ENV6 and ENV7 - Alternative Options
Showing comments and forms 1 to 1 of 1
Comment
Core Strategy Preferred Options (Revised October 2008)
Representation ID: 3830
Received: 16/12/2008
Respondent: Baltic Distribution Ltd
Representation Summary:
Should consider use of the water power in the River Crouch for power generation as they do in Scotland with a barrage across the river at an appropriate location.
The use of underwater generators.
Full text:
Should consider use of the water power in the River Crouch for power generation as they do in Scotland with a barrage across the river at an appropriate location.
The use of underwater generators.