H6 Lifetime Homes - Preferred Option

Showing comments and forms 1 to 7 of 7

Support

Core Strategy Preferred Options (Revised October 2008)

Representation ID: 3599

Received: 12/12/2008

Respondent: Mrs Gill Plackett

Representation Summary:

I support the Lifetime homes preferred option.

Full text:

I support the Lifetime homes preferred option.

Support

Core Strategy Preferred Options (Revised October 2008)

Representation ID: 3803

Received: 16/12/2008

Respondent: Stolkin and Clements (Southend) LLP

Agent: Firstplan

Representation Summary:

Stolkin and Clements (Southend) LLP support this policy which requires all new housing developments to comply with the Lifetime Homes standard from 2010 unless this threatens the viability of the development.

Full text:

Stolkin and Clements (Southend) LLP support this policy which requires all new housing developments to comply with the Lifetime Homes standard from 2010 unless this threatens the viability of the development.

Object

Core Strategy Preferred Options (Revised October 2008)

Representation ID: 4125

Received: 15/12/2008

Respondent: Swan Hill Homes Limited

Agent: Charles Planning Associates Ltd

Representation Summary:

Policy H6 - Lifetime Homes

2.17 In regard to this policy, Swan Hill objects to the Council's preferred options where all new dwellings should be provided to the Lifetime Homes Standard. Whilst it is acknowledged that the UK has an aging population, Swan Hill considers the Alternative Option set out in the Core Strategy represents the most suitable option for this type of policy provision. Seeking to provide Lifetime Homes on all sites is considered to be overly onerous for proposed developers, particularly when considering the requirement for all car parking spaces to be suitable for disabled users, which could result in more schemes becoming unviable. Therefore, the provision of a degree of Lifetime Homes should be considered through negotiations with the Council at the planning application stage, and should be determined on a case-by-case basis.

Full text:

Representations on behalf of
Swan Hill Homes Limited
RESPONDENT NUMBER: 5040

1.0 Instructions and Introduction

1.1 Charles Planning Associates Limited (Chartered Town Planners) is Instructed by Swan Hill Homes Limited (Swan Hill) to prepare and submit representations on their behalf in respect of the Rochford District Local Development Framework: Core Strategy Preferred Options (October 2008) Development Plan Document.

1.2 The comments refer to the relevant sections and policy designations in the Preferred Options document, as appropriate.

1.3 The comments set out in this submission are intended to assist the District Council in taking forward its Local Development Framework. It is our intention to continue to be involved in the preparation process and we look forward to the opportunity to comment further at the Submission Version stage. Prior to the assessment of the Core Strategy Preferred Options (October 2008), Swan Hill had serious concerns regarding the way the document had been prepared. The lack of clearly defined policies meant that any policies would have only appeared in the Submission Version of the document, giving the Council no opportunity to make amendments, and limited opportunity for Consultees to see the exact policy position of the Council. It is considered that this Revised Preferred Options document has addressed this position, and enables Consultees to examine further the proposed position of the District Council, and the direction with which they are seeking to take their Core Strategy.

1.4 If you have any queries regarding the content of this submission then please do not hesitate to contact:

Peter Kneen BSc (Hons) MSc MRTPI
Planner

Charles Planning Associates Limited
1644-1645 Parkway
Solent Business Park
Whiteley, Fareham
Hampshire
PO15 7AH

Tel: 01489 580853
Fax: 01489 580913
E-mail: peter.kneen@charlesplanning.co.uk

2.0 Housing:

2.1 Swan Hill recognises the importance of seeking to concentrate new developments mainly in the existing urban areas, on previously developed land where possible, particularly in view of the Government seeking to ensure 60% of all such new developments are on previously development land (PDL).

2.2 However, given the character of the District, and the strategic housing requirement of the East of England Plan, Swan Hill supports the approach that the Council must also make provision for additional development on the edge of existing settlements on greenfield sites, particularly in the most sustainable locations. Swan Hill supports the approach that green field land on the edge of settlements that are released for development should not have a significant impact on the characteristics of the Green Belt, and that densities are in line with the objectives of PPS3 and reflect the local character of the settlement to which the extension is proposed.

Policy H1 - Distribution

2.3 Swan Hill generally supports the approach taken by the Council in this preferred option. As set out above, Swan Hill consider the Council's acknowledgment that housing requirements should be met through the allocation of land on the edge of the existing settlements is the most suitable way forward to meeting the Council's strategic housing requirement and complies with the advise in PPS3.

2.4 The need for suitable greenfield urban extensions represents the best way forward for the Council to meet its strategic housing requirement, as set out in the East of England Plan. Swan Hill supports the recognition that 70% of new residential properties will need to be on sustainable greenfield urban extensions to the existing settlements of the District.

2.5 As such, it is essential within the Core Strategy to establish general locations suitable for the expansion of settlements into the Green Belt. This should not be as site specific as determining the exact parameters of settlement expansions, but should include a general assessment around settlements where development could be accommodated without conflicting with the objectives of the Green Belt. Swan Hill considers that the Council has had regard to these implications in this version of the Core Strategy, and supports the overall distribution policy set out by the District Council.

Policy H2 - General Locations and Phasing

2.6 As set out above, Swan Hill supports the overall approach the Council has taken in this revised version of the Core Strategy, which has both recognised the need for sustainable green field urban extensions in addition to the recognition of the most suitable 'general' locations for such extensions.

2.7 Swan Hill considers that the level of provision for the Tier 1 and 2 settlements (Tier 1: Rochford/Ashingdon, Hockley/Hawkwell and Rayleigh; Tier 2: Great Wakering and Hullbridge), which represents almost 98% of the proposed urban extensions, is appropriate, particularly given that these settlements either benefit from established services and facilities or are located within good proximity to the important service centres surrounding the District, principally Shoeburyness and Southend. This approach, as also set out in the supporting text to Policy H2 would help ensure that the second and third tier settlements remain viable rural settlements, supporting their local communities.

2.8 Additionally, Swan Hill welcomes the recognition that the provision of development on larger sites, in these first and second tier settlements can positively contribute to infrastructure provision, particularly in areas where there is an identified need for improvements.

Policy H3 - General Locations Post 2021

2.9 Swan Hill supports the general principles of this policy, and that the Council has sought to make provision for a 15-year supply of housing land supply, from the date of adoption of the document, as set out in PPS3.

2.10 Policy H1 of the Adopted RSS, East of England Plan sets out a requirement for the remaining 5-year supply, beyond 2021 to be based on the higher amount of the annual average for the period 2001 to 2021 or 2006 to 2021, whichever is higher. Based on this assessment, the 5-year period beyond 2021 would make a minimum requirement for 1,000 dwellings. However, Swan Hill considers it is important that the Policy provision sets out that this is a minimum level, and is likely to change over the course of the Core Strategy period.

2.11 Whilst Policy H3 sets out a degree of flexibility towards the deliverability of these 'general locations', it is important that Policy H3 sets out that the potential number of units proposed on those 'general locations' are a minimum, based on the current Adopted East of England Plan. Further, the East of England Plan is currently under review, and it is likely that the strategic annual housing figure for the period beyond 2021 is likely to increase. This should be reflected in Policy H3.

Policy H4 - Affordable Housing

2.12 In general terms, Swan Hill supports the approach taken by the Council towards the provision of affordable housing for new residential developments. Additionally, the threshold is considered the most appropriate, given that most developments below 15 dwellings or 0.5ha may not be viable to support an element of affordable housing, unless being provided solely for affordable housing.

2.13 The proposed Policy sets out a degree of flexibility for those sites which, if demonstrated by the developer that a provision of 35% affordable housing would make a scheme unviable, has been included. However, it is considered that a greater degree of flexibility should be set out in the policy, in order to ensure the level of affordable homes is considered through negotiation with the Council, and that each application is assessed on a site-by-site basis.

2.14 Additionally, it is considered that many Registered Social Landlords (RSLs) may consider the 'pepper potting' of affordable dwellings throughout larger sites can have significant logistical and cost implications which could discourage RSLs from wanting to take up those units. Whilst Swan Hill acknowledges the benefits of pepper potting affordable housing units around a large development, as this would ensure less disparity between those units and the open market units, clustering affordable housing units together, whether that is in one area or in groups can significantly reduce costs and logistical management issues for many RSLs, making them more attractive to manage and rent.

Policy H5 - Dwelling Types

2.15 Swan Hill supports the policy provision of H5, and considers that the approach taken by the Council for this policy represents a suitably flexible alternative to stipulating percentages of dwelling mix, sought by some local authorities. With the exception of providing a suitable proportion of the provision of affordable units with three-bedrooms, the policy appears to represent to best option for ensuring flexibility for new housing developments, enabling developers to ensure the most up-to-date market assessments play a pivotal role in determining the appropriate level of mix, at any given time.

2.16 In respect of the reference to the Strategic Housing Market Assessment for Thames Gateway South Essex, it is important that if the Council chooses to rely on such assessments as a key factor in determining the appropriate level of mix, it is important that such an assessment is up-to date, and represent the most appropriate model for assessment the level of housing requirements.

Policy H6 - Lifetime Homes

2.17 In regard to this policy, Swan Hill objects to the Council's preferred options where all new dwellings should be provided to the Lifetime Homes Standard. Whilst it is acknowledged that the UK has an aging population, Swan Hill considers the Alternative Option set out in the Core Strategy represents the most suitable option for this type of policy provision. Seeking to provide Lifetime Homes on all sites is considered to be overly onerous for proposed developers, particularly when considering the requirement for all car parking spaces to be suitable for disabled users, which could result in more schemes becoming unviable. Therefore, the provision of a degree of Lifetime Homes should be considered through negotiations with the Council at the planning application stage, and should be determined on a case-by-case basis.

3.0 The Green Belt:

Policy GB1 - Green Belt Protection

3.1 Swan Hill generally supports the policy approach taken towards the protection of the Green Belt, where the key objectives of PPG2 can be met and maintained. It is important that Policy GB1 has regard to the need for a review of the Green Belt boundaries around the key settlements of the District, in order to achieve the required level of residential development required by the East of England Plan.

3.2 As such, and whilst a review of the Green Belt is set out in the supporting text, Swan Hill considers that Policy GB1 of the Core Strategy should be amended to address the need to review the Green Belt boundaries as a means to ensure that minor greenfield sustainable extensions to the settlements can occur without offending the overarching policy objectives of the Metropolitan Green Belt.

Policy GB2 - Rural Diversification and Recreational Uses

3.3 Swan Hill generally supports the Council's policy approach towards rural diversification and provision of recreational uses within the Green Belt.

4.0 Environmental Issues:

Policy ENV3 - Flood Risk

4.1 Swan Hill supports the preferred option approach towards dealing with settlements at risk of flooding. Whilst Great Wakering is identified as a particular area at risk of flooding, this is predominantly associated with the eastern part of the settlement, and as such should not be considered as an overriding constraint to development at other parts of the settlement. Swan Hill concurs with the Council that restricting all new development away from Great Wakering could have a significant adverse impact on the long term viability of the settlement.

4.2 Swan Hill supports the Council's collaboration with the Environment Agency in seeking to ensure Great Wakering is protected from flooding for the existing and future residents.

Policy ENV4 - Sustainable Drainage System (SUDS)

4.3 In respect of Policy ENV4, Swan Hill supports the general principle of sustainable drainage systems. However, given the difficulties in transferring the future management and operation of SUDS to water companies and local authorities, it is not considered appropriate to require the provision of SUDS as a pre-requisite to development in all cases.

4.4 As such, it is considered that the provision of SUDS should be considered on a site-by-site basis, and the level of provision should form part of the negotiations at the planning application stage of the larger developments in the District.

Policy ENV8 - Code for Sustainable Homes

4.5 The need to provide all new dwellings to the Code level 3 of the 'Code for Sustainable Homes' by 2010 is a key objective of the Government. This policy approach is supported by Swan Hill. However, Swan Hill consider the requirement to achieve Code level 6 by 2013 is unrealistic and whilst Swan Hill recognises the importance of this issue, and the desire for carbon neutral homes, producing this on all new dwellings by 2013 could have significant implications on the cost of developments, viability and deliverability. The Government target for achieving Code Level 6 for new dwellings is 2016, and as such, Swan Hill considers the Council should not seek to supersede Government policy on this matter.

5.0 Transport:

Policy T1 - Highways

5.1 Swan Hill supports the overall objectives set out in Policy T1 requiring developments to be located and designed to reduce the reliance on the private car and to meet the infrastructure needs generated by development or seek to help achieve these needs is acceptable in principle.

5.2 Swan Hill recognises the importance between providing sufficient infrastructure provision to meet the requirements of development, and that where developments have no consideration of impact on existing infrastructure, they should be considered unacceptable and contrary to National policy guidance. However, Swan Hill considers it important to emphasise that the developer's role should not be seen as a means to meet existing shortfalls in provision.

Policy T2 - Public Transport

5.3 Swan Hill supports the policy approach taken by the Council on Policy T2.

Policy T4 - Travel Plans

5.4 Swan Hill supports the policy approach taken by the Council on Policy T4.

Policy T5 - Cycling and Walking

5.5 Swan Hill supports the general approach to this policy, as Swan Hill recognises the importance of promoting the use of alternatives to the private car. However, it is important that any policy on the provision of additional off site facilities is based on a site-by-site assessment, and should be related to the impact generated by the development proposed.

5.6 As such, Swan Hill considers this policy should allow for a greater degree of flexibility on the provision and justification of off-site improvements to the cycle and pedestrian network of the District.

Policy T7 - Parking Standards

5.7 The Council has recently (January 2007) adopted SPD on the requirements for parking standards, and as such, Swan Hill supports the policy approach chosen by the Council. However, Swan Hill consider it relevant that the Council set out within the wording of the policy that they have adopted supplementary guidance, which should be applied by developers in the preparation of proposals.

6.0 Character of Place:

Policy CP1 - Design

6.1 The Town and Country Planning (General Development Procedure) Order 1995 (As Amended) makes the submission of a Design and Access Statement for most types of planning applications a Statutory requirement, and as such, the provision of a Design Brief represents a pre-requisite of all major planning applications.

6.2 Policy CP1 seeks to ensure the provision of good, high quality developments that reflect local characteristics and distinctiveness, this ideology is supported by Swan Hill.

7.0 Community Infrastructure, Leisure and Tourism:

Policy CLT1 - Planning Obligations and Standard Charges

7.1 Swan Hill generally supports the overall approach the Council has taken in Policy CLT1. It is considered Policy CLT1 sets out a degree of flexibility to ensure that all sites are considered on a site-by-side basis, assessing the individual merits of each planning application, in order to ensure the levels of contributions applicable meet the five tests of Circular 05/05.

Policies CLT5 - Open Space;
CLT7 - Play Space;
CLT8 - Youth Facilities; and,
CLT10 - Playing Pitches

7.2 Swan Hill supports the need for new residential developments to incorporate a degree of new publicly accessible open space, children's play space, youth facilities and playing pitches, and as such, generally supports the policy approaches taken by the Council.

7.3 However, it is important that whilst the Council may seek to undertake an assessment of providing standard charges for new development, which, as set out in Policy CLT1, this should be based on thorough public consultation and consideration and sound justification. Swan Hill consider that within the provision of a standard charge, it is important that such provision allows for a degree of flexibility to ensure that each site is assessed individually and on its own merits. This is particularly important for those sites close to existing open spaces and facilities. As such, the levels of open space and recreation facilities required in the 'standard charge' should be based on an up-to-date PPG17 Open Space assessment, which should be used to form a key consideration in the levels of provision likely to be required in the standard charge system proposed.

Policy CLT6 - Community Facilities

7.4 Swan Hill supports the approach set out by the Council in policy CLT6, and in particular, that the Council has identified a need for new community facilities within Great Wakering.

8.0 Summary:

8.1 In Summary, Swan Hill considers that overall the 2008 version of the Core Strategy presents a significant improvement on the earlier document, and seeks to address the strategic housing requirements for the District up to and beyond 2021 with clarity. However, it is considered that in general terms the Core Strategy is overly prescriptive and detailed, dealing with too many issues and providing too many policies that could be and should be dealt with in other Development Plan Documents, such as the Development Control Policies DPD. Whilst some of the policies provide flexibility and allow for the individual assessment of development proposals through negotiations with the Council, Swan Hill considers that many of these can removed from the Core Strategy, to be considered later in other DPDs.

8.2 Swan Hill considers the Core Strategy could be significantly reduced in size, in order to provide a more concise, directed document, which deals with the key, overarching strategic policy requirements of the District, as required by PPS12.

Support

Core Strategy Preferred Options (Revised October 2008)

Representation ID: 4224

Received: 16/12/2008

Respondent: Fairview New Homes Ltd

Agent: Planning Potential

Representation Summary:

In line with our comments in respect of Preferred Policy H4 Fairview New Homes would like to provide support to the recognition that in some instances the Lifetime Homes Standard will not be able to be met. It is requested that this level of flexibility is retained when developing the Core Strategy Submission Document.

Full text:

Dear Sir / Madam,

Rochford District Council Local Development Framework, Core Strategy Preferred Options Consultation Document

We are instructed by our client, Fairview New Homes Ltd, to submit comments on the published Preferred Options Core Strategy Document, and these are set out below. For ease, specific reference has been made in accordance with the paragraph numbers as contained in the published document.

Vision

The Council's key planning objectives include the following:

o To work towards sustainable development by making the most effective and efficient use of land.
o To improve the quality of life of the inhabitants of the District by providing the best possible environment, and satisfying social needs by making accessible provision for the necessary health, housing, educational, community and leisure facilities in the interests of the total well being of all groups within the population.
o To ensure the availability of land in appropriate locations for housing, commercial and industrial uses.
o To retain, conserve and enhance the built and natural environments, including the architectural and historical heritage, flora, fauna and their habitats throughout the District.
o To make provisions for transportation improvements to effect the most environmentally sustainable, efficient, convenient movement of goods and people.
o To define and protect the Metropolitan Green Belt, the undeveloped coast and area of ecological interest by directing development towards the District's established settlements.
o To enable the existing business community to function as efficiently as possible and to support economic and regeneration development throughout the Borough.

Whilst our client would like to provide support for the Council's key planning objectives, at present there are a number of aspects which are currently inconsistent or do not accurately reflect the sentiments of the Preferred Policies set out in the remainder of the draft Core Strategy.

Firstly, there is currently no recognition within the Council's key objectives of the most appropriate direction for development. Whilst it is understood that these are overarching aims, it is considered particularly important that locating future development within and adjacent to the Borough's existing larger settlements is essential in order to uphold national, regional and local sustainability aims. This requirement is in line with our further comments on this particular subject below.

Further, it should be made clear as part of objective six that the Green Belt boundary is to be re-defined. This provision will ensure that the objective is consistent with the allowances made in preferred Policy GB1 and the associated supporting text to release some Green Belt land where deemed appropriate and necessary.

Housing

In response the Council's method regarding the location, type and timing of housing development, as set out on page 24 of the draft Core Strategy Document, care should be taken to ensure that the requirements stipulated at Paragraph 54 of PPS3 are adhered to. In particular, the deliverability of sites should be carefully considered when taking decisions on the timing of housing development, in that the site should be available, suitable and achievable, in order that the five year housing supply is realistic in its aims.

Distribution

The Council's Preferred Option for housing distribution is set out as follows:

Policy H1 - Distribution - Preferred Option

We will prioritise the reuse of previously developed land identified as being appropriate as part of our Urban Capacity Study, having regard to the need to protect sites of ecological importance. Areas coming forward for residential development identified within the Urban Capacity Study will be required to conform to all policies within the Core Strategy, particularly in relation to infrastructure, and larger sites will be required to be comprehensively planned.
In order to protect the character of existing settlements, we will resist the intensification of smaller sites within residential areas. Limited infilling will be acceptable if it corresponds to the existing street pattern and density of the locality. We will encourage an appropriate level of residential intensification within town centre areas, where higher density schemes (60+ dwellings per hectare) may be appropriate. The remaining housing requirement will be met through the allocation of land on the edge of existing settlements as outlined in H2.
Our client would like to provide support to the realistic approach taken by the Council in respect of brownfield development within existing settlement boundaries. However, in order that the character of existing settlements can be maintained and Policy H1 can be adequately implemented, Policy GB1 relating to Green Belt protection will need to incorporate a sufficient level of flexibility to allow the release of Green Belt land where it is considered appropriate.

General Locations

At present, support cannot be provided to the Settlement hierarchy as set out on Page 26 of the draft Core Strategy Document. Whilst it is considered appropriate for Rayleigh to be designated as a Tier 1 settlement, the draft Core Strategy is currently not consistent throughout in this respect. It is noted on Page 20 of the Strategy that Rayleigh is the only first tier settlement which could be classed as a 'principle town centre'. Rayleigh is also considered to have the best access to services in the District. However, when considering the general locations for housing development there is no consideration of the higher order level of the settlement of Rayleigh. Rayleigh should be considered the priority direction for housing development given the greater level of services available and public transport connections, in line with the designation set out on Page 20. The greater concentration of services available within Rayleigh results in adequate capacity being available to support a higher level of resident development. In addition, directing development in this manner will act to support the Council's environmental and sustainability aims, particularly, Preferred Policies ENV1,2 and 3.

We, therefore, recommend on behalf of Fairview New Homes that the settlement hierarchy set out on Page 26 be amended in order to reflect the higher level order of Rayleigh.

The Council's preferred option for the general location and phasing of housing development is as follows:

Policy H2 - General Locations and Phasing - Preferred Option

We will extend the residential envelope of existing settlements for the purposes of residential development in the following areas to deliver the following approximate number of units by 2015 or between 2015 and 2021, as stipulated below and indicated on the Key Diagram.

Area - North of London Road, Rayleigh
No. of units by 2015 - 450
No. of units 2015 - 2021 - 200

Area - South West Rayleigh
No. of units by 2015 - 100
No. of units 2015 - 2021 - 0

Area - West Rochford
No. of units by 2015 - 300
No. of units 2015 - 2021 - 100

Area - West Hockley
No. of units by 2015 - 50
No. of units 2015 - 2021 - 0

Area - South Hawkwell
No. of units by 2015 - 100
No. of units 2015 - 2021 - 100

Area - East Ashingdon
No. of units by 2015 - 120
No. of units 2015 - 2021 - 0

Area - South East Ashingdon
No. of units by 2015 - 20
No. of units 2015 - 2021 - 0

Area - South West Hullbridge
No. of units by 2015 - 0
No. of units 2015 - 2021 - 450

Area - South West Great Wakering
No. of units by 2015 - 100
No. of units 2015 - 2021 - 100

Area - West Great Wakering
No. of units by 2015 - 50
No. of units 2015 - 2021 - 100

Area - South Canewdon
No. of units by 2015 - 60
No. of units 2015 - 2021 - 0

Total no. of units by 2015 - 1450
Total no. of units 2015-2021 - 1050

The detailed location and quantum of development will be articulated within the Allocations Development Plan Document.
Development with the above areas will be required to be comprehensively planned. A range of other uses and infrastructure (including off-site infrastructure), having regard to the requirements of the Core Strategy, will be required to be developed and implemented in a timely manner alongside housing. H Appendix 1 outlines the infrastructure that will be required for each residential area, and should be read in conjunction with Preferred Option CLT1.

We will maintain a flexible approach with regards to the timing of the release of land for residential development to ensure a constant five year supply of land.

Fairview New Homes would like to offer strong support in response to Preferred Policy H2 as well as to the general housing locations as shown on the accompanying Key Diagram. In particular, it is requested that the intention to extend the existing settlement boundary in the south west area of Rayleigh is retained when formulating the Core Strategy Submission document. Our client has an interest in a large parcel of land in this location of Rayleigh which is available for redevelopment in the immediate future, therefore, reflecting the phasing option set out in Preferred Policy H2.

In addition, the retention of a flexible approach to the timing of the release of the areas of land set out in Policy H2 is particularly important in order that sites can come forward when available and required.

Affordable Housing

The Council's preferred option for affordable housing is set out as follows:

Policy H4 - Affordable Housing - Preferred Option

At least 35% of dwellings on all developments of 15 or more units, or on sites greater than 0.5 hectares, shall be affordable. These affordable dwellings shall be spread (pepper potted) throughout larger developments. Affordable dwellings shall be required to remain affordable in perpetuity - this will be secured through legal agreements.

This requirement will only be relaxed in highly exceptional circumstances, for example where constraints make on-site provision impossible or where the developer is able to definitely demonstrate that 35% provision will be economically unviable, rendering the site undeliverable. In such cases we will negotiate the proportion of affordable dwellings based on the economic viability calculations. It is expected that affordable housing will be provided on each development site; in rare cases, taking account of particular site characteristics, the affordable housing contribution may be provided by way of a commuted sum towards off-site affordable housing.

The Council's realistic approach to securing affordable housing throughout the Borough is supported by Fairview New Homes. In particular, the flexibility and recognition that it may not be possible to provide the full requirement of affordable housing on all sites is offered strong support by our client. In this respect full consideration should be had towards individual locations and specific sites depending on the findings of the Strategic Housing Needs Assessment (PPS3 Paragraph 29 Part 3).

It is requested that the Council seek to retain an element of negotiation within Policy H4 when developing the Core Strategy to submission stage in order to allow a sensitive approach to local housing need as it fluctuates throughout the Council's administrative area rather than a blanket approached.

Further, the first part of the preferred policy requires that affordable housing be spread "(pepper potted)" throughout new development. Whilst my client is sure you are aware, management is a real issue for social landlords, and often it is not practical to adopt a 'pepper pot' approach, and further consideration should be had of the 'user' / 'management' requirements when developing the Core Strategy to Submission Stage.

Lifetime Homes

The Council's preferred policy for Lifetime Homes is as follows:

Policy H6 - Lifetime Homes - Preferred Option

We will normally require all new housing developments to comply with the Lifetime Homes Standard from 2010. Exceptions will be made where such a requirement threatens the viability of developments, in which case we will seek a proportion of units to comply with the standard.

In line with our comments in respect of Preferred Policy H4 Fairview New Homes would like to provide support to the recognition that in some instances the Lifetime Homes Standard will not be able to be met. It is requested that this level of flexibility is retained when developing the Core Strategy Submission Document.

The Green Belt

Protection of the Green Belt

Whilst it is recognised that there is a need to protect Green Belt land throughout the Borough, on behalf of our client, we would like to provide full support to the acknowledgement on Page 41 that a proportion of the currently allocated Green Belt land will need to be released for redevelopment. When considering areas of land for release, those adjacent to the existing settlement boundary should be prioritised in order that settlements within the Borough are coherently extended.

In particular, the area of land to the South West of Rayleigh, designated as a general location for housing in Preferred Policy H2, should be a key priority for reallocation. This land is available for development and is sited in a particularly sustainable location, therefore, meeting with the wider aims of the draft Core Strategy, as well as contributing towards the Council's housing requirements for the Borough. Release of small areas of Green Belt surrounding larger settlements will allow a concentration of development in key areas. In addition, there is no risk of coalescence of settlements should Green Belt land be release to the south west of Rayleigh.

Further, our client would also like to support the provision set out on Page 42 of the Draft Core Strategy document for high density development on the areas of Green Belt land released for development in order that remaining Green Belt land is sufficiently protected.

The Council's preferred policy for Green Belt Protection is stated as follows:

Policy GB1 - Green Belt Protection - Preferred Option

We will seek to direct development away from the Green Belt, minimise the reallocation of Green Belt land and will prioritise the protection of Green Belt land based on how well the land helps to achieve the purposes of the Green Belt.

The need to prevent the coalescence of individual settlements, in order to help preserve their identities, will be given particular consideration.

In line with our comments above, our client would like to endorse Policy GB1 in that some allowance remains within the policy to permit the release of Green Belt land where appropriate and necessary. This flexibility is essential in order that the Council are able to meet the housing provision requirements set out in the adopted East of England Plan in the plan period until 2021.

Transport

Parking Standards

Rochford Borough Council's preferred policy on parking standards is set out as follows:

Policy T7 - Parking Standards - Preferred Option

We will apply minimum parking standards, including visitor parking, to residential development. We will be prepared to relax such standards for residential development within town centre locations and sites in close proximity to any of the District's train stations.

Whilst applying maximum parking standards for trip destinations, we will still require such development to include adequate parking provision. Developers will be required to demonstrate that adequate provision for the parking, turning and unloading of service vehicles has been provided.

At present our client is unable to support Preferred Policy T7 in its current form, due to the lack of coherence with national planning policy set out in PPG13. The first part of the preferred policy specifies the Council's intention to apply minimum parking standards to residential development. Paragraph 17 of PPG13 clearly states that parking policies should not be expressed as minimum standards. Considering this against advice set out in PPS12 at Paragraph 4.52, Local Planning Authorities should ensure that Core Strategies are consistent with National Policy in order that the document can be considered to be sound. As this is the case we are unable to endorse Preferred Policy T7 in this respect. Instead, it is requested that the Council seek to enforce a maximum parking standard to ensure that the sustainable aims of PPG13 are upheld.

Open Space

The Council's preferred policy relating to the provision of open space is set out as follows:

Policy CLT5 - Open Space - Preferred Option

New public open space will be required to accompany additional residential development, having regard to local current and projected future need. Standard Charges may be applied to developments as necessary.

In particular we will seek the incorporation of a significant amount of public open space to accompany new, and be integrated with existing residential development in the west of Rayleigh.

Furthermore, the following existing uses will be protected, whether in public or private ownership:

• Parks
• Amenity areas
• Allotments
• Playing pitches
• Any other form of open space that has a high townscape value or is intrinsic to the character of the area.

New forms of the above will be promoted.

Fairview New Homes strongly object to the requirements set out in preferred Policy CLT5.
Whilst the sentiments of the policy are well founded and it is recognised that there is a need to provide public open space throughout the Borough, there is no justification as to why a significant amount of public space will be required in the west of Rayleigh. No information or evidence is provided to rationalise this requirement either as part of preferred Policy CLT5 or within the accompanying supporting text. Further, there is no explanation as to why this particular area of the Borough is specified for a higher than average provision of public open space, as an exception.

On behalf of our client, we would be grateful if you would acknowledge receipt of this submission and have due regard to these comments when making changes to the Core Strategy prior to the submission of the document.

Comment

Core Strategy Preferred Options (Revised October 2008)

Representation ID: 4267

Received: 17/12/2008

Respondent: J F Spencer & Son Ltd

Agent: RW Land & Planning

Representation Summary:

H6 Lifetime Homes

We welcome the fact that the pursuit of 100% Lifetime Homes from 2010 will be viability tested.

Full text:

Executive summary

RW Land & Planning Ltd welcome the opportunity to submit representations on
behalf of J F Spencer & Son Ltd in response to the Core Strategy Preferred Options, published by Rochford District Council in October 2008.
This submission is split into two parts:

1. Core Strategy Representations
It is felt that the "Core Strategy Preferred Options" does not provide a balanced or
justified distribution of the housing numbers throughout the district and that key
sustainability principles have been disregarded when identifying the preferred housing allocations.

Accordingly, it is considered that Hockley, as a first tier settlement within the district should be allocated a larger proportion of the housing numbers in the area already identified on the Key Diagram as being suitable for housing growth (West Hockley).

2. Site Suitability Appraisal - Land and property at Folly Chase, Hockley

A suitability appraisal of land off Folly Chase, Hockley including the residential plot
known as Thistledown, demonstrates its suitability as a deliverable location for housing in line with the Core Strategy principles. The sites location, within walking distance of Hockley town centre and the available facilities, services and public transport links locally and regionally identify this site as being able to meet sustainability principles and should be considered
appropriate for development.

A Masterplan illustrates one of the many ways this site can be developed for housing and provide a deliverable opportunity to provide social housing within a sustainable location, reducing the reliance on the private car.
Appendix 1 - Site Suitability Matrix
Appendix 2 - Site Photographs

1. Core Strategy Representations
Sustainable Community Strategy - Page 6
We welcome the importance the Council place on the close links between the Sustainable Community Strategy and the Core Strategy including ensuring accessibility to services.
Housing Issues and Options - Page 16
We welcome the acceptance by the Council that infilling alone will not be able to provide the housing numbers necessary and that this would have an adverse effect on the character of the towns.

Whilst we acknowledge that the release of greenfield sites for development present
an opportunity to provide new infrastructure, it is surely more sustainable to concentrate additional housing on greenfield sites which benefit from existing infrastructure and nearby services. This would then enable Planning Obligations to improve services and facilities rather than having to focus on providing basic
infrastructure.

Transport Issues and Options - Page 18
It is acknowledged within the Core Strategy that car dependency within the district
is higher away from the main three settlements of Rayleigh, Hockley/Hawkwell and
Rochford/Ashingdon, primarily due to the rail links within these three towns.

This principle of sustainable development therefore dictates, unless there is a justifiable reason, that the majority of the housing proposed should be within or adjacent to the main three settlements.

Settlements Issues and Options - Page 20
We welcome the four tiers of settlements and the Council's acknowledgment that Hockley is classed as a Tier One settlement containing a "local town centre catering for local need".
We also agree that the Second tier Settlements of Hullbridge and Great Wakering have a "more limited range of services access to public transport is relatively poor".

H1 Distribution - Preferred Option
We acknowledge that brownfield sites should take priority over the development of
Greenfield sites. However, with a rising housing market over recent years, many of the sites identified in the Urban Capacity Study still remain undeveloped it could be argued that if the sites were suitable for development they would have come forward by now. The Council must therefore demonstrate that there is evidence to
suggest that the remaining sites are genuinely available and deliverable within the specified phased timescale.

If they are not deemed to be available, the housing must be allocated on greenfield sites associated with a Tier One settlement.

H2 General Locations and Phasing - Preferred Option

It is welcomed that the Core Strategy accepts that greenfield development will be necessary in order to achieve the required housing numbers.
As set out in the H2 chart and Key diagram, the reliance of Tier Two and Three settlements (Hullbridge, Great Wakering and Canewdon) to provide 860 houses pre 2021 is unsustainable, unjustified and contrary to sustainable planning
guidance at national, regional and local level.

It is acknowledged by the Core Strategy that the Tier Two and Three Settlements only having limited services and poor public transport links and despite this, over 34% of the greenfield housing allocations have been located here without justification.

We acknowledge that development in Tier Two and Three Settlements is necessary to ensure that village communities continue to grow. However, there has been no justification provided that warrants such a large percentage of the overall housing numbers being allocated to these lower tier settlements.

The distribution of the greenfield housing allocations as it stands is contrary to PPS3 which provides clear local level guidance for Core Strategies when deciding on housing locations:
"...at the local level, Local Development Documents should set out a strategy for
the planned location of new housing which contributes to the achievement of
sustainable development." Part of which is "...the contribution to be made to cutting carbon emissions from focusing new development in locations with good public transport accessibility and/or by means other than the private car..."
Even with significant public transport improvements, residents will have to travel a
substantial distance to Rayleigh, Hockley/Hawkwell or Rochford/Ashingdon in order to catch a train and go beyond the local area. This level of development in the lower tier locations are promoting a significant increase in carbon emissions, contrary to PPS3, even if the residents travel by public transport, which the Core Strategy accepts is not the current situation, with high car dependency.

Despite being a Tier One Settlement with an active and diverse town centre and good public transport including a train station, Hockley has only been allocated 50 houses (2% of the total greenfield allocation within the district). This goes against the Core Strategy vision of concentrating development on Upper Tier settlements which have the services and facilities to accommodate additional development.
In light of this unsustainable and unsound approach to housing distribution, Policy H2 General Locations and Phasing - Preferred Option and the Key diagram should be amended to reduce the proposed housing numbers associated with Tier Two and Three settlements and redistribute the surplus to Tier One Settlements and Hockley in particular which has received an unnecessarily low number of houses
despite existing services and facilities to accommodate additional development.

It is proposed in the analysis set out in Appendix 1 that Land at Folly Chase, West Hockley is suitable and capable of accommodating circa 200 houses. Policy H2 should be amended to reflect this.

We welcome a flexible approach to the release of land in order to maintain a five year land supply is supported and necessary. It is imperative, however that in assessing the release of land, the landowners willingness to sell or develop the site is taken into account.

We welcome the identification of West Hockley as being a suitable location for development pre-2015.

H2 Alternative Options
We welcome the comments regarding North East Hockley and agree that the location would place undue pressure on the highway network and that it is unviable for development.

H3 General Locations - Post 2021
The continued reliance on lower tier settlements post 2021 is again unjustified and
unsustainable with 340 homes proposed. These locations, even following improvements to the infrastructure will not provide genuine alternatives to the private car due to the length of journeys required to get to services, facilities and employment.

H4 Affordable Housing
The 35% level proposed must be based on sound qualitative evidence with the flexibility to be reduced if there are site specific circumstances that warrant it.

We do not accept the desire by the Core Strategy to "pepper pot" social housing
throughout developments, it causes difficulty for Housing Associations to manage their properties effectively and efficiently. This should be amended to allow for clusters of social housing units in say, groups of 15-20.

H5 Dwelling Types
Whilst we acknowledge that PPS3 suggests that local level planning documents should assist in developing a suitable mix of houses on sites, PPS3 para 23 also states that developers should "...bring forward proposals that reflect demand and the profile of households requiring market housing...". It is therefore imperative
that H5 makes reference to the influence of market demands and does not solely
rely on the advice of the Strategic Housing Team as the policy currently intimates.

H6 Lifetime Homes
We welcome the fact that the pursuit of 100% Lifetime Homes from 2010 will be viability tested.
H Appendix 1

We welcome the associated infrastructure required in relation to development at
West Hockley.

As part of the development of Land off Folly Chase, Hockley, further community benefits beyond those listed could be included, such as a new community woodland and play space.
Proposed development at the lower tier settlements (Hullbridge, Great Wakering
and Canewdon) are reliant on significant public transport improvements which sequentially is contrary to sustainability principles of focusing development in areas of good public transport, with the ability to improve further.

ENV3 Flood Risk
We welcome the proposal to pursue development in areas which fall into Flood
Zone 1 and the use of the sequential test in PPS25.

ENV4 Sustainable Urban Drainage
SUDS is not always the best environmental option for dealing with drainage. We welcome the viability test intended to identify those sites where SUDS is not appropriate.

ENV8 Renewable Energy
We recognise the Core Strategies desire to adhere to the Code for Sustainable Homes star rating, however, there remains a doubt as to whether Code Level 6 is realistically achievable within the current timescales. There will always be the potential for National Policies to alter the rating system and timescales. There is a
requirement for the Core Strategy to remain flexible and be in parity with The Code for Sustainable Homes, or its successor. Moving away from the Code should it alter, would alienate the Districts development sites from developers and reduce the likelihood of them being built within the Core Strategy phasing timescales.

We welcome the decision to not pursue the 10% renewable "Merton Rule" as piecemeal renewable energy production is not an efficient approach to its production.

T1 Highways
We welcome the objective to locate and design housing developments that reduce the reliance on the private car.

T2 Public Transport
We welcome the objective developments must be well related to public transport, or accessible by means other than the private car.

RTC1 Retail
We welcome the designation of Hockley as a district centre and that retail developments will be focussed towards it along with Rayleigh and Rochford.

RTC5 Hockley Town Centre
We welcome the proposals contained within this policy for the improvement of facilities, services and town centre living within Hockley Town centre.

CLT1 Planning Obligations and Standard Charges
We welcome the continued use of Planning Obligations to secure reasonable on and off site improvements as set out in Circular 05/2005.
Standard charges must take into account the level of impact the future residents are likely to have on the strategic infrastructure and be negotiated on a site by site basis.

[more details including photographs regarding the site put forward can be found our ref allocations no. 69]

Object

Core Strategy Preferred Options (Revised October 2008)

Representation ID: 4285

Received: 17/12/2008

Respondent: Pond Chase Nurseries Ltd

Agent: Boyer Planning Ltd

Representation Summary:

Whilst it is acknowledged that some residents may wish to adapt homes at different stages in life but that will not be the case for all residents. Indeed it is an unduly onerous and unnecessary requirement for housing development to meet Lifetime Homes standard since it ignores the general movement of people between different housing locations.

Full text:

We object to the policy in that requires that all new housing meet Lifetime Homes standard. We would agree that a percentage of new housing development coming foward should achieve such a standard but it appears to us it is unduly onerous to require a 100% provision.

Whilst it is acknowledged that some residents may wish to adapt homes at different stages in life but that will not be the case for all residents. Indeed it is an unduly onerous and unnecessary requirement for housing development to meet Lifetime Homes standard since it ignores the general movement of people between different housing locations.

Comment

Core Strategy Preferred Options (Revised October 2008)

Representation ID: 4497

Received: 08/12/2008

Respondent: East of England Local Government Association

Representation Summary:

Question - Is there a policy that seeks to achieve a high quality built environment, including sustainable construction?
RSS Policy - ENV7
Local Policy - H6, ED5, ENV8, ENV9, CP1
Comments - Local policies ENV8 & ENV9 advocate the implementation of Code for Sustainable Homes (CSH) and BREEAM standards. It would be helpful if a timescale was included showing when the Council expects to implement the various code standards.

Full text:

Re: Rochford District Council - Core Strategy Preferred Options

Thank you for consulting the Assembly on this matter.

The Regional Planning Panel Standing Committee considered the attached report at its meeting on 5th December 2008 and endorsed the following recommendation:

'Overall, the preferred options put forward in the Core Strategy respond well to the RSS. The Assembly does have some minor concerns but considers that these do not give rise to any major conformity issue'

Our detailed comments, which are set out in Appendix A of the attached report, constitute the Assembly's formal response to this consultation.

If you have any queries concerning the content of the report or any other issue relating to conformity with the Regional Spatial Strategy, please contact myself or James Cutting, Team Leader - Strategy & Implementation

Regional Planning Panel Standing Committee

5th December 2008

Subject: Rochford District Council's Core Strategy Preferred Options consultation document

Report by: Regional Secretariat

Purpose

To give a response to Rochford District Council's Core Strategy Preferred Options consultation document

Recommendation

The Standing Committee is asked to consider the recommendation that the comments in this report and those in Appendix A constitute the Assembly's formal response to Rochford's Core Strategy Preferred Options consultation document.

1. Introduction

1.1 Rochford District Council has published for consultation a revised version of its Core Strategy Preferred Options Development Plan Document. This is the second stage in the Local Development Framework (LDF) process and will, in due course, lead to a Submission Version. As the principle document in Rochford's LDF, the Core Strategy sets out the overall strategy for the district until 2021 and, where appropriate, beyond.

1.2 The Council consulted on an earlier version of its Core Strategy during June and July 2007 (see RPPSC 15 June 2007 - Item3). In submitting its response, the Assembly noted that whilst the document responded well to the then emerging East of England Plan there were issues with regards to affordable housing and major releases of land from the Green Belt.
1.3 The closing date for comments on this revised Core Strategy is 17th December 2008. Further details can be found on Rochford District Council's website.

1.4 A copy of the Core Strategy Key Diagram is included at Appendix B.

2. Background

2.1 Rochford District covers an area of approx. 168 sq. km's (65 sq. miles) and is situated within a peninsula between the Rivers Thames and Crouch. Bounded to the east by the North Sea, it shares land boundaries with Basildon and Castle Point District and Southend-on-Sea Borough Councils. It also has marine boundaries with Maldon and Chelmsford Districts. The A127 and the A13 provide a strategic road link to the M25 Motorway and there are direct rail links into London. London Southend Airport is also located within the district boundary.

2.2 The district has a noticeable east - west divide. The majority of the population, which recent estimates put at 81,300 (expected to rise to 87,000 by 2021), live in the west where the three main urban areas of Rochford, Rayleigh, Hockley are located. To the east, the district is more rural in nature, and is characterised by stretches of unspoilt coastline and countryside, with a scattering of smaller settlements. Approximately 75 per cent of the district is designated as Metropolitan Green Belt.

2.3 A significant proportion of the districts workforce (estimated to be around 68 per cent) work beyond the district boundary. Southend-on-Sea exerts a particularly strong influence, not just as an employment location but also as the largest retail centre in the sub-region. Beyond the three main urban areas of Rochford, Rayleigh and Hockley, which offer greater opportunities to access public transport, there is a high dependency on private car use.

3. Regional and Local Policy

3.1 Regional planning guidance for Rochford is contained within the adopted East of England Plan (hereafter referred to as the RSS) and the remaining six "saved" structure plan policies for Essex and Southend-on-Sea. At a local level, the Core Strategy and other LDF documents will replace the Rochford District Replacement Local Plan (2006).

3.2 In considering general conformity the Core Strategy was assessed against all policies contained within the RSS, with particular attention paid to policies relating to the Essex Thames Gateway (ETG1 - ETG5).

4. Comments

4.1 Overall, the preferred options put forward in the Core Strategy respond well to the RSS. There is recognition that growth needs to be delivered in a sustainable manner and evidence of continued joint working with neighbouring authorities, and the County Council, to ensure delivery of regionally significant schemes such as London Southend Airport and the South Essex Rapid Transit system.

4.2 The Assembly does have some minor concerns over the amount of development that is planned to come forward on previously developed land, and also on the Council's position with regards to larger scale renewable energy schemes. However, it considers that these do not give rise to any major conformity issue.

5. Recommendations

5.1 The Standing Committee is asked to consider the recommendation that this report and the comments in Appendix A constitute the Assembly's formal response to Rochford District Council's Core Strategy Preferred Options consultation document.


Appendix A
LOCAL DEVELOPMENT DOCUMENT CHECKLIST
PART TWO - GENERAL POINTS

Question - Does the area covered lie within the Eastern Region?
Answer - Yes


Question - Are all references to the East of England Plan correct?
Answer: - Yes

Question - Does the area covered include a Key Centre for Development and Change?
Answer - Yes
Comments - London Southend Airport is included within the Essex Thames Gateway policy area.

Question - Are there any key issues covered by the document that are of strategic or regional importance?
Answer - Yes
Comments - Expansion at London Southend Airport and the regeneration of the Thams Gateway are of regional importance.

PART THREE - CONSISTENCY/CONFORMITY CHECKLIST

Question - Is there a clear push for sustainable development?
RSS Policy - SS1
Local Policy - All
Comments - The overall objectives and policies seek to achieve a balance between bringing forward sufficient new growth to meet the needs of the district whilst protecting its natural and historic built environment. There is also clear recognition of the need to ensure that the necessary infrastructure is delivered in a timely and effective manner.

Question - Does policy seek to maximise the use of previously developed land (PDL), and will it contribute towards the 60% target?
RSS Policy - SS2
Local Policy - H1
Comments - (See also comments below relating to Green Belt.)
While local policy H1 supports prioritising the reuse of PDL, the findings of the Council's recent Urban Capacity Study (2007) and concerns over town cramming will mean that only some 30% of new housing development will come forward on PDL.
Although accepting that the 60% target may not be deliverable in all parts of the region, the Council is encouraged to maximise the development potential of all brownfield sites (including "windfall' sites) and, through its monitoring procedures, ensure that delivery does not fall below the proposed 30% level.

Question - Is there a clear pattern of development for 'Key Centres' or for other urban and rural areas?
RSS Policy - SS3, SS4
Local Policy - Various

Question - Is the role of city/town centres clear? Is there a clear retail hierarchy?
RSS Policy - SS6
Local Policy - RTC1 to RTC5
Comments - The influence of out-of-district shopping facilities; particularly those provided at Southend, is acknowledged. Local policy seeks to maintain and enhance the current market share of retail spending, with the focus for development centered on Hockley, Rayleigh and Rochford.

Question - If appropriate, is there a policy dealing with the Green Belt?
RSS Policy - SS7, ETG1
Local Policy - Page 4, GB1, GB2
Comments - RSS policy SS7 states that the broad extent of the Green Belt in the region is appropriate and should be retained. There are no plans for a Green Belt review around Rochford.

Whilst local policy seeks to protect the existing Green Belt, it does allow for some limited reallocation in order that built development can come forward. Where this release is considered to be unavoidable, the Core Strategy proposes that development occurs at a reasonably high density.

In accepting that some Green Belt land will be released, using that which contributes least to its main purpose seems appropriate. Either through this document or through relevant future documents, the Council should clarify what level of development constitutes a 'reasonably high density'.

Question - Is there a policy on coastal issues?
RSS Policy - SS9
Local Policy - ENV2
Comments - The biological/landscape value of the District's coastline is recognised.

Question - Is the East of England Plan employment target met?
RSS Policy - E1, ETG5
Local Policy - Econ' Dev' Chapter, ED1, ED2
Comments - The introductory paragraphs set out districts job requirement figure as quoted in RSS policy ETG5. There is acknowledgment of the important role that London Southend Airport can play in bringing forward employment and other economic development opportunities, as expressed through local policy ED1.

Question - Is employment land protected and is its designated use consistent with relevant RSS policies?
RSS Policy - E2 - E4
Local Policy - ED3, ED4, ED5

Question - Is the RSS housing target met? Is there a housing policy post 2021?
RSS Policy - H1
Local Policy - Housing Chapter H2, H3
Comments - The introductory section sets out district housing figures in line with RSS requirements. Local policies H2 & H3 relate to general distribution, including indicative housing numbers within settlement areas for the period to 2015, from 2015 to 2021, and post 2021.

Question - Is there an affordable housing policy and does it meet the RSS target?
RSS Policy - H2
Local Policy - H4, H5
Comments - The Preferred Option is consistent with the RSS target (35%) and national site size thresholds (15 or more dwellings). It is noted that local evidence shows the actual level of need is much higher, but that the Council is seeking to strikes a balance between deliverability of affordable housing and overall site viability.

Question - Is there a clear policy for meeting the accommodation needs of Gypsies and Travellers?
RSS Policy - H3
Local Policy - H7
Comments - Local policy H7, which states that provision will be made in line with recommendations set out in the RSS Single Issue Review, is welcomed. It is also noted that local authorities in Essex have expressed concerns over the RSS review process.
The Assembly encourages all local authorities to make provision in line with its recommendations to 2011 and beyond, noting that they will need to be mindful of any amendment to district pitch requirement figures as the RSS Single Issue Review is progressed.

Question - Are culture issues addressed?
RSS Policy - C1, C2
Local Policy - CLT6 - 11

Question - Is there a policy seeking to change travel behaviour? Is there a policy seeking to enhance provision for non-motorised forms of transport?
RSS Policy - T2, T9, T13 & T14
Local Policy - T1 - T6
Comments - The Core Strategy recognises that, away from the three main urban areas, there will continue to be a high dependency on private car use. Policies that encourage and bring forward the delivery of alternate and non-motorised forms of transport are supported.
Opportunities to facilitate home-working within new development proposals should not be ignored.

Question - Are any major transport generators covered by appropriate proposals?
RSS Policy - T11, T12
Local Policy - ED1
Comments - [The Council is referred to concerns raised by the Assembly during recent consultation on the JAAP Issues & Options consultation stage - see RPPSC 18 July 2008, Agenda item 4]

Question - Are any transport schemes being promoted that match regional priorities?
RSS Policy - T15
Local Policy - T3
Comments - Local policy T3 supports the implementation of the South Essex Rapid
Transport (SERT) scheme.

Question - Is there a policy dealing with green infrastructure?
RSS Policy - ENV1
Local Policy - ENV1, ENV2, T6

Question - Are landscape, wildlife and other conservation issues addressed?
RSS Policy - ENV2, ENV3
Local Policy - ENV1, ENV2, URV1, URV2

Question - Is agricultural land and soil conservation covered by a policy? Is there a policy relating to rural diversification?
RSS Policy - ENV4
Local Policy - GB2
Comments - The introductory paragraphs in the Environmental Issues chapter (pg 51) states that the Council will endeavour to ensure that the districts agricultural land will not be adversely affected. Local policy GB2 offers support for rural diversification schemes within the designated Green Belt.

Question - Are woodlands protected by a policy?
RSS Policy - ENV5
Local Policy - ENV1, URV1 (ENV6)
Comments - The Preferred Options seek to ensure that areas of ancient woodland are protected.

Question - Is the conservation/enhancement of the historic environment addressed?
RSS Policy - ENV6
Local Policy - CP2, CP3
Comments - The Council intends to reinstate a 'Local List' which will afford protection to local buildings with special architectural / historic value.

Question - Is there a policy that seeks to achieve a high quality built environment, including sustainable construction?
RSS Policy - ENV7
Local Policy - H6, ED5, ENV8, ENV9, CP1
Comments - Local policies ENV8 & ENV9 advocate the implementation of Code for Sustainable Homes (CSH) and BREEAM3 standards. It would be helpful if a timescale was included showing when the Council expects to implement the various code standards.

Question - Is there a policy dealing with the reduction of CO2 emissions? Is there a policy on renewable energy, including the setting of a target?
RSS Policy - ENG1, ENG2
Local Policy - ENV6, ENV7
Comments - The Core Strategy contains two policies on renewable energy - ENV6 and ENV7. While the Assembly is supportive of any policy that actively seeks to implement renewable energy technologies it is concerned that (i) as worded, policy ENV6 seemingly discourages any large scale scheme from coming forward and, (ii) that whilst local policy ENV7 is welcomed, difficulties may arise in measuring the effectiveness of small scale schemes and relating this back to regional and national targets.

Local policy ENV6 should be more 'proactive' by, for example, indicating which type of scheme(s) the Council would be wiling to support. The Assembly will be looking to the relevant Development Control documents to ensure that appropriate targets are set in line with regional targets.

Question - Is there a policy promoting water efficiency?
RSS Policy - WAT1
Local Policy - ENV8, ENV9
Comments - Water efficiency measures are being promoted through policies that adopt BREEAM and Code for Sustainable Homes (CSH) standards

Question - Is Flood Risk Management addressed? Are proposals to implement Sustainable Urban Drainage technologies included?
RSS Policy - WAT4
Local Policy - ENV2, ENV4

Question - Is there a policy dealing with waste management?
RSS Policy - WM1 - WM8
Local Policy - ENV8, ENV9
Comments - It is implied that domestic/commercial waste management practices will addressed through adoption of CSH and BREEAM Standards.

Question - Is there a policy that deals with implementation and monitoring?
RSS Policy - IMP1 - IMP2
Local Policy - Page 107 and Table

PART FOUR - OVERALL ASSESSMENT

Question - Is the document in general conformity with the RSS? If the answer is 'no', what is needed to rectify this?
Answer - Yes
Comments - Overall, the preferred options put forward in the Core Strategy respond well to the RSS. There is recognition that growth needs to be delivered in a sustainable manner and evidence of continued joint working with neighbouring authorities, and the County Council, to ensure delivery of regionally significant schemes such as London Southend Airport and the South Essex Rapid Transit system.

The Assembly does have some minor concerns over the amount of development that is planned to come forward on previously developed land, and also on the Council's position with regards to larger scale renewable energy schemes. However, it considers that these do not give rise to any major conformity issue.