GB2 Rural Diversification and Recreational Uses - Preferred Option

Showing comments and forms 1 to 12 of 12

Comment

Core Strategy Preferred Options (Revised October 2008)

Representation ID: 3174

Received: 05/11/2008

Respondent: Mr James Bryan

Representation Summary:

This is my preferred option. Developers should not be allowed to "cherry pick" easy development opportunities in green belt areas at the cost of the local community and environment. Particularly in the case of new homes.

Full text:

This is my preferred option. Developers should not be allowed to "cherry pick" easy development opportunities in green belt areas at the cost of the local community and environment. Particularly in the case of new homes.

Support

Core Strategy Preferred Options (Revised October 2008)

Representation ID: 3215

Received: 12/11/2008

Respondent: Mr Derek Coe

Representation Summary:

This is a clear and concise option

Full text:

This is a clear and concise option

Object

Core Strategy Preferred Options (Revised October 2008)

Representation ID: 3299

Received: 24/11/2008

Respondent: Whirledge & Nott

Agent: Whirledge & Nott

Representation Summary:

This proposal is in conflict with government guidance set out in PPS7 and will do nothing to encourage the rural economy. It is accepted that the government supports re-use of rural buildings however this policy sets out in its first sentence 'a restrictive approach' in direct conflict.

Most diversification proposals are on developed land and as such have no imapct on the openness of the Green Belt. Wider sustainability issues should not focus solely on transport.

PPS7 supports residential re-use and the replacement of rural buildings in approprate locations and this should be reflected in this policy.

Full text:

We object to this policy in its current form as it is too restrictive and in direct conflict with accepted government policy.

It is accepted within PPS7 that the governments policy is to support the re-use of appropriate and suitably constructed existing buildings in the countryside. This policy does not set out this position. It is important that a positive approach is reflected in the policy. Currently the first sentence sets out the opposite with the negative wording of 'a restrictive approach'.

It is acknowledged that the Districts rural area is all Green Belt and this must be balanced with development. However diversification can occur in well designed locations wihout a detrimental impact on the principles of the Green Belt and this should be acknowledged in policy GB2. Most if not all diversification proposals are on previously developed land and as such do not have any impact on the openness of the Green Belt.

Reference within the policy to acceptance in 'appropriate cirumstances in the Green Belt' is ambiguous and has potential to add more restrictive criteria. The further limit of employment use to only 'small-scale' employment use is restrictive and unrealistic in the rural area. Many farm buildings have significant floor areas and can offer ideal employment sites without alteration or significant impact. Whilst no definition of small-scale is given to curb further the type of employment use that is appropriate is damaging to the rural economy.

It is positive that the council acknowledge that allowances for the fact public transport is limited in the rural areas will be made. Rural area are by their nature dependent on car use and diversification within this area will not necessarily exacerbate this. Many drive to school or work so to shorten the distance travelled by offering employment opportunities closer to home is a positive step.

It is important that 'wider sustainability issues' do not focus solely on car movements and public transport. Other sustainability issues such as the recycling of existing buildings reducing the impact of additional construction and loss of green sites should be an important factor in the sustainability of diversification proposals. Further more the revival of employment in rural areas supports other local services and can bring more sustainable work patterns back to rural areas.

Many rural buildings are of a traditional design and offer historic character within the landscape. To be unable to re-use these buildings results in empty, run down and poorly maintained buildings scattered throughout the landscape. The refusal to consider residential development is short sighted and unreasonably negative. Government guidance in PPS7 acknowledges that "residential conversion may be more appropriate in some locations and for some types of buildings". To preclude any residential development is contrary to government policy and will result in some buildings with historic charater being lost to the rural landscape.

Policy GB2 should acknowledge the emphasis in PPS7 that the replacement of buildings in the countryside for economic development purposes is acceptable and set out criteria for this.

In summary the policy GB2 as set out in this document is in conflict with government guidacne and will do nothing to encourage the rural economy. The council should consider carefully its rural area and without the opportunityf or diversification many land managers will struggle to maintain the rural landsacpe. It is felt that the balance as set out in this policy is still weighed against the rural economy.

Object

Core Strategy Preferred Options (Revised October 2008)

Representation ID: 3784

Received: 16/12/2008

Respondent: Mr S Hayhurst

Representation Summary:

Paragraph 19 of PPS7 supports the replacement of existing buildings in the countryside for employment purposes where this would result in a more acceptable and sustainable development than conversion. Lubards Lodge Farm contains an existing vibrant employment area of 3.5 hectares, where a large number of former farm buildings of various shapes and sizes now form an important reservoir of premises for local start up businesses. The inclusion of a policy in accordance with paragraph 19 of PPS7 would provide scope for limited redevelopment of existing buildings where this would result in a more acceptable and sustainable form of development.

Full text:

OBJECTION TO POLICY GB2

1. Paragraph 19 of PPS7 (Sustainable Development in Rural Areas) states: -
"The Government is also supportive of the replacement of suitably located, existing
buildings of permanent design and construction in the countryside for economic development purposes. The replacement of buildings should be favoured where this would result in a more acceptable and sustainable development than might be achieved through conversion, for example, where the replacement building would bring about an environmental improvement in terms of the impact of the development on its
surroundings and the landscape. Local planning authorities should set out in their LDDs the criteria they will apply to the replacement of countryside buildings. These should take
account of the considerations set out in paragraph 17 that apply to the conversion and
reuse for economic purposes of existing buildings in the countryside. Authorities should
also set out the circumstances where replacement would not be acceptable and clarify the permissible scale of replacement buildings."

2. There appears to be no consideration in policy GB2 of the possibility of the
replacement of countryside buildings for economic development purposes in accordance
with the requirements of PPS7. Even if a detailed policy on this matter is planned for a
later local development document, the Core Strategy should at least include an indication
that there is scope for the replacement of countryside buildings for economic
development purposes, subject to criteria that will be elaborated in a later LDD.

3. Lubards Lodge Farm contains an existing vibrant employment area of 3.5 hectares on
a rectangular site on the western side of Hullbridge Road, about 450m north of its
junction with Rawreth Lane. This site presently consists of a large number of former farm
buildings of various shapes and sizes and has gradually become established over the
years as an important reservoir of premises for local start up businesses. In other
representations to this Core Strategy document we argue for the designation of this large
area of "previously developed land" as an employment area, to enable the expansion and
redevelopment of the existing buildings within the confines of the site. The inclusion of a
policy along the lines suggested above, in accordance with paragraph 19 of PPS7, would
at least provide scope for limited redevelopment of existing buildings where this would
result in a more acceptable and sustainable development than might be achieved through
conversion.

Object

Core Strategy Preferred Options (Revised October 2008)

Representation ID: 3883

Received: 17/12/2008

Respondent: AWSquier Ltd

Representation Summary:

We would support the Alternative Option. Reasons being :-
PPS7 is more supportive of Diversification of rural assets than the Core Strategy. PPS7 does not preclude against residential uses quote "residential conversion may be more appropriate in sime locations and for some types of buildings."
This is re-use of existing structures - not new build. Additionally the District is peppered with individual houses. These convertions would be within the curtiledge of existing farmsteads and as such can easily be visually protected by tree planting if required.

Full text:

We would support the Alternative Option. Reasons being :-
PPS7 is more supportive of Diversification of rural assets than the Core Strategy. PPS7 does not preclude against residential uses quote "residential conversion may be more appropriate in sime locations and for some types of buildings."
This is re-use of existing structures - not new build. Additionally the District is peppered with individual houses. These convertions would be within the curtiledge of existing farmsteads and as such can easily be visually protected by tree planting if required.

Support

Core Strategy Preferred Options (Revised October 2008)

Representation ID: 4104

Received: 11/12/2008

Respondent: Sport England

Representation Summary:

Option GB2: Rural Diversification and Recreational Uses
SUPPORT
Sport England welcome recognition of the sport and recreation as a legitimate Green Belt use, albeit one which demands careful guidance in terms of siting and design.

Full text:

CORE STRATEGY PREFERRED OPTIONS

Thank you for consulting Sport England on the above document. Sport England is the Government agency responsible for delivering the Government's sporting objectives. Maximising the investment into sport and recreation through the land use planning system is one of our national and regional priorities. You will also be aware that Sport England is a statutory consultee on planning applications affecting playing fields. In this context, I wish to make comments on the following aspects of the document:


Vision to Reality (p.8)
SUPPORT
Sport England welcome the identification of the role of the Core Strategy in achieving Priority 6 of the LAA: "We are committed to improving access to sporting facilities such as informal open space, playing pitches and leisure facilities where a need has been identified, as reinforced within the Core Strategy".

Option GB2: Rural Diversification and Recreational Uses
SUPPORT
Sport England welcome recognition of the sport and recreation as a legitimate Green Belt use, albeit one which demands careful guidance in terms of siting and design.

CLT5: Open Space (p.93/94)
SUPPORT WITH MODIFICATIONS
The reference to playing pitches as part of the complement of open space is welcomed. However, reference to background documents such as the emerging Playing Pitch Strategy would be helpful, as would be a cross-reference to Preferred Option CLT10 (Playing Pitches).

CLT9: Leisure Facilities (p.97/98)
SUPPORT WITH MODIFICATIONS
The spirit and broad content of this preferred option is welcomed as a robust means of their protection and enhancement throughout the District. However, there should be direct reference to a PPG17-compliant assessment of sport and recreation facilities to justify the protection and enhancement of these facilities. Is this the Retail and Leisure Study 2008? In turn, the study should be the basis for the establishment of local standards of provision and justifying developer contributions towards the provision of these facilities. A PPG17 assessment would also be expected to identify sport and recreation facility needs which may have land use allocations e.g. if the PPG17 assessment showed a need to provide new playing fields or new indoor sports facilities, reference to this should be made in the core strategy, especially if this would have implications for the related site specific allocations DPD.

While reference to Sport England's planning tools and the data used for calculating demand for sports facilities is welcomed, I am surprised that there is no reference in this section to the recently launched Essex Sports Facilities Strategy (2008) which has been prepared by Sport Essex (the county sports partnership) in conjunction with all the local authorities in the county including Rochford District Council through the Chief Leisure Officers group. The strategy builds upon the regional sports facility strategy, Creating Active Places (www.sportengland.org/east_index/east_get_resources/iyr_east-planning/creatingactiveplaces.htm) and provides more detail about strategic sports facility needs in Essex including an overview of issues and priorities in Rochford district e.g. sports hall, swimming pool etc needs and sport specific requirements. The county strategy can be downloaded from Sport Essex's website at (www.sportessex.com/publications.php). As the strategy provides an up-to-date evidence base on strategic sports facility needs in Rochford, the content of the strategy should be used to inform the preparation of the core strategy in terms of planning for the provision of community sports facilities.

The above comments are made in the context of the first examination relating to a submitted core strategy DPD in England, where the Inspector who considered the Lichfield Core Strategy DPD concluded that the document's open space policy was unsound because of a lack of a credible evidence base to support the policy relating to the provision of open space in new development. The lack of a credible evidence base was one of the two reasons why this core strategy was considered to be unsound and the DPD was subsequently withdrawn. Further details can be found in the Inspector's report (paragraphs 2.3 to 2.5 and 2.74-2.80 of the report are particularly relevant), which can be downloaded from www.lichfielddc.gov.uk/downloads/Report_on_the_Examination_into_the_Core_Strategy.pdf. I would advise that a number of other core strategies have been considered to be unsound due to the lack of a credible evidence base

In addition, reference to Sport England's document 'Active Design' would be useful to encourage clearer thinking about the role of good urban design in promoting physical activity. Taking widely accepted principles of good design (character, continuity, quality, legibility etc) as a starting point, the guidance uses three objectives to frame advice on positive design: improving accessibility; enhancing amenity; and increasing awareness. Using the three design objectives, the guidance explores in detail their application to three activity settings:

• Everyday activity destinations (shops, homes, schools workplaces)
• Informal activity and recreation (play areas, parks & gardens)
• Formal sports and leisure activities (sports pitches, swimming pools etc)

Active Design poses a number of questions for consideration by planners. The following table gives a flavour of these.

Theme
Accessibility (21 questions)

Example questions
• Are everyday activity destinations accessible to all travel modes?
• Does the design enable the most direct and safe active travel route between everyday activity destinations?
• Are everyday activity destinations co-located to offer the opportunity for linked trips?
• Are active travel routes to everyday activity destinations prioritised?
• Does the design and layout of everyday activity destinations help to prioritise pedestrian, cycle and public transport access?

Theme
Amenity(12 questions)

Example questions
• Are flexible and durable high-quality public spaces proposed?
• Does the quality, design and layout of open spaces enhance the setting of development?
• Does the design of informal sport and recreation facilities create a high quality environment?

Theme
Awareness (13 questions)

Example questions
• Are everyday activity destinations co-located with sports and leisure facilities in a manner that promotes awareness?
• Are informal sport and recreation facilities located in prominent positions?
• Is appropriate high quality provision made for all age groups within the community?
• Are formal sports and leisure facilities located in prominent positions playing a positive role as landmarks and attractions?
The full guidance is available at: www.sportengland.org/index/get_resources/planning_for_sport_front_page/planning_active_design.htm.

CLT10: Playing Pitches (p.98-100)
SUPPORT WIH MODIFICATIONS
Sport England welcome the attention paid to this aspect of the provision of sport and recreation facilities within the District. Reference to Sport England guidance is helpful, as is the commitment to produce a SPD on playing pitch provision. It is assumed that this document will set out local standards for their provision. The same comments would apply as set out in our response to preferred option CLT9 with respect to the reference to the evidence base i.e. a PPG17 compliant assessment. Sport England would therefore expect such a reference to be included to support the preferred option.

I hope that this response is a helpful contribution to the evolution of the Core Strategy. Please contact me if you have any queries about this response or would like advice on how Sport England can assist the Council to develop its LDF in relation to sport and recreation.

Support

Core Strategy Preferred Options (Revised October 2008)

Representation ID: 4127

Received: 15/12/2008

Respondent: Swan Hill Homes Limited

Agent: Charles Planning Associates Ltd

Representation Summary:

Policy GB2 - Rural Diversification and Recreational Uses

3.3 Swan Hill generally supports the Council's policy approach towards rural diversification and provision of recreational uses within the Green Belt.

Full text:

Representations on behalf of
Swan Hill Homes Limited
RESPONDENT NUMBER: 5040

1.0 Instructions and Introduction

1.1 Charles Planning Associates Limited (Chartered Town Planners) is Instructed by Swan Hill Homes Limited (Swan Hill) to prepare and submit representations on their behalf in respect of the Rochford District Local Development Framework: Core Strategy Preferred Options (October 2008) Development Plan Document.

1.2 The comments refer to the relevant sections and policy designations in the Preferred Options document, as appropriate.

1.3 The comments set out in this submission are intended to assist the District Council in taking forward its Local Development Framework. It is our intention to continue to be involved in the preparation process and we look forward to the opportunity to comment further at the Submission Version stage. Prior to the assessment of the Core Strategy Preferred Options (October 2008), Swan Hill had serious concerns regarding the way the document had been prepared. The lack of clearly defined policies meant that any policies would have only appeared in the Submission Version of the document, giving the Council no opportunity to make amendments, and limited opportunity for Consultees to see the exact policy position of the Council. It is considered that this Revised Preferred Options document has addressed this position, and enables Consultees to examine further the proposed position of the District Council, and the direction with which they are seeking to take their Core Strategy.

1.4 If you have any queries regarding the content of this submission then please do not hesitate to contact:

Peter Kneen BSc (Hons) MSc MRTPI
Planner

Charles Planning Associates Limited
1644-1645 Parkway
Solent Business Park
Whiteley, Fareham
Hampshire
PO15 7AH

Tel: 01489 580853
Fax: 01489 580913
E-mail: peter.kneen@charlesplanning.co.uk

2.0 Housing:

2.1 Swan Hill recognises the importance of seeking to concentrate new developments mainly in the existing urban areas, on previously developed land where possible, particularly in view of the Government seeking to ensure 60% of all such new developments are on previously development land (PDL).

2.2 However, given the character of the District, and the strategic housing requirement of the East of England Plan, Swan Hill supports the approach that the Council must also make provision for additional development on the edge of existing settlements on greenfield sites, particularly in the most sustainable locations. Swan Hill supports the approach that green field land on the edge of settlements that are released for development should not have a significant impact on the characteristics of the Green Belt, and that densities are in line with the objectives of PPS3 and reflect the local character of the settlement to which the extension is proposed.

Policy H1 - Distribution

2.3 Swan Hill generally supports the approach taken by the Council in this preferred option. As set out above, Swan Hill consider the Council's acknowledgment that housing requirements should be met through the allocation of land on the edge of the existing settlements is the most suitable way forward to meeting the Council's strategic housing requirement and complies with the advise in PPS3.

2.4 The need for suitable greenfield urban extensions represents the best way forward for the Council to meet its strategic housing requirement, as set out in the East of England Plan. Swan Hill supports the recognition that 70% of new residential properties will need to be on sustainable greenfield urban extensions to the existing settlements of the District.

2.5 As such, it is essential within the Core Strategy to establish general locations suitable for the expansion of settlements into the Green Belt. This should not be as site specific as determining the exact parameters of settlement expansions, but should include a general assessment around settlements where development could be accommodated without conflicting with the objectives of the Green Belt. Swan Hill considers that the Council has had regard to these implications in this version of the Core Strategy, and supports the overall distribution policy set out by the District Council.

Policy H2 - General Locations and Phasing

2.6 As set out above, Swan Hill supports the overall approach the Council has taken in this revised version of the Core Strategy, which has both recognised the need for sustainable green field urban extensions in addition to the recognition of the most suitable 'general' locations for such extensions.

2.7 Swan Hill considers that the level of provision for the Tier 1 and 2 settlements (Tier 1: Rochford/Ashingdon, Hockley/Hawkwell and Rayleigh; Tier 2: Great Wakering and Hullbridge), which represents almost 98% of the proposed urban extensions, is appropriate, particularly given that these settlements either benefit from established services and facilities or are located within good proximity to the important service centres surrounding the District, principally Shoeburyness and Southend. This approach, as also set out in the supporting text to Policy H2 would help ensure that the second and third tier settlements remain viable rural settlements, supporting their local communities.

2.8 Additionally, Swan Hill welcomes the recognition that the provision of development on larger sites, in these first and second tier settlements can positively contribute to infrastructure provision, particularly in areas where there is an identified need for improvements.

Policy H3 - General Locations Post 2021

2.9 Swan Hill supports the general principles of this policy, and that the Council has sought to make provision for a 15-year supply of housing land supply, from the date of adoption of the document, as set out in PPS3.

2.10 Policy H1 of the Adopted RSS, East of England Plan sets out a requirement for the remaining 5-year supply, beyond 2021 to be based on the higher amount of the annual average for the period 2001 to 2021 or 2006 to 2021, whichever is higher. Based on this assessment, the 5-year period beyond 2021 would make a minimum requirement for 1,000 dwellings. However, Swan Hill considers it is important that the Policy provision sets out that this is a minimum level, and is likely to change over the course of the Core Strategy period.

2.11 Whilst Policy H3 sets out a degree of flexibility towards the deliverability of these 'general locations', it is important that Policy H3 sets out that the potential number of units proposed on those 'general locations' are a minimum, based on the current Adopted East of England Plan. Further, the East of England Plan is currently under review, and it is likely that the strategic annual housing figure for the period beyond 2021 is likely to increase. This should be reflected in Policy H3.

Policy H4 - Affordable Housing

2.12 In general terms, Swan Hill supports the approach taken by the Council towards the provision of affordable housing for new residential developments. Additionally, the threshold is considered the most appropriate, given that most developments below 15 dwellings or 0.5ha may not be viable to support an element of affordable housing, unless being provided solely for affordable housing.

2.13 The proposed Policy sets out a degree of flexibility for those sites which, if demonstrated by the developer that a provision of 35% affordable housing would make a scheme unviable, has been included. However, it is considered that a greater degree of flexibility should be set out in the policy, in order to ensure the level of affordable homes is considered through negotiation with the Council, and that each application is assessed on a site-by-site basis.

2.14 Additionally, it is considered that many Registered Social Landlords (RSLs) may consider the 'pepper potting' of affordable dwellings throughout larger sites can have significant logistical and cost implications which could discourage RSLs from wanting to take up those units. Whilst Swan Hill acknowledges the benefits of pepper potting affordable housing units around a large development, as this would ensure less disparity between those units and the open market units, clustering affordable housing units together, whether that is in one area or in groups can significantly reduce costs and logistical management issues for many RSLs, making them more attractive to manage and rent.

Policy H5 - Dwelling Types

2.15 Swan Hill supports the policy provision of H5, and considers that the approach taken by the Council for this policy represents a suitably flexible alternative to stipulating percentages of dwelling mix, sought by some local authorities. With the exception of providing a suitable proportion of the provision of affordable units with three-bedrooms, the policy appears to represent to best option for ensuring flexibility for new housing developments, enabling developers to ensure the most up-to-date market assessments play a pivotal role in determining the appropriate level of mix, at any given time.

2.16 In respect of the reference to the Strategic Housing Market Assessment for Thames Gateway South Essex, it is important that if the Council chooses to rely on such assessments as a key factor in determining the appropriate level of mix, it is important that such an assessment is up-to date, and represent the most appropriate model for assessment the level of housing requirements.

Policy H6 - Lifetime Homes

2.17 In regard to this policy, Swan Hill objects to the Council's preferred options where all new dwellings should be provided to the Lifetime Homes Standard. Whilst it is acknowledged that the UK has an aging population, Swan Hill considers the Alternative Option set out in the Core Strategy represents the most suitable option for this type of policy provision. Seeking to provide Lifetime Homes on all sites is considered to be overly onerous for proposed developers, particularly when considering the requirement for all car parking spaces to be suitable for disabled users, which could result in more schemes becoming unviable. Therefore, the provision of a degree of Lifetime Homes should be considered through negotiations with the Council at the planning application stage, and should be determined on a case-by-case basis.

3.0 The Green Belt:

Policy GB1 - Green Belt Protection

3.1 Swan Hill generally supports the policy approach taken towards the protection of the Green Belt, where the key objectives of PPG2 can be met and maintained. It is important that Policy GB1 has regard to the need for a review of the Green Belt boundaries around the key settlements of the District, in order to achieve the required level of residential development required by the East of England Plan.

3.2 As such, and whilst a review of the Green Belt is set out in the supporting text, Swan Hill considers that Policy GB1 of the Core Strategy should be amended to address the need to review the Green Belt boundaries as a means to ensure that minor greenfield sustainable extensions to the settlements can occur without offending the overarching policy objectives of the Metropolitan Green Belt.

Policy GB2 - Rural Diversification and Recreational Uses

3.3 Swan Hill generally supports the Council's policy approach towards rural diversification and provision of recreational uses within the Green Belt.

4.0 Environmental Issues:

Policy ENV3 - Flood Risk

4.1 Swan Hill supports the preferred option approach towards dealing with settlements at risk of flooding. Whilst Great Wakering is identified as a particular area at risk of flooding, this is predominantly associated with the eastern part of the settlement, and as such should not be considered as an overriding constraint to development at other parts of the settlement. Swan Hill concurs with the Council that restricting all new development away from Great Wakering could have a significant adverse impact on the long term viability of the settlement.

4.2 Swan Hill supports the Council's collaboration with the Environment Agency in seeking to ensure Great Wakering is protected from flooding for the existing and future residents.

Policy ENV4 - Sustainable Drainage System (SUDS)

4.3 In respect of Policy ENV4, Swan Hill supports the general principle of sustainable drainage systems. However, given the difficulties in transferring the future management and operation of SUDS to water companies and local authorities, it is not considered appropriate to require the provision of SUDS as a pre-requisite to development in all cases.

4.4 As such, it is considered that the provision of SUDS should be considered on a site-by-site basis, and the level of provision should form part of the negotiations at the planning application stage of the larger developments in the District.

Policy ENV8 - Code for Sustainable Homes

4.5 The need to provide all new dwellings to the Code level 3 of the 'Code for Sustainable Homes' by 2010 is a key objective of the Government. This policy approach is supported by Swan Hill. However, Swan Hill consider the requirement to achieve Code level 6 by 2013 is unrealistic and whilst Swan Hill recognises the importance of this issue, and the desire for carbon neutral homes, producing this on all new dwellings by 2013 could have significant implications on the cost of developments, viability and deliverability. The Government target for achieving Code Level 6 for new dwellings is 2016, and as such, Swan Hill considers the Council should not seek to supersede Government policy on this matter.

5.0 Transport:

Policy T1 - Highways

5.1 Swan Hill supports the overall objectives set out in Policy T1 requiring developments to be located and designed to reduce the reliance on the private car and to meet the infrastructure needs generated by development or seek to help achieve these needs is acceptable in principle.

5.2 Swan Hill recognises the importance between providing sufficient infrastructure provision to meet the requirements of development, and that where developments have no consideration of impact on existing infrastructure, they should be considered unacceptable and contrary to National policy guidance. However, Swan Hill considers it important to emphasise that the developer's role should not be seen as a means to meet existing shortfalls in provision.

Policy T2 - Public Transport

5.3 Swan Hill supports the policy approach taken by the Council on Policy T2.

Policy T4 - Travel Plans

5.4 Swan Hill supports the policy approach taken by the Council on Policy T4.

Policy T5 - Cycling and Walking

5.5 Swan Hill supports the general approach to this policy, as Swan Hill recognises the importance of promoting the use of alternatives to the private car. However, it is important that any policy on the provision of additional off site facilities is based on a site-by-site assessment, and should be related to the impact generated by the development proposed.

5.6 As such, Swan Hill considers this policy should allow for a greater degree of flexibility on the provision and justification of off-site improvements to the cycle and pedestrian network of the District.

Policy T7 - Parking Standards

5.7 The Council has recently (January 2007) adopted SPD on the requirements for parking standards, and as such, Swan Hill supports the policy approach chosen by the Council. However, Swan Hill consider it relevant that the Council set out within the wording of the policy that they have adopted supplementary guidance, which should be applied by developers in the preparation of proposals.

6.0 Character of Place:

Policy CP1 - Design

6.1 The Town and Country Planning (General Development Procedure) Order 1995 (As Amended) makes the submission of a Design and Access Statement for most types of planning applications a Statutory requirement, and as such, the provision of a Design Brief represents a pre-requisite of all major planning applications.

6.2 Policy CP1 seeks to ensure the provision of good, high quality developments that reflect local characteristics and distinctiveness, this ideology is supported by Swan Hill.

7.0 Community Infrastructure, Leisure and Tourism:

Policy CLT1 - Planning Obligations and Standard Charges

7.1 Swan Hill generally supports the overall approach the Council has taken in Policy CLT1. It is considered Policy CLT1 sets out a degree of flexibility to ensure that all sites are considered on a site-by-side basis, assessing the individual merits of each planning application, in order to ensure the levels of contributions applicable meet the five tests of Circular 05/05.

Policies CLT5 - Open Space;
CLT7 - Play Space;
CLT8 - Youth Facilities; and,
CLT10 - Playing Pitches

7.2 Swan Hill supports the need for new residential developments to incorporate a degree of new publicly accessible open space, children's play space, youth facilities and playing pitches, and as such, generally supports the policy approaches taken by the Council.

7.3 However, it is important that whilst the Council may seek to undertake an assessment of providing standard charges for new development, which, as set out in Policy CLT1, this should be based on thorough public consultation and consideration and sound justification. Swan Hill consider that within the provision of a standard charge, it is important that such provision allows for a degree of flexibility to ensure that each site is assessed individually and on its own merits. This is particularly important for those sites close to existing open spaces and facilities. As such, the levels of open space and recreation facilities required in the 'standard charge' should be based on an up-to-date PPG17 Open Space assessment, which should be used to form a key consideration in the levels of provision likely to be required in the standard charge system proposed.

Policy CLT6 - Community Facilities

7.4 Swan Hill supports the approach set out by the Council in policy CLT6, and in particular, that the Council has identified a need for new community facilities within Great Wakering.

8.0 Summary:

8.1 In Summary, Swan Hill considers that overall the 2008 version of the Core Strategy presents a significant improvement on the earlier document, and seeks to address the strategic housing requirements for the District up to and beyond 2021 with clarity. However, it is considered that in general terms the Core Strategy is overly prescriptive and detailed, dealing with too many issues and providing too many policies that could be and should be dealt with in other Development Plan Documents, such as the Development Control Policies DPD. Whilst some of the policies provide flexibility and allow for the individual assessment of development proposals through negotiations with the Council, Swan Hill considers that many of these can removed from the Core Strategy, to be considered later in other DPDs.

8.2 Swan Hill considers the Core Strategy could be significantly reduced in size, in order to provide a more concise, directed document, which deals with the key, overarching strategic policy requirements of the District, as required by PPS12.

Support

Core Strategy Preferred Options (Revised October 2008)

Representation ID: 4147

Received: 15/12/2008

Respondent: Natural England

Representation Summary:

GB2 Rural Diversification and Recreational Uses - Preferred Option
Natural England supports the Council's preferred option on this issue. We have recently assessed the case for a review of green belt policy where the role of the green belt is reconsidered. The value of the green belt should be judged on its contribution to quality of life, nature conservation, landscape protection, flood mitigation and the impact of a changing climate. Linked with this is a desire to improve the environmental quality of existing green belt. We would therefore support rural diversification within the green belt such as green tourism and outdoor recreation, provided these activities are linked with environmental enhancements and an increase in biodiversity.

Full text:

Revised Core Strategy Preferred Options Consultation

Thank you for consulting Natural England on the above, in your letter received by this office by email on 5 November 2008. We refer you to previous comments made in our letter of 27 June 2007 during the initial preferred options consultation. Whilst we are generally supportive of the plan, we would like to make the following comments.

Evidence Base
Natural England is pleased to note that the Essex Landscape Character Assessment (2003) and the Local Wildlife Site Review (2007) has been included under this heading.

Vision
Natural England supports the vision because it sets out the intention to retain the essential landscape characteristics of the district and the distinctiveness of both the natural and built environment. These are aspects which are compatible with our own objectives. We also support the recognition of the District's position within Thames Gateway South Essex to promote the District as the "green part" of the sub region.

Objectives
Whilst Natural England generally supports the objectives we would liked to have seen specific reference to "landscape" within the fourth bullet point. We also consider that there should be a stronger reference to climate change within the objectives, linked particularly to the transport objective (6th bullet point) by referring to the need to reduce carbon emissions. An additional objective should also be included on the issue of renewable energy and climate change, for example "to promote renewable energy and address the causes and potential impacts of climate change"

The Green Belt

GB2 Rural Diversification and Recreational Uses - Preferred Option
Natural England supports the Council's preferred option on this issue. We have recently assessed the case for a review of green belt policy where the role of the green belt is reconsidered. The value of the green belt should be judged on its contribution to quality of life, nature conservation, landscape protection, flood mitigation and the impact of a changing climate. Linked with this is a desire to improve the environmental quality of existing green belt. We would therefore support rural diversification within the green belt such as green tourism and outdoor recreation, provided these activities are linked with environmental enhancements and an increase in biodiversity.



Economic Development

ED1 London Southend Airport - Preferred Option
Natural England reiterate our previous comments on the London Southend Airport, that is we are concerned with the impact of the growth in the airport on air quality and on the disturbance of Natura 2000 sites. We also would actively encourage enhanced North South links including greenways, as envisaged in the Thames Gateway South Essex Greengrid

Environmental issues

Crouch and Roach Estuary Management Plan (Page 52, 4th paragraph)
In this paragraph a list of stakeholders is given who are working with Rochford District Council on the above plan. Natural England should also be actively involved in this project and listed accordingly.

All references to 'English Nature' should be changed to read 'Natural England', e.g. page 52, 1st paragraph.

ENV1 Protection and Enhancement of the Natural Landscape and Habitats - Preferred Option
Natural England supports the overall aims of the preferred option and we are pleased to note that the wording now includes "maintain, restore and enhance" rather than just protect. However we consider that the policy does not fully cover all aspects of the natural environment but concentrates on the protection and enhancement of designated sites. We therefore suggest that the policy is expanded to include the following points:

i. Wildlife Networks- Natural England would like the policy wording to encourage an approach to conservation management which is focussed not solely on individual site protection but which seeks to rebuild the fabric of the landscape in which individual sites sit. Actions such as reducing habitat fragmentation and creating green corridors for wildlife can help to achieve this. PPS9 states specifically at paragraph 12 that "Local authorities should aim to maintain networks by avoiding or repairing the fragmentation and isolation of natural habitats through policies in plans." This policy could link to a wider policy on Green Infrastructure. We would therefore suggest that the following point is added to the policy wording: "The Council will ensure the protection and enhancement of a network of local wildlife sites and wildlife corridors, links and stepping stones between areas of natural green space to avoid fragmentation of habitats".

ii. Designing in Wildlife - We would recommend the inclusion of designing in biodiversity measures within this policy. By incorporating ecologically sensitive design and features for biodiversity early on within a development scheme, significant improvements for biodiversity can be achieved, along with easier integration with wider environmental, design and planning aspects. For example designing for biodiversity can include the retention of sensitive or valuable habitats present, or enhancements for protected species that may be present, whilst integrating other development design requirements such as drainage and engineering. By addressing ecological aspects early on, design aspects such as site layout can be tailored to provide enhancements and improvements for biodiversity that may not be possible later on within the design process. Measures to encourage biodiversity can include green roofs, planting and landscaping using native species, setting up bird and bat boxes and sustainable urban drainage systems. We would suggest that the following point is added to the policy wording: "The Council will ensure development seeks to produce a net gain in biodiversity by designing in wildlife, and ensuring any unavoidable impacts are appropriately mitigated for."

iii. BAP Targets - We would suggest that this policy is linked to the Essex Biodiversity Strategy (1999) which has established targets to boost priority habitats and targets. The policy should therefore include the additional wording: "The Council will promote wildlife enhancements which will contribute to the habitat and species restoration targets set out in the Essex Biodiversity Strategy."

iv. Landscape Character - In addition this policy, although it mentions "natural landscape" in the title does not fully cover the protection and enhancement of landscape character and quality. The Landscape Character Assessment of Essex (2002) should be specifically mentioned in the policy wording. LCAs are a tool to understand the intrinsic character of the landscape and direct appropriate sustainable development and should be used as part of the evidence base to underpin planning and management decisions in the preparation of the LDF. We therefore suggest the insertion of wording which seeks to achieve the following: "The landscape character and local distinctiveness of the District will be protected, conserved and where possible enhanced. Proposals for development will take into account the local distinctiveness and sensitivity to change of distinctive landscape character types. These landscape character types are described in the Essex Landscape Character Assessment"

ENV2 Coastal Protection Belt - Preferred Option
Whilst Natural England generally supports the aims of the preferred option and agrees with the overall approach of protecting the open character of the undeveloped coast and its important wildlife sites, we suggest that this policy should give explicit recognition to the implications of climate change and sea level rise, and the need for necessary adaptation. The current draft appears to defend a 'static' situation. We also draw your attention to policy SS9 of the East of England Plan, which states that LDDs should (inter alia):
• protect important coastal environmental assets, if practicable and sustainable without causing adverse impacts elsewhere. If it is not practicable to protect sites and habitats in situ, including sites of European or international importance for wildlife, shoreline management plans and development plans should include proposals for their long-term replacement and the recording of any lost historic assets;
investigate and pursue opportunities for the creation of new coastal habitats, such as salt marsh and mudflat, in areas identified for managed realignment. New development should not be permitted in such areas.

ENV4 Sustainable Urban Drainage Systems (SUDS) - Preferred Option
Natural England agrees that Sustainable Urban Drainage Systems (SUDs) should be encouraged within new developments as part of sustainable design. SUDS can be used to provide open space and wildlife habitats around areas of vegetation, water channels and storage ponds which are positive steps to increasing biodiversity.

ENV6 Large Scale Renewable Energy Projects - Preferred Option
Natural England agrees that large scale projects should only be considered where there is no significant adverse affect on the landscape or wildlife. We would also recommend that when considering locations for renewable energy installations that the Essex Landscape Character Assessment should be referred to. This will help to ensure that installations are located in places which will cause minimum impact on the surrounding landscape.

Notwithstanding the above, and the current policy wording to protect site integrity, we highlight to the Council the supplement to PPS1: Planning and Climate Change, which requires that: "19. In developing their core strategy and supporting local development documents, planning authorities should provide a framework that promotes and encourages renewable and low carbon energy generation. Policies should be designed to promote and not restrict renewable and low-carbon energy and supporting infrastructure."
And
"20. In particular, planning authorities should:.......
ensure any local approach to protecting landscape and townscape is consistent with PPS22 and does not preclude the supply of any type of renewable energy other than in the most exceptional circumstances"
Natural England therefore comments that an appropriate balance needs to be struck between site protection and the promotion of renewable and low-carbon energy generation projects. We also suggest that a fuller criteria-based policy is included in the Development Control Policies DPD.

ENV7 Small Scale Renewable Energy projects - Preferred Option
We are supportive of small scale energy projects as part of sustainable design and construction.


ENV8 Code for Sustainable Homes - Preferred Option
Natural England supports the preferred option as it is compatible with our own promotion of sustainable design and construction including energy efficiency in homes. We would draw the Council's attention to our project "A New Vernacular for the Countryside" which addresses broad sustainable design and construction principles for the countryside.

Transport

T5 Cycling and Walking - Preferred Option
Natural England supports the preferred option. Footpaths and cycleways should be provided as part of new development layouts which will contribute to sustainable transport and also provide informal recreation opportunities to help improve the health and well-being of residents.

T6 Greenways - Preferred Option
Natural England is supportive of the Thames Gateway Green Grid Strategy and would see the provision of greenways as a contribution to a wider network of green infrastructure. We therefore welcome this commitment to the implementation

Character of Place

CP1 Design - Preferred Option
Natural England supports this preferred option and acknowledges the importance of setting high standards of design in all new development. We would like to ensure that development is "good enough to approve", accessible to all, locally distinctive and makes a positive contribution to the character of the area, utilising the opportunities presented by the location. In particular we are glad to note that Village Design Statements have been included in the policy wording as this is an initiative which Natural England actively promotes.

In our previous comments on this issue we also made the point that opportunities should be sought to promote accessible greenspace provision that meets local requirements and provides functional links for people and wildlife. We recommended that the authority should consider the use of policies to promote the delivery and long-term management and maintenance of greenspace and green linkages.

Community Infrastructure, Leisure and Tourism

CLT1 Planning Obligations and Standard Charges - Preferred Option
Natural England would suggest that countryside recreation projects including the management and maintenance of greenspace, wildlife sites and environmental improvements should be included in the list of activities that planning obligations and charges could contribute to.

CLT5 Opens Space - Preferred Option
Whilst Natural England supports the preferred option we consider that it should be expanded in greater detail. We would like the point emphasised that all development should incorporate sufficient new green space in accordance with Natural England's Natural Green Space Standards of achieving natural greenspace within 300m of every home.

The policy should also emphasise how open spaces and green areas could be improved and enhanced and linked to a wider network of open spaces, footpaths, amenity areas, river corridors i.e. Green Infrastructure. Wherever possible opportunities should be taken to improve the biodiversity and amenity value of these areas by suitable planting with native species or improved management regimes. It may also be possible to introduce footpaths or cycleways through these areas which would increase the provision of informal recreation and contribute to sustainable transport measures.

CT11 Tourism - Preferred Option
Natural England supports the preferred option particularly the proviso that green tourism projects should not adversely impact on character of place or biodiversity. We would reiterate our previous comments that it should be mentioned in the policy wording that this approach is consistent with the objectives of the Thames Gateway South Essex Greengrid. We would also make the point that the conversion of rural buildings could involve damage to protected species such as barn owls and this should be mentioned in the explanatory text.

Upper Roach Valley and Wallasea Island

URV1 Upper Roach Valley - Preferred Option
As we said in our previous comments Natural England supports the Council's preferred option for the enhancement and protection of the Upper Roach Valley including the Country Park. This provides an opportunity to link this area with the wider green infrastructure network and improve access to the countryside from surrounding areas. We suggest however that the policy is reworded to refer to 'appropriate management', as 'minimum of interference' as presently set out may not in fact 'permit certain flora and fauna to flourish.'

URV2 Wallasea Island - Preferred Option
Natural England supports the Council's preferred option as it supports the Wallasea Wild Coast Project which will create a variety of wildlife habitats and enhance the biodiversity of the area. We suggest however that the policy is reworded from 'no adverse impacts' to 'provided any adverse ecological impacts are avoided, mitigated, or compensated for.'

Habitat Regulations Assessment

As discussed in our responses to the previous Core Strategy Preferred Options and Strategic Environmental Assessment, dated 27 and 13 June 2007, we remind the Council that the Core Strategy will require assessment against the Habitats Regulations. I provide an extract below from our 27 June 2007 letter:

"Where a plan may affect a European site, the European Court of Justice ruling (October 2005), has concluded Article 6(3) of the Habitats Directive provides that any plan or project not directly connected with or necessary to the management of a European site but likely to have a significant effect thereon, either individually or in combination with other plans or projects, must be subject to appropriate assessment of its implications for the site in view of the site's conservation objectives. In practice, the SEA should aim to be sufficiently detailed in its assessment to address the requirements of The Habitats Directive 92/43/EEC of 21 May 1992.

The Assessment will require an initial screening of all policies alone and in combination with other plans and projects. This aims to establish whether any policies should be regarded as likely to cause/have a significant effect on the interest features of the European Sites, either alone or in combination with other plans or projects. Options should then be considered to establish whether amendments to individual policies, suite of policies or supporting text could effectively address concerns to 'not likely significant effect'.

Those policies that are still regarded as likely to have a significant effect will then require an appropriate assessment in accordance with Regulation 48 of the Habitat Regulations. National Government direction encourages local planning authorities to develop local development documents that clearly demonstrate that they avoid an adverse affect on the integrity of the Natura 2000 sites, either alone or in combination with other plans or projects.

Furthermore, consistent with the cross-border working that is necessary in delivering strategic solutions we recommend you gain a brief appreciation of the assessment from the developing Habitat Regulations Assessment for Southend on Sea Borough Council's Core Strategy (see Topic Papers for Examination in Public www.southend.gov.uk ).

Our initial assessment indicates that the particular elements of the strategic direction could be likely to have a significant effect, either alone or in combination with other plans or projects and these are listed below:

i) Overall growth targets, alone and in combination with relevant Regional growth area targets, will lead to increased population and subsequent increased recreational pressure on Natura 2000 sites.

ii) The aspirations for significant growth in airport movements at Southend Airport, which may result in increased air quality and/or disturbance impacts on Natura 2000 sites.

iii) Development in, or immediately adjacent to, intertidal or coastal areas that either requires land-take through encroachment or exacerbates the effects of coastal squeeze."

I trust these comments are of assistance to you and please do not hesitate to contact me if you wish to discuss any of the above further.

Support

Core Strategy Preferred Options (Revised October 2008)

Representation ID: 4287

Received: 17/12/2008

Respondent: Mr & Mrs Wilson

Agent: John H Bayliss & Co (part of Hilbery Chaplin Group)

Representation Summary:

Forms of rural diversification that will be considered acceptable in appropriate circumstances in the Green Belt include:

Conversion of existing buildings for small scale employment use
Green Tourism
Outdoor rectreation and leisure activities
Conversion of buildings to bed and breakfast /hotels

Full text:

Forms of rural diversification that will be considered acceptable in appropriate circumstances in the Green Belt include:

Conversion of existing buildings for small scale employment use
Green Tourism
Outdoor rectreation and leisure activities
Conversion of buildings to bed and breakfast /hotels

Object

Core Strategy Preferred Options (Revised October 2008)

Representation ID: 4296

Received: 17/12/2008

Respondent: M D Smith & Son

Agent: Capita Symonds

Representation Summary:

We will continue our restrictive approach to development within the Green Belt, but with some relaxation for rural diversitifcation. Forms of rural diversitifaction that will be considered acceptable in appropriate circumstances in the Green Belt include:

. Conversion of existing buildings for appropriate employment use, particularly on larger previously developed sites that are able to contribute to sustainable job creation
. Green tourism (crossed out/deleted)
. Outdoor recreation and leisure activities
. Conversion of buildings to bed and breakfasts/hotels

In considering proposals for the above, issues pertaining to the purposes of the Green Belt and wider sustainability issues will be considered, but we will make allowances for the fact that public transport is limited within rural areas of the District. Proposals for retail (with the exception of farm shops) and residential development will be considered acceptable only where the site is poor in assessment of the Green Belt objectives or acceptable forms of rural diversification in the Green Belt including previously developed land.

The Green Belt provides leisure opportunities for the District, and we will allow development that contributes towards or provides facilities for outdoor sport and recreation activities considered appropriate in the Green Belt, eg changing rooms connected with a sports use. Such essential facilities will be expected to have a minimal impact on the openness of the Green Belt and contribute towards achieving sustainable communities.

Full text:

Summary of Representations on behalf of MD Smith & Son

Land at the former Hambro Nursery, Rawreth (see attached location plan) should be utilised as part of the Core Strategy (CS) policies to help contribute towards delivering sustainable housing and employment opportunities, as part of a mixed use development on previously developed land. Notwithstanding the green belt designation which affects the whole district, the CS is not currently flexible enough to facilitate previously developed land within the District coming forward for appropriate uses. These opportunities should take a higher priority over future green field, green belt allocations.

Details of Representations

The CS recognises the need to provide a minimum of 4600 additional homes within the District. This should be stated within the CS as being a lower and not an upper limit for development in accordance with Policy H1 of the Regional Spatial Strategy (RSS), The East of England Plan. Setting a minimum target will help deliver the required and identified housing.

In addition, there is a need for the District to help contribute towards the delivery of 55,000 additional jobs within the Essex Thames Gateway area by reference to Policy E1. These two Policy references (H1 and E1) would help the conformity of the CS with the RSS and establish the need for additional growth.

Green Belt Study

Recognition of the relative constraints of the District are acknowledged and correct in contextual terms, as set out within the draft CS Key diagram. This clearly shows the constrained nature of the district. It is, however, difficult to determine the quality and contribution of the Green Belt designation in the absence of any detailed study to determine the relative quality, value and performance of the site against those criteria identifying the purposes of Green Belt designation as set out in PPG2 (Para 1.5). Whilst this appears not to have been undertaken within the main body of the CS or the Evidence Base, such a study would justify and support the Council's choice of options. Such a study would not necessarily identify some other site sustainability credentials which may make development in broad locations acceptable, but would enable the Council to identify and map out those areas which are most important in green belt terms to protect.

Development to the west of Rayleigh may not perform against all of the Green Belt functions which are to:

check the unrestricted sprawl of large built-up areas;
prevent neighbouring towns from merging into one another;
assist in safeguarding the countryside from encroachment;
preserve the setting and special character of historic towns; and
assist in urban regeneration, by encouraging the recycling of derelict and other urban land.

All previously developed land, including the Hambro Nursery site, should be considered in a hierarchical manner with preference above green field allocations. The CS does not allow suitable flexibility within its policies for such sites to be considered either as part of mixed use or stand alone, residential or employment sites. In terms of PPS3 (Housing) the site performs well by making use of previously developed land where options for appropriate community facilities including open space and affordable housing could help sustain the existing local community. Options to make use of proposed cycle links could also be explored with adjoining landowners and the Hambro Nursery site could form the location of a sustainable business park or mixed community. The site also benefits from close proximity to existing community facilities at Battlesbridge including a doctor's, museum and public houses.

Strategic Housing Land Availability Assessment

It is noted that the Council relies upon a 2007 Urban Capacity Study (UCS) as part of its Evidence Base and the data it provides underpins the Council's housing land supply figures as set out in Policies H2 and H3. Using urban capacity as a means of assessing housing land supply does not accord with Government advice set out in PPS3, which advises that housing land supply should be assessed via a Strategic Housing Land Availability Assessment (SHLAA).

In light of the above we therefore object to the following policies:

H1, H2, H3, GB1, GB2, ED2, ED4 and T7.

Changes are proposed which may overcome our objections and incorporate suitable flexibility within the CS to deliver suitable development on previously developed sites in preference to greenfield housing allocations to the west of Rayleigh, north of London Road. Amendments as suggested.

Comment

Core Strategy Preferred Options (Revised October 2008)

Representation ID: 4473

Received: 08/12/2008

Respondent: East of England Local Government Association

Representation Summary:

Question - If appropriate, is there a policy dealing with the Green Belt?
RSS Policy - SS7, ETG1
Local Policy - Page 4, GB1, GB2
Comments - RSS policy SS7 states that the broad extent of the Green Belt in the region is appropriate and should be retained. There are no plans for a Green Belt review around Rochford.

Whilst local policy seeks to protect the existing Green Belt, it does allow for some limited reallocation in order that built development can come forward. Where this release is considered to be unavoidable, the Core Strategy proposes that development occurs at a reasonably high density.

In accepting that some Green Belt land will be released, using that which contributes least to its main purpose seems appropriate. Either through this document or through relevant future documents, the Council should clarify what level of development constitutes a 'reasonably high density'.

Full text:

Re: Rochford District Council - Core Strategy Preferred Options

Thank you for consulting the Assembly on this matter.

The Regional Planning Panel Standing Committee considered the attached report at its meeting on 5th December 2008 and endorsed the following recommendation:

'Overall, the preferred options put forward in the Core Strategy respond well to the RSS. The Assembly does have some minor concerns but considers that these do not give rise to any major conformity issue'

Our detailed comments, which are set out in Appendix A of the attached report, constitute the Assembly's formal response to this consultation.

If you have any queries concerning the content of the report or any other issue relating to conformity with the Regional Spatial Strategy, please contact myself or James Cutting, Team Leader - Strategy & Implementation

Regional Planning Panel Standing Committee

5th December 2008

Subject: Rochford District Council's Core Strategy Preferred Options consultation document

Report by: Regional Secretariat

Purpose

To give a response to Rochford District Council's Core Strategy Preferred Options consultation document

Recommendation

The Standing Committee is asked to consider the recommendation that the comments in this report and those in Appendix A constitute the Assembly's formal response to Rochford's Core Strategy Preferred Options consultation document.

1. Introduction

1.1 Rochford District Council has published for consultation a revised version of its Core Strategy Preferred Options Development Plan Document. This is the second stage in the Local Development Framework (LDF) process and will, in due course, lead to a Submission Version. As the principle document in Rochford's LDF, the Core Strategy sets out the overall strategy for the district until 2021 and, where appropriate, beyond.

1.2 The Council consulted on an earlier version of its Core Strategy during June and July 2007 (see RPPSC 15 June 2007 - Item3). In submitting its response, the Assembly noted that whilst the document responded well to the then emerging East of England Plan there were issues with regards to affordable housing and major releases of land from the Green Belt.
1.3 The closing date for comments on this revised Core Strategy is 17th December 2008. Further details can be found on Rochford District Council's website.

1.4 A copy of the Core Strategy Key Diagram is included at Appendix B.

2. Background

2.1 Rochford District covers an area of approx. 168 sq. km's (65 sq. miles) and is situated within a peninsula between the Rivers Thames and Crouch. Bounded to the east by the North Sea, it shares land boundaries with Basildon and Castle Point District and Southend-on-Sea Borough Councils. It also has marine boundaries with Maldon and Chelmsford Districts. The A127 and the A13 provide a strategic road link to the M25 Motorway and there are direct rail links into London. London Southend Airport is also located within the district boundary.

2.2 The district has a noticeable east - west divide. The majority of the population, which recent estimates put at 81,300 (expected to rise to 87,000 by 2021), live in the west where the three main urban areas of Rochford, Rayleigh, Hockley are located. To the east, the district is more rural in nature, and is characterised by stretches of unspoilt coastline and countryside, with a scattering of smaller settlements. Approximately 75 per cent of the district is designated as Metropolitan Green Belt.

2.3 A significant proportion of the districts workforce (estimated to be around 68 per cent) work beyond the district boundary. Southend-on-Sea exerts a particularly strong influence, not just as an employment location but also as the largest retail centre in the sub-region. Beyond the three main urban areas of Rochford, Rayleigh and Hockley, which offer greater opportunities to access public transport, there is a high dependency on private car use.

3. Regional and Local Policy

3.1 Regional planning guidance for Rochford is contained within the adopted East of England Plan (hereafter referred to as the RSS) and the remaining six "saved" structure plan policies for Essex and Southend-on-Sea. At a local level, the Core Strategy and other LDF documents will replace the Rochford District Replacement Local Plan (2006).

3.2 In considering general conformity the Core Strategy was assessed against all policies contained within the RSS, with particular attention paid to policies relating to the Essex Thames Gateway (ETG1 - ETG5).

4. Comments

4.1 Overall, the preferred options put forward in the Core Strategy respond well to the RSS. There is recognition that growth needs to be delivered in a sustainable manner and evidence of continued joint working with neighbouring authorities, and the County Council, to ensure delivery of regionally significant schemes such as London Southend Airport and the South Essex Rapid Transit system.

4.2 The Assembly does have some minor concerns over the amount of development that is planned to come forward on previously developed land, and also on the Council's position with regards to larger scale renewable energy schemes. However, it considers that these do not give rise to any major conformity issue.

5. Recommendations

5.1 The Standing Committee is asked to consider the recommendation that this report and the comments in Appendix A constitute the Assembly's formal response to Rochford District Council's Core Strategy Preferred Options consultation document.


Appendix A
LOCAL DEVELOPMENT DOCUMENT CHECKLIST
PART TWO - GENERAL POINTS

Question - Does the area covered lie within the Eastern Region?
Answer - Yes


Question - Are all references to the East of England Plan correct?
Answer: - Yes

Question - Does the area covered include a Key Centre for Development and Change?
Answer - Yes
Comments - London Southend Airport is included within the Essex Thames Gateway policy area.

Question - Are there any key issues covered by the document that are of strategic or regional importance?
Answer - Yes
Comments - Expansion at London Southend Airport and the regeneration of the Thams Gateway are of regional importance.

PART THREE - CONSISTENCY/CONFORMITY CHECKLIST

Question - Is there a clear push for sustainable development?
RSS Policy - SS1
Local Policy - All
Comments - The overall objectives and policies seek to achieve a balance between bringing forward sufficient new growth to meet the needs of the district whilst protecting its natural and historic built environment. There is also clear recognition of the need to ensure that the necessary infrastructure is delivered in a timely and effective manner.

Question - Does policy seek to maximise the use of previously developed land (PDL), and will it contribute towards the 60% target?
RSS Policy - SS2
Local Policy - H1
Comments - (See also comments below relating to Green Belt.)
While local policy H1 supports prioritising the reuse of PDL, the findings of the Council's recent Urban Capacity Study (2007) and concerns over town cramming will mean that only some 30% of new housing development will come forward on PDL.
Although accepting that the 60% target may not be deliverable in all parts of the region, the Council is encouraged to maximise the development potential of all brownfield sites (including "windfall' sites) and, through its monitoring procedures, ensure that delivery does not fall below the proposed 30% level.

Question - Is there a clear pattern of development for 'Key Centres' or for other urban and rural areas?
RSS Policy - SS3, SS4
Local Policy - Various

Question - Is the role of city/town centres clear? Is there a clear retail hierarchy?
RSS Policy - SS6
Local Policy - RTC1 to RTC5
Comments - The influence of out-of-district shopping facilities; particularly those provided at Southend, is acknowledged. Local policy seeks to maintain and enhance the current market share of retail spending, with the focus for development centered on Hockley, Rayleigh and Rochford.

Question - If appropriate, is there a policy dealing with the Green Belt?
RSS Policy - SS7, ETG1
Local Policy - Page 4, GB1, GB2
Comments - RSS policy SS7 states that the broad extent of the Green Belt in the region is appropriate and should be retained. There are no plans for a Green Belt review around Rochford.

Whilst local policy seeks to protect the existing Green Belt, it does allow for some limited reallocation in order that built development can come forward. Where this release is considered to be unavoidable, the Core Strategy proposes that development occurs at a reasonably high density.

In accepting that some Green Belt land will be released, using that which contributes least to its main purpose seems appropriate. Either through this document or through relevant future documents, the Council should clarify what level of development constitutes a 'reasonably high density'.

Question - Is there a policy on coastal issues?
RSS Policy - SS9
Local Policy - ENV2
Comments - The biological/landscape value of the District's coastline is recognised.

Question - Is the East of England Plan employment target met?
RSS Policy - E1, ETG5
Local Policy - Econ' Dev' Chapter, ED1, ED2
Comments - The introductory paragraphs set out districts job requirement figure as quoted in RSS policy ETG5. There is acknowledgment of the important role that London Southend Airport can play in bringing forward employment and other economic development opportunities, as expressed through local policy ED1.

Question - Is employment land protected and is its designated use consistent with relevant RSS policies?
RSS Policy - E2 - E4
Local Policy - ED3, ED4, ED5

Question - Is the RSS housing target met? Is there a housing policy post 2021?
RSS Policy - H1
Local Policy - Housing Chapter H2, H3
Comments - The introductory section sets out district housing figures in line with RSS requirements. Local policies H2 & H3 relate to general distribution, including indicative housing numbers within settlement areas for the period to 2015, from 2015 to 2021, and post 2021.

Question - Is there an affordable housing policy and does it meet the RSS target?
RSS Policy - H2
Local Policy - H4, H5
Comments - The Preferred Option is consistent with the RSS target (35%) and national site size thresholds (15 or more dwellings). It is noted that local evidence shows the actual level of need is much higher, but that the Council is seeking to strikes a balance between deliverability of affordable housing and overall site viability.

Question - Is there a clear policy for meeting the accommodation needs of Gypsies and Travellers?
RSS Policy - H3
Local Policy - H7
Comments - Local policy H7, which states that provision will be made in line with recommendations set out in the RSS Single Issue Review, is welcomed. It is also noted that local authorities in Essex have expressed concerns over the RSS review process.
The Assembly encourages all local authorities to make provision in line with its recommendations to 2011 and beyond, noting that they will need to be mindful of any amendment to district pitch requirement figures as the RSS Single Issue Review is progressed.

Question - Are culture issues addressed?
RSS Policy - C1, C2
Local Policy - CLT6 - 11

Question - Is there a policy seeking to change travel behaviour? Is there a policy seeking to enhance provision for non-motorised forms of transport?
RSS Policy - T2, T9, T13 & T14
Local Policy - T1 - T6
Comments - The Core Strategy recognises that, away from the three main urban areas, there will continue to be a high dependency on private car use. Policies that encourage and bring forward the delivery of alternate and non-motorised forms of transport are supported.
Opportunities to facilitate home-working within new development proposals should not be ignored.

Question - Are any major transport generators covered by appropriate proposals?
RSS Policy - T11, T12
Local Policy - ED1
Comments - [The Council is referred to concerns raised by the Assembly during recent consultation on the JAAP Issues & Options consultation stage - see RPPSC 18 July 2008, Agenda item 4]

Question - Are any transport schemes being promoted that match regional priorities?
RSS Policy - T15
Local Policy - T3
Comments - Local policy T3 supports the implementation of the South Essex Rapid
Transport (SERT) scheme.

Question - Is there a policy dealing with green infrastructure?
RSS Policy - ENV1
Local Policy - ENV1, ENV2, T6

Question - Are landscape, wildlife and other conservation issues addressed?
RSS Policy - ENV2, ENV3
Local Policy - ENV1, ENV2, URV1, URV2

Question - Is agricultural land and soil conservation covered by a policy? Is there a policy relating to rural diversification?
RSS Policy - ENV4
Local Policy - GB2
Comments - The introductory paragraphs in the Environmental Issues chapter (pg 51) states that the Council will endeavour to ensure that the districts agricultural land will not be adversely affected. Local policy GB2 offers support for rural diversification schemes within the designated Green Belt.

Question - Are woodlands protected by a policy?
RSS Policy - ENV5
Local Policy - ENV1, URV1 (ENV6)
Comments - The Preferred Options seek to ensure that areas of ancient woodland are protected.

Question - Is the conservation/enhancement of the historic environment addressed?
RSS Policy - ENV6
Local Policy - CP2, CP3
Comments - The Council intends to reinstate a 'Local List' which will afford protection to local buildings with special architectural / historic value.

Question - Is there a policy that seeks to achieve a high quality built environment, including sustainable construction?
RSS Policy - ENV7
Local Policy - H6, ED5, ENV8, ENV9, CP1
Comments - Local policies ENV8 & ENV9 advocate the implementation of Code for Sustainable Homes (CSH) and BREEAM3 standards. It would be helpful if a timescale was included showing when the Council expects to implement the various code standards.

Question - Is there a policy dealing with the reduction of CO2 emissions? Is there a policy on renewable energy, including the setting of a target?
RSS Policy - ENG1, ENG2
Local Policy - ENV6, ENV7
Comments - The Core Strategy contains two policies on renewable energy - ENV6 and ENV7. While the Assembly is supportive of any policy that actively seeks to implement renewable energy technologies it is concerned that (i) as worded, policy ENV6 seemingly discourages any large scale scheme from coming forward and, (ii) that whilst local policy ENV7 is welcomed, difficulties may arise in measuring the effectiveness of small scale schemes and relating this back to regional and national targets.

Local policy ENV6 should be more 'proactive' by, for example, indicating which type of scheme(s) the Council would be wiling to support. The Assembly will be looking to the relevant Development Control documents to ensure that appropriate targets are set in line with regional targets.

Question - Is there a policy promoting water efficiency?
RSS Policy - WAT1
Local Policy - ENV8, ENV9
Comments - Water efficiency measures are being promoted through policies that adopt BREEAM and Code for Sustainable Homes (CSH) standards

Question - Is Flood Risk Management addressed? Are proposals to implement Sustainable Urban Drainage technologies included?
RSS Policy - WAT4
Local Policy - ENV2, ENV4

Question - Is there a policy dealing with waste management?
RSS Policy - WM1 - WM8
Local Policy - ENV8, ENV9
Comments - It is implied that domestic/commercial waste management practices will addressed through adoption of CSH and BREEAM Standards.

Question - Is there a policy that deals with implementation and monitoring?
RSS Policy - IMP1 - IMP2
Local Policy - Page 107 and Table

PART FOUR - OVERALL ASSESSMENT

Question - Is the document in general conformity with the RSS? If the answer is 'no', what is needed to rectify this?
Answer - Yes
Comments - Overall, the preferred options put forward in the Core Strategy respond well to the RSS. There is recognition that growth needs to be delivered in a sustainable manner and evidence of continued joint working with neighbouring authorities, and the County Council, to ensure delivery of regionally significant schemes such as London Southend Airport and the South Essex Rapid Transit system.

The Assembly does have some minor concerns over the amount of development that is planned to come forward on previously developed land, and also on the Council's position with regards to larger scale renewable energy schemes. However, it considers that these do not give rise to any major conformity issue.

Comment

Core Strategy Preferred Options (Revised October 2008)

Representation ID: 4491

Received: 08/12/2008

Respondent: East of England Local Government Association

Representation Summary:

Question - Is agricultural land and soil conservation covered by a policy? Is there a policy relating to rural diversification?
RSS Policy - ENV4
Local Policy - GB2
Comments - The introductory paragraphs in the Environmental Issues chapter (pg 51) states that the Council will endeavour to ensure that the districts agricultural land will not be adversely affected. Local policy GB2 offers support for rural diversification schemes within the designated Green Belt.

Full text:

Re: Rochford District Council - Core Strategy Preferred Options

Thank you for consulting the Assembly on this matter.

The Regional Planning Panel Standing Committee considered the attached report at its meeting on 5th December 2008 and endorsed the following recommendation:

'Overall, the preferred options put forward in the Core Strategy respond well to the RSS. The Assembly does have some minor concerns but considers that these do not give rise to any major conformity issue'

Our detailed comments, which are set out in Appendix A of the attached report, constitute the Assembly's formal response to this consultation.

If you have any queries concerning the content of the report or any other issue relating to conformity with the Regional Spatial Strategy, please contact myself or James Cutting, Team Leader - Strategy & Implementation

Regional Planning Panel Standing Committee

5th December 2008

Subject: Rochford District Council's Core Strategy Preferred Options consultation document

Report by: Regional Secretariat

Purpose

To give a response to Rochford District Council's Core Strategy Preferred Options consultation document

Recommendation

The Standing Committee is asked to consider the recommendation that the comments in this report and those in Appendix A constitute the Assembly's formal response to Rochford's Core Strategy Preferred Options consultation document.

1. Introduction

1.1 Rochford District Council has published for consultation a revised version of its Core Strategy Preferred Options Development Plan Document. This is the second stage in the Local Development Framework (LDF) process and will, in due course, lead to a Submission Version. As the principle document in Rochford's LDF, the Core Strategy sets out the overall strategy for the district until 2021 and, where appropriate, beyond.

1.2 The Council consulted on an earlier version of its Core Strategy during June and July 2007 (see RPPSC 15 June 2007 - Item3). In submitting its response, the Assembly noted that whilst the document responded well to the then emerging East of England Plan there were issues with regards to affordable housing and major releases of land from the Green Belt.
1.3 The closing date for comments on this revised Core Strategy is 17th December 2008. Further details can be found on Rochford District Council's website.

1.4 A copy of the Core Strategy Key Diagram is included at Appendix B.

2. Background

2.1 Rochford District covers an area of approx. 168 sq. km's (65 sq. miles) and is situated within a peninsula between the Rivers Thames and Crouch. Bounded to the east by the North Sea, it shares land boundaries with Basildon and Castle Point District and Southend-on-Sea Borough Councils. It also has marine boundaries with Maldon and Chelmsford Districts. The A127 and the A13 provide a strategic road link to the M25 Motorway and there are direct rail links into London. London Southend Airport is also located within the district boundary.

2.2 The district has a noticeable east - west divide. The majority of the population, which recent estimates put at 81,300 (expected to rise to 87,000 by 2021), live in the west where the three main urban areas of Rochford, Rayleigh, Hockley are located. To the east, the district is more rural in nature, and is characterised by stretches of unspoilt coastline and countryside, with a scattering of smaller settlements. Approximately 75 per cent of the district is designated as Metropolitan Green Belt.

2.3 A significant proportion of the districts workforce (estimated to be around 68 per cent) work beyond the district boundary. Southend-on-Sea exerts a particularly strong influence, not just as an employment location but also as the largest retail centre in the sub-region. Beyond the three main urban areas of Rochford, Rayleigh and Hockley, which offer greater opportunities to access public transport, there is a high dependency on private car use.

3. Regional and Local Policy

3.1 Regional planning guidance for Rochford is contained within the adopted East of England Plan (hereafter referred to as the RSS) and the remaining six "saved" structure plan policies for Essex and Southend-on-Sea. At a local level, the Core Strategy and other LDF documents will replace the Rochford District Replacement Local Plan (2006).

3.2 In considering general conformity the Core Strategy was assessed against all policies contained within the RSS, with particular attention paid to policies relating to the Essex Thames Gateway (ETG1 - ETG5).

4. Comments

4.1 Overall, the preferred options put forward in the Core Strategy respond well to the RSS. There is recognition that growth needs to be delivered in a sustainable manner and evidence of continued joint working with neighbouring authorities, and the County Council, to ensure delivery of regionally significant schemes such as London Southend Airport and the South Essex Rapid Transit system.

4.2 The Assembly does have some minor concerns over the amount of development that is planned to come forward on previously developed land, and also on the Council's position with regards to larger scale renewable energy schemes. However, it considers that these do not give rise to any major conformity issue.

5. Recommendations

5.1 The Standing Committee is asked to consider the recommendation that this report and the comments in Appendix A constitute the Assembly's formal response to Rochford District Council's Core Strategy Preferred Options consultation document.


Appendix A
LOCAL DEVELOPMENT DOCUMENT CHECKLIST
PART TWO - GENERAL POINTS

Question - Does the area covered lie within the Eastern Region?
Answer - Yes


Question - Are all references to the East of England Plan correct?
Answer: - Yes

Question - Does the area covered include a Key Centre for Development and Change?
Answer - Yes
Comments - London Southend Airport is included within the Essex Thames Gateway policy area.

Question - Are there any key issues covered by the document that are of strategic or regional importance?
Answer - Yes
Comments - Expansion at London Southend Airport and the regeneration of the Thams Gateway are of regional importance.

PART THREE - CONSISTENCY/CONFORMITY CHECKLIST

Question - Is there a clear push for sustainable development?
RSS Policy - SS1
Local Policy - All
Comments - The overall objectives and policies seek to achieve a balance between bringing forward sufficient new growth to meet the needs of the district whilst protecting its natural and historic built environment. There is also clear recognition of the need to ensure that the necessary infrastructure is delivered in a timely and effective manner.

Question - Does policy seek to maximise the use of previously developed land (PDL), and will it contribute towards the 60% target?
RSS Policy - SS2
Local Policy - H1
Comments - (See also comments below relating to Green Belt.)
While local policy H1 supports prioritising the reuse of PDL, the findings of the Council's recent Urban Capacity Study (2007) and concerns over town cramming will mean that only some 30% of new housing development will come forward on PDL.
Although accepting that the 60% target may not be deliverable in all parts of the region, the Council is encouraged to maximise the development potential of all brownfield sites (including "windfall' sites) and, through its monitoring procedures, ensure that delivery does not fall below the proposed 30% level.

Question - Is there a clear pattern of development for 'Key Centres' or for other urban and rural areas?
RSS Policy - SS3, SS4
Local Policy - Various

Question - Is the role of city/town centres clear? Is there a clear retail hierarchy?
RSS Policy - SS6
Local Policy - RTC1 to RTC5
Comments - The influence of out-of-district shopping facilities; particularly those provided at Southend, is acknowledged. Local policy seeks to maintain and enhance the current market share of retail spending, with the focus for development centered on Hockley, Rayleigh and Rochford.

Question - If appropriate, is there a policy dealing with the Green Belt?
RSS Policy - SS7, ETG1
Local Policy - Page 4, GB1, GB2
Comments - RSS policy SS7 states that the broad extent of the Green Belt in the region is appropriate and should be retained. There are no plans for a Green Belt review around Rochford.

Whilst local policy seeks to protect the existing Green Belt, it does allow for some limited reallocation in order that built development can come forward. Where this release is considered to be unavoidable, the Core Strategy proposes that development occurs at a reasonably high density.

In accepting that some Green Belt land will be released, using that which contributes least to its main purpose seems appropriate. Either through this document or through relevant future documents, the Council should clarify what level of development constitutes a 'reasonably high density'.

Question - Is there a policy on coastal issues?
RSS Policy - SS9
Local Policy - ENV2
Comments - The biological/landscape value of the District's coastline is recognised.

Question - Is the East of England Plan employment target met?
RSS Policy - E1, ETG5
Local Policy - Econ' Dev' Chapter, ED1, ED2
Comments - The introductory paragraphs set out districts job requirement figure as quoted in RSS policy ETG5. There is acknowledgment of the important role that London Southend Airport can play in bringing forward employment and other economic development opportunities, as expressed through local policy ED1.

Question - Is employment land protected and is its designated use consistent with relevant RSS policies?
RSS Policy - E2 - E4
Local Policy - ED3, ED4, ED5

Question - Is the RSS housing target met? Is there a housing policy post 2021?
RSS Policy - H1
Local Policy - Housing Chapter H2, H3
Comments - The introductory section sets out district housing figures in line with RSS requirements. Local policies H2 & H3 relate to general distribution, including indicative housing numbers within settlement areas for the period to 2015, from 2015 to 2021, and post 2021.

Question - Is there an affordable housing policy and does it meet the RSS target?
RSS Policy - H2
Local Policy - H4, H5
Comments - The Preferred Option is consistent with the RSS target (35%) and national site size thresholds (15 or more dwellings). It is noted that local evidence shows the actual level of need is much higher, but that the Council is seeking to strikes a balance between deliverability of affordable housing and overall site viability.

Question - Is there a clear policy for meeting the accommodation needs of Gypsies and Travellers?
RSS Policy - H3
Local Policy - H7
Comments - Local policy H7, which states that provision will be made in line with recommendations set out in the RSS Single Issue Review, is welcomed. It is also noted that local authorities in Essex have expressed concerns over the RSS review process.
The Assembly encourages all local authorities to make provision in line with its recommendations to 2011 and beyond, noting that they will need to be mindful of any amendment to district pitch requirement figures as the RSS Single Issue Review is progressed.

Question - Are culture issues addressed?
RSS Policy - C1, C2
Local Policy - CLT6 - 11

Question - Is there a policy seeking to change travel behaviour? Is there a policy seeking to enhance provision for non-motorised forms of transport?
RSS Policy - T2, T9, T13 & T14
Local Policy - T1 - T6
Comments - The Core Strategy recognises that, away from the three main urban areas, there will continue to be a high dependency on private car use. Policies that encourage and bring forward the delivery of alternate and non-motorised forms of transport are supported.
Opportunities to facilitate home-working within new development proposals should not be ignored.

Question - Are any major transport generators covered by appropriate proposals?
RSS Policy - T11, T12
Local Policy - ED1
Comments - [The Council is referred to concerns raised by the Assembly during recent consultation on the JAAP Issues & Options consultation stage - see RPPSC 18 July 2008, Agenda item 4]

Question - Are any transport schemes being promoted that match regional priorities?
RSS Policy - T15
Local Policy - T3
Comments - Local policy T3 supports the implementation of the South Essex Rapid
Transport (SERT) scheme.

Question - Is there a policy dealing with green infrastructure?
RSS Policy - ENV1
Local Policy - ENV1, ENV2, T6

Question - Are landscape, wildlife and other conservation issues addressed?
RSS Policy - ENV2, ENV3
Local Policy - ENV1, ENV2, URV1, URV2

Question - Is agricultural land and soil conservation covered by a policy? Is there a policy relating to rural diversification?
RSS Policy - ENV4
Local Policy - GB2
Comments - The introductory paragraphs in the Environmental Issues chapter (pg 51) states that the Council will endeavour to ensure that the districts agricultural land will not be adversely affected. Local policy GB2 offers support for rural diversification schemes within the designated Green Belt.

Question - Are woodlands protected by a policy?
RSS Policy - ENV5
Local Policy - ENV1, URV1 (ENV6)
Comments - The Preferred Options seek to ensure that areas of ancient woodland are protected.

Question - Is the conservation/enhancement of the historic environment addressed?
RSS Policy - ENV6
Local Policy - CP2, CP3
Comments - The Council intends to reinstate a 'Local List' which will afford protection to local buildings with special architectural / historic value.

Question - Is there a policy that seeks to achieve a high quality built environment, including sustainable construction?
RSS Policy - ENV7
Local Policy - H6, ED5, ENV8, ENV9, CP1
Comments - Local policies ENV8 & ENV9 advocate the implementation of Code for Sustainable Homes (CSH) and BREEAM3 standards. It would be helpful if a timescale was included showing when the Council expects to implement the various code standards.

Question - Is there a policy dealing with the reduction of CO2 emissions? Is there a policy on renewable energy, including the setting of a target?
RSS Policy - ENG1, ENG2
Local Policy - ENV6, ENV7
Comments - The Core Strategy contains two policies on renewable energy - ENV6 and ENV7. While the Assembly is supportive of any policy that actively seeks to implement renewable energy technologies it is concerned that (i) as worded, policy ENV6 seemingly discourages any large scale scheme from coming forward and, (ii) that whilst local policy ENV7 is welcomed, difficulties may arise in measuring the effectiveness of small scale schemes and relating this back to regional and national targets.

Local policy ENV6 should be more 'proactive' by, for example, indicating which type of scheme(s) the Council would be wiling to support. The Assembly will be looking to the relevant Development Control documents to ensure that appropriate targets are set in line with regional targets.

Question - Is there a policy promoting water efficiency?
RSS Policy - WAT1
Local Policy - ENV8, ENV9
Comments - Water efficiency measures are being promoted through policies that adopt BREEAM and Code for Sustainable Homes (CSH) standards

Question - Is Flood Risk Management addressed? Are proposals to implement Sustainable Urban Drainage technologies included?
RSS Policy - WAT4
Local Policy - ENV2, ENV4

Question - Is there a policy dealing with waste management?
RSS Policy - WM1 - WM8
Local Policy - ENV8, ENV9
Comments - It is implied that domestic/commercial waste management practices will addressed through adoption of CSH and BREEAM Standards.

Question - Is there a policy that deals with implementation and monitoring?
RSS Policy - IMP1 - IMP2
Local Policy - Page 107 and Table

PART FOUR - OVERALL ASSESSMENT

Question - Is the document in general conformity with the RSS? If the answer is 'no', what is needed to rectify this?
Answer - Yes
Comments - Overall, the preferred options put forward in the Core Strategy respond well to the RSS. There is recognition that growth needs to be delivered in a sustainable manner and evidence of continued joint working with neighbouring authorities, and the County Council, to ensure delivery of regionally significant schemes such as London Southend Airport and the South Essex Rapid Transit system.

The Assembly does have some minor concerns over the amount of development that is planned to come forward on previously developed land, and also on the Council's position with regards to larger scale renewable energy schemes. However, it considers that these do not give rise to any major conformity issue.