MM95

Showing comments and forms 1 to 1 of 1

Comment

Allocations: Schedule of modifications

Representation ID: 33067

Received: 10/01/2014

Respondent: Raven Group

Agent: Pomery Planning Consultants

Representation Summary:

The text needs to be specific to guide development, advising that the allocation for NEL 2 shall be served by a single access/egress onto Star Lane, to be sited south of a landscaped buffer of at least 10 metres, between BFR1 and NEL 2. The route of the footpath to the wildlife site could remain within the buffer land.

Full text:

The new sentence to be added to this paragraph needs to include direction, as to the proposed vehicular access to be provided to site NEL 2(previously NEL 3). The Plan requires a Landscaped Green Buffer to be provided the north, south and east of NEL 2 (previously NEL 3) , which is achievable. The buffer to the north is required to separate the new residential development planed for BFR1 and the employment allocation NEL 2 (previously NEL 3). This buffer would need to be provided directly south of the BFR1 development, over the existing access/public footpath to the wildlife site. There is no room to provide an upgraded vehicular access to NEL 2 (previously NEL 3) over the existing road, as well as providing the Landscaped Green Buffer of an appropriate width to combat amenity issues. A new access over the old would also conflict with the requirements of MM94 Page 103 para 5.61, as heavy lorries accessing the employment land would run close to the residential boundaries of BFR1, creating an amenity conflict. The text needs to be specific to guide development, advising that the allocation for NEL 2 shall be served by a single access/egress onto Star Lane, to be sited south of a landscaped buffer of at least 10 metres, between BFR1 and NEL 2. The route of the footpath to the wildlife site could remain within the buffer land.