Do not have policies on town centres

ECC does not consider these options to be mutually exclusive. ECC would expect RDC to develop a combination of options based on evidence and in accordance with the NPPF.

As set out in response to paragraph 6.117 in respect of the JAAP, ECC recommends that RDC should consider and clarify the "in principle" inter-relationship and compatibility between these Area Action Plans and new emerging Local Plan. For example, is the intention to incorporate these Area Action Plans into the new Local Plan, or will they be separate standalone Area Action Plans subject to their own reviews?
DELIVERING INFRASTRUCTURE (SECTION 8)

SP3.1Highways Infrastructure

Paragraph 8.17 ECC welcomes and supports the references and importance given to the Essex and Southend "A127 A Corridor for Growth - An Economic Plan (2014)" and the need for investment in the highway and transportation network, in accordance with the Essex LTP. ECC will continue to seek funding through bids from central Government, SELEP and S106 contributions as appropriate (CIL?) (as stated in 6.111 above).

ECC can advise that work is progressing on the next phase of the A127 Route Management Strategy, with the Options Appraisal and Strategy Report, in conjunction with the South Essex authorities, the London Borough of Havering, Transport for London and Highways England, to promote the importance of the A127 to facilitate growth across the area. In respect of improvements to the strategic transport network, ECC can confirm that the 'short term' funded transport scheme for the A127/A130 Fairglen Interchange is planned for implementation by 2022/23. ECC is also preparing a Joint A13 Route Management Strategy with Southend on Sea BC and Thurrock BC Highway Authorities.

In moving forward it is considered that RDC's approach to the Highways and Transportation will need to take into account the ASELA South Essex 2050 vision and emerging Infrastructure workstreams and the JSP.

Paragraph 8.18 ECC welcomes the reference to work with ECC as the Highways Authority and neighbouring authorities to promote strategic and more localised improvements to the highways network. ECC will continue to work with RDC on an ongoing basis to ensure these strategic matters are addressed collectively within the respective emerging Local Plans and a wider South Essex Joint Strategic Plan.

Paragraph 8.20 Options for the Local Highway Network:

A. Retain current policies on the local highway network
B. Prioritise local highways and junctions between Rayleigh, Hockley and Rochford (B1013), to support and direct funds to improve the local highway network
C. Prioritise local highways and junctions by upgrading the east to west connection north of Rayleigh, Hockley and Rochford, to support and direct funds to improve the local highway network
D. Do not have a specific policy on the local highway network

ECC Comments

ECC does not consider these options to be mutually exclusive. ECC would expect RDC to develop a combination of options in consultation with ECC as highway and transport authority, based on evidence (including transport modelling) and in accordance with the NPPF.

ECC would anticipate the strategy for the local highways network to be a combined approach as part of an integrated package of transport solutions (including sustainable travel options) and for this to be embedded within the Local Plans' spatial strategy.

As stated in response to SP1.3 and paragraphs 6.46 and 6.113 above, ECC considers greater emphasis should be placed on an integrated transport solution, in accordance with the Essex LTP to move away from the traditional reliance on road improvements, which is only part of the solution. For example, the inclusion and promotion of sustainable modes of travel (in addition to the outcomes of the transport modelling work) would support the community (both residents and businesses) in respect of transport and travel through the main towns and improve rural transport options. There is a need to ensure the appropriate approaches for the local highway network also take into account the requirements and inter-relationship with the wider local and Strategic networks as well as cross boundary issues / impacts.

Strategic Highways Network Transport

Paragraph 8.21 ECC welcome the reference for RDC to work with ECC and Southend BC (as the Highways Authorities) in the development of a transport model for the length of the A127, however please refer to ECC's update on the A127 Route Management Strategy in paragraph 8.17 above.

ECC can advise that the A127 comprises three highway authorities (Southend on Sea, ECC and the London Borough of Havering (LBH)), as such the A127 Route Management Strategy is being extended to incorporate the LBH. Furthermore LBH and the seven south Essex authorities (including ECC) have signed a Statement of Common Ground in respect of the importance of the A127 to facilitate growth.
ECC is engaging with the South Essex authorities in respect of a potential South Essex transport model which would be consistent with ECC's aspirations for an Essex wide model, drawing on the modelling work to date. This will however need to take into account the Highways England modelling information, including for example the Lower Thames Crossing.

ECC can also advise that Highways England would wish to be engaged in emerging Local Plans, to ensure any potential "ripple effect" of development is considered in respect of their transport network, for example the M25, A12 and sections of the A13 within South Essex.

Paragraph 8.21 Options identified for the strategic highway network:
A. Support improvements to the strategic highway network
B. Do not have a specific policy on the strategic highway network

ECC Comments
ECC would expect RDC to prepare a policy approach to the strategic highway network in consultation with ECC as highway and transport authority, based on evidence (including transport modelling) and in accordance with the NPPF.
In respect of Option A, ECC would anticipate the policy for the strategic highways network to be a combined approach as part of an integrated package of transport solutions (including sustainable travel options) and moving away from the traditional reliance on road improvements, which is only part of the solution. This would be in accordance with the Essex Local Transport Plan, and the A127 and emerging A13 Route Management Strategies as set out in response to paragraphs 8.17-21 above, and in response to SP1.3, paragraphs 6.46 and 6.111.
ECC does not support Option B for the reasons stated within the justification; it is considered contrary to the NPPF, the Essex LTP and A127 Route Management Strategy and the emerging vision and strategic objectives in the draft Local Plan.

SP3.2 Sustainable Travel

Paragraph 8.22 ECC welcome the desire for a modal shift towards more sustainable ways to travel, given that car use is the dominant mode of transport. ECC recommends there to be a need to change the modal shift in the short term, with greater emphasis placed on promoting alternative travel options (walking, cycling, passenger and public transport) and given greater weight in the Local Plan, to ensure these facilities are planned in now, to enable the options and benefits to be realised during the plan period. Greater emphasis is required on an integrated transport solution, and moving away from the traditional reliance on road improvements, which is only part of the solution.

Paragraph 8.22 ECC notes the reference to the Rayleigh Town Centre AQMA, however recommend this should be expanded to include reference to the National Air Quality Plan published by DEFRA in July 2017 which designates a site on the A127 to the east of Rayleigh Weir.

Paragraph 8.24 ECC welcomes the reference to Public Transport and recognition of the importance and connectivity to the rural areas and cross boundary connections, however there is a need to recognise that Public Transport is of value to everyone (all residents and employers) and not solely to residents who do not have access to private vehicles. There is a need for a change in emphasis, with the principles of alternative sustainable travel and accessibility (including passenger transport) to be embedded within the Local Plans' emerging spatial strategy to deliver the "vision" for the district and modal shift in transport. ECC recommends that RDC actively engages and works with the local transport operators in the District as well as ECC to develop services.

For example, there is the opportunity to explore innovative ways to deliver a more demand led public transport service to broaden accessibility away from the scheduled bus service. It could bring improved frequencies and less complex journeys by being able to be more responsive to demand for specific journeys, and provide quicker interchanges between modes. How this is supported could be explored within the context of paragraph 8.30, and may have potential to form part of the solution to air quality issues identified in paragraph 8.31.

Paragraph 8.27 ECC recommend that reference is made to the Rochford Cycling Action Plan 2018; prepared by Essex Highways and further information on the Essex Cycling Strategies is available here:
http://www.essexhighways.org/getting-around/cycling/cycle-programme.aspx.
Please note for consistency of terminology the references to "Cycle "Storage" within this paragraph should be change to "Cycle "Parking".

Paragraph 8.28 For clarity, ECC recommends that greater references should be made to "cycling" and "cycling networks", to help distinguish the nature of the routes being referred to, for example by inserting "cycle" before "routes to link homes" within this paragraph.

Paragraphs ECC welcomes the reference to the positive role of "Green Infrastructure"
8.27, 8.28 within this section which highlights the high dependency on cars, and that
and 8.32 other sustainable modes of travel should be encouraged.

In respect of the approach to car use, consideration should be given to the provision for charging points for electric cars (see also comments under Renewable Energy Generation). Further consideration is required on the practicality of long term public transport provision with the likely changes in car ownership patterns in 20 years' time, arising from the Government's commitment to ban the sale of new diesel and petrol vehicles from 2040 and responses from the car industry and possible growth in the use of electric vehicles, be it hybrid or pure electric vehicles, with sales projected to increase to around 10% of new vehicles by 2025. The industry anticipate the share of Electric Vehicles will continue to rise and that by 2025 Electric Vehicles will be more affordable than internal combustion vehicles, even without Government subsidies.

The need for and provision of Electric Vehicle charging points should be explored further and ECC's Environment team wish to engage with RDC on this matter, including sharing examples of good practice in emerging and new Local Plans.
Paragraph 8.30 ECC would welcome the opportunity to work closely with RDC on the development and implementation of Travel Plans for all new developments, or extensions to existing businesses, or where the development will have a significant impact on the highway. The ECC Sustainable Travel team would welcome the opportunity to explore this further with RDC and recommend reference is made to ECC's Passenger Transport Strategy - Getting Around In Essex 2015.

Paragraph 8.33 ECC would welcome the opportunity to work with RDC to explore the issues raised (bullet points 1-6) in relation to sustainable travel choices for communities across the district, which could be addressed through the Local Plan. Further consideration is required regarding the role and importance of realistic sustainable travel options to support the growth in the District.

Key issues ECC would like to explore further with RDC include:

Fifth bullet point - ECC considers the proposal to re-route the bus services away from Marked Square in Rochford Town Centre to be unsound. The removal of buses from this key location would be contrary to the principles of sustainable and accessible communities, and the strategic objectives in the Local Plan including the need for a modal shift in transport towards realistic and sustainable travel options for all. For example; if buses could not serve this area then residents would be encouraged to travel by car, adding further traffic to the already congested road network.

Sixth & Seventh bullet point - Further clarification is required on the nature of the issues.

Paragraph 8.34 ECC supports the proposal for setting a more challenging mode share; and would wish to work with RDC to explore and develop these issues and opportunities further within the context of the emerging new Local Plan.

Paragraph 8.35 ECC welcomes the opportunity to work with RDC and partners to explore and help shape new and improved passenger transport options across the District, as part of ongoing "duty to co-operate" engagement in the preparation of the Local Plan.

Paragraph 8.36 ECC consider the reference to SERT, which concerns bus services to be unclear within this paragraph on cycling.

Paragraph 8.37 Options identified to support Sustainable Travel
A. Retain the current policy on public transport
B. Support the development of a rapid public transit system for South Essex
C. Retain the current policy on travel plans
D Lower the threshold to require travel plans to be prepared for schemes under 50 homes
E. Retain the current policy on walking and cycling
F. Do not have policies on sustainable travel

ECC Comments

ECC would expect RDC to develop a combination of options A-E, in consultation with ECC as highway and transport authority, based on evidence and in accordance with the NPPF.

ECC would anticipate the approach to support sustainable travel to be a combination of options, as part of an all-encompassing, integrated package of transport solutions (including highway network improvements) and for this to be embedded within the Local Plans.

ECC recommend RDC has regard to NPPF (section 4 Promoting Sustainable Transport and section 8 Promoting Healthy Communities), the Essex Local Transport Plan, the A127 and emerging A13 Route Management Strategies, ECC's Sustainable Travel Strategy, and evidence (including transport modelling the Cycle Action Plan and South Essex Active Travel programme), and ECC's Passenger Transport Strategy - Getting Around in Essex (2015).

In respect of Option A, ECC considers this to have the potential for greatest advantages to prepare the District for its future transportation needs, including the potential for a more demand- led model, to work alongside scheduled bus and rail services. ECC would anticipate the need to consider this as part of a wider cross boundary engagement, with neighbouring authorities, ECC and transport providers. ECC would welcome the opportunity to engage with RDC on this matter.
In respect of Option D, ECC recommend that the threshold for travel plans is considered further to take into account the thresholds within EPOA Guidance for Health Impact Assessments 2008; where active and sustainable travel is already considered. ECC is currently reviewing the EPOA Guidance for Health Impact Assessments, to ensure it is up to date and relevant. ECC would welcome the opportunity to work with RDC on the development of this aspect within the Local Plan.

In respect of Option E, ECC considers the current approach in policy T6 positively encourages people to travel sustainably.

ECC does not support Option F for the reasons stated in the Justification, it is considered contrary to national policy, the Essex Local Transport Plan, and ECC Passenger Transport Strategy and the emerging vision and strategic objectives of the draft Local Plan.

SP3.3 Communications Infrastructure,

Paragraph 8.43 ECC recommends that reference is made to the BT Openreach policy of providing FTTP connections to any new development of houses over 30 properties, free of charge to the developer. Further information is available on the BT Open reach web link: https://www.ournetwork.openreach.co.uk/property-developers/site-registration.aspx

This provides the framework for implementation of superfast broadband within new residential developments

Paragraph 8.44 Options identified for communications infrastructure:
A. Retain the existing policy on telecommunications infrastructure
B. Amend the existing policy to include specific reference to improving broadband and mobile coverage
C. Ensure that all commercial and residential developments over a certain threshold are conditioned to deliver appropriate broadband infrastructure
D. Do not have a policy on telecommunications infrastructure

ECC Comments
ECC would expect RDC to develop a combination of options A-C based on evidence and in accordance with the NPPF. ECC would anticipate the strategy for the communication infrastructure to be a combined approach embedded within the Local Plan.

As set out in response to Section 6, paragraphs 6.94, 6.96 and 6.127, ECC recommend all references to the provision of and requirements for future broadband are pre-fixed by "Ultrafast". ECC acknowledge the current rollout programme is "Superfast Broadband", however it is recommended that the draft new Local Plan should refer to "Ultrafast Broadband" to reflect the Government's next roll out initiative, thereby provide longevity in the draft Local Plan and to distinguish the standards for new provision from the "standard broadband" which is not fast enough.

ECC also recommends that reference is made to the BT Openreach policy of providing FTTP connections to any new development of houses over 30 units, free of charge to the developer. Further information is available on the BT Open reach web link: https://www.ournetwork.openreach.co.uk/property-developers/site-registration.aspx
This provides the framework for implementation of superfast broadband within new residential developments.

In respect of Option B, ECC considers this to be a positive approach to develop infrastructure resilience to support the growth ambitions within RDC. ECC recommends that the needs of both residents and businesses are incorporated within the policy requirements for good communication infrastructure provision.

ECC would welcome the opportunity to work with RDC to ensure the latest policies; guidance and evidence are taken into account to inform the principles, strategies and policies and site allocations within the emerging Local Plan.

ECC does not support Option D for the reasons stated in the justification, and considers it to be contrary to the NPPF (paragraphs 42-43) and the emerging vision and strategic objectives of the Local Plan, for example SO9.

SP3.4 Water and Flood Management,

Paragraph 8.45 ECC wish to draw RDC's attention to the requirements of NPPF paragraph 100, which requires development in areas at risk from all forms of flooding should be avoided and not just fluvial and coastal flooding. This is in line with national guidance which states:

In plan-making, local planning authorities apply a sequential approach to site selection so that development is, as far as reasonably possible, located where the risk of flooding (from all sources) is lowest, taking account of climate change and the vulnerability of future uses to flood risk. (Paragraph: 001 Reference ID: 7-001-20140306 https://www.gov.uk/guidance/flood-risk-and-coastal-change)
ECC notes that the South Essex Strategic Flood Risk Assessment 2011 is in the process of being updated given the changes to the Environment Agency (EA) climate change allowance.

ECC also recommends that the following guidance and evidence
published since 2011, should be taken into account in the preparation of
the Local Plan:
 EA - Risk of Flooding from Surface Water (RoFSW) maps;
 ECC Sustainable Urban Drainage Design Guide 2016
 ECC Essex SUDS Design Guide 2016;
 South Essex Surface Water Management Plan (2012 and emerging
revision due 2018);
 ECC Developers' Guide to Infrastructure Contributions (2016)

ECC also advises that the following Assessments and Strategies are
currently being updated and once complete should also be taken into
account as part of the Local Plan and Sustainability Appraisals evidence
base:
 The Preliminary Flood Risk Assessment for Essex; and
 The Essex Flood Risk Management Strategy
ECC would welcome the opportunity to work with RDC to ensure the latest
policies; guidance and evidence are taken into account to inform the
principles, strategies and policies and site allocations within the emerging
Local Plan.

Paragraph 8.46 & 8.48 Whilst the preferred intent of management in the Shoreline
Management Plan might be to maintain or upgrade defences along the
coast, there is no guarantee that funding will be available to deliver these
preferred policies. It is therefore appropriate that RDC seeks to secure
funding from development or other sources to potentially allow a funding
contribution towards any coast flood or erosion schemes especially given
the new approach of 'partnership funding' which now applies.

Paragraph 8.47 ECC welcome the positive consideration and approach to locate
& 8.48 development, within the lower flood risk areas, whilst taking into account
climate change, the vulnerability of future uses to flood risk and the impact
on water supply from a changing climate.

Paragraph 8.49 ECC can advise that the South Essex Surface Water Management Plan (2012) is being updated and this includes revisions to the Critical
Drainage Areas. The review is scheduled to be completed in 2018 and
ECC would welcome the opportunity to work with RDC and to provide this
additional information to inform preparation of the Local Plan, in particular
the emerging spatial strategy and the assessment of site allocations.

Paragraph 8.50 In respect of the reference to below and above ground SUDS features,
ECC's requires priority to be given to the provision of above ground
SUDS features (with the exception of soakaways) and that below ground
SUDS features should only be considered acceptable, if it is
demonstrated that above ground SUDS features are not viable. In all
cases ECC would require any features to provide acceptable levels of
water quality treatment/ storage requirements

Paragraph 8.50 & 8.51 ECC welcomes and supports the use of SUDS to alleviate flooding and that it should be incorporated in to new developments, domestic and
commercial. SUDS can provide great opportunity to improve our
environment and, linked with Green Infrastructure, could create a more
balanced and natural ecology in our communities. SUDS can help meet
the growing demands to deliver GI by creating green open spaces which
encourage biodiversity, habitats, wildlife corridors and health and
wellbeing.

Paragraph 8.51 ECC recommend that the emphasis of the statements within this
paragraph are changed, to encourage SUDS on all new developments,
including minor developments, and should not be limited to the major
developments which are subject to statutory consultation with ECC as the
LLFA.

ECC recommend that the last sentence in this paragraph should be
changed to reflect the overall requirements and application of SUDS
design principles, to read as follows:

"In some instances, financial contributions could be sought to improve
surface water drainage infrastructure through a standard CIL charge for
example (considered in detail below)."

Further information is available within the ECC Sustainable Drainage
Systems Design Guide (2016) and ECC will work with RDC on this matter
in the preparation of the Local Plan.

Paragraph 8.53 ECC welcome the positive consideration and approach to locate
development, within the lower flood risk areas, whilst taking into account
climate change, the vulnerability of future uses to flood risk and the impact
on water supply from a changing climate.
ECC recommend that reference is made to the Environment Agency's
revised climate change allowances, further details are available here:
https://www.gov.uk/guidance/flood-risk-assessments-climate-changeallowances

Paragraph 8.56 ECC recommends that new developments should be supported by
infiltration and groundwater testing. Further details are set out within the
ECC Sustainable Drainage Systems Design Guide (2016).

Paragraph 8.58 Options identified to minimise flood risk:
A. Retain the existing flood risk policy for coastal flooding
B. Revise Core Strategy policy ENV3
C. Continue to apply SUDS policies
D. Do not have a policy on flood risk

ECC Comments

ECC would expect RDC to develop a combination of options A-C based on evidence and in accordance with national policy including the NPPF.

ECC will engage with RDC on an ongoing basis in the preparation of the Local Plan to ensure it is based on the most up to date Guidance and evidence including the ECC SUDS guide, the revised South Essex Surface Water Management Plan, as well as the latest EA climate change allowances.
ECC does not support Option D for the reasons stated in the justification, it is considered contrary to national policy (including paragraphs 99-108).

SP3.5 Renewable Energy Generation

Paragraph 8.62 ECC note and support the reference to the Rayleigh Town Centre Air Quality Action Plan (AQAP) in respect of the need to explore different measures including for example provision for electric vehicles (Electric Charging Points).

Paragraph 8.64 & 8.65 ECC welcome the recognition of the need for charging points in urban centre car parks. ECC is currently preparing a strategy for Electric Vehicles and would welcome the opportunity to work with RDC, including on the need for new policies to promote the provision of Electric Charging Points for new domestic and commercial developments (see paragraphs 8.22-8.37 above). This is required to support the need for this new infrastructure with a variety of Electric Charging Points required to meet the anticipated grown in Electric Vehicles, which could not be solely met by urban car parks.

Paragraph 8.66 Options identified to support renewable energy provision within the district:
A. Retain the current policies on renewable energy
B. Include a specific policy on electric vehicle charging points
C. Do not have a policy on renewable energy

ECC Comments

ECC does not consider these options to be mutually exclusive and would expect
RDC develop a combination options A & B based on evidence and in accordance with the NPPF and other national policy.

In respect of Options A and B, ECC would support a review of the current policies and amendments to ensure they are in accordance with the most up to date evidence (including developments in technology) and national policy and guidance.

ECC consider the policy should be amended to include the provision for Electric Vehicles Charging Points. ECC would welcome the opportunity to explore these requirements further with RDC in the preparation of the local plan, including the policies and infrastructure requirements for the provision of Electric Charging Points, and consideration given to engaging the key stakeholders.

ECC does not support Option C for the reasons stated in the justification, it is considered contrary to national policy and the Essex Local Transport Plan, supporting evidence and the emerging vision for the Local Plan.

SP3.6 Planning Obligations and Standard Charges;

Paragraph 8.73 ECC welcome the reference to and identification of the issues raised in respect of the delivery of infrastructure provision associated with a large number of small sites, as set out in ECC's earlier comments in response to paragraph 6.48 (options to provide a realistic strategy for delivering homes).

ECC a statutory authority responsible for the provision of specific infrastructure in support of communities and the preparation of Local Plans, would wish to engage with RDC on an ongoing basis in the preparation of the Local Plan and Spatial Strategy, especially as the Local Plan progresses to consider specific sites and spatial strategy. ECC can also provide details of our policies, strategies, guidance and standards in respect of the delivery of specific infrastructure and the respective levels of growth required, for example:
 the ECC Developers' Guide to Infrastructure Contributions (2016); and
 the Essex County Council Local and Neighbourhood Planners' Guide to School Organisation (2018).

Please be advised that the latter Guide includes changes and updates to ECC's policy for the minimum size and land requirements for new primary and secondary school provision, please also refer to Section 8 below.

ECC can confirm that the issues do arise and that, subject to the scale of development, small schemes may not bring the level of investment required. In essence this reflects the "critical mass" in the scale of development required to enable effective infrastructure and service planning, which it may not be possible to secure with a number of smaller developments given the effect of the CIL Regs (Regulation 123) and restrictions on the pooling of contributions.

Paragraph 8.75 Options for planning obligations and standard charges:
A. Retain the existing policy and provisions in current local plan policy
B. Do not have a policy on planning obligations and standard charges

ECC Comments

ECC would expect RDC to prepare a policy for planning and obligations and standard charge, based on evidence and in accordance with the NPPF.

ECC considers there to be a requirement to retain an appropriate and up to date policy for securing the necessary Planning Obligations and Standard Charges in accordance with the NPPF, the Planning Practice Guidance, the forthcoming changes in national policy on this matter, and the ECC Developers' Guide to Infrastructure Contributions and the recommended 'Infrastructure delivery and impact mitigation' policy set out in Appendix B to the Essex County Council Local and Neighbourhood Planners' Guide to School Organisation (2018). With reference to ECC comments in response to paragraph 6.48 and 8.74 above, the principle of "pooling" restrictions and applying standard charges to smaller sites is not sufficient to meet the substantial levels of investment required to enable the provision of the appropriate infrastructure.

ECC therefore recommends that RDC's existing planning t policy is amended to take into account the latest material considerations and that RDC uses the best practice policy for "Infrastructure delivery and impact mitigation policy' (referred to above) to deal with pooled contributions, and to list any on-site facilities (new schools or extra land to expand existing schools) within the individual housing allocation policies. It is necessary to separately designate land to be allocated for Education use as D1 use class. This is considered necessary to avoid residential hope value being attributed to school land as part of any development viability assessment.

ECC recommends that the use of the best practice policy approach, referred to above is applied to the provision of other specific infrastructure, as outlined in ECC Developers' Guide to Infrastructure Contributions (2016).

ECC would welcome the opportunity to work with RDC on an ongoing basis to develop an effective approach through the preparation of the Local Plan.

SUPPORTING HEALTH, COMMUNITY AND CULTURE (SECTION 9)

SP4.1 Health and Well-being;

ECC welcomes and strongly supports the approach taken by RDC regarding health within this section. ECC considers the approach to be very positive towards Public Health and the wider issues of health have been considered and the promotion of Public Health with reference to the NPPF. ECC would welcome the opportunity to work with RDC in the development of this policy in conjunction with their planning and Health and Wellbeing team; and can provide advice on a range of supporting evidence and good practice available to inform the preparation of the local plan. This includes:
 FEAT tool (http://www.feat-tool.org.uk/), which allows authorities identify the various types of food retailers within their districts, including A5, fast food retailers.
 RTPI dementia friendly practice guidance- http://www.rtpi.org.uk/knowledge/practice/dementia-and-town-planning/
 Sports England Active Design- https://www.sportengland.org/media/3426/spe003-active-design-published-october-2015-email-2.pdf
 Public Health England - Health profiles- https://fingertips.phe.org.uk/profile/health-profiles
Paragraph 9.11 Options to promote health and wellbeing:
A. Retain the existing policy in current local plan policy
B. Ensure that land is specifically for healthcare
C. No policy on healthcare needs
D. Build on the existing healthcare policy to address wider health and well-being issues

ECC Comments

ECC would expect RDC to develop a combination of options based on evidence and in accordance with the NPPF.

ECC as a lead advisor for Public Health will engage with RDC on an ongoing basis in the preparation of the Local Plan and Spatial Strategy, especially as the Local Plan progresses to consider specific sites and spatial strategy. ECC can also provide details of its policies, strategies, guidance and standards in respect of the delivery of specific infrastructure and the respective levels of growth required.

In respect of Option D, ECC is supportive of this approach to refresh and build upon the existing health and wellbeing policy and ECC Public Health would welcome the opportunity to work with RDC in the development of this policy in conjunction with their planning and Health and Wellbeing teams.

ECC considers this approach should include greater recognition of the role of the natural environment and Green Infrastructure within the communities' health and wellbeing, including opportunities in preventing and treating ill health, as well as promoting wellness, including greater access and use of green space

ECC does not support Option C, for the reasons stated within the justification, it is considered contrary to national policy, the emerging vision for the Local Plan, ECC's vision for Essex and the revised EDG.

SP4.2 Community Facilities;

Paragraph 9.15 Options for Community Facilities:
A. Retain the existing policy in current local plan policy
B. Strengthen provisions in the existing policy
C. No policy on community facilities

ECC would expect RDC to prepare a policy option based on evidence and in accordance with the NPPF.

ECC would anticipate the provision of a range of community infrastructure in support of Local Plans, would wish to engage with RDC on an ongoing basis in the preparation of the Local Plan and Spatial Strategy, especially as the Local Plan progresses to consider specific sites and spatial strategy. Further details are set out in Section 2B above and in response to Section 4 of the Issues and Options Report.
In terms of future provision, opportunities for the co-location of services and maximising the use of existing buildings will be encouraged, to respond to the increasingly integrated models of service provision and provision for multi-purpose facilities. There is increasing emphasis on the integration of other form of community infrastructure, such as libraries and community spaces.

New provision is therefore likely to be in the form of a co-located community hub/library. This will be dependent on the level of population growth and the demographic of that population, along with the service requirements of future library provision. It is therefore likely that new provision could be made at some of the larger growth locations, particularly if there is a need for other community facilities, e.g. health centres, community halls etc. However, at this stage it is not possible to identify specific needs or costs of provision. It is not possible to identify specific needs or costs at this stage. Co-location may be something that should be encouraged but this would be more of a policy focus, possibly through a masterplanning approach, for the new development.

Funding will need to come from developer contributions and will be delivered through the masterplanning of new development sites.

ECC does not support Option C for the reasons stated in the justification, it is considered contrary to national policy, the emerging vision and objectives of the draft local plan and would not enable the necessary infrastructure to be appropriately planned for and delivered to meet the needs of the local community (residents and businesses).

SP4.3 Education and Skills;

ECC note the scope of Strategic Priority 4.3 (this section) mainly concerns Educational facilities; however there is no acknowledgement of or reference to the provision and requirements for Special Education Needs, either within schools or the wider community. ECC recommends that this is addressed, to consider and demonstrate the needs of the residents and the contribution that it can make. ECC welcome the opportunity to work with RDC to explore this further and can provide additional information on ECC's policies, strategies and evidence in respect of the requirements for this service, to be taken into account in the preparation of the Local Plan.

Paragraph 9.17 ECC welcomes the references within this paragraph, however the reference to "Nursery Education" should be changed to "EYCC provision" and this change should be incorporated throughout the document. Equally the reference to the need to ensure that there is sufficient capacity within "schools" should be amended to specifically refer to "EYCC provision" in addition to schools

Paragraph 9.22 & 9.27 ECC advises that the Essex Employment and Skills Board (ESB), through its 2017-18 Evidence Base, has identified seven priority sectors for Greater Essex including: construction, logistics, advanced manufacturing and engineering, IT/digital, healthcare and finance and insurance. To address shortages in these areas the ESB works in partnership with skills training providers, employers and other partners to offer an Education and Industry, Science, Technology, Engineering and Maths programme, to all secondary schools. These taster day opportunities, open to the District's schools would complement the District's Career Taster Days and continue to promote apprenticeships and access to skills and training. ECC welcomes the opportunity to explore this further with RDC in the preparation of the Local Plan.

Paragraph 9.23 ECC would like to advise RDC that it is in the process of updating the referenced ECC Developers' Guide to Infrastructure Contributions (2016), to include planning obligations and standard charges for contributions to support the full range of post-16 provision, where need is sufficiently evidenced. This is as a result of students 16-18 being required to stay in some form of education or training. This would support workforces, support apprenticeships and work with local colleges to address identified skills gaps. This also reflects ECC's overarching Lifelong Learning Strategy 2014 - 2018 and supporting strategies

Paragraph 9.26 ECC requests that the references to the scale of residential development that would generate the need for a viable new school are updated, to reflect section 2.2 of the recently published Essex County Council Local and Neighbourhood Planners' Guide to School Organisation (the Planners Guide) i.e. circa 1,400 houses for a 2 form entry primary school and 4,500 houses for a 6 form entry secondary school.

ECC's School Organisation Team welcomes the opportunity to assist in the preparation of the Local Plan and the next stage will be for ECC to 'scenario test' the preferred option to identify the education infrastructure required to mitigate the cumulative impact of allocations and permitted development.

Paragraph 9.27 Please refer to ECC's comments in paragraph 9.22 above, ECC would welcome the opportunity to explore this further with RDC in the preparation of the Local Plan.

Paragraph 9.29 Options identified to plan for education and skills development in the future:

A. Retain the current policies on schools provision
B. Ensure that land is specifically allocated for schools
C. Do not have a policy on meeting education needs
D. Update the current employment growth policy on skills and continue to support skills development through a skills training academy
E. Promote apprenticeships through planning

ECC Comments

ECC does not consider these options to be mutually exclusive. ECC would expect RDC to develop a combination of the options based on evidence and in accordance with the NPPF.

In respect of this section and the range of Options, ECC recommends that they are expanded to explicitly incorporate the requirements and provision of Special Education Needs within schools and the wider community. ECC welcomes the opportunity to work with RDC on an ongoing basis to ensure this is addressed in the development of the Local Plan, in accordance with ECC's overarching Lifelong Learning Strategy 2014 - 2018 and supporting strategies, which include the provision of services from pre-birth to 24 for children with Special Educational Needs or Disabilities.
Further details are also available within
 Essex Early Years and Childcare Strategy 2015-2018;
 ECC Local and Neighborhood Planners' Guide to School Organisation; and the
 ECC Developers' Guide to Infrastructure Contributions (2016).
In respect of Options A and B, ECC does not consider there to be a need for separate education infrastructure policies as before. ECC recommends that RDC uses the best practice policy set out in Appendix B to the ECC Local and Neighborhood Planners' Guide to School Organisation, as set out in response to SP3.6 and paragraphs 8.73 and 8.75 above)regarding an appropriate and effective approach to pooled contributions, and to list any on-site facilities (new schools or extra land to expand existing schools) within the individual housing allocation policies.

It is necessary to separately designate land to be allocated for Education use as D1 use class. This is considered necessary to avoid residential hope value being attributed to school land as part of any development viability assessment.

In respect of Option C, ECC does not support this approach for the reasons stated in justification, it is considered contrary to the emerging vision and strategic objectives of the draft local plan, to national policy and would fail to comply with "Duty to Co-operate" in the preparation of a sound, legally compliant and deliverable local plan, as it would not enable the necessary educational infrastructure to be appropriately planned for and delivered to meet the needs of the local community (residents and businesses).

In respect of Option D, ECC recommends the current employment growth policy on skills and supporting skills development are amended and based upon the most up to date evidence and strategies, to determine the requirements for the future. For example ECC would wish to reserve the position on the proposal for construction of a specific academy; ECC recommends further investigation of the skills system is required to ensure it more closely reflects the needs (both now and emerging) of current and new employers. ECC would wish to engage and work with RDC on these matters including the need to address the social determinants of health.

In respect of Option E, ECC welcomes and is supportive of the approach to using development as a way of supporting local apprenticeships. ECC is in the process of updating the referenced ECC Developers' Guide to Infrastructure Contributions (2016), to include planning obligations and standard charges for contributions to support the full range of post-16 provision, where need is sufficiently evidenced.
This is as a result of students 16-18 being required to stay in some form of education or training. This would support workforces, support apprenticeships and work with local colleges to address identified skills gaps. ECC would wish to engaged and work with RDC in the development of these matters in the preparation of the Local Plan, to ensure it reflects the latest evidence and strategies, including for example (but not limited to) ECC's overarching Lifelong Learning Strategy 2014 - 2018.

SP4.4 Early Years and Childcare Provision;

Paragraph 9.30 Overall ECC is generally supportive of the approach to EYCC, as presented, however please be advised that the ECC Strategy "Essex Early Years and Childcare Strategy 2015-2016 will be reviewed late 2018. ECC would welcome the opportunity to work with RDC on an ongoing basis to ensure the draft Local Plan is prepared based upon the most up to date ECC strategies and objectives as well as the latest EYCC sufficiency data, which is reviewed annually. ECC wishes to be engaged with the next stages of the Local Plan and the consideration of site allocations and their assessments to ensure full consideration is given to the opportunities and impacts on EYCC infrastructure requirements and delivery matters arising from both individual and cumulative site allocations.

Paragraph 9.31 ECC recommend that the emphasis and role of the EYCC service as referred to is changed to correctly reflect the role and provision of EYCC services, which is for every child to achieve a good level of development and best start in life, and not for parents employment. The provision of EYCC facilities is a key service which supports parents wishing to re-enter employment, continue with their current employment or to pursue further or higher education. Please refer to the Essex Early Years and Childcare Strategy 2015-2018 for further clarification, which includes ECC's vision that "Children in Essex get the best start in life to enable them to reach their full potential". The access to high quality education is one of the fundamental influences on the long term life chances of children living in Essex. Furthermore this strategy forms part of ECC's broader Lifelong Learning Strategy 2014 - 2018, for children from pre-birth to 19 and pre-birth to 24 for children with Special Education Needs or Disabilities.

Paragraph 9.32 ECC welcomes and supports the reference to the EYCC sufficiency data (at August 2016) presented within table 11, however please be advised that this data is monitored and updated on an annual basis, and more recent information is now available. ECC would welcome the opportunity to work with RDC on an ongoing basis as the draft Local Plan is prepared, to ensure it based upon the most up to date and relevant ECC strategies and objectives including this EYCC sufficiency data (as referred to in paragraph 9.30 above).

Paragraph 9.33 ECC recommends that all references to nursery education is changed to "Early Years and Childcare Provision". ECC notes the reference to "Childrens Centres" within the paragraph and can advise that the provision of these service had been changed is and is now call "Essex Child and Family Well-being Service" as set out in paragraph 9.35. ECC recommends that all references to "Childrens Centres" throughout the draft Plan are now changed to "Essex Child and Family Well-being Service". Further information and evidence is available on ECC's website as follows: http://www.essex.gov.uk/Education-Schools/Early-Years-Childcare/Pages/Children%E2%80%99s-centres.aspx

Paragraph 9.34 & 9.35 ECC recommends that the references to "PB" are changed to "pre-Birth" to provide the clarification on the nature of the services being provided.

Paragraph 9.36 Options Identified for the provision of early years and childcare facilities:

A. Retain the current policies on schools, early years and childcare
B. Ensure that land is specifically allocated for schools, early years and childcare
C. Do not have a policy on early years and childcare facilities
ECC Comments
ECC would anticipate the strategy for early years and childcare facilities to be developed with a combination of the options, based on evidence and in accordance with the NPPF

In respect of this section and the range of Options, ECC recommends that they are expanded to explicitly incorporate the requirements and provision of Special Education Needs within EYCC and the wider community. ECC welcomes the opportunity to work with RDC on an ongoing basis to ensure this is addressed in the development of the Local Plan, in accordance with ECC's overarching Lifelong Learning Strategy 2014 - 2018 and supporting strategies, which include the provision of services from pre-birth to 24 for children with Special Educational Needs or Disabilities.

Further details are also available within:
 Essex Early Years and Childcare Strategy 2015-2018;
 ECC Local and Neighborhood Planners' Guide to School Organisation and the
 ECC Developers' Guide to Infrastructure Contributions (2016)
In respect of Option A, ECC is supportive of a broad approach in respect of Education and EYCC to ensuring there is sufficient provision. There is however a need to ensure that the policies are updated to reflect current and future need for the community. ECC recommends that the following are taken into account:
 ECC's Essex Early Years and Childcare Strategy 2015-2018;
 the implementation of the Government's Extended Funding Entitlement offer (30 hours) introduced in September 2017;
 ECC's emerging strategy for the "Essex Child and Family Service",
 the most up to date EYCC Sufficiency Data; and
 the Infrastructure delivery requirements set out in ECC Developers' Guide to Infrastructure Contributions (2016).

ECC would welcome the opportunity to continue to work with RDC, to ensure the most-up to date and relevant Strategies, guidance and evidence is used to inform the broad policy approach as well as the wider preparation of the draft Local Plan.

In respect of Option B, ECC is supportive of this approach to ensure specific land is allocated for the provision of schools and EYCC facilities. ECC would welcome the opportunity to continue to engage with RDC on this matter, and draw your attention to the requirements of the ECC Developers' Guide to Infrastructure Contributions (2016), the ECC Local and Neighborhood Planners' Guide to School Organisation, as well as ECC's comments above to paragraph 9.36 and the Options identified to plan for education and skills development in the future.

ECC does not support Option C, for the reasons stated in the justification, it is considered contrary, national planning policy and would fail to comply with the "Duty to Co-operate" in the preparation of a sound, legally compliant and deliverable Local Plan, the emerging vision and objectives, and it would not enable EYCC and educational infrastructure to be appropriately planned for and delivered to meet the needs of the local community (residents and businesses).

SP4.5 Open Space and Outdoor Sports and Recreation

Paragraph 9.37 ECC welcomes and supports the provision of Open Space, Outdoor Sports and Recreation (both formal and informal) and supports the preparation of up to date evidence with the joint South Essex Playing Pitch Strategy, in co-operation with Active Essex, as well as the need to commission a new Open Space Study incorporating Green space and infrastructure.

ECC recommends further consideration is given to the wider role of and value of green space to support healthy communities including general landscape value, green infrastructure, biodiversity, green corridors and country parks for the provision of managed informal passive and active recreational space for all residents.

Paragraph 9.42 Options identified for open space, outdoor sports and recreation:
A. Retain, and where necessary update, the existing overarching policy on open spaces
B. Retain, and where necessary update, our current policy on existing open space
C. Retain, and where necessary update, our current policy on new open space
D. Retain, and where necessary update, our current policies
ECC would expect RDC to develop a combination of the options, based on evidence and in accordance with the NPPF.

ECC would expect this to include the South Essex Playing Pitch Strategy and the Open Space and Green Infrastructure Study to be commissioned) and in accordance with the NPPF and guidance, including the emerging EDG (to be published February 2018) and Sport England's Active Design Principles, to create and promote healthy communities.

ECC recommend that further consideration is given to connectivity investment and improvements between green spaces through the provision of green corridors and enhancement of existing and new Green Infrastructure, which would provide a number of key benefits. This includes
 Climate change adaptation and mitigation
 Health, wellbeing and social cohesion
 Economic growth and investment
 Wildlife and habitats

This would support the creation of stronger communities and these benefits could be achieved through good planning and management to ensure green space is supplied and maintained. ECC would wish to engage with RDC on an ongoing basis in the preparation of the Local Plan, especially as the plan progresses to consider specific sites and spatial strategy.

In respect of Option C, ECC recommends that the "Challenge" on how to deliver infrastructure to support new homes should also seek to incorporate new open space Suitable Accessible Natural Greenspace (SANG) as part of new residential developments to avoid recreational impacts on European sites. Further details on this aspect are incorporated within the revisions to the emerging EDG. ECC also consider that this approach and option is cross referenced to the challenges set out in paragraph 4.17 and the approach to Greenways in paragraph 10.29 (Option H).

SP4.6 Indoor Sports and Leisure Centres

Paragraph 9.50 Options to address the provision of the indoor sports and leisure centres:
A. Retain the existing policy
B. Do not have a policy on indoor sports and leisure centres

ECC Comments

ECC would expect RDC to develop a policy approach based on evidence and in accordance with the NPPF.

ECC support Option A, subject to the need for any amendment arising from the new / emerging evidence base.

ECC does not support Option B, for the reasons stated within justification, it is considered contrary to the NPPF and the emerging vision and strategic objectives of the draft local plan.

SP4.7 Facilities for Young People;

Please refer to ECC's comments in response to SP4.3 - 4.5 above regarding community facilities; Education and Skills; Open Space and Outdoor Sports and Recreation; and Indoor Sports and Leisure Centres.

ECC would welcome the opportunity to work with RDC to ensure the latest ECC policies; guidance and evidence are taken into account to inform the principles, strategies and specific policies within the emerging Local Plan, please also refer to the Revised EDG.

SP4.8 Play Space Facilities;

Please refer to ECC's comments in response to SP4.3 - 4.5 above regarding community facilities; Education and Skills; Open Space and Outdoor Sports and Recreation; and indoor sports and leisure centres.

ECC would welcome the opportunity to work with RDC to ensure the latest ECC policies; guidance and evidence are taken into account to inform the principles, strategies and specific policies within the emerging Local Plan, please also refer to the Revised EDG.

PROTECTING AND ENHANCING OUR ENVIRONMENT (SECTION 10)

Paragraph 10.1 Overall ECC welcomes the Strategic Priority SP5

ECC supports the inclusion and strategic priority 5 (and SO19) regarding conservation and enhancement of the natural environment, broadly in accordance with NPPF (paragraph 156). ECC recommends that the objectives should be further amended, to include policies which seek to minimise the impacts to biodiversity in accordance with NPPF paragraph 117, which sets out the need for planning policies to:
 plan for biodiversity at a landscape-scale across local authority boundaries;
 identify and map components of the local ecological networks, including the hierarchy of international, national and locally designated sites of importance for biodiversity, wildlife corridors and stepping stones that connect them and areas identified by local partnerships for habitat restoration or creation;
 promote the preservation, restoration and re-creation of priority habitats, ecological networks and the protection and recovery of priority species populations, linked to national and local targets, and identify suitable indicators for monitoring biodiversity in the plan;
 aim to prevent harm to geological conservation interests;

ECC recommends that this is developed under the Duty to Co-operate with neighbouring authorities to both identify the wildlife corridors and to implement them through planning policies.

ECC consider the following Acts, Strategies and Guidance to be relevant and recommends that these are taken into account and used as appropriate:
 NERC Act 2006 concerning biodiversity duties for public bodies;
 England Biodiversity Strategy 2020; Net Gain initiative;  DEFRA's biodiversity metric calculator; and
 Essex Biodiversity Validation Checklist.

SP5.1 Green Belt

Paragraphs 10.5 ECC notes and supports RDC's desire to protect the Green Belt,
10.15 whilst also seeking to meet the emerging vision and strategic objectives for the District, including the preparation of evidence incorporating a review of the Green Belt boundary for plan making purposes in accordance with the NPPF.
ECC supports this approach and welcomes the opportunity to work closely with RDC on this matter, in accordance with ECC's Full Council motion in December 2014 and 2017, to support the Essex District, Borough and City Councils which when developing their Local Plans, seek to protect Green belt sites from inappropriate development and to ensure that housing development cannot occur where there is insufficient infrastructural provision. ECC will not support Local (Development) Plans unless adequate resources are identified from developers, local councils and/or Government grants to ensure that sufficient infrastructure, including roads, schools, medical facilities, parking, sewerage and drainage, is provided in a timely manner and in a way that balances the needs to promote economic growth and provide housing for residents whilst protecting their quality of life.

In 2017 ECC called on the Secretary of State for Communities and Local Government to issue urgent statutory guidance, which removes the opportunity for this exploitation and protects valued greenfield sites from predatory development.'

Paragraph 10.16 Options in relation to the Green Belt:

A. Retain the existing policy on broad Green Belt principles in the Core Strategy
B. Amend the current Green Belt policy in the Core Strategy
C. Do not have a policy on the Green Belt

ECC Comments

ECC would expect RDC to develop a policy option based on evidence and in accordance with the NPPF. In respect of both Options A and B, ECC recommend a Review of the Green Belt boundary as part of the evidence base to inform the preparation of the Local Plan and its emerging spatial strategy, in accordance with NPPF (paragraphs 83-85), to set the framework for Green Belt and settlement policy.

ECC would welcome the opportunity to work with RDC to ensure the latest ECC policies; guidance and evidence are taken into account to inform the principles, strategies and specific policies within the emerging Local Plan.

ECC does not support Option C, for the reasons stated within the justification and would expect RDC to take any decision based on robust evidence and in accordance with the NPPF.

SP5.2 Biodiversity, Geology and Green Infrastructure

Paragraph 10.17 ECC welcomes the overall approach to protect and enhance the natural environment by RDC, including a review of the evidence base to ensure decisions are based upon the most up to date biodiversity and geodiversity information.

ECC recommends the inclusion and reference to the Outer Thames Estuary SPA within the list of European sites.

Paragraph 10.19 ECC note that Green Infrastructure (GI) is only referred to in its wider District context (see ECC comments to paragraph 6.4). However, due to the rural nature of the District, ECC considers localised GI design principles should be incorporated as part of a proposed housing development, specifically large developments such as Garden Communities and Urban Extensions. This would be in accordance with the NPPF and the Core Planning Principles and in particular paragraph 114 for conserving and enhancing the natural environment, by setting out the strategic approach within the Local Plans.

ECC recommends the principles in NPPF paragraph 114 are incorporated within Strategic Priority SP5.2 to protect, manage and enhance important habitats, nature conservation areas, geo-diversity and greenways.

Paragraph 10.20 ECC recommends Local Geodiversity/Geological Sites (LoGS) are added to the list of local sites. These are in addition to Local Wildlife sites (LoWS) and would be in accordance with NPPF paragraph 117.

Paragraph 10.21 As outlined above in response to Strategic Objective 12, ECC welcomes the reference to 'encouraging adherence to the waste hierarchy' and making 'best use of mineral deposits' but considers that these statements could be afforded slightly more clarity. Supporting the waste hierarchy and ensuring a sustainable use of minerals requires that existing facilities and infrastructure are safeguarded to ensure that they are able to continue to make their planned contribution to the mineral and waste strategies operating in the County. Whilst already covered by MLP Policy S8 and WLP Policy 2, it is considered beneficial for this to be incorporated into the Rochford LP objectives (see suggested change to Strategic Objective 12 above).

ECC welcomes and supports the reference to the requirement to safeguard mineral development recognised in paragraph 10.21 and consider the proposed modification to Strategic Objective12 to be in accordance with this recognition. However, it is noted that there is no similar recognition for waste facilities, which the proposed modification to Strategic Objective 12 would then cover.

Paragraph 10.22 ECC supports the approach outlined in this paragraph and polices DM25-DM27 which are considered to be in accordance with NPPF paragraph 118 to deliver biodiversity and the requirements of the NERC Act

Paragraph 10.26 ECC welcome and support the development of an Essex-wide strategy in respect of Recreational Disturbance Avoidance Mitigation Strategy, however note that this would mitigate for recreational disturbance impacts, in-combination with other plans and projects.

Paragraph 10.27 Options in relation to Biodiversity and Geodiversity in the district:
A. Retain or amend our current broad policy on sites of nature conservation importance
B. Do not have a policy on sites of nature conservation importance

Paragraph 10.28 Options identified to support and protect local habitats which have important ecological value:
C. Retain our current policy on trees and woodlands
D. Retain our current policy on other important landscape features
E. Retain our current policy on species and habitat protection
F. Update our current policy on Local Wildlife Sites
G. Condense and merge our current policies on nature conservation
Paragraph10.29 Options identified in relation to greenways in the district:
H. Retain our current policy on greenways
I. Do not have a policy on greenways

ECC Comments

Options A- I: ECC does not consider the options to be mutually exclusive. ECC would expect RDC to develop a combination of the options based on evidence and in accordance with the NPPF and guidance, whilst also having regard to the evidence presented in sections SP4.5 and 4.6 and ECC comments (see above).

ECC would wish to engage with RDC on an ongoing basis in the preparation of the Local Plan, especially as the plan progresses to consider specific sites and spatial strategy.

In respect of Option A, ECC welcomes and supports the proposal to commission a joint South Essex Open Space and Green Strategy, which shall subsequently inform this Local Plan. ECC also welcomes the importance assigned to nature conservation sites, the identification and enhancement of local wildlife/green corridors and networks to build biodiversity resilience to climate change allowing species dispersal within the urban landscape. These corridors will also provide a provision of greenways for walking and cycling; improve accessibility to green spaces and should have regard to the cycle network in the Rochford Cycling Action Plan.

ECC consider there to be the additional benefits including the health and wellbeing agenda, as well as improving the attractiveness of a place and potential to attract visitors and investment to the area.

In respect of Options C-G (local habitats) - Whilst ECC does not disagree with these options, consideration should be given to the preparation of one policy, incorporating all the policies referred to (within options C-G and ENV1). This would enable a holistic approach to be taken to our natural environment, with the elements considered as a "whole", within Option G.

In respect of Option G, if developed, ECC recommends that the policy is expanded to include "greenways" (please refer to ECC's comments in sections SP4.5 and 4.6 above in relation to open space and outdoor recreation and green infrastructure).
ECC supports Option H (Greenways), in principle, if it is not incorporated within Option G, as suggested above. ECC consider there to be a need to ensure "greenways" are captured, in accordance to NPPF, and having regard to the wider benefits as outlined above in respect of biodiversity; resilience to climate change, protecting the health of the green space, green infrastructure, open space, outdoor recreation, sustainable travel options and to promoting healthy communities.

ECC does not support Options B and I, for the reasons stated within their justifications, they are considered contrary to national policy and the emerging Local Plans strategy and vision.

SP5.3 Wallasea Island and the RSPB Wild Coast Project

Paragraph 10.34 Options identified for Wallasea Island and the RSPB's Wild Coast Project:
A. Retain the current policy which supports the Wallasea Island Wild Coast Project
B. Continue to support further development at Essex Marina as per current policy
C. Do not support further development at Essex Marina

ECC Comments

ECC would expect RDC to develop a policy approach for based on evidence and in accordance with the NPPF.

In respect of Option A, ECC would anticipate the strategy for Wallasea Island and the RSPB's Wild Coast project, to be developed with a combination of the options, based on evidence and in accordance with the NPPF including consideration for a project level HRA and appropriate mitigation for recreational disturbance.
ECC would recommend the need for a holistic approach within the context of the wider emerging spatial strategy, as well as the other emerging strategies in respect of open space, green space, nature conservation, rural diversification, tourism green infrastructure and sustainable travel. A balanced approach is considered necessary to both support the Wallasea project and improvements to accessibility, whilst ensure this would be sustainable with minimal ecological impact to ensure its survival and viability as a visitor destination.

In respect of Options B & C in relation to the Essex Marina, ECC would expect a policy approach to be developed based on evidence and in accordance with the NPPF.

SP5.4 Landscape Character;

Paragraph 10.35 ECC notes and welcomes inclusion of this section and the importance and use of Landscape Character Assessments as part of the baseline criteria for any development proposal. The principle of this approach is supported and should ensure the existing landscape elements are retained and that any new elements should enhance the overall landscape character.

Paragraph 10.44 Options identified for Landscape Character:
A. Retain the current policies on the Upper Roach Valley
B. Retain the current policies on the Coastal Protection Belt
C. Develop a broad policy on landscape character
D. Ensure consistency throughout Development Management Plan policies in relation to supporting development in appropriate landscape character areas and special landscapes.
E. Do not have a policy on landscape character

ECC Comments

ECC would anticipate a combination of the options A-D to be developed based upon evidence and in accordance with NPPF.

ECC does not support Option E for the reasons stated within the "justification", it is considered contrary to NPPF (paragraph156).

SP5.5 Protecting and Enhancing Heritage and Culture

Paragraph 10.45 ECC notes and welcomes the reference to the EDG, within this section and throughout the Issues and Options Report; however as this EDG is being revised and now includes sections such as Green infrastructure, Garden Communities and SUDS, which could form other key adoptable guidelines for future development.

ECC recommend that the new revised EDG is taken into account in the ongoing preparation of the draft Local Plan and ECC would welcome the opportunity to work with RDC on this matter.

SP5.6 Good Design and Building Efficiency

Paragraph 10.54 ECC recommend that this section is updated to reflect the updates and changes within the revised EDG 2018, which now specifically addresses health and wellbeing requirements. ECC can confirm that Sports England has been engaged with the revisions to the EDG, to include the Sport England - Active Design Principles 2015; which is supported by Public Health England and is consistent with the overall approach to health and wellbeing.

Paragraph 10.57 ECC recommend that a reference should be included to require the sustainable use of minerals in the construction of approved developments. This would be consistent with Strategic Objective 12 which aims to make best use of mineral resources, in accordance with the NPPF.

Paragraph 10.62 Options identified in relation to ensuring design principles are appropriate:
A. Retain the existing policies on design.
Ensure design policies make specific reference to Secured by Design, and the need to strike an appropriate balance between urban design and security.
C. Retain current guidance within our Supplementary Planning Documents.
D. Develop specific design principles for individual towns and villages building on the current guidance within our Supplementary Planning Documents.

ECC Comments

ECC would anticipate a combination of the options A-D to be developed based upon evidence and in accordance with NPPF.

ECC recommends the following Guidance and Evidence is also taken into account to inform the emerging Local Plan:
 The Revised EDG (to be published in February 2018)
 Sport England - Active Design Principles 2015 (which provide updates which specifically include health and well-being requirements and the creation of inclusive and active places. ECC can confirm that Sports England has been engaged with the revisions to the EDG, to include the; which is supported by Public Health England and is consistent with the overall approach to health and wellbeing.

In respect of Option A, ECC considered this option would need to be amended to take into account changes in national policy and guidance, including the removal of the Code for Sustainable Homes.

In respect of Option B, ECC consider the guidance within the Revised EDG to be applicable and relevant.

Paragraph 10.63 Options for building efficiency standards for new homes, and new commercial and industrial buildings.
E. Remove reference to the Code for Sustainable Homes and replace with a simpler policy on water efficiency.
F. Continue to drive up energy efficiency standards for new homes through replacing the Code for Sustainable Homes with one that focuses on energy, thermal and water efficiency in particular.
G. Do not have a policy on energy efficiency standards for new homes.
H. Retain existing policy on BREEAM.
I. Amend the existing policy on BREEAM to apply to only certain types of buildings.
J. Include a specific policy on the efficiency of conversions, extensions and alterations to existing homes.
K. Do not have a policy on energy efficiency standards for conversions, extensions and alterations to existing homes.

ECC Comments

ECC would anticipate a combination of the options E-F and H-J to be developed based upon evidence and in accordance with NPPF (paragraph 156).

In respect of Option E, whilst the removal of reference to the "Code for Sustainable Homes" would be appropriate, there would be a need to ensure an appropriate approach to water efficiency is developed, in accordance with the NPPF to address the broad principles being developed within the emerging vision, strategic objectives and spatial strategy (as outlined in Option C) and to incorporate the standard for energy efficiency within Option F to promote sustainable development, and resilience to climate change, in accordance with the NPPF.

In respect of Option J, this is supported by ECC and is considered to be consistent with best practice, for example the approach contained in Uttlesford District Council's Supplementary Planning Document on home extensions to reduce carbon dioxide emissions from existing building.

ECC does not support Options G & K, for the reasons stated within the respective justifications, they are it is considered contrary to the NPPF (paragraph 156) and the emerging vision and strategic objectives of the draft Local Plan.

SP5.7 Air Quality

Paragraph 10.64 ECC recommends that the scope and content of this section is expanded to include the latest national policy advice including the "National Air Quality Plan (2017)" published by DEFRA in July 2017, and the designation of the A127 to the east of Rayleigh Weir as an area having possible air quality issues.
Paragraph 10.69 ECC recommends inclusion and reference to the adoption of the AQMP for Rayleigh should be updated to say it was adopted in 2017 as this document has been issued after the date of adoption

Paragraph 10.72. Options in relation to Air Quality:

A. Retain the existing policies on air quality
B. Continue to promote clean air initiatives, such as sustainable ways to travel and renewable energy projects
C. Support, where appropriate, the actions put forward in the Rayleigh Town Centre Air Quality Action Plan
D. Do not have a policy on air quality
ECC Comments
ECC would anticipate a RDC to develop a combination of options, based on evidence and in accordance with the NPPF and DEFRA's National Air Quality Plan (2017), which specifically designates the A127 to the east of Rayleigh Weir as having possible air quality issues.

ECC recommends that consideration is also given to the use and role of wider sustainable development principles including green infrastructure, green spaces and green design principles to provide an opportunity to enhance the environment and support wider health.

ECC does not support Option D, for the reasons stated in the justification, it is considered contrary to NPPF (Paragraph 156), the National Air Quality Plan (Defra 2017) legislation, and the emerging vision and strategic objectives of the draft local plan.

DETAILED POLICY CONSIDERATIONS (SECTION 11)

ECC notes the majority of the issues identified within this section concern detailed matters, below the overarching strategic polices and principles addressed in the preceding sections of the ECC response to the Issues and Options consultation.
The principle of the approach is noted, however, ECC would anticipate all the themes and options to be developed, based on evidence and in accordance with the NPPF, taking into account the outcomes of the wider emerging spatial strategies and principles being developed within this Issues and Options consultation, as part of the preparation of the Local Plan.

In addition to the above, ECC can provide the following detailed comments on specific themes:

D.P1.1 Mix of Affordable Housing

Paragraph 11.5 Options to address the split between affordable housing products:
F. Retain the current affordable homes split (80% social and 20% intermediate) where a scheme meets the prescribed threshold
G. Amend the split taking into account any changes in national planning policy and guidance (if the definition of affordable homes is widened to include other products)
H. Do not have a prescribed split in a policy

ECC Comments

ECC would anticipate a RDC to develop a combination of options, based on evidence and in accordance with the NPPF

Please refer to ECC's comments in response to SP1.1 (see Paragraphs 6.30, 6.31 and 6.32) above which equally apply to this option; and in particular ECC's recommendations for consideration to be given to the provision of key worker homes through the affordable housing schemes, to support the needs of healthcare providers (see paragraph 6.31)

DP1.8 Options for development of Brownfield (Previously Developed) Land in the Green Belt in the future
A. Retain the current policy on previously developed land
B. Do not have a policy on previously developed land

ECC Comments

ECC would anticipate the approach to the development of Brownfield Land in the Green Belt, to be developed based on evidence and in accordance with the NPPF, as stated in ECC's response to SP5.1 and paragraph 10.16 regarding the policy approach to Green Belt, the need for a Review of the Green Belt Boundary.

ECC does not support Option B for the reasons stated within the justification, and it is considered contrary to the NPPF (paragraphs 79-92).

DP1.10 Parking standards and Traffic Management

Paragraph 11.57 Options identified for Parking and Traffic Management:
A. Retain our broad policy on parking standards and remove our Development Management Plan
B. Retain our current approach to traffic management
C. Do not have policies on parking and traffic management.

ECC Comments

ECC would expect RDC to develop a combination of options A and B, based on evidence and in accordance with the NPPF.

Please also refer to ECC's response to highway infrastructure (Section 8) regarding the Local and Strategic Highway Network and Sustainable Travel. There is a need for greater emphasis to be placed on an integrated package of transport solutions, which is applicable to Parking Standards and Traffic Management. Please also refer to ECC's earlier comments in Sections 6-8, regarding the development of sustainable communities, and in particular active design principles, promotion of healthy communities and the revised EDG to be applicable. This is necessary to ensure a holistic approach and consistency across the emerging vision and strategic objectives within the draft Local Plan.

In respect of Option B, this is partially supported by ECC, given the need to ensure that the policy is strengthened to provide an appropriate level of off street parking and to fully mitigate the impact of development (as set out in the traffic management plan), however there may be the potential to combine these options into one policy.

ECC would welcome the opportunity to explore this further with RDC as part of the preparation of the Local Plan.

ECC does not support Option C, for the reasons stated in the justification; it is considered contrary to NPPF (paragraph 156 & 157), the Essex LTP, EPOA's Parking Standards Design and Good Practice Guide; and the revised EDG.

D.P1.11 Home Businesses

Paragraph 11.61 Options to deal with home businesses:
A. Retain the current policy
B. Take a more restrictive approach to home businesses
C. Take a more flexible approach to home Businesses
D. Do not have a policy on home businesses

ECC Comments

ECC would expect RDC to develop a combination of the options A-C, based on evidence and in accordance with the NPPF.

In respect of Option C, ECC would support a more flexible approach to home businesses, taking into account the balances within this section and the inter-relationship and links to ECC's earlier comments regarding the ambition for communication infrastructure (improvements to broadband coverage and speed) as well as the need for "grow on space", to accommodate businesses as they become more successful and need more space from which to operate.

Further details on this are set out in ECC's response to meeting business needs (SP1.7 and paragraph 6.87); the options to support employment and economic growth (paragraphs 6.94 & 6.96); and Communication Infrastructure and the options to improve broadband coverage and speed including ultrafast broadband (SP3.3 and paragraphs 8.43 & 8.44).

ECC's considers there to be a need for a holistic approach and consistency across the emerging vision and strategic objectives within the draft Local Plan.

ECC does not support Option C for the reasons stated within the justification, it is considered contrary to the emerging vision and strategic objectives within the draft Local Plan.

DRAFT SUSTAINABILITY APPRAISAL

ECC consider the SA to be a good example of an initial Regulation 18 'Issues and Options' appraisal, exploring the sustainability considerations of a wide range of strategic options and assessing them to the same level of detail.
Whilst not a criticism of the SA, it is considered that the options explored surrounding OAN possibilities within the Plan could be expanded upon within the SA. The Plan, at Table 2 (South Essex Housing Market Area - OAN for new homes (Source: South Essex SHMA Addendum 2017)) indicates a range of between 331 and 361 homes per year. Although the upper and lower figures displayed are perhaps not distinctively different to warrant separate assessment within the SA under the Regulations, RDC may want the SA to consider assessing indicative higher and lower figures in future iterations. If felt necessary, this could also be expanded to assess reasonable spatial strategy options / permutations under different scenarios regarding levels of growth (i.e. at which level of growth would certain spatial strategy options be considered reasonable). Further, it may also be considered necessary to assess the figure included for the District in the recent DCLG consultation which set a standardised methodology for calculating housing needs. This is in consideration of the Plan being at an early stage of preparation and uncertainty as to what might be the District's OAN later on in the plan-making process.

ECC notes the reference throughout the SA and the Issues and Options Report, to 'a combination of options' and considers that whilst this may be a logical option in most cases, care needs to be taken as to what form a 'combined' policy would contain and aspire to.

ECC recommends that the "Climate Change" section should include a reference on whether the proposal will support the findings/priorities of the South Essex Surface Water Management Plan (2012 and emerging 2018 revision).